B.08.02 Attachment B - Plans.pdf
PDF 11 MB Posted
- Solicitation number
- W912DR20B0004
About this file
This solicitation package describes a contract opportunity for concrete repairs at Foster Joseph Sayers Dam in Beech Creek, Pennsylvania. The work includes removing deteriorated concrete from the stilling basin and baffle blocks; installing a water diversion and dewatering system; conducting 3D laser scans before and after work; placing silica fume concrete and epoxy coated reinforcing steel; installing temporary fencing and signage; and obtaining necessary permits. A registered professional engineer must design the water diversion system to carry 700 cubic feet per second and remain in place for 28 days after concrete work is complete. The contractor must submit a dewatering and monitoring plan involving daily movement surveys with 0.1-inch accuracy throughout construction. The goal is to improve flow characteristics and prevent further riprap damage in the channel.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VICINITY MAP LOCATION MAP
ALT
BEECH CREEK, PENNSYLVANIA
SAYERS STILLING BASIN
FOSTER JOSEPH-SAYERS LAKE
PROJECT
LOCATION
FOSTER JOSEPH
SAYERS DAM
CONCRETE REMEDIATION - STILLING BASIN REPAIRS
D R
A W
N
B
Y
D E
S I G
N
B
Y
S B
M T
B
Y
S I Z
E
F I L
E
N
A M
E
I S
S U
E
D
A T
E
C O
N T
R A
C
N
O
S O
L I C
I T
A T
I O
N
N
O
U S
A
R M
Y
C
O R
P
F
E
N G
I N
E E
R S
C K
D
B
Y
US Army Corps of
Engineers ® x
F I L
E
N
U M
B E
R
P L
A
L E
P L
D
T
E
B E
E C
H
C
R E
E K
N
N S
Y L
V A
N I A
A U
G
Baltimore District
F X
X X
B A
L T
I M
O R
E
D
I S
T R
I C
T
B A
L T
I M
O R
E
M
A R
Y L
A N
D
E N
G I N
E E
R I N
G
D
I V
I S
I O
N
C O
N C
R E
M
E D
I A
T I O
N
D E
S C
R I P
T I O
N D
A T
E A
P P
R
F O
S T
J
S E
H
Y
E R
S
L
A K
E
S T
I L
L I N
G
B
A S
I
P
A I R
GI001
STILLING BASIN
SEE SHEET
GI003
D R
A W
N
B
Y
D E
S I G
N
B
Y
S B
S I Z
E
F I L
E
N
A M
E
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
M
Y
C
O R
E
N G
I N
E E
R S
C K
D
B
Y
US Army Corps of
Engineers ® x
F I L
E
N
U M
B E
R
P L
A
L E
P L
T
E
B E
E C
H
C
R E
N
N S
Y L
V A
N I A
A U
G
Baltimore District
F X
X X
B A
L T
I M
O R
E
D
I S
T R
I C
T
B A
L T
I M
O R
E
M
A R
Y L
A N
D
E N
G I N
E E
R I N
G
D
I V
I S
I O
N
C O
N C
R E
M
E D
I A
T I O
N
D E
S C
R I P
T I O
N D
A T
E A
P P
R
F O
S T
S E
Y
E R
S
L
A K
E
S T
I L
L I N
G
B
A S
P
A I R
GI002
CONTRACTORS
STAGING AREA.
[22+45C]
[24+41C]
[25+00C]
[24+88C]
EXIST STILLING
BASIN, SEE SHEETS
CE101, CE301 -
CE304 & CP101
FOR ADDITIONAL
INFORMATION.
OUTLET
WORKS
CONTROL
TOWER.
NATURAL CHANNEL
ENGINEERED
CHANNEL
{6
{6
{5
{6
{5
{6
ACCESS ROAD RADIUS
APPROXIMATELY 80'
ACCESS ROAD
RADIUS
APPROXIMATELY 20'
RM3
STILLING BASIN
WORK LIMITS / STAGING AREA PLAN
DAM CREST / ROAD.
{6
EXIST STA. & FEATURE NOTES:
1) STA. [22+45C] END EXIST CONDUIT / BEGIN EXIST STILLING BASIN.
2) STA. [24+41C] END EXIST CONCRETE / BEGIN EXIST RIPRAP.
3) STA. [24+88C] EXIST RIP RAP, END CHANNEL SLOPE UP.
4) STA. [25+00C] EXIST RIP RAP, BEGIN CHANNEL SLOPE DOWN.
SURVEY NOTES:
1) ALL COORDINATES ARE IN FEET AND REFERENCE THE PENNSYLVANIA STATE
PLANE NORTH ZONE COORDINATE SYSTEM, NORTH AMERICAN DATUM OF 1983
(NAD83).
2) ALL ELEVATIONS ON THESE DRAWINGS REFERENCE THE PROJECT CONTROL
DATUM (PCD).
3) PRIMARY BENCH MARK "SW5 (PIDBBCH68)" IS LOCATED AT THE APEX OF THE
SPILLWAY AND MIDWAY BETWEEN THE SPILLWAY WALLS. A COMPARISON OF PCD
AND NAVD88 ELEVATIONS FOR SW5 ARE:
A.) PCD = 656.97'
B.) NAVD88 = 656.24'
ABBREVIATIONS:
CONST. = CONSTRUCTION
CONT. = CONTINUED
EL. = ELEVATION
ELEV. = ELEVATION
EX. = EXISTING
EXIST = EXISTING
JT. = JOINT
AREA ELEVATIONS ON THIS SHEET ARE APPROXIMATE AND
ARE PROVIDED FOR WORK STAGING AND ACCESS PLANNING
ONLY. AREA ELEVATIONS ARE SHOWN AS {###'} AND SHALL
NOT BE USED FOR ESTIMATION OR DESIGN IN ANY CAPACITY.
FOR ELEVATIONS IN STILLING BASIN & CHANNEL SEE PROFILE
SHEET CE101.
AREA ELEVATIONS
4) SECONDARY BENCH MARK "RM3 (PIDBBCV77)" IS LOCATED ON THE NORTHWEST
ABUTMENT OF THE SERVICE BRIDGE LEADING TO THE OUTLET WORKS CONTROL
TOWER. A COMPARISON OF PCD AND NAVD88 ELEVATIONS FOR RM3 ARE:
A.) PCD = 682.74'
B.) NAVD88 = 682.01'
PRIMARY BENCHMARK - SW5
SECONDARY BENCHMARK - RM3
D R
A W
N
B
Y
D E
S I G
N
B
Y
S B
S I Z
E
F I L
E
N
A M
E
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
M
Y
C
O R
E
N G
I N
E E
R S
C K
D
B
Y
US Army Corps of
Engineers ® x
F I L
E
N
U M
B E
R
P L
A
L E
P L
T
E
B E
E C
H
C
R E
N
N S
Y L
V A
N I A
A U
G
Baltimore District
F X
X X
B A
L T
I M
O R
E
D
I S
T R
I C
T
B A
L T
I M
O R
E
M
A R
Y L
A N
D
E N
G I N
E E
R I N
G
D
I V
I S
I O
N
C O
N C
R E
M
E D
I A
T I O
N
D E
S C
R I P
T I O
N D
A T
E A
P P
R
F O
S T
S E
Y
E R
S
L
A K
E
S T
I L
L I N
G
B
A S
P
A I R
S
GI003
NTS = NOT TO SCALE
SFC = SILICA FUME CONCRETE
STA. = STATION
1. ALL CONCRETE REPAIR WORK AS SPECIFIED IN SPECIFICATION SECTION 03 30 00
SHALL BE CONDUCTED IN THE DRY. THEREFORE TO MAINTAIN FLOW THROUGH THE
OUTLET WORKS DURING CONSTRUCTION, A WATER DIVERSION AND DEWATERING SYSTEM
SHALL BE IMPLEMENTED TO ALLOW FOR CONTROLLING THE UPSTREAM RESERVOIR LEVEL
AND DOWNSTREAM RIVER LEVEL.
2. BECAUSE OF RESERVOIR REGULATIONS, WATER DIVERSION AND DEWATERING SHALL
NOT BEGIN UNTIL 1 JUNE. ALL WORK SHALL BE COMPLETE BY OCTOBER 30.
3. DAM FLOW SHUT DOWNS CANNOT EXCEED 1 HOUR WITH A WAITING PERIOD OF 1.5
HOURS BETWEEN SHUT DOWNS. THIS WILL AFFECT THE CONSTRUCTION AND
DECONSTRUCTION OF THE WATER DIVERSION SYSTEM, ESPECIALLY THE BULKHEAD. THE
CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER AND HEAD DAM TENDER A
MINIMUM OF 3 DAYS IN ADVANCE TO ARRANGE FOR FLOW SHUT DOWNS.
