This document contains bid abstracts for a federal construction contract opportunity. The solicitation is for rehabilitation work at the Georgetown Reservoir Building in Washington, DC, including repairs to four buildings, a gravel road, perimeter fencing, and sediment removal from an 84-inch conduit. The work requires expertise in historical restoration and compliance with constraints such as confined work areas, limited staging, and maintaining site security and access. The opportunity is set aside for small businesses as a 100% small business contract. Nine contractors submitted bids ranging from $5.5 million to $17 million for the base work. Specific requirements include repairs to building structures, architectural features, mechanical and electrical systems. The work must result in improved building lifespan and functionality while maintaining historical accuracy.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912DR-17-B-0001-00004.pdf | ||
| W912DR-17-B-0001-03.pdf | ||
| 16Nov2016SiteVisit.pdf | ||
| W912DR-17-B-0001-02.pdf | ||
| W912DR-17-B-0001-01.pdf | ||
| Specifications_10_14_16.pdf | ||
| W912DR-17-B-0001.pdf | ||
| Drawings_10_14_16.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Chart1
SERVICE All costs in connection with work on the Influent Gatehouse, complete as shown on the drawings and specified.
All costs in connection with the work on the Castle Gatehouse, including but not limited to the site work at the paved entrance, parking area and sluice gate replacement complete as shown on the drawings and specified All costs in connection with work on Meigs Vault, complete as shown on the drawings and specified.
All costs in connection with work on the West Shaft Gatehouse, including but not limited to the sidewalk replacement and site grading complete as shown on the drawings and specified.
All costs in connection with work on the Circular Platform next to Meigs Vault, complete as shown on the drawings and specified All costs in connection with the removal and replacement of the Georgetown Reservoir and West Shaft Gatehouse perimeter fences, complete as shown on the drawings and specified.
All costs in connection with By-Conduit Debris Removal, complete as shown on the drawings and specified.
All costs in connection with the construction of the Georgetown Reservoir Road, complete as shown on the drawings and specified All costs in connection with the construction of the Dalecarlia Reservoir Road, complete as shown on the drawings and specified.
TOTAL = PERCENT ABOVE/BELOW IGE = AMOUNT OVER IGE = BID ABSTRACT FOR W912DR-17-B-0001 Georgetown, Reservoir LOCATION: Washington , DC LINE CLIN 0001 CLIN 0002 CLIN 0003 CLIN 0004 CLIN 0005 CLIN 0006 CLIN 0007 CLIN 0008 CLIN 0009 0 336400 1103111 340345 443154 312456 644700 1197123 342120 526537 5245946 SERVICE All costs in connection with work on the Influent Gatehouse, complete as shown on the drawings and specified.
All costs in connection with the work on the Castle Gatehouse, including but not limited to the site work at the paved entrance, parking area and sluice gate replacement complete as shown on the drawings and specified All costs in connection with work on Meigs Vault, complete as shown on the drawings and specified.
All costs in connection with work on the West Shaft Gatehouse, including but not limited to the sidewalk replacement and site grading complete as shown on the drawings and specified.
All costs in connection with work on the Circular Platform next to Meigs Vault, complete as shown on the drawings and specified All costs in connection with the removal and replacement of the Georgetown Reservoir and West Shaft Gatehouse perimeter fences, complete as shown on the drawings and specified.
All costs in connection with By-Conduit Debris Removal, complete as shown on the drawings and specified.
All costs in connection with the construction of the Georgetown Reservoir Road, complete as shown on the drawings and specified All costs in connection with the construction of the Dalecarlia Reservoir Road, complete as shown on the drawings and specified.
TOTAL = PERCENT ABOVE/BELOW IGE = AMOUNT OVER IGE = BID ABSTRACT FOR W912DR-17-B-0001 Georgetown, Reservoir LOCATION: Washington , DC LINE CLIN 0001 CLIN 0002 CLIN 0003 CLIN 0004 CLIN 0005 CLIN 0006 CLIN 0007 CLIN 0008 CLIN 0009 0 1737464 4436543 2368257 1505669 556760 484399 3969986 784486 1188608 17032172 -2.246730332336627 11786226 SERVICE All costs in connection with work on the Influent Gatehouse, complete as shown on the drawings and specified.
All costs in connection with the work on the Castle Gatehouse, including but not limited to the site work at the paved entrance, parking area and sluice gate replacement complete as shown on the drawings and specified All costs in connection with work on Meigs Vault, complete as shown on the drawings and specified.
All costs in connection with work on the West Shaft Gatehouse, including but not limited to the sidewalk replacement and site grading complete as shown on the drawings and specified.
