I.B.08.03_W912DR19B006-0002.pdf
PDF 259 KB Posted
- Attached to
- Jennings Randolph Tainter Gate Upgrade Federal contract opportunity
- Solicitation number
- W912DR19B0006
About this file
Amendment 2 - Responses to RFIs
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| I.C.04.01_Abstract_of_Bids_-_JRL_Electrical_Upgrade.pdf | ||
| I.B.08.03_W912DR19B0006-0003.pdf | ||
| I.B.08.03_W912DR19B0006-0001.pdf | ||
| I.A.02.10_Attachment_D_-_EFT_FORM.PDF | ||
| I.A.02.10_Attachment_E_-_Certificate_of_Corporate_Authority_Form.PDF | ||
| I.A.02.10_Attachment_A_-_Specifications.pdf | ||
| I.A.02.10_Attachment_C_-_Standard_Form_LLL.PDF | ||
| I.A.02.10_Attachment_B_-_Plans.pdf | ||
| I.B.01.01_Solicitation_W912DR19B0006.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
PROJECT TITLE: JENNINGS RANDOLPH LAKE GATED SPILLWAY ELECTRICAL UPGRADE
The purpose of this amendment is to provide responses to the Requests for Information (RFIs). All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 04-Apr-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DR19B0006
X 9B. DATED (SEE ITEM 11)
11-Mar-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
04-Apr-2019
CODE
U.S. ARMY CORPS OF ENGINEERS, BALTIMORE
2 HOPKINS PLAZA
03-G-04
BALTIMORE MD 21201
W912DR 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DR19B0006
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
QUESTION AND ANSWERS
FOR INFORMATION ONLY
Solicitation No.W912DR19R0023 4 April 2019
Q.1 What is the budget for this project ?
A.1 The estimated magnitude of construction is between $1,000,000.00 and $5,000,000.00.
Q.2 What is the name of the electrical panles?
A.2 See Specifications Section 26 05 00.00 25 (Common Work Results for Electrical), Part
2.9.1 (Panelboards-General.)
Q.3 If/when the new Power Distribution Panel extends out of the existing fence, will the
Contractor be required to modify the fence to accommodate the new panel?
A.3 Fencing is not present in the area where the Distribution Center (DCQ)is to be placed.
Q.4 The spec calls for a Carbon Steel Support Frame, fabricated in accordance with AWS
D1.1/D1.1M. It also calls for coupling Guide Handles with grips. What material shall the Guide Handles be in to suit the weather conditions and for long lasting purpose?
A.4 The handle and other components of the coupling support assembly are required to be carbon steel per ASTM A36. These material callouts are provided on drawing M-501. To prevent corrosion the handle and coupling support assembly components must be painted in accordance with spec section 09 97 03.00 25 (reference section 3.1).
Q.5 Are there any other security clearance requirements than E-Verify?
A.5 Regarding general security clearance requirements in addition to E-Verify, pages 44 of 64 of the solicitation identifies the following:
Suspicious Activity Reporting Training (e.g. iWATCH, CorpsWatch, or See Something, Say Something). The contractor and all associated sub-contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to
W912DR19B0006
watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 5 calendar days after the completion of the training.
Q.6 Will the Government share the design drawings in CAD format for the Contractor to produce the As-Built drawings?
A.6 The Government will provide CAD files of the Contract Drawings after contract award.
(End of Summary of Changes)