4. THE WATER DIVERSION SYSTEM SHALL CONSIST OF A PIPE CONVEYANCE ACROSS THE
BASIN TO MAINTAIN CONTINUOUS UNINTERRUPTED DISCHARGE FROM THE OUTLET WORKS
WHILE ALLOWING FOR A DRY WORK ENVIRONMENT IN THE BASIN/CHANNEL THROUGHOUT
THE CONSTRUCTION DURATION. IN GENERAL THE PRIMARY FEATURES OF THE SYSTEM
SHALL INCLUDE AS A MINIMUM THE FOLLOWING:
a. A BULKHEAD CONSTRUCTED WITHIN THE TUNNEL FOR A PORTION OF THE TUNNEL'S
HEIGHT TO IMPOUND WATER WITHIN THE TUNNEL.
b. A PIPE WHICH RUNS THROUGH THE BULKHEAD AND IS SUSPENDED ACROSS THE
BASIN TO CONVEY THE IMPOUNDED FLOW TO THE DOWNSTREAM CHANNEL.
c. A SUPPORT SYSTEM TO SUPPORT THE PIPE ACROSS THE BASIN.
d. A COFFERDAM NEAR THE DOWNSTREAM END OF THE PIPE TO PREVENT THE
DISCHARGE FROM ENTERING BACK INTO THE BASIN. IT SHOULD BE NOTED THAT
STEEP SLOPES AT THE EDGES OF THE CHANNEL MAY REQUIRE THAT THE
CONTRACTOR CONSTRUCT TEMPORARY RAMPS TO ACCESS THE AREA. ANY ACCESS
RAMPS OR OTHER SITE ACCESS MODIFICATIONS SHALL BE SUBMITTED TO USACE FOR
APPROVAL. AT COMPLETION OF CONTRACT, CONTRACTOR SHALL REMOVE ALL
TEMPORARY ACCESS FEATURES AND RETURN PROJECT TO ORIGINAL CONDITIONS AT
THE CONTRACTOR'S EXPENSE.
e. PUMPS WITHIN THE BASIN TO KEEP THE BASIN DRY AND DEWATERED.
INITIAL PUMPING OF WATER FROM THE BASIN (AFTER WEEPHOLE CLEARING) SHALL BE
SLOWLY PERFORMED AT A UNIFORM RATE OVER A MINIMUM OF 48 HOURS. DURING THE
DEWATERING, THE BASIN SHALL BE CONTINUOUSLY MONITORED. THIS IS TO 1) ENSURE
THERE IS NO MOVEMENT OF THE BASIN DURING DEWATERING AND 2) TO ENSURE THAT
MATERIAL IS NOT REMOVED FROM BEHIND THE WALLS OR BELOW THE MAT. IF ANY
MOVEMENT OF THE BASIN OR CLOUDS OF SEDIMENT ARE DETECTED, DEWATERING
OPERATIONS SHALL IMMEDIATELY CEASE. APPROPRIATE LIGHTING AND MONITORING
SYSTEMS SHALL BE PROVIDED DURING THE WORK. THE USACE DESIGN ENGINEER SHALL
BE CONTACTED FOR FURTHER DISCUSSION PRIOR TO THE INITIAL PUMPING FROM THE
BASIN.
5. SPECIAL REQUIREMENTS ASSOCIATED WITH THE WEEPHOLES IN THE BASIN WALLS
AND MAT/RAMP ARE REQUIRED:
a. PRIOR TO DEWATERING OF THE BASIN, WEEPHOLES IN THE MAT AND RAMP FROM
THE TUNNEL SHALL BE CLEARED FOR THEIR FULL DEPTH. THESE WEEPHOLES
EXTEND 10' INTO ROCK BELOW THE CONCRETE. THIS CLEARING IS TO ENSURE
WEEPHOLES FUNCTION PROPERLY AND ALLOW PRESSURE RELIEF. THE PIPING TO
THE WEEPHOLES IN THE WALL IS LABELED ON THE ORIGINAL DRAWINGS AS "FIBRE
PIPING" AND IT IS THEREFORE UNCERTAIN WHETHER IT MAY CONTAIN ASBESTOS.
THE CONTRACTOR SHALL THEREFORE AVOID WORK THAT DISTURBS ANY OF THE
PIPING. IF IT IS DETERMINED THAT WORK IS REQUIRED TO DISTURB THE PIPING, IT
MUST FIRST BE TESTED TO DETERMINE WHETHER IT CONTAINS ASBESTOS. IF WORK
IS REQUIRED WITH THE PIPING AND IF IT DOES CONTAIN ASBESTOS, RELATED SAFETY
PRECAUTIONS WILL BE REQUIRED AND SUCH ITEMS WILL BE COVERED UNDER THE
CHANGES CLAUSE OF THE CONTRACT.
b. CONTRACTOR SHALL ASSUME THAT ONCE CLEARED, THE WEEPHOLES IN THE MAT &
RAMP SHALL BE FILLED WITH ASTM C33 #8 AGGREGATE. THE INTENT WOULD BE
FOR THIS AGGREGATE TO FILTER THE WATER PASSING THROUGH THE WEEPHOLES.
PRIOR TO THE USE OF ANY AGGREGATE THE CONTRACTOR SHALL MEET WITH THE
USACE DESIGN ENGINEER TO DISCUSS WHETHER THE AGGREGATE WILL BE
REQUIRED FOR CERTAIN. CONTRACTOR SHALL ASSUME THAT SEEPAGE FROM
WEEPHOLES THROUGHOUT THE WORK WOULD INTERFERE WITH THE CONSTRUCTION
AND SHALL THEREFORE INSTALL A SYSTEM OF VERTICAL AND HORIZONTAL PIPING
TO DIVERT WATER FROM THE WEEPHOLES. PIPING FROM THE WEEPHOLES IN THE
MAT & RAMP SHALL NOT BE EXTENDED VERTICALLY ABOVE ELEVATION 572.0' AND
PIPES FROM THE WALL SHALL NOT EXTEND ABOVE THE DRAIN'S OUTLET ELEVATION.
FLOW WITHIN THE PIPES SHALL BE BY GRAVITY ONLY AND SHALL NOT BE PUMPED.
FLOW FROM THE PIPES SHALL OUTFALL INTO A TEMPORARY COLLECTION AREA
FROM WHERE THE WATER CAN THEN BE PUMPED UP AND OUT OF THE BASIN.
c. DISCHARGE WATER FROM THE WEEPHOLE PIPING SYSTEM SHALL BE MONITORED
FOR ANY SEDIMENT (TO ENSURE SOIL IS NOT BEING REMOVED FROM BELOW THE
MAT OR BEHIND THE WALLS). MONITORING SHALL BE DISCUSSED WITH AND TO THE
SATISFACTION OF THE COR AND USACE DESIGN ENGINEER.
d. WATER ENTERING THE BASIN THROUGH JOINTS SHALL ALSO BE CONTROLLED.
6. THE BASIN SHALL BE MONITORED FOR MOVEMENT BY SURVEY METHODS THROUGHOUT
THE WORK. MONITORING IS REQUIRED TO DETECT ANY UPLIFT OF THE BASIN OR
SIDEWAYS MOVEMENT OF THE WALLS. SEVERAL MONITORING POINTS SHALL BE
ESTABLISHED AND READINGS SHALL HAVE AN ACCURACY OF 0.1 INCH. CONTRACTOR
SHALL ASSUME THAT MONITORING WILL BE REQUIRED AT ONE HOUR INTERVALS DURING
THE INITIAL DEWATERING OF THE BASIN AND AT DAILY INTERVALS THEREAFTER
THROUGHOUT THE DURATION OF THE WORK. THE CONTRACTOR SHALL SUBMIT HIS
MONITORING PLAN FOR APPROVAL.
7. PHOTO'S ON SHEET GD002 ILLUSTRATE AN EXAMPLE OF A PIPED CONVEYANCE WATER
DIVERSION SYSTEM IMPLEMENTED AT CURWENSVILLE LAKE DAM IN 1977 FOR
CONSTRUCTION OF OUTLET CHANNEL IMPROVEMENTS WITHIN THE STILLING BASIN. THIS
IS FOR EXAMPLE ONLY. THE ACTUAL DESIGN AND IMPLEMENTATION OF THE WATER
DIVERSION AND DEWATERING SYSTEM IS THE CONTRACTORS RESPONSIBILITY.
