B.01.02_Abstract_of_Bids.pdf

PDF 198 KB Posted

Attached to
Building 328 Restoration & Modernization, Aberdeen Proving Ground, MD - W912DR18B0012
Solicitation number
W912DR18B0012
Issued by

View the file

Other files

File Type Posted
W912DR18B0012-0005.pdf PDF
W912DR18B0012-0004.pdf PDF
W912DR18B0012_AMENDMENT_0003_090518.pdf PDF
I3A_Technical_Criteria_Feb_2010.pdf PDF
Site_Visit_Sign-in_sheet_27_Aug_18.pdf PDF
Site_Visit_Sign_In_8-16-18_.jpg JPG image
W912DR18B0012-02.pdf PDF
W912DR18B0012-01.pdf PDF
W912DR18B0012.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

3. DATE OPENED PAGE

17-Sep-18 1 of 2

4. ISSUING OFFICE Name and title of Certifying Official (Type) I CERTIFY that I have opened, read, and

USACE, BALTIMORE DISTRICT recorded on this abstract all offers Signature Date Signed 17 September 2018 10 SOUTH HOWARD STREET, ROOM 7000 received in response to this solicitation.

BALTIMORE, MD 21201 Contracting Officer: Ashley M. Wingfield

5. PROJECT TITLE

8. GOVERNMENT ESTIMATE

(Check A, B or C and complete D, E, and F.)

A. HIRED LABOR

B. REASONABLE CONTRACT B. Bid Security (Type and Amount) B. Bid Security (Type and Amount) Contract Specialist: Patricia Morrow (Without Profit)

X C. REASONABLE CONTRACT C. Amendment Acknowledged: C. Amendment Acknowledged (Including Profit)

7A. 7B. 7C. D. E. F. E. F. E. F.

ITEM DESCRIPTION OF OFFERED ITEM EST. UNIT UNIT ESTIMATED UNIT ESTIMATED UNIT ESTIMATED No. QUANTITY PRICE AMOUNT IGE PRICE AMOUNT PRICE AMOUNT

Building 328 Utilities Informational

0001AA All costs in connection with the renovation of Building 328, APG MD, including all utilities to points 5 feet outside the building lines, complete as shown on drawings and specified.

1 JOB 17,019,419.15$ 17,019,419.15$ $11,467,000.00 $11,467,000.00 $10,445,000.00

0001AB

All costs in connection with the renovation of Building 328, APG MD, including all utilities from points 5 feet and beyond the building lines, $ complete as shown on drawings and specified.

1 JOB 164,382.84$ 164,382.84$ 185,000.00$ 185,000.00$ 136,000.00$

All costs in connection with the renovation of Building 328, APG MD, including all utilities from points 5 feet and beyond the building lines, $ complete as shown on drawings and specified.

1 JOB 497,511.31$ 497,511.31$ 660,000.00$ 660,000.00$ 438,000.00$

Floor Laboratory areas for all disciplines, $ inclusive of work in rooms 004A, 004B, 004C, 004E, 004F, 004G, 004H, 004I, 004J, and 102-15 as shown on the drawings and specifications. Offeror is advised that interior gypsum drywall on the exterior wall of the Ground Floor Laboratory areas listed above and minimal electrical and mechanical work as indicated in the drawings is included in the Base Bid.

1 JOB 1,109,997.98$ 1,109,997.98$ 392,000.00$ 392,000.00$ 426,000.00$

0004 All costs in connection with unspecified hazmat $ abatement that could be present in areas that were not in the scope or were inaccessible during the time of the survey.

1 JOB 374,960.18$ 374,960.18$ 266,000.00$ 266,000.00$ 270,000.00$

All costs in connection with a complete sound masking system inclusive of design, infrastructure (when separated from horizontal pathways), and equipment in accordance with drawings and $ specifications.

1 JOB 43,145.37$ 43,145.37$ 32,000.00$ 32,000.00$ 17,000.00$

All costs in connection with coordinating of installation of the Furniture, Fixtures, and Equipment (FF&E) with the Vendor of a separate Government FF&E contract in accordance with the (a) notional concept FF&E drawings and specifications and (b) the Independent Government Cost Estimate placeholder for the separate FF&E contract in the rough order of magnitude of $1,900,000. Cost to include (a) coordinating the final FF&E locations for power and data connection based on FF&E Vendors shop drawings (b) making final FF&E power connections to building fitup infrastructure and (c)furnishing and installing all pathway (cable trays, J-hooks, conduit, junction boxes, etc), plenum-rated cabling, equipment (including communication/combination data outlets) and all final connections and support of system commissioning/activation for telecommunication work in accordance with the drawings and specifications.