All costs in connection with work on the Circular Platform next to Meigs Vault, complete as shown on the drawings and specified All costs in connection with the removal and replacement of the Georgetown Reservoir and West Shaft Gatehouse perimeter fences, complete as shown on the drawings and specified.
All costs in connection with By-Conduit Debris Removal, complete as shown on the drawings and specified.
All costs in connection with the construction of the Georgetown Reservoir Road, complete as shown on the drawings and specified All costs in connection with the construction of the Dalecarlia Reservoir Road, complete as shown on the drawings and specified.
TOTAL = PERCENT ABOVE/BELOW IGE = AMOUNT OVER IGE = BID ABSTRACT FOR W912DR-17-B-0001 Georgetown, Reservoir LOCATION: Washington , DC LINE CLIN 0001 CLIN 0002 CLIN 0003 CLIN 0004 CLIN 0005 CLIN 0006 CLIN 0007 CLIN 0008 CLIN 0009 0 1572000 275000 177000 28000 28000 130000 2210000 -5.9952038369304558E-2 -125000 SERVICE All costs in connection with work on the Influent Gatehouse, complete as shown on the drawings and specified.
All costs in connection with the work on the Castle Gatehouse, including but not limited to the site work at the paved entrance, parking area and sluice gate replacement complete as shown on the drawings and specified All costs in connection with work on Meigs Vault, complete as shown on the drawings and specified.
All costs in connection with work on the West Shaft Gatehouse, including but not limited to the sidewalk replacement and site grading complete as shown on the drawings and specified.
All costs in connection with work on the Circular Platform next to Meigs Vault, complete as shown on the drawings and specified All costs in connection with the removal and replacement of the Georgetown Reservoir and West Shaft Gatehouse perimeter fences, complete as shown on the drawings and specified.
All costs in connection with By-Conduit Debris Removal, complete as shown on the drawings and specified.
All costs in connection with the construction of the Georgetown Reservoir Road, complete as shown on the drawings and specified All costs in connection with the construction of the Dalecarlia Reservoir Road, complete as shown on the drawings and specified.
TOTAL = PERCENT ABOVE/BELOW IGE = AMOUNT OVER IGE = BID ABSTRACT FOR W912DR-17-B-0001 Georgetown, Reservoir LOCATION: Washington , DC LINE CLIN 0001 CLIN 0002 CLIN 0003 CLIN 0004 CLIN 0005 CLIN 0006 CLIN 0007 CLIN 0008 CLIN 0009 SERVICE All costs in connection with work on the Influent Gatehouse, complete as shown on the drawings and specified.
All costs in connection with the work on the Castle Gatehouse, including but not limited to the site work at the paved entrance, parking area and sluice gate replacement complete as shown on the drawings and specified All costs in connection with work on Meigs Vault, complete as shown on the drawings and specified.
All costs in connection with work on the West Shaft Gatehouse, including but not limited to the sidewalk replacement and site grading complete as shown on the drawings and specified.
All costs in connection with work on the Circular Platform next to Meigs Vault, complete as shown on the drawings and specified All costs in connection with the removal and replacement of the Georgetown Reservoir and West Shaft Gatehouse perimeter fences, complete as shown on the drawings and specified.
All costs in connection with By-Conduit Debris Removal, complete as shown on the drawings and specified.
All costs in connection with the construction of the Georgetown Reservoir Road, complete as shown on the drawings and specified All costs in connection with the construction of the Dalecarlia Reservoir Road, complete as shown on the drawings and specified.
TOTAL = PERCENT ABOVE/BELOW IGE = AMOUNT OVER IGE = BID ABSTRACT FOR W912DR-17-B-0001 Georgetown, Reservoir LOCATION: Washington , DC LINE CLIN 0001 CLIN 0002 CLIN 0003 CLIN 0004 CLIN 0005 CLIN 0006 CLIN 0007 CLIN 0008 CLIN 0009 SERVICE All costs in connection with work on the Influent Gatehouse, complete as shown on the drawings and specified.
All costs in connection with the work on the Castle Gatehouse, including but not limited to the site work at the paved entrance, parking area and sluice gate replacement complete as shown on the drawings and specified All costs in connection with work on Meigs Vault, complete as shown on the drawings and specified.
All costs in connection with work on the West Shaft Gatehouse, including but not limited to the sidewalk replacement and site grading complete as shown on the drawings and specified.
All costs in connection with work on the Circular Platform next to Meigs Vault, complete as shown on the drawings and specified All costs in connection with the removal and replacement of the Georgetown Reservoir and West Shaft Gatehouse perimeter fences, complete as shown on the drawings and specified.
All costs in connection with By-Conduit Debris Removal, complete as shown on the drawings and specified.