DEWATERING NOTES:
DEWATERING NOTES
(CONTINUED):
D R
A W
N
B
Y
D E
S I G
N
B
Y
S B
S I Z
E
F I L
E
N
A M
E
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
M
Y
C
O R
E
N G
I N
E E
R S
C K
D
B
Y
US Army Corps of
Engineers ® x
F I L
E
N
U M
B E
R
P L
A
L E
P L
T
E
B E
E C
H
C
R E
N
N S
Y L
V A
N I A
A U
G
Baltimore District
F X
X X
B A
L T
I M
O R
E
D
I S
T R
I C
T
B A
L T
I M
O R
E
M
A R
Y L
A N
D
E N
G I N
E E
R I N
G
D
I V
I S
I O
N
C O
N C
R E
M
E D
I A
T I O
N
D E
S C
R I P
T I O
N D
A T
E A
P P
R
F O
S T
S E
Y
E R
S
L
A K
E
S T
I L
L I N
G
B
A S
P
A I R
GD001
8. DIMENSIONS OF THE TUNNEL DIAMETER, BASIN LENGTHS AND HEIGHTS ARE ILLUSTRATED
ON THE DRAWINGS.
9. THE WATER DIVERSION SYSTEM SHALL BE DESIGNED TO CARRY A DESIGN DISCHARGE OF
700 CFS.
10. EXIT VELOCITIES OF THE WATER DIVERSION SYSTEM SHALL BE CONTROLLED TO PREVENT
DOWNSTREAM EROSION AND SCOUR.
11. THE COFFERDAM DAM SHALL BE LOCATED FAR ENOUGH DOWNSTREAM TO ENSURE
THAT THE FULL STILLING BASIN TO STATION 24+41 IS EXPOSED FOR WORK AND TO ENSURE
THAT WATER DOES NOT BACK UP AND ENTER INTO THE STILLING BASIN. THE COFFERDAM
SYSTEM SHALL NOT INCREASE THE AMOUNT OF SEDIMENT IN THE WATER. THE DEWATERING
SYSTEM SHALL BE LARGE ENOUGH TO REMOVE EXISTING WATER FROM WITHIN THE STILLING
BASIN AREA AND TO COLLECT AND REMOVE ANY ADDITIONAL WATER THAT ENTERS INTO
THE STILLING BASIN AREA TO PROVIDE A DRY ENVIRONMENT AS REQUIRED TO COMPLETE
THE CONCRETE REPAIR WORK.
12. THE DESIGN AND IMPLEMENTATION OF THE WATER DIVERSION AND DEWATERING
SYSTEM SHALL BE COMPLETED AT THE COST AND RESPONSIBILITY OF THE CONTRACTOR.
THE CONTRACTOR IS REQUIRED TO HIRE A PROFESSIONAL ENGINEER FOR THE DESIGN OF
THE WATER DIVERSION AND DEWATERING SYSTEMS. THE PROFESSIONAL ENGINEER SHALL
HAVE A MINIMUM OF 5 YEARS OF DESIGN EXPERIENCE PERTAINING TO DESIGN OF THESE
TYPES OF SYSTEMS. THE CONTRACTOR'S DESIGN SHALL ALSO INCLUDE STRUCTURAL
ANALYSES AS NECESSARY TO ENSURE THAT THERE IS NO DAMAGE CAUSED TO THE EXISTING
STRUCTURES. THE CONTRACTOR SHALL SUBMIT THE WATER DIVERSION AND DEWATERING
PLAN FOR APPROVAL 30 DAYS PRIOR TO STARTING WORK. SUBMIT DRAWINGS AND
CALCULATIONS, CERTIFIED BY THE PROFESSIONAL ENGINEER, DESCRIBING THE METHOD. THE
PROFESSIONAL ENGINEER SHALL CONDUCT A PRE-CONSTRUCTION AND PERIODIC SITE VISITS
TO UPDATE THE WATER DIVERSION AND DEWATERING PLANS AS CONSTRUCTION
PROGRESSES TO REFLECT CHANGING CONDITIONS AND SHALL SUBMIT UPDATED PLANS AND
CALCULATIONS AS NECESSARY. A WRITTEN REPORT COMPLETED BY THE PROFESSIONAL
ENGINEER SHALL BE SUBMITTED, AT LEAST BI-WEEKLY, INFORMING THE CONTRACTOR AND
CONTRACTING OFFICER OF THE STATUS OF THE PLAN AND AN ACCOUNTING OF THE
CONTRACTOR'S ADHERENCE TO THE PLAN ADDRESSING ANY PRESENT OR POTENTIAL
PROBLEMS. THE PROFESSIONAL ENGINEER SHALL BE AVAILABLE TO MEET WITH THE
CONTRACTING OFFICER AT ANY TIME THROUGHOUT THE CONTRACT DURATION.
13. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL APPLICABLE PERMITS.
14. IN THE EVENT OF AN ANTICIPATED HIGH WATER EVENT, THE CONTRACTOR WILL BE
DIRECTED BY THE CONTRACTING OFFICER TO STOP WORK, EVACUATE ALL PERSONNEL,
EQUIPMENT AND MATERIALS, INCLUDING THE WATER DIVERSION AND DEWATERING SYSTEM
FROM THE STILLING BASIN AREA WITHIN 48 HOURS. THE CONTRACTOR SHALL PROVIDE THE
CONTRACTING OFFICER AND THE HEAD DAM TENDER A 24-HOUR PHONE NUMBER.
PAYMENT FOR THIS STOP WORK DIRECTIVE AS DIRECTED BY THE CONTRACTING OFFICER
WILL BE MADE IN CONFORMANCE WITH THE CHANGES CLAUSE OF THE CONTRACT CLAUSES.
15. THE TEMPORARY WATER DIVERSION SHALL REMAIN IN PLACE AND THE BASIN SHALL
REMAIN DEWATERED FOR A MINIMUM OF 28 DAYS AFTER COMPLETION OF THE CONCRETE
PLACEMENT. THE DIVERSION SYSTEM SHALL NOT BE DISMANTLED UNTIL APPROVAL OF ALL
WORK BY USACE.
DEWATERING NOTES
(CONTINUED): GENERAL NOTES:
1) CONTRACTOR SHALL NOT STAGE MATERIALS OR EQUIPMENT ON DAM EMBANKMENTS
OR WITHIN 25' OF DAM EMBANKMENT TOE, OUTLET STRUCTURES OR OTHER DAM
FEATURES.
2) STILLING BASIN WALLS SHALL BE PROTECTED DURING DEWATERING AND PIPE
CONVEYANCE INSTALLATION.
3) FALL PROTECTION / CHAIN-LINK FENCING.
A. REMOVAL OR DAMAGE TO 8' HIGH FALL PROTECTION STRUCTURE, GATE,
MAINTENANCE PLATFORM LADDER AND MAINTENANCE PLATFORM OVER APRON AT
INTERSECTION TO CONDUIT SHALL BE RETURNED TO ORIGINAL CONDITION AT
CONTRACTORS EXPENSE. 8' HIGH FALL PROTECTION EXTENDS FROM APPROXIMATE STA.
[22+44.25] TO STA. [22+69].
B. EXISTING 3.5'+\- HIGH FENCING ON TOP OF STILLING BASIN WALLS EXTENDS FROM
APPROXIMATE STA. [22+69] TO DOWN STREAM END OF WALL EACH SIDE OF STILLING
BASIN, SEE CP102 FOR INFORMATION ON REMOVAL, DISPOSAL AND REPLACEMENT.
D R
A W
N
B
Y
D E
S I G
N
B
Y
S B
S I Z
E
F I L
E
N
A M
E
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
M
Y
C
O R
E
N G
I N
E E
R S
C K
D
B
Y
US Army Corps of
Engineers ® x
F I L
E
N
U M
B E
R
P L
A
L E
P L
T
E
B E
E C
H
C
R E
N
N S
Y L
V A
N I A
A U
G
Baltimore District
F X
X X
B A
L T
I M
O R
E
D
I S
T R
I C
T
B A
L T
I M
O R
E
M
A R
Y L
A N
D
E N
G I N
E E
R I N
G
D
I V
I S
I O
N
C O
N C
R E
M
E D
I A
T I O
N
D E
S C
R I P
T I O
N D
A T
E A
P P
R
F O
S T
S E
Y
E R
S
L
A K
E
S T
I L
L I N
G
B
A S
P
A I R
GD002
STEEL BEAMS SPANNING
BASIN WALLS.
LONGITUDINAL PLATFORMS
ON STEEL BEAMS.
STEEL BEAMS SPANNING
BASIN WALLS.
LONGITUDINAL PLATFORMS
ON STEEL BEAMS.
CABLES STRUNG FROM
LONGITUDINAL PLATFORMS
TO CONVEYANCE PIPE.
CONVEYANCE PIPE.
VERTICAL STEEL FRAME.
CONVEYANCE PIPE CARRIER
ON VERTICAL STEEL FRAME.
VERTICAL STEEL FRAME.
CONVEYANCE PIPE CARRIER
ON VERTICAL STEEL FRAME.
COFFER DAM.
CONVEYANCE PIPE
STEEL BEAMS SPANNING
BASIN WALLS.
LONGITUDINAL PLATFORMS
ON STEEL BEAMS.
