W912DR-16-B-0018-02.pdf
PDF 30 KB Posted
- Solicitation number
- W912DR-16-B-0018
About this file
Amendment 02
View the file
Other files
| File | Type | Posted |
|---|---|---|
| G24_Bid_Abstract_.xlsx | XLSX spreadsheet | |
| W912DR-16-B-0018-0004.pdf | ||
| W912DR-16-B-0018-03.pdf | ||
| W912DR-16-B-0018-01.pdf | ||
| Cox_Creek_Plans_.pdf | ||
| BH_Dredging_2016.pdf | ||
| W912DR-16-B-0018.pdf | ||
| Specs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment to do the follow ing:
1. Answ er RFI Questions
2. Extend RFI Due Date 3.Update Price Schedule
4. Update Specifications - See Continuation Sheet for changes
1. CONTRACT ID CODE PAGE OF PAGES
1 6
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 21-Jul-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DR-16-B-0018
X 9B. DATED (SEE ITEM 11)
05-Jul-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
21-Jul-2016
CODE
U.S. ARMY CORPS OF ENGINEERS, BALTIMORE
10 S. HOWARD STREET
ROOM 7000
BALTIMORE MD 21201
W912DR 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DR-16-B-0018
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
CHANGES TO SPECS
SPECIFICATIONS:
SECTION 35 20 23 DREDGING:
1. Paragraph 1.28.12: In the fourth sentence change the word “North” to read “South”.
2. Paragraph 1.29.1.a: Delete the fourth sentence and substitute the following two sentences.
“Plan sheet 4 shows surface contours within the Cox Creek DMCF taken in 2013 representing a viscous slurry layer within the south cell. An inflow of approximately 477,352 CY of dredged material was placed into the south cell in 2016.”
3. Paragraph 1.29.1.a: In the sixth sentence change the word “north” to read “south”.
4. Paragraph 1.29.2 (4): Change the word “north” to read “south”.
5. Paragraph 1.30.5.b: Change the word “slip” to read “basin”.
6. Paragraph 1.30.9 (h) (h): In the second paragraph change the word “slip” to read “basin”.
7. Paragraph 2.1.5: In the fourth sentence change the word “slip” to read “basin”.
8..Paragraph 2.8.12: Immediately after the word “Project” insert the following “, Masonville CAD,”
SECTION 00010 - SOLICITATION CONTRACT FORM
The following