All costs in connection with the construction of the Georgetown Reservoir Road, complete as shown on the drawings and specified All costs in connection with the construction of the Dalecarlia Reservoir Road, complete as shown on the drawings and specified.
TOTAL = PERCENT ABOVE/BELOW IGE = AMOUNT OVER IGE = BID ABSTRACT FOR W912DR-17-B-0001 Georgetown, Reservoir LOCATION: Washington , DC LINE CLIN 0001 CLIN 0002 CLIN 0003 CLIN 0004 CLIN 0005 CLIN 0006 CLIN 0007 CLIN 0008 CLIN 0009 0 1 -17032172 SERVICE All costs in connection with work on the Influent Gatehouse, complete as shown on the drawings and specified.
All costs in connection with the work on the Castle Gatehouse, including but not limited to the site work at the paved entrance, parking area and sluice gate replacement complete as shown on the drawings and specified All costs in connection with work on Meigs Vault, complete as shown on the drawings and specified.
All costs in connection with work on the West Shaft Gatehouse, including but not limited to the sidewalk replacement and site grading complete as shown on the drawings and specified.
All costs in connection with work on the Circular Platform next to Meigs Vault, complete as shown on the drawings and specified All costs in connection with the removal and replacement of the Georgetown Reservoir and West Shaft Gatehouse perimeter fences, complete as shown on the drawings and specified.
All costs in connection with By-Conduit Debris Removal, complete as shown on the drawings and specified.
All costs in connection with the construction of the Georgetown Reservoir Road, complete as shown on the drawings and specified All costs in connection with the construction of the Dalecarlia Reservoir Road, complete as shown on the drawings and specified.
TOTAL = PERCENT ABOVE/BELOW IGE = AMOUNT OVER IGE = BID ABSTRACT FOR W912DR-17-B-0001 Georgetown, Reservoir LOCATION: Washington , DC LINE CLIN 0001 CLIN 0002 CLIN 0003 CLIN 0004 CLIN 0005 CLIN 0006 CLIN 0007 CLIN 0008 CLIN 0009 SERVICE All costs in connection with work on the Influent Gatehouse, complete as shown on the drawings and specified.
All costs in connection with the work on the Castle Gatehouse, including but not limited to the site work at the paved entrance, parking area and sluice gate replacement complete as shown on the drawings and specified All costs in connection with work on Meigs Vault, complete as shown on the drawings and specified.
All costs in connection with work on the West Shaft Gatehouse, including but not limited to the sidewalk replacement and site grading complete as shown on the drawings and specified.
All costs in connection with work on the Circular Platform next to Meigs Vault, complete as shown on the drawings and specified All costs in connection with the removal and replacement of the Georgetown Reservoir and West Shaft Gatehouse perimeter fences, complete as shown on the drawings and specified.
All costs in connection with By-Conduit Debris Removal, complete as shown on the drawings and specified.
All costs in connection with the construction of the Georgetown Reservoir Road, complete as shown on the drawings and specified All costs in connection with the construction of the Dalecarlia Reservoir Road, complete as shown on the drawings and specified.
TOTAL = PERCENT ABOVE/BELOW IGE = AMOUNT OVER IGE = BID ABSTRACT FOR W912DR-17-B-0001 Georgetown, Reservoir LOCATION: Washington , DC LINE CLIN 0001 CLIN 0002 CLIN 0003 CLIN 0004 CLIN 0005 CLIN 0006 CLIN 0007 CLIN 0008 CLIN 0009 SERVICE All costs in connection with work on the Influent Gatehouse, complete as shown on the drawings and specified.
All costs in connection with the work on the Castle Gatehouse, including but not limited to the site work at the paved entrance, parking area and sluice gate replacement complete as shown on the drawings and specified All costs in connection with work on Meigs Vault, complete as shown on the drawings and specified.
All costs in connection with work on the West Shaft Gatehouse, including but not limited to the sidewalk replacement and site grading complete as shown on the drawings and specified.
All costs in connection with work on the Circular Platform next to Meigs Vault, complete as shown on the drawings and specified All costs in connection with the removal and replacement of the Georgetown Reservoir and West Shaft Gatehouse perimeter fences, complete as shown on the drawings and specified.
All costs in connection with By-Conduit Debris Removal, complete as shown on the drawings and specified.
All costs in connection with the construction of the Georgetown Reservoir Road, complete as shown on the drawings and specified All costs in connection with the construction of the Dalecarlia Reservoir Road, complete as shown on the drawings and specified.