CABLES STRUNG FROM
LONGITUDINAL PLATFORMS
TO CONVEYANCE PIPE.
BULKHEAD.
CONVEYANCE PIPE.
EXAMPLE PHOTO NOT FROM SAYERS DAM EXAMPLE PHOTO NOT FROM SAYERS DAM
EXAMPLE PHOTO NOT FROM SAYERS DAMEXAMPLE PHOTO NOT FROM SAYERS DAM
EXAMPLE PHOTO NOT FROM SAYERS DAM EXAMPLE PHOTO NOT FROM SAYERS DAM
EXAMPLE PHOTO NOT FROM SAYERS DAMEXAMPLE PHOTO NOT FROM SAYERS DAM
TEMPORARY STEEL I-BEAM HANGAR STRUCTURE
- VIEW OUTLET CHANNEL DOWN STREAM
TEMPORARY CONVEYANCE PIPE TRANSITION FROM STEEL HANGAR
STRUCTURE TO VERTICAL STEEL FRAME - VIEW UP STREAM
TEMPORARY CONVEYANCE PIPE TERMINATION AT TEMPORARY
COFFERDAM
TEMPORARY CONVEYANCE PIPE & BULKHEAD AT TUNNEL OUTLET
- VIEW UP STREAM
STEEL BEAMS SPANNING
BASIN WALLS.
LONGITUDINAL PLATFORMS
ON STEEL BEAMS.
CABLES STRUNG FROM
LONGITUDINAL PLATFORMS
TO CONVEYANCE PIPE.
BULKHEAD.
STEEL BEAMS SPANNING
BASIN WALLS.
LONGITUDINAL PLATFORMS
ON STEEL BEAMS.
CABLES STRUNG FROM
LONGITUDINAL PLATFORMS
TO CONVEYANCE PIPE.
CONVEYANCE PIPE.
VERTICAL STEEL FRAME.
CONVEYANCE PIPE CARRIER
ON VERTICAL STEEL FRAME.
VERTICAL STEEL FRAME.
CONVEYANCE PIPE CARRIER
ON VERTICAL STEEL FRAME.
CONVEYANCE PIPE
COFFER DAM.
STEEL BEAMS SPANNING
BASIN WALLS.
LONGITUDINAL PLATFORMS
ON STEEL BEAMS.
CONVEYANCE PIPE.
D R
A W
N
B
Y
D E
S I G
N
B
Y
S B
S I Z
E
F I L
E
N
A M
E
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
M
Y
C
O R
E
N G
I N
E E
R S
C K
D
B
Y
US Army Corps of
Engineers ® x
F I L
E
N
U M
B E
R
P L
A
L E
P L
T
E
B E
E C
H
C
R E
N
N S
Y L
V A
N I A
A U
G
Baltimore District
F X
X X
B A
L T
I M
O R
E
D
I S
T R
I C
T
B A
L T
I M
O R
E
M
A R
Y L
A N
D
E N
G I N
E E
R I N
G
D
I V
I S
I O
N
C O
N C
R E
M
E D
I A
T I O
N
D E
S C
R I P
T I O
N D
A T
E A
P P
R
F O
S T
S E
Y
E R
S
L
A K
E
S T
I L
L I N
G
B
A S
P
A I R
GD003
#6 @ 12
588.0' +
615.0'
#6 @ 12
#10 @ 6
#10 @ 6
#6 @ 12
AS CONSTRUCTED
CONDUIT / STILLING BASIN1
WATER
STOP
3" CLEAR
#10 @ 12
CONTRACTION
JOINT.
IN
SI
D E D
IA
M
E
TE
R
SLOPE
0.0060
WATER
STOP
MAINTENANCE
PLATFORM
CHAIN LINK FALL
PROTECTION, TYP.
#6 @ 12 BENT ROD
CHAIN LINK FALL
PROTECTION ACCESS
GATE FOR MAINTENANCE
PLATFORM BEYOND
AS CONSTRUCTED
CONDUIT2
* ELEV. VARIES
CONSTRUCTION
JOINT, TYP.
#11@12
#6@12
#6@12
#6@12
#10@6
#10@6
NOTES:
1) ALL LONGITUDINAL STEEL #6@12.
2) ALL REINFORCING MINIMUM
4" CONCRETE COVER.
45°
* ELEVATION VARIES, LOW POINT
INVERT 588.0' AT CONTRACTION
JOINT BETWEEN CONDUIT AND
APRON STA. 22+45C.
15'-0" DIA.
ASSUMED
ROCK SURFACE
STILLING
BASIN
CONDUIT
D
1.5'
C
E
ELEV. B
RA
D.
F
CL
ELEV. A
AS CONSTRUCTED
WALL DIMENSIONS
ST
A
[2 +4
C
D R
A W
N
B
Y
D E
S I G
N
B
Y
S B
S I Z
E
F I L
E
N
A M
E
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
M
Y
C
O R
E
N G
I N
E E
R S
C K
D
B
Y
US Army Corps of
Engineers ® x
F I L
E
N
U M
B E
R
P L
A
L E
P L
T
E
B E
E C
H
C
R E
N
N S
Y L
V A
N I A
A U
G
Baltimore District
F X
X X
B A
L T
I M
O R
E
D
I S
T R
I C
T
B A
L T
I M
O R
E
M
A R
Y L
A N
D
E N
G I N
E E
R I N
G
D
I V
I S
I O
N
C O
N C
R E
M
E D
I A
T I O
N
D E
S C
R I P
T I O
N D
A T
E A
P P
R
F O
S T
S E
Y
E R
S
L
A K
E
S T
I L
L I N
G
B
A S
P
A I R
CE301
#10@6 FOR 12'
BOTTOM
#10@12
BOTTOM
#6@12
#6@12
VARIES
RA
DI
US
V
AR
IE
S
#8@12 (#6@12
ABOVE ELEV. 600.0'
FROM STA. [22+45C]
- STA. [22+70C])
#6@12
#6@12
600.0', CONST. JOINT
STA. [22+45C] - STA. [22+95C]
591.0', CONST. JOINT
VARIES, CONST. JOINT
V A R
IE
S
NO SPLICE
FROM STA.
[22+45C] TO
STA. [22+70C]
591.0', CONST. JOINT
STA. [22+70C] - [23+19.5C]
#8@6
#6@12
"#11@6
16'
#10@6
#10@12 BOTTOM
#6@12
#11@12
VARIES, CONST. JOINT
VARIES
581.0' CONST. JOINT
STA. [22+95C] - [23+19.5C]
#8@12
12" TILE PIPE
DRAIN
12" TILE PIPE
DRAIN
ALTERNATE
#11 BARS 7'-0"
AS CONSTRUCTED WALL SECTION
STA. [22+45C] TO [22+95C]1
AS CONSTRUCTED WALL SECTION
STA. [22+95C] TO [23+19.5C]2
NOTE:
ALL LONGITUDINAL STEEL #6@12
V A R
IE
S
1'-6"
FALL
PROTECTION,
TYP. 1'-6"
FALL
PROTECTION,
TYP.
D R
A W
N
B
Y
D E
S I G
N
B
Y
S B
S I Z
E
F I L
E
N
A M
E
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
M
Y
C
O R
E
N G
I N
E E
R S
C K
D
B
Y
US Army Corps of
Engineers ® x
F I L
E
N
U M
B E
R
P L
A
L E
P L
T
E
B E
E C
H
C
R E
N
N S
Y L
V A
N I A
A U
G
Baltimore District
F X
X X
B A
L T
I M
O R
E
D
I S
T R
I C
T
B A
L T
I M
O R
E
M
A R
Y L
A N
D
E N
G I N
E E
R I N
G
D
I V
I S
I O
N
C O
N C
R E
M
E D
I A
T I O
N
D E
S C
R I P
T I O
N D
A T
E A
P P
R
F O
S T
S E
Y
E R
S
L
A K
E
S T
I L
L I N
G
B
A S
P
A I R
CE302
#6@12
596.0'
#6@12
#6@12
#11@12
586.5', CONST. JOINT
576.5', CONST. JOINT 576.5', CONST. JOINT
#6@12
#11@12 #6@12
560.5'
596.0'
566.5', CONST. JOINT
8" TILE PIPE
DRAIN
8" TILE PIPE
DRAIN
ALTERNATE
#11 BARS 7'-0"
AS CONSTRUCTED WALL SECTION
STA. [23+19.5C] TO [23+63.5C]3
AS CONSTRUCTED WALL SECTION
STA. [23+63.5C] TO [24+06C]4
NOTE:
ALL LONGITUDINAL STEEL #6@12
16'
#10@6
#10@12 BOTTOM
#9@12
566.5', CONST. JOINT
#11@6
ALTERNATE
#11 BARS 7'-0"
560.5'
16'
#11@6
#11@12 BOTTOM
586.5', CONST. JOINT
#6@12
#9@12 1
566.0'
1'-6"
FALL PROTECTION, TYP.
