PART I - THE PRICE SCHEDULE

SECTION 00010 - SUPPLIES OR SERVICES AND PRICES

00010-1

PRICE SCHEDULE

Item No.

Description Amount

Base Bid Items

0001 All costs in connection with the construction of the General

Instruction Building to points 5 feet outside the building lines, including utilities, complete as shown on drawings and specified, but exclusive of Bid Items 0002 – 0013 below. $___________

0002 All costs in connection with construction of the General Instruction Building beyond points 5 feet outside the building lines, including site improvements, utilities and applicable related work, complete as shown on the drawings and specified, but exclusive of work covered under Bid Items 0001, 0003 – 0013 below. $___________

Total Base Bid Amount $____________

Bid Items

0003 All costs in connection with tree removal, saw cut and remove asphalt pavement sections, parking lot, re-stripe portion of existing parking lot with associated stormwater improvements, landscape and lighting between B625 and B632, complete as shown on Sheet C-015 as Bid Option 2,and specified, exclusive of work covered under Bid Items 0001, 0002, 0004 – 0013 below. $___________

0004 All costs in connection with demolish soccer fields and trees, construct 26 space parking lot with associated stormwater improvements, landscaping and lighting features, complete as shown on Sheet C-015 as Bid Option 3 and specified, but exclusive of work covered under Bid Items 0001-0003, 0005 – 0013 below. $___________

00010-2

PRICE SCHEDULE

Item No.

Description Amount

0005 All costs in connection with demolish Building 609 and Building 637 with associated utilities, trees and pavement, construction of new parking lot, walkways, stormwater improvements, landscaping and lights, complete as shown on Sheet C-015 as Bid Option 4 and specified, exclusive of work covered under Bid Items 0001-0004, 0006 – 0013 below. $___________

0006 All costs in connection with landscape, walkway paths, circular pavement, free standing wall, serpentine retaining walls south of the General Instruction Building, complete as shown on Sheet C-015 as Bid Option 5 and specified, exclusive of work covered under Bid Items 0001-0005, 0007 – 0013 below. $___________

0007 All costs to provide turf and landscape plantings, in lieu of landscape plans in the base bid, complete as shown on Sheet C-015 as Bid Option 6 and specified, exclusive of work covered under Bid Items 0001-0006, 0008 – 0013 below. $___________

0008 All costs in connection with the purchase & delivery of

Furniture, Fixtures & Equipment, complete as shown on the drawings and specified. $___________

0009 All costs in connection with installation of the Furniture, Fixtures & Equipment, complete as shown on drawings and specified. $___________

0010 All costs in connection with the purchase & delivery of Audio- Visual Equipment, complete as shown on the drawings and specified. $___________

0011 All costs in connection with the installation of the Audio- Visual Equipment, complete as shown on the drawings and specified. $___________

0012 All costs in connection with the purchase & delivery of Kitchen Equipment, complete as shown on the drawings and specified. $___________

0013 All costs in connection with the installation of the Kitchen Equipment, complete as shown on the drawings and specified. $___________

00010-3

Total Base and Bid Option Amount $______________

NOTES TO OFFERORS

Offerors must quote on all items including Bid Option Items. Failure to quote on all items may be cause for rejection of the proposal.

Bid Option Items may be exercised at any time within 60 calendar days after contract award.

The Contracting Officer may exercise the Bid Option Items by written notice to the Contractor, postmarked within the period specified above. The Government may exercise any, all or none of the listed Bid Option Items in any order.

No additional time for contract completion will be allowed when an Bid Option Item is exercised.

EVALUATION OF OPTIONS: Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interest, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirements. Evaluation of options will not obligate the Government to exercise the option(s). (FAR 52.217-5 JUL 1990)