1 JOB 93,016.21$ 93,016.21$ 126,000.00$ 126,000.00$ 236,000.00$

TOTAL BASE BID AMOUNT 19,302,433.04$ 13,128,000.00$ -$

Option

0011 1 JOB XXX XXX XXX

TOTAL ESTIMATED OPTIONAL AND BASE BID AMOUNT 19,302,433.04$ 13,128,000.00$ $11,968,000.00 -$

PERCENTAGE ABOVE OR BELOW IGE -31.99% -100.00%

NSN 7540-01-150-0981 501419-101 NOTE: If more than two offers are received, continue on OF 1419A. Prescribed by GSA-FAR(48 CER)53.236-1 OPTIONAL FORM 1419 (11-88)

9. OFFERS

Bid Bond 20%

Lobart Construction Services

Yes

No. 2

Bancroft Construction Company

ABSTRACT OF OFFERS - CONSTRUCTION 2. DATE ISSUED1. SOLICITATION NUMBER

6. NUMBER OF AMENDMENTS ISSUED: 2 (two) Yes

Bid Bond 20%

10-Aug-18W912DR18B0012

No. 1

Ashley M. Wingfield

1. SOLICITATION NUMBER PAGE

ABSTRACT OF OFFERS 2 OF 2

CONSTRUCTION INSTRUCTIONS - Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on CONTINUATION SHEET a construction project. Each Continuation Sheet will accommodate 14 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 14 and attach additional Continuation Sheets (OF 1419A) as needed.

B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount)

3. CONTRACT ITEMS C. AMENDMENT ACKNOWLEDGED C. AMENDMENT ACKNOWLEDGED C. AMENDMENT ACKNOWLEDGED C. AMENDMENT ACKNOWLEDGED 7A. B. C. D.

ITEM DESCRIPTION OF OFFERED ITEMS ESTIMATED UNIT E. UNIT F. ESTIMATED E. UNIT F. ESTIMATED E. UNIT F. ESTIMATED E. UNIT F. ESTIMATED

NO. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT

Building 328 Utilities Informational

0001AA All costs in connection with the renovation of Building 328, APG MD, including all utilities to points 5 feet outside the building lines, complete as shown on drawings and specified.

JOB $13,037,150.00 $13,037,150.00 $10,972,000.00 $10,972,000.00 $12,244,998.00 $12,244,998.00 $12,718,789.00 $12,718,789.00

0001AB

All costs in connection with the renovation of Building 328, APG MD, including all utilities from points 5 feet and beyond the building lines, $ complete as shown on drawings and specified.

JOB 560,000.00$ 560,000.00$ 130,000.00$ 130,000.00$ 178,048.00$ 178,048.00$ 287,828.00$ 287,828.00$

All costs in connection with the renovation of Building 328, APG MD, including all utilities from points 5 feet and beyond the building lines, $ complete as shown on drawings and specified.

JOB 590,000.00$ 590,000.00$ 632,750.00$ 632,750.00$ 656,222.00$ 656,222.00$ 692,027.00$ 692,027.00$

All costs in connection with fit-out of the Ground Floor Laboratory areas for all disciplines, $ inclusive of work in rooms 004A, 004B, 004C, 004E, 004F, 004G, 004H, 004I, 004J, and 102-15 as shown on the drawings and specifications. Offeror is advised that interior gypsum drywall on the exterior wall of the Ground Floor Laboratory areas listed above and minimal electrical and mechanical work as indicated in the drawings is included in the Base Bid.

JOB 415,000.00$ 415,000.00$ 475,000.00$ 475,000.00$ 801,094.00$ 801,094.00$ 340,893.00$ 340,893.00$

All costs in connection with unspecified hazmat $ abatement that could be present in areas that were not in the scope or were inaccessible during the time of the survey.

JOB 188,850.00$ 188,850.00$ 149,250.00$ 149,250.00$ 200,054.00$ 200,054.00$ 109,073.25$ 109,073.25$

All costs in connection with a complete sound masking system inclusive of design, infrastructure (when separated from horizontal pathways), and equipment in accordance with drawings and $ specifications.

JOB 30,000.00$ 30,000.00$ 35,000.00$ 35,000.00$ 67,815.00$ 67,815.00$ 36,000.00$ 36,000.00$

All costs in connection with coordinating of installation of the Furniture, Fixtures, and Equipment (FF&E) with the Vendor of a separate Government FF&E contract in accordance with the (a) notional concept FF&E drawings and specifications and (b) the Independent Government Cost Estimate placeholder for the separate FF&E contract in the rough order of magnitude of $1,900,000. Cost to include (a) coordinating the final FF&E locations for power and data connection based on FF&E Vendors shop drawings (b) making final FF&E power connections to building fitup infrastructure and (c)furnishing and installing all pathway (cable trays, J-hooks, conduit, junction boxes, etc), plenum-rated cabling, equipment (including communication/combination data outlets) and all final connections and support of system commissioning/activation for telecommunication work in accordance with the drawings and specifications.

JOB 145,000.00$ 145,000.00$ 140,000.00$ 140,000.00$ 128,566.00$ 128,566.00$ 2,549,100.00$ 2,549,100.00$

TOTAL BASE BID AMOUNT 14,966,000.00$ $12,534,000.00 $14,276,797.00 $16,733,710.25

Option

TOTAL ESTIMATED OPTIONAL AND BASE BID AMOUNT

PERCENTAGE ABOVE OR BELOW IGE

NSN 7540-01-150-0981 501419-101 NOTE: If more than two offers are received, continue on OF 1419A. Prescribed by GSA-FAR(48 CER)53.236-1 OPTIONAL FORM 1419 (11-88)

2. PROJECT TITLE

Bid Bond 20%

Yes

OFFERS (Continued) No. 6No. 3 No. 4

EdificeWilliam M. Schlosser Co. James W. Ancel

W912DR18B0012

Kimbel Construction Company

Bid Bond 20%Bid Bond 20% Bid Bond 20%

No. 5

1
Abstract of Bids (Part B).pdf
2

File details come from the government source that posted it.