1'-6"
FALL PROTECTION, TYP.
D R
A W
N
B
Y
D E
S I G
N
B
Y
S B
S I Z
E
F I L
E
N
A M
E
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
M
Y
C
O R
E
N G
I N
E E
R S
C K
D
B
Y
US Army Corps of
Engineers ® x
F I L
E
N
U M
B E
R
P L
A
L E
P L
T
E
B E
E C
H
C
R E
N
N S
Y L
V A
N I A
A U
G
Baltimore District
F X
X X
B A
L T
I M
O R
E
D
I S
T R
I C
T
B A
L T
I M
O R
E
M
A R
Y L
A N
D
E N
G I N
E E
R I N
G
D
I V
I S
I O
N
C O
N C
R E
M
E D
I A
T I O
N
D E
S C
R I P
T I O
N D
A T
E A
P P
R
F O
S T
S E
Y
E R
S
L
A K
E
S T
I L
L I N
G
B
A S
P
A I R
CE303
596.0'
#6@12
#6@12
586.5', CONST. JOINT
VARIES, CONST. JOINT
VARIES, CONST. JOINT
#6@12
596.0'
8" TILE PIPE
DRAIN (ENDS STA.
[24+28C])
AS CONSTRUCTED WALL SECTION
STA. [24+06C] TO [24+23.5C]5
AS CONSTRUCTED WALL SECTION
STA. [24+23.5C] TO [24+41.0C]6
NOTE:
ALL LONGITUDINAL STEEL #6@12
#9@12
ALTERNATE @
ELEV. 577.5'
586.5', CONST. JOINT
#6@12
#9@12 1
6'
#6@12
NORMAL TO
WALL
#8@6
NORMAL TO WALL
NORMAL APRON
SLAB STEEL
#6@12 EW-EF
RETAIN FULL
LENGTH AND
BEND DOWN
INTO KEY OR
CONCRETE
BACKFILL AT
APRON
3'-3"
#9@12 #6@12 EW-EF
#6@12
#6 DOWELS
@12
#9@12
1'-6"
FALL PROTECTION, TYP.
1'-6"
FALL PROTECTION, TYP.
D R
A W
N
B
Y
D E
S I G
N
B
Y
S B
S I Z
E
F I L
E
N
A M
E
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
M
Y
C
O R
E
N G
I N
E E
R S
C K
D
B
Y
US Army Corps of
Engineers ® x
F I L
E
N
U M
B E
R
P L
A
L E
P L
T
E
B E
E C
H
C
R E
N
N S
Y L
V A
N I A
A U
G
Baltimore District
F X
X X
B A
L T
I M
O R
E
D
I S
T R
I C
T
B A
L T
I M
O R
E
M
A R
Y L
A N
D
E N
G I N
E E
R I N
G
D
I V
I S
I O
N
C O
N C
R E
M
E D
I A
T I O
N
D E
S C
R I P
T I O
N D
A T
E A
P P
R
F O
S T
S E
Y
E R
S
L
A K
E
S T
I L
L I N
G
B
A S
P
A I R
CE304
VIEW
NORTH WEST
VIEW
WEST
VIEW
SOUTH
VIEW DOWNSTREAM
NORTH EAST
{620'}
{620'}
{605'} {595'}
{610'}
{600'} {595'}
{610'}
{630'}
{630'}
{630'}
{595'}
{620'}
{630'}{595'} {610'}
{620'}
{610'}
AREA ELEVATIONS ON THIS SHEET ARE APPROXIMATE AND ARE PROVIDED FOR WORK
STAGING AND ACCESS PLANNING ONLY. AREA ELEVATIONS ARE SHOWN AS {###'}
AND SHALL NOT BE USED FOR ESTIMATION OR DESIGN IN ANY CAPACITY. FOR
ELEVATIONS IN STILLING BASIN & CHANNEL SEE PROFILE SHEET CE101.
AREA ELEVATIONS
D R
A W
N
B
Y
D E
S I G
N
B
Y
S B
S I Z
E
F I L
E
N
A M
E
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
M
Y
C
O R
E
N G
I N
E E
R S
C K
D
B
Y
US Army Corps of
Engineers ® x
F I L
E
N
U M
B E
R
P L
A
L E
P L
T
E
B E
E C
H
C
R E
N
N S
Y L
V A
N I A
A U
G
Baltimore District
F X
X X
B A
L T
I M
O R
E
D
I S
T R
I C
T
B A
L T
I M
O R
E
M
A R
Y L
A N
D
E N
G I N
E E
R I N
G
D
I V
I S
I O
N
C O
N C
R E
M
E D
I A
T I O
N
D E
S C
R I P
T I O
N D
A T
E A
P P
R
F O
S T
S E
Y
E R
S
L
A K
E
S T
I L
L I N
G
B
A S
P
A I R
S
CE305
{615'} {615'}
{615'}
1. GENERAL:
A. THESE NOTES ARE PROVIDED TO GIVE THE CONTRACTOR AN IDEA OF THE CONDITION
OF THE CONCRETE STILLING BASIN AND BAFFLE BLOCKS AS WAS OBSERVED DURING THE
MAY 2017 UNDERWATER INSPECTION. BASED UPON COMPARISONS WITH PREVIOUS
UNDERWATER INSPECTIONS, IT SHALL BE ANTICIPATED THAT THE DAMAGE HAS PROGRESSED.
THE 2017 UNDERWATER INSPECTION REPORT IS INCLUDED IN THE PROJECT SPECIFICATIONS.
B. THERE IS SEVERE ABRASION/SCOUR OF THE STILLING BASIN FLOOR SLAB AND
UPSTREAM AND SIDE FACES OF BAFFLE BLOCKS.
C. MULTIPLE PILES OF BENT REBAR AND DEBRIS (STONES FROM DOWNSTREAM RIP RAP)
ARE PRESENT THROUGHOUT STILLING BASIN. DIAMETERS OF STONE ARE AS LARGE AS
3-FEET IN DIAMETER.
D. THE MAJORITY OF THE ABRASION/SCOUR IS PRESENT WITHIN THE UPSTREAM AND SIDE
FACES OF THE BAFFLE BLOCKS AND IN THE CENTER (APPROXIMATELY 35-FEET WIDE) OF THE
STILLING BASIN FLOOR SLAB EXTENDING FROM APPROXIMATELY 15-FEET DOWNSTREAM
FROM THE SLOPED RAMP TO THE KNEE WALL WITH SEVERE ABRASION/SCOUR LOCATED AT
THE SLOPED RAMP AND FLOOR SLAB INTERFACE FOR THE ENTIRE WIDTH (STA. 23+19.5C).
TYPICAL ABRASION/SCOUR FOR EACH SUB-COMPONENT OF THE STILLING BASIN IS DISCUSSED
BELOW AND ILLUSTRATED ON SHEET CP102 & SHEETS CP901 - CP903 FIGURES 9 - 19.
2. STILLING BASIN WALLS:
A. MINOR SCALING AND EXPOSED AGGREGATE.
B. ACUTE ABRASION APPROXIMATELY 6-INCHES WIDE BY 5-INCHES HIGH BY 3-INCHES
DEEP LOCATED ON NORTH WALL AT INTERFACE BETWEEN STILLING BASIN FLOOR SLAB,
SLOPED RAMP AND BOTTOM OF WALL.
3. STILLING BASIN SLOPED RAMP (STA. 22+45C - STA. 23+19.5C):
A. ONLY LOWER 5-FEET OF SLOPED RAMP ADJACENT TO FLOOR SLAB WAS INSPECTED
DURING 2017 UNDERWATER INSPECTION.
B. MODERATE SCALING WITH MODERATE AGGREGATE EXPOSURE ACROSS ENTIRE LENGTH.
4. STILLING BASIN FLOOR SLAB (STA. 23+19.5C - STA. 24+06C):
A. APPROXIMATELY 75 PERCENT OF THE STILLING BASIN FLOOR SLAB HAS SOME LEVEL
OF ABRASION/SCOUR WITH REBAR LOSS AND EXPOSURE.
B. 18-INCH WIDE BY 6-INCH DEEP SCOUR HOLE WITH SIGNIFICANT REBAR EXPOSURE FOR
THE ENTIRE WIDTH OF THE BASIN AT THE SLOPED RAMP AND FLOOR SLAB INTERFACE (STA.
23+19.5C).
C. SIGNIFICANT ACUTE AND LOCALIZED ABRASION/SCOUR ADJACENT TO BAFFLE BLOCKS
BETWEEN 2 TO 12 INCHES DEEP INTO STILLING BASIN FLOOR SLAB AND EXTENDING 4-FEET
HORIZONTALLY UPSTREAM FROM THE BAFFLE BLOCKS.
