B.08.03_W912DR19B0018-0004_9-4-19.pdf

PDF 409 KB Posted

Attached to
Combat Capabilities Development Command (CCDC) Building 3072 Renovation Aberdeen Proving Ground Federal contract opportunity
Solicitation number
W912DR19B0018
Issued by
Department of the Army Corps of Engineers Engineering District Baltimore

About this file

Amendment-0004

View the file

Other files for this federal contract opportunity

Other files attached to Combat Capabilities Development Command (CCDC) Building 3072 Renovation Aberdeen Proving Ground, newest first.
File Type Posted
9.12.19_Abstract_of_Bid_Rev._1.pdf PDF
Bldg_3072_Renovation_Abstract_of_Bids.pdf PDF
B.08.03_W912DR19B0018-0003_(002).pdf PDF
B.08.03_W912DR19B0018-0002.pdf PDF
B.08.03_W912DR19B0018-0001.pdf PDF
B.08.02_DRAWINGS_2019-08-02.pdf PDF
B.08.02_Option_1_-_Furniture_Footprint_Plans.pdf PDF
B.08.02_Option_1_-_CID_FFE_Procurement_Package.pdf PDF
B.08.02_Original_Documents_-_Specifications_-_Vol_2.pdf PDF
B.08.02_Original_Documents_-_Specifications_-_Vol_1.pdf PDF
B.08.02_W912DR-19-B-0018.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Combat Capabilities Development Command (CCDC), Building 3072 Renovation, Aberdeen Proving Ground (APG), Aberdeen, Maryland

Please See Attached

1. CONTRACT ID CODE PAGE OF PAGES

1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 04-Sep-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DR19B0018

X 9B. DATED (SEE ITEM 11)

12-Aug-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

04-Sep-2019

CODE

U.S. ARMY CORPS OF ENGINEERS, BALTIMORE

2 HOPKINS PLAZA

BALTIMORE MD 21201

W912DR 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

AMENDMENT NO. 0004 TO IFB W912DR-19-B-0018

EFFECTIVE SEP 04, 2019

AMENDMENTS:

1. Amendment 0001, Item 1, Revised Price Schedule: Delete all previously issued price schedules in their entirety and substitute the attached revised price schedule, dated Sep 04, 2019.

ATTACHMENTS: Revised Price Schedule, dated Sep 04, 2019

PART I - THE PRICE SCHEDULE

SECTION 00010 - SUPPLIES OR SERVICES AND PRICES

W912DR-19-B-0018

00010-1

REVISED SEP 04, 2019

PRICE SCHEDULE

Item Description Amount No.

Base Bid Items

0001 All costs in connection with the renovation of Building 3072 to points 5ft outside the building lines, including utilities, complete as shown on drawings and specified, exclusive of work covered under Base Bid Items 0004, and Optional Bid Items 0006, 0007, 0008 & 0009, and 0010 below. $________________

0002 All costs in connection with the renovation of Building 3072 beyond points 5ft outside the building lines, including site improvements, utilities and applicable related work, complete as shown on drawings and specified, but exclusive of work covered under Base Bid Item 0005, and Optional Bid Items 0006, 0007, 0008, 0009, and 0010 below. $________________

0003 All costs in connection with the identification, remediation, removal, and disposal of hazardous materials within Building 3072, complete as shown on drawings and specified. $________________

0004 All costs in connection with the procurement and installation of telecommunication cabling (inside plant), equipment, patch panels, communication cabinets, equipment racks and intrusion detection system cables, sensors and equipment to points 5ft outside the building lines of Building 3072, complete as shown on drawings and specified. $________________

0005 All costs in connection with the procurement and installation of telecommunication cabling (outside plant), equipment, patch panels, communication cabinets, equipment racks and intrusion detection system cables, sensors and equipment beyond points 5ft outside the building lines of Building 3072, complete as shown on drawings and specified. $________________

TOTAL BASE BID AMOUNT $________________

00010-2

PRICE SCHEDULE

Item Description Amount No.

Optional Bid Items

0006 All costs in connection with the procurement and installation of furniture, fixtures and equipment (FF&E) for Building 3072, complete as shown as Option 1 on drawings and specified. $________________

0007 All costs in connection with the construction of ATFP compliant windows, complete as shown as Option 2 on drawings and specified. $________________

0008 All costs in connection with the construction of the exterior screen wall, surrounding the outdoor mechanical equipment for Building 3072, complete as shown as Option 3 on drawings and specified. $________________

0009 All costs in connection with the construction of ATFP required landscaping for Building 3072, complete as shown as Option 4 on drawings and specified. $________________

0010 All costs in connection with the construction of ATFP required overhead bracing of equipment and fixtures for Building 3072, complete as shown as Option 5 on drawings and specified. $________________

TOTAL BASE AND OPTIONAL BID AMOUNT $________________

00010-3

Notes to Offerors

Offerors must quote on all items including Optional Items. Failure to quote on all items may be cause for rejection of the proposal.

Optional Items 0007, 0008, 0009, and 0010 may only be exercised at award and no additional time will be given if those optional items are exercised. Optional Item 0006 may be exercised at any time within 365 calendar days after receipt of the notice to proceed. Thirty (30) additional calendar days will be added to the performance period when Option 1 (CLIN 0006) is exercised.

The Contracting Officer may exercise the Optional Items by written notice to the Contractor, postmarked within the period specified above. The Government may exercise any, all, or none of the listed Optional Items in any order.

EVALUATION OF OPTIONS: Except when it is determined in accordance with FAR 17.206(b) not to be in the Government’s best interest, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirements. Evaluation of options will not obligate the Government to exercise the option(s). (FAR 52.217-5 JUL 1990)

File details come from the government source that posted it.