W912DR19R0018_AMENDMENT_0003_21AUG19.pdf
PDF 520 KB Posted
- Attached to
- U. S. Army War College (USAWC), General Instruction Building (GIB), Carlisle Barracks, Carlisle, PA
- Solicitation number
- W912DR19R0018
About this file
AMENDMENT 0003 RESPONSES TO RFIS
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this Amendment is to respond to requests for information. All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 21-Aug-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DR19R0018
X 9B. DATED (SEE ITEM 11)
22-Jul-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
21-Aug-2019
CODE
U.S. ARMY CORPS OF ENGINEERS, BALTIMORE
2 HOPKINS PLAZA
BALTIMORE MD 21201
W912DR 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DR19R0018
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
RFIS (AMENDMENT 0002)
REQUESTS FOR INFORMATION AND RESPONSES
21 AUGUST 2019
1.) The RFP states that all non-price factors when combined are approximately equal to price. Will the
Government consider releasing Part I Factor ratings for the Volume I and III(a) RFP submission to allow the offeror to determine our ability to submit a best value price proposal based on Part I Factor ratings? For example, if our projects are deemed not relevant, we would wish to withdraw from the Part II process.
RESPONSE: No.
2.) The RFP states "The Foundation System Contractor/ Subcontractor shall submit completed Drilled Pier Foundation projects with at least one (1) of these projects demonstrating experience completing drilled pier foundations in Karst Pinnacled Limestone." Is there a minimum of three projects and maximum of five projects for Factor 2?
RESPONSE: No.
3.) Please consider providing a two week extension to allow for adequate time to build a full schedule and technical approach narrative in compliance with the specifications.
RESPONSE: Proposal due date has been extended.
4.) Will Offerors be afforded the opportunity to provide a revised schedule during the Part 2 RFP process in order to made adjustments based on the final 100% drawings and specification which will not be released until the Part 2 RFP process?
RESPONSE: The purpose of Part 2 is to evaluate pricing and small business participation plan.
5.) Sheet C-010 within the 90% drawings provides an overall phasing plan, phases 1-4. Please clarify if these phases are allowed to run concurrently/overlap at all OR if each phase must be completed prior to executing work on the next phase.
RESPONSE: An amendment containing the final 100% design will be issued.
6.) We respectfully request an extension of the RFI deadline and our RFP Volume I submission due date.
RESPONSE: The Request for Information period is closed for the Request for Proposal part I. The proposal due date has been extended via Amendment 0002.
7.) See RFP Section II.B.1.1 - Relevancy of Past Experience. Please advise if the requirement for the construction completion date can be revised to no earlier that ten (10) years preceding the issuance of the solicitation.
RESPONSE: All projects must have a construction completion date no earlier than six (6) years preceding the original date of issuance of this solicitation.
8.) The Administrative Documents are to be submitted in Volume III(a) and (b).
Section D - 6 states for Volume III(a) the SF1442 and acknowledgement of Amendments in Block is required.
Section D - 7 states for Volume III(b) the SF1442, acknowledgment of Amendments and the Bid Guarantee is required.
Please confirm no documentation for SAMs, Representations and Certifications, or FAPIIS, are required.
Please confirm Execution of amendment forms SF30 are not required, only the acknowledgement of Block 19 on the SF1442.
RESPONSE: Documentation for SAMs, Representations and Certifications, and FAPIIS, are required.
Execution of amendment forms SF30 are required.
9.) Please clarify in which Volume the CERTIFICATE OF CORPORATE AUTHORITY is to be submitted in the proposal?
RESPONSE: Volume III(a).
10.) Confirm the Factor 1 Experience requirements (completion of Attachment A) does no apply to the Drilled Pier Foundation projects submitted in Factor 2.
RESPONSE: The Solicitation does not require the use of the attachments for Factor 3. Offerors may use the forms to organize their response, so long as all information required by the Solicitation for Factor 3 is addressed.
11.) It was indicated that the Retention Basin for Collins Hall is in the footprint of the new building. Please provide as-builts. (Size, location and depth).
12.) How are liquidated damaged to be assessed given the phases of the project now seen in the 90% documents.
RESPONSE: RESPONSE: An amendment containing the final 100% design will be issued.
13.) The 90% specifications do not reference in the Table of Contents or include a drilled pier specification.
Drilled pier specification is a key element necessary for bidders to provide Volume I RFP response. Please provide.
14.) Section C. Foundations and Earthwork, Item 1 on drawing S-001 refers to a Geotechnical Engineering report prepared by the United States Army Corops of Engineers (USACE), Report title "General Instruction Building", dated July 2019. This report has not been provded in the 90% documents and is necessary for bidders to provide a Volume I RFP response. Please provide.
15.) The typical drilled pier details on drawing S601 state "Dowels w/std. hooks to match size and quantity of vert. reinf.". Please advise if rebar terminators may be utilized in lieu of the std hooks for constructability purposes.
16.) The 90% construction documents, sheets C-010 thru C-014, denote that the project is to be completed in four (4) phases. As depicted on the drawings these phases are sequential (i.e. Phase 1 must be complete before 2 can start and 2 must be complete before 3 can start). Please confirm that this is correct and the work in Phases 2, 3 and 4 cannot commence until the previous phase has been complete?
17.) Please clarify if the duration for the project (1,095 days) is for the Phase 1 base bid work only, or this period of performance meant to include all phases (Phase 1 through Phase 4).
RESPONSE: The Contractor shall be required to complete the entire work ready for use not later than 36 months. The time stated for completion shall include final cleanup of the premises.
18.) Neither the original RFP nor Addendum 01 containing the 90% plans and specifications contain the geotechnical engineering report. Please provide a geotechnical report, if available.
REPSONSE: An amendment containing the final 100% design will be issued.
19.) The drilled piers schedule references a specification 31 63 26 for Drilled Piers. This specification was not included in the original RFP or Addendum 1. Please provide this specification, if it is available.
REPSONSE: An amendment containing the final 100% design will be issued.
20.) Can the Government confirm the minimum / maximum number of projects required to demonstrate experience with completing Drilled Pier Foundations for Factor 2?
RESPONSE: Qualifications of the Foundation System Contractor/Subcontractor shall demonstrate that they have been engaged in the successful installation of Drilled Pier Foundations within the last six (6) years.
The Foundation System Contractor / Subcontractor shall submit completed Drilled Pier Foundation projects with at least one (1) of these projects demonstrating experience completing drilled pier foundations in Karst Pinnacled Limestone.
21.) Can the Government confirm that ProjNet will be reopened to Phase I offerors upon 100% Design Documents being issued for Phase II pricing?
RESPONSE: Yes, this will be addressed in the Amdemdent requesting pricing.
22.) Is the Access control solution going to be tied into the Base wide system?
23.) Can the Government confirm what system is being used if the access control solution is to be tied into the Base wide system? Please provide software version and revisions.
24.) Will all security equipment be furnished and installed by the Government (GFGI) under a separate contractor or by the contractor (CFCI) under this contract?
25.) Confirm the Factor 2 Drilled Pier Foundation Project Experience does not require the completion of the Attachment B Past Performance Questionnaire.
The Solicitation does not require the use of the attachments for Factor 3. Offerors may use the forms to organize their response, so long as all information required by the Solicitation for Factor 3 is addressed.
(End of Summary of Changes)