D. WIDE SPREAD ABRASION/SCOUR EXTENDS UPSTREAM FROM THE BLOCKS (AS
INDICATED ABOVE) TO THE SLOPED BOTTOM RAMP (STA. 23+19C) TO A DEPTH LESS THAN 12
INCHES AS INDICATED ABOVE ADJACENT TO THE BAFFLE BLOCKS.
EXISTING CONDITION OF STILLING BASIN BASED UPON
JUNE 2017 UNDERWATER INSPECTION:
E. LARGE AMOUNTS OF REBAR ARE EXPOSED THROUGHOUT STILLING BASIN FLOOR SLAB.
EXPOSED REBAR RANGED FROM JUST TOP OF REBAR BEING EXPOSED TO THE FULL REBAR
BEING EXPOSED WITH CONCRETE LOSS EXCEEDING 2-INCHES BETWEEN THE BOTTOM OF THE
REBAR AND FLOOR SLAB SURFACE. IN MANY AREAS, REBAR WITH “FREE” ENDS SEVERAL
FEET LONG ARE EXPOSED RESULTING IN REBAR SWINGING “FREE” IN THE WATER COLUMN.
F. AS ILLUSTRATED ON THE "CE" SHEETS (BASED UPON AS-BUILT DRAWINGS), TWO
LAYERS OF #6 REBAR (0.75-INCH DIAMETER) ARE LOCATED NEAR THE SURFACE WITH
4-INCHES COVER. THEREFORE, BASED UPON OBSERVATIONS, IT IS ESTIMATED THAT
ABRASION DEPTHS IN THESE AREAS RANGE BETWEEN 4 AND 9 INCHES DEEP BENEATH THE
STILLING BASIN FLOOR SLAB SURFACE.
G. THE ABRASION/SCOUR IN THE STILLING BASIN FLOOR SLAB DOWNSTREAM FROM THE
BAFFLE BLOCKS IS SIMILAR TO THE WIDE SPREAD SCOUR UPSTREAM OF THE BAFFLE BLOCKS
AS INDICATED ABOVE.
5. BAFFLE BLOCKS:
A. GENERAL: ACUTE ABRASION/SCOUR UP TO 6-INCHES INTO SOME OF THE FACES OF
THE BLOCKS AND EXTENDING FROM THE FLOOR SLAB UP TO 23-INCHES HIGH ONTO THE
BLOCKS.
B. BAFFLE BLOCK #1: MODERATE SURFACE PITTING ON ENTIRE BLOCK. 12-INCH HIGH BY
12-INCH LONG BY 6-INCH DEEP SPALL/ABRASION AT SOUTH UPSTREAM BOTTOM CORNER
WITH REBAR EXPOSURE. SIGNIFICANT ABRASION/SCOUR OF BASIN FLOOR SLAB WITH
EXPOSED REBAR.
C. BAFFLE BLOCK #2: LARGE ABRASION ON LOWER 18-INCHES OF UPSTREAM FACE WITH
LOSS OF CONCRETE AND EXPOSURE OF REBAR.
D. BAFFLE BLOCK #3: ABRASION/SCOUR ALONG THE LOWER 6-INCHES OF THE UPSTREAM
FACE WITH EXPOSED REBAR. SIGNIFICANT ABRASION/SCOUR OF BASIN FLOOR SLAB WITH
EXPOSED REBAR.
E. BAFFLE BLOCK #4: MODERATE SURFACE PITTING ON ENTIRE BLOCK. SIGNIFICANT
ABRASION/SCOUR OF BASIN FLOOR SLAB WITH EXPOSED REBAR WITH WITH EXPOSED REBAR.
APPEARS TO BE WORST LOCATION OF CONCRETE LOSS AND REBAR EXPOSURE/LOSS.
F. BAFFLE BLOCK #5: MODERATE SURFACE PITTING ON ENTIRE BLOCK. NO REBAR
EXPOSURE ON ANY FACE. MODERATE TO SEVERE ABRASION/SCOUR NEAR BOTTOM OF
BAFFLE BLOCK.
6. KNEE WALL (STA. 24+06C):
A. MODERATE ABRASION/SCOUR AND SOME EXPOSED AGGREGATE. ACUTE
ABRASION/SCOUR 5-FEET OFF OF NORTH WALL AT THE BOTTOM OF KNEE WALL
APPROXIMATELY 6-INCH WIDE BY 6-INCHES HIGH BY 6-INCHES DEEP.
7. OBSERVED ONE LARGE RIP RAP STONE 2'-3' DIAMETER ON FLOOR SLAB WITH A HANDFUL
OF 6"-1' DIAMETER SMALLER STONES IN THE STILLING BASIN. THERE IS A GOOD AMOUNT OF
SMALL GRAVEL TYPE STONE THROUGHOUT THE FLOOR SLAB FILLING IN MANY OF THE
HEAVILY ABRADED AREAS.
D R
A W
N
B
Y
D E
S I G
N
B
Y
S B
S I Z
E
F I L
E
N
A M
E
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
M
Y
C
O R
E
N G
I N
E E
R S
C K
D
B
Y
US Army Corps of
Engineers ® x
F I L
E
N
U M
B E
R
P L
A
L E
P L
T
E
B E
E C
H
C
R E
N
N S
Y L
V A
N I A
A U
G
Baltimore District
F X
X X
B A
L T
I M
O R
E
D
I S
T R
I C
T
B A
L T
I M
O R
E
M
A R
Y L
A N
D
E N
G I N
E E
R I N
G
D
I V
I S
I O
N
C O
N C
R E
M
E D
I A
T I O
N
D E
S C
R I P
T I O
N D
A T
E A
P P
R
F O
S T
S E
Y
E R
S
L
A K
E
S T
I L
L I N
G
B
A S
P
A I R
CP101
570.5'
SECTION - PROPOSED WEDGE
[2 +0
C
[2 +8
.5
C
[2 +7
.7
C
4"
4"
4"
MINMIN
M
IN
M
IN
MIN
M
IN
" M
IN
EXISTING STILLING BASIN WALL
CONTROL JOINT BEYOND.
EXISTING WATER STOP IN
STILLING BASIN WALL BEYOND.
EXISTING CONSTRUCTION
JOINT IN STILLING BASIN
WALL BEYOND.
4'
K E Y
D E P
TH
APPROXIMATE KEY WIDTH
SPLICE PER
ACI
EXISTING
REINFORCING.
PROPOSED 4
EACH #4 HOOK
@12" O.C.
6"
SEE NOTE 7B
THIS SHEET
SEE NOTE 7B
THIS SHEET
570.0'
569.0'
568.0'
PROPOSED #4 HOOK
@ 12" EACH WAY
PROPOSED WEEPHOLE
EXTENSION, SEE NOTE 8.
SEE NOTE 7A THIS SHEET.
EXISTING WEEPHOLES.
PROPOSED
PERPENDICULAR
4 ROWS/3 EACH
#8 CONTINUOUS
PROPOSED ALL
PERPENDICULAR
ROWS
#6 @ 12" O.C.
E Q
E Q
E Q
E Q
E Q
E Q
E Q
E Q
E Q
E Q
PROPOSED
PERPENDICULAR
3 ROWS/5 EACH
#7 CONTINUOUS
PROPOSED
PERPENDICULAR
4 ROWS/5 EACH
#7 CONTINUOUS
PROPOSED #6 HOOK
PROPOSED
5 EACH #6 @ 12"
* NOTE
* NOTE - FOR INTERFERENCE BETWEEN HORIZONTAL LEGS
OF PROPOSED #4 HOOKS, HOOK SHALL BE ROTATED
ABOUT AXIS OF VERTICAL LEG NO MORE THAN NECESSARY
TO PROVIDE 1" CLEAR BETWEEN HORIZONTAL LEGS.
PROPOSED #8 @ 12"
PROPOSED #6 @ 12".
SEE NOTE 7A THIS
SHEET.#6 @ 12".
#6 @ 12".
1 2
PROPOSED DOWEL AND EPOXY
#4 HOOKS EMBED A MINIMUM OF
4-1/2" WITH HILTI HIT-HY200 OR
EQUAL, SEE NOTE 3.
PROPOSED #6 @ 12" O.C.
EXISTING
REINFORCING.
566.0'
AT SLAB
P R O
P O
SE
D
W E D G E
E X
IS
TI
N
G B A
SI
N
[2 +0
C
570.5'
PROJECTION
LINE OF
EXISTING
STILLING
BASIN SLOPE.
EXISTING
STILLING
BASIN
KNEEWALL.
PROJECTION
LINE OF
PROPOSED
WEDGE SLOPE.
PROPOSED
CONCRETE
WEDGE.
EX
IS
T
KN
EE
W
AL
L
INTERSECTION OF PROPOSED WEDGE
PROJECTION, EXISTING STILLING
BASIN SLOPE PROJECTION, STA.