TOTAL = PERCENT ABOVE/BELOW IGE = AMOUNT OVER IGE = BID ABSTRACT FOR W912DR-17-B-0001 Georgetown, Reservoir LOCATION: Washington , DC LINE CLIN 0001 CLIN 0002 CLIN 0003 CLIN 0004 CLIN 0005 CLIN 0006 CLIN 0007 CLIN 0008 CLIN 0009 Sheet1 BID ABSTRACT FOR W912DR-17-B-0001 Georgetown, Reservoir
| LOCATION: Washington , DC | ||||||||||||
| LINE | SERVICE | IGE | GW Management | PWC Builders | Builders | NorAir | FEI Construction | DCM | IMI, Inc | Hunter Allied of MD | Amatea LLC | Desbuild, INC |
CLIN 0001 All costs in connection with work on the Influent Gatehouse, complete as shown on the drawings and specified.
| $336,400.00 | $1,737,464.00 | $875,000.00 | $860,000.00 | $641,000.00 | $667,374.00 | $583,800.00 | $919,582.00 | $700,000.00 | $742,400.00 |
| CLIN 0002 | All costs in connection with the work on the Castle Gatehouse, |
including but not limited to the site work at the paved entrance, parking area and sluice gate replacement complete as shown on the drawings and specified
| $1,103,111.00 | $4,436,543.00 | $1,750,000.00 | $3,650,000.00 | $2,741,000.00 | $1,968,113.00 | $1,404,900.00 | $1,420,284.00 | $2,450,000.00 | $1,093,613.00 |
| CLIN 0003 | All costs in connection with work on Meigs Vault, complete as |
shown on the drawings and specified.
| $340,345.00 | $2,368,257.00 | $775,000.00 | $300,000.00 | $419,000.00 | $1,324,846.00 | $179,300.00 | $418,400.00 | $570,000.00 | $839,841.00 |
| CLIN 0004 | All costs in connection with work on the West Shaft Gatehouse, |
including but not limited to the sidewalk replacement and site grading complete as shown on the drawings and specified.
| $443,154.00 | $1,505,669.00 | $1,300,000.00 | $980,000.00 | $292,000.00 | $757,407.00 | $490,000.00 | $460,670.00 | $820,000.00 | $755,804.00 |
| CLIN 0005 | All costs in connection with work on the Circular Platform next |
to Meigs Vault, complete as shown on the drawings and specified
| $312,456.00 | $556,760.00 | $650,000.00 | $990,000.00 | $430,000.00 | $210,125.00 | $229,900.00 | $218,042.00 | $360,000.00 | $781,000.00 |
| CLIN 0006 | All costs in connection with the removal and replacement of the |
Georgetown Reservoir and West Shaft Gatehouse perimeter fences, complete as shown on the drawings and specified.
| $644,700.00 | $484,399.00 | $400,000.00 | $397,000.00 | $280,000.00 | $307,683.00 | $273,600.00 | $323,334.00 | $310,000.00 | $420,468.00 |
| CLIN 0007 | All costs in connection with By-Conduit Debris Removal, |
complete as shown on the drawings and specified.
| $1,197,123.00 | $3,969,986.00 | $3,200,000.00 | $2,700,000.00 | $2,979,000.00 | $3,434,250.00 | $2,995,000.00 | $570,000.00 | $1,125,000.00 | $157,749.00 |
| CLIN 0008 | All costs in connection with the construction of the Georgetown |
Reservoir Road, complete as shown on the drawings and specified
| $342,120.00 | $784,486.00 | $700,000.00 | $400,000.00 | $543,000.00 | $296,872.00 | $500,000.00 | $447,030.00 | $615,000.00 | $323,929.00 |
| CLIN 0009 | All costs in connection with the construction of the Dalecarlia |
Reservoir Road, complete as shown on the drawings and specified.
| $526,537.00 | $1,188,608.00 | $900,000.00 | $750,000.00 | $786,000.00 | $588,137.00 | $329,000.00 | $710,250.00 | $1,555,000.00 | $377,908.00 | ||||||
| TOTAL = | $5,245,946.00 | $17,032,172.00 | $10,550,000.00 | $11,027,000.00 | $9,111,000.00 | $9,554,807.00 | $6,985,500.00 | $5,487,592.00 | $8,505,000.00 | $5,492,712.00 | |||||
| PERCENT ABOVE/BELOW IGE = | -224.67% | -101.11% | 100.00% | 100.00% | ERROR:#DIV/0! | ERROR:#DIV/0! | -110.20% | -73.68% | -82.14% | -33.16% | -4.61% | -62.13% | -4.70% | ||
| AMOUNT OVER IGE = | $11,786,226.00 | $5,304,054.00 | -$17,032,172.00 | -$10,550,000.00 | $0.00 | $0.00 | $5,781,054.00 | $3,865,054.00 | $4,308,861.00 | $1,739,554.00 | $241,646.00 | $3,259,054.00 | $246,766.00 |