[24+01C] & ELEV. 570.5'.
RA
DI
US
T
O M
AT
CH
564.5'
BOTTOM
OF KEY
C
LE
A R
C/L
8"
9"
PROPOSED
#6 @ 12"
NOTES:
1. CONCRETE STRENGTH PER SPECIFICATIONS.
2. PROPOSED CONCRETE WEDGE TO BE KEYED INTO EXISTING
STILLING BASIN SLAB. DEMOLITION WILL BE REQUIRED TO MAKE
KEY.
3. #4 HOOKS SHALL BE SPACED 12" ON CENTER, EACH WAY.
SUBMIT ADHESIVE FOR REVIEW AND APPROVAL, SEE SPECIFICATIONS.
4. ALL REINFORCEMENT AT CONCRETE WEDGE SHALL BE
EPOXY-COATED.
5. SPLICE REINFORCEMENT PER ACI 318-14.
6. CONCRETE WEDGE SHALL BE CONSTRUCTED IN A SINGLE
PLACEMENT.
7. ALL EXISTING CONCRETE SURFACES HAVING CONTACT WITH
PROPOSED CONCRETE WEDGE SHALL BE ROUGHENED TO RECEIVE
PROPOSED WEDGE. SEE "SECTION-PROPOSED WEDGE" THIS SHEET
AND "PLAN-PROPOSED LIMITS OF REPAIR" SHEET CP102 FOR LIMITS.
CONTRACTOR SHALL ENSURE ROUGHENED SURFACES ARE ONLY
PERFORMED TO THOSE SURFACES HAVING CONTACT WITH PROPOSED
WEDGE AND KEY. ROUGHENED SURFACES INCLUDE:
A) EXISTING SURFACES - STILLING BASIN WALLS (NOT SHOWN IN
SECTION), KNEEWALL AND STILLING BASIN SLAB. SLAB
ELEVATION = 566.0'.
B) EXCAVATION OF EXISTING SURFACES - HORIZONTAL AND
VERTICAL PORTION OF STILLING BASIN SLAB TO RECEIVE
PROPOSED WEDGE KEY.
D R
A W
N
B
Y
D E
S I G
N
B
Y
S B
S I Z
E
F I L
E
N
A M
E
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
M
Y
C
O R
E
N G
I N
E E
R S
C K
D
B
Y
US Army Corps of
Engineers ® x
F I L
E
N
U M
B E
R
P L
A
L E
P L
T
E
B E
E C
H
C
R E
N
N S
Y L
V A
N I A
A U
G
Baltimore District
F X
X X
B A
L T
I M
O R
E
D
I S
T R
I C
T
B A
L T
I M
O R
E
M
A R
Y L
A N
D
E N
G I N
E E
R I N
G
D
I V
I S
I O
N
C O
N C
R E
M
E D
I A
T I O
N
D E
S C
R I P
T I O
N D
A T
E A
P P
R
F O
S T
S E
Y
E R
S
L
A K
E
S T
I L
L I N
G
B
A S
P
A I R
S
CP301
PROPOSED
#4 HOOK
NOT SHOWN
FOR CLARITY
NOTES (CONTINUED):
8. EXISTING FOUR WEEPHOLES IN VICINITY OF PROPOSED CONCRETE
WEDGE SHALL REMAIN SERVICEABLE. CONTRACTOR SHALL FORM
AND EXTEND WEEPHOLES THROUGH PROPOSED WEDGE WITH
MATERIALS OTHER THAN METAL OR MATERIALS PRONE TO EXPOSING
NEW CONCRETE TO CORROSION RELATED DAMAGE. DIAMETER OF
WEEPHOLE EXTENSIONS SHALL MATCH EXISTING WEEPHOLES. AS SHOWN ABOVE, WEEPHOLES MAY INTERFERE WITH LOCATION OF REINFORCING. AS SUCH CONTRACTOR SHALL ADJUST REINFORCING AS NECESSARY WHILE MAINTAINING MINIMUM REINFORCING FREQUENCY, SIZE OF REINFORCING AND MINIMUM CONCRETE COVERAGE AS SHOWN ON THESE PLANS AND IN THE SPECIFICATIONS. SEE
SHEET CP102 FOR PLAN VIEW OF WEEPHOLES IN VICINITY OF PROPOSED WEDGE.
9. ALL EXISTING WEEPHOLES IN STILLING BASIN SLAB SHALL REMAIN SERVICEABLE. EXISTING WEEPHOLES IMPACTED BY PROPOSED WORK SHALL BE RECONSTRUCTED TO DRAIN AT TOP OF STILLING BASIN SLAB AT ELEV. 566.0'. CONTRACTOR SHALL FORM AND EXTEND WEEPHOLES WITH MATERIALS OTHER THAN METAL OR MATERIALS PRONE TO EXPOSING NEW CONCRETE TO CORROSION RELATED DAMAGE. DIAMETER OF WEEPHOLE EXTENSIONS SHALL MATCH EXISTING WEEPHOLES. SEE SHEET CP102 FOR PLAN VIEW OF
WEEPHOLES IN VICINITY OF PROPOSED REPAIRS.
CONCRETE REMOVAL AND SFC PLACEMENT
EXISTING STEEL
REINFORCING.
EXISTING CONCRETE
STILLING BASIN AND
BAFFLE BLOCKS.
PREPARED CONCRETE
SURFACES TO RECEIVE
SFC.
NOTES:
1) CONTRACTOR TO CONDUCT 3D LASER SCANNING (ALSO REFERED TO AS
HIGH DEFINITION SURVEYING ((HDS)), 3D IMAGING, TERRESTRIAL SCANNING
AND LIDAR) OF THE STILLING BASIN SLAB AND BAFFLE BLOCKS BEFORE
AND AFTER DEMOLITION AND FOLLOWING SFC PLACEMENT TO ESTABLISH
QUANTITIES FOR PAYMENT FOR DEMOLITION AND PLACEMENT OF NEW SFC
(NOT TO INCLUDE NEW CONCRETE FOR WEDGE ABOVE AS-BUILT SLAB AT
ELEVATIONS 566.0' WHICH IS TO BE PAID VIA LUMP SUM).
2) REMOVE CONCRETE & PREPARE SURFACE TO RECEIVE SFC PER
SPECIFICATION SECTION 03 30 00.
3) PREPARE CONCRETE SUBSTRATE SURFACES AND PLACE AND CURE SFC
MATERIAL PER SPECIFICATION SECTION 03 30 00.
4) PERIMETER OF ALL REPAIRS SHALL BE VERTICALLY SAWCUT TO A
MINIMUM DEPTH OF 2" BELOW TOP OF CONCRETE SURFACE TO ENSURE NO
NTS
SE
E
N O
TE
SE
E
N O
TE
FEATHERED EDGES OF NEW SFC MATERIAL. TO ENSURE REINFORCING IS NOT CUT OR DAMAGED SAWCUT SHALL BE PERFORMED TO A MAXIMUM DEPTH OF 3" BELOW TOP OF CONCRETE SURFACE OR JUST ABOVE REINFORCING.
5) FOLLOWING SAWCUTTING, CONCRETE SHALL BE REMOVED TO A DEPTH OF 4" BELOW TOP OF CONCRETE OR
1/2" INTO SOUND CONCRETE, WHICHEVER IS GREATER.
6) WHENEVER MORE THAN 50% OF PERIMETER OF STEEL REINFORCING IS EXPOSED OR CORRODED REINFORCING IS ENCOUNTERED, CONCRETE SHALL BE REMOVED TO A MINIMUM DEPTH OF 1 1/2" BELOW
BOTTOM OF STEEL REINFORCING OR 1/2" INTO SOUND CONCRETE, WHICHEVER IS GREATER.
CLEANING OF REINFORCING STEEL
NOTE:
ALL HEAVY OXIDES AND SCALE SHALL BE REMOVED
FROM THE BAR AS NECESSARY TO PROMOTE
MAXIMUM BOND OF REPLACEMENT SFC MATERIAL
PER SPECIFICATION SECTION 03 30 00.
PATH OF ABRASIVES
CLEANING REQUIRED
HEAVILY
OXIDIZED
SECTION
LIGHT/MEDIUM
OXIDIZED
SECTION
ORIGINAL MILL
SCALE
UNOXIDIZED
CLEANING UNDERSIDE
OF BAR
NTS
EXISTING SOUND
CONCRETE
REPAIR OF REINFORCING STEEL DUE TO LOSS OF SECTION
NOTES:
1) SPLICE ON NEW #6 EPOXY COATED STEEL REBAR WHERE THE EXISTING #6 STEEL REBAR HAS BEEN COMPLETELY REMOVED BY EROSION OR WHERE THERE IS A LOSS OF 25 PERCENT OF THE BARS CROSS-SECTIONAL
AREA.
2) IF THE REINFORCING STEEL HAS LOST MORE THAN 25 PERCENT OF ITS CROSS-SECTIONAL AREA, SPLICE USING AN EPOXY COATED BAR OF CROSS-SECTIONAL AREA EQUAL TO OR EXCEEDING THE CROSS-SECTIONAL AREA LOST BY CORROSION OF THE EXISTING BAR. ALTERNATIVELY, WHEN THE CROSS-SECTIONAL AREA LOSS IS LESS THAN 50 PERCENT OF EACH BAR, THE CROSS-SECTIONAL AREA LOSS MAY BE SUMMED AND ONE BAR OF EQUIVALENT CROSS-SECTIONAL AREA MAY BE SPLICED AT 2' O.C. MAXIMUM. HOWEVER, IN NO CASE SHALL THE SPLICED BAR BE OF LARGER CROSS-SECTIONAL AREA THAN THE EXISTING BAR.
3) BARS MAY BE SPLICED WITH EITHER LAP SPLICES OR MECHANICAL SPLICES. LAP LENGTH SHALL BE IN ACCORDANCE WITH ACI-318 (CLASS B SPLICE).
AFFECTED AREA
LOSS OF SECTION
ACI REQUIRED LAP ACI REQUIRED LAP
ORIGINAL MILL SCALE
NO SECTIONAL LOSS
ORIGINAL MILL SCALE
NO SECTIONAL LOSS
NTS
D R
A W
N
B
Y
D E
S I G
N
B
Y
S B
S I Z
E
F I L
E
N
A M
E
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
M
Y
C
O R
E
N G
I N
E E
R S
C K
D
B
Y
US Army Corps of
Engineers ® x
F I L
E
N
U M
B E
R
P L
A
L E
P L
T
E
B E
E C
H
C
R E
N
N S
Y L
V A
N I A
A U
G
Baltimore District
F X
X X
B A
L T
I M
O R
E
D
I S
T R
I C
T
B A
L T
I M
O R
E
M
A R
Y L
A N
D
E N
G I N
E E
R I N
G
D
I V
I S
I O
N
C O
N C
R E
M
E D
I A
T I O
N
D E
S C
R I P
T I O
N D
A T
E A
P P
R
F O
S T
S E
Y
E R
S
L
A K
E
S T
I L
L I N
G
B
A S
P
A I R
CP501
FIGURE 9: EXPOSED REBAR
SEVERE ABRASION AT RAMPED SLOPE & FLOOR SLAB INTERFACE
FIGURE 10: EXPOSED REBAR
APPROXIMATELY 15' DOWNSTREAM OF SLOPE AT MID-CHANNEL
FIGURE 11: PARTIALLY EXPOSED REBAR
APPROXIMATELY 25' DOWNSTREAM OF SLOPE & 15' OFF WALL
FIGURE 12: EXPOSED REBAR WITH 1-2" CONCRETE LOSS BELOW
APPROXIMATELY 35' DOWNSTREAM OF SLOPE AT MID-CHANNEL
D R
A W
N
B
Y
D E
S I G
N
B
Y
S B
S I Z
E
F I L
E
N
A M
E
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
M
Y
C
O R
E
N G
I N
E E
R S
C K
D
B
Y
US Army Corps of
Engineers ® x
F I L
E
N
U M
B E
R
P L
A
L E
P L
T
E
B E
E C
H
C
R E
N
N S
Y L
V A
N I A
A U
G
Baltimore District
F X
X X
B A
L T
I M
O R
E
D
I S
T R
I C
T
B A
L T
I M
O R
E
M
A R
Y L
A N
D
E N
G I N
E E
R I N
G
D
I V
I S
I O
N
C O
N C
R E
M
E D
I A
T I O
N
D E
S C
R I P
T I O
N D
A T
E A
P P
R
F O
S T
S E
Y
E R
S
L
A K
E
S T
I L
L I N
G
B
A S
P
A I R
S
CP901
FIGURE 13: MULTIPLE EXPOSED AND BENT BARS
APPROXIMATELY 45' DONWSTREAM OF SLOPE AT W WALL
FIGURE 14: EXPOSED REBAR
BOTTOM SLAB JUST DOWNSTREAM OF BAFFLE BLOCK 5
FIGURE 15: EXPOSED REBAR & DEBRIS
UNDERNEATH ON BOTTOM SLAB DOWSTREAM OF BAFFLE BLOCK 3
FIGURE 16: REBAR BENT VERTICALLY
BOTTOM OF LONGITUDINAL BAR JUST UPSTREAM OF BAFFLE BLOCK 4
D R
A W
N
B
Y
D E
S I G
N
B
Y
S B
S I Z
E
F I L
E
N
A M
E
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
M
Y
C
O R
E
N G
I N
E E
R S
C K
D
B
Y
US Army Corps of
Engineers ® x
F I L
E
N
U M
B E
R
P L
A
L E
P L
T
E
B E
E C
H
C
R E
N
N S
Y L
V A
N I A
A U
G
Baltimore District
F X
X X
B A
L T
I M
O R
E
D
I S
T R
I C
T
B A
L T
I M
O R
E
M
A R
Y L
A N
D
E N
G I N
E E
R I N
G
D
I V
I S
I O
N
C O
N C
R E
M
E D
I A
T I O
N
D E
S C
R I P
T I O
N D
A T
E A
P P
R
F O
S T
S E
Y
E R
S
L
A K
E
S T
I L
L I N
G
B
A S
P
A I R
CP902
FIGURE 17: 7' LONG REBAR BENT VERTICALLY
LONGITUDINAL REBAR JUST UPSTREAM OF BAFFLE BLOCK 4
FIGURE 18: TYPICAL BOTTOM SLAB CONDITION
ADJACENT TO BAFFLE BLOCK 4
FIGURE 19: EXPOSED BENT UP REBAR & DEBRIS
ADJACENT TO KNEEWALL
D R
A W
N
B
Y
D E
S I G
N
B
Y
S B
S I Z
E
F I L
E
N
A M
E
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
M
Y
C
O R
E
N G
I N
E E
R S
C K
D
B
Y
US Army Corps of
Engineers ® x
F I L
E
N
U M
B E
R
P L
A
L E
P L
T
E
B E
E C
H
C
R E
N
N S
Y L
V A
N I A
A U
G
Baltimore District
F X
X X
B A
L T
I M
O R
E
D
I S
T R
I C
T
B A
L T
I M
O R
E
M
A R
Y L
A N
D
E N
G I N
E E
R I N
G
D
I V
I S
I O
N
C O
N C
R E
M
E D
I A
T I O
N
D E
S C
R I P
T I O
N D
A T
E A
P P
R
F O
S T
S E
Y
E R
S
L
A K
E
S T
I L
L I N
G
B
A S
P
A I R
CP903
| GI001 VICINITY MAP / LOCATION MAP / INDEX TO DRAWINGS |
| GI002 SYMBOLS LEGEND / OVERALL SITE PLAN / CONTRACTOR ACCESS ROUTE |
| GI003 WORK LIMITS / STAGING - STOCKPILE AREAS |
| GD001 DEWATERING NOTES |
| GD002 DEWATERING NOTES (CONTINUED) / GENERAL NOTES |
| GD003 FLOW DIVERSION / LEGACY REPAIR PHOTOS, OTHER PROJECT (CURWENSVILLE DAM) |
| CE101 STILLING BASIN PLAN AND SECTION - AS CONSTRUCTED |
| CE301 CONDUIT TO STILLING BASIN SECTIONS & WALL DIMENSIONS - AS CONSTRUCTED |
| CE302 WALL SECTIONS - STA. [22+45C] TO [23+19.5C] - AS CONSTRUCTED |
| CE303 WALL SECTIONS - STA. [23+19.5C] TO [24+06C] - AS CONSTRUCTED |
| CE304 WALL SECTIONS - STA. [24_06C] TO [24+41.0C] - AS CONSTRUCTED |
| CE305 STILLING BASIN VICINITY PHOTOS - EXISTING CONDITIONS |
| CP101 PROPOSED REPAIRS - 2015 UNDERWATER INSPECTION NOTES |
| CP102 PROPOSED REPAIRS - STILLING BASIN LIMITS OF CONCRETE REPAIR |
| CP103 PROPOSED REPAIRS - GENERAL LOCATION 2009 CONCRETE CORES |
| CP301 PROPOSED REPAIRS - SECTION-STILLING BASIN PROPOSED CONCRETE WEDGE |
| CP501 PROPOSED REPAIRS - CONCRETE & REINFORCING STEEL DETAILS |
| CP901 PROPOSED REPAIRS - FIGURES 9 THRU 12 |
| CP901 PROPOSED REPAIRS - FIGURES 13 THRU 16 |
| CP903 PROPOSED REPAIRS - FIGURES 17 THRU 19 |
File details come from the government source that posted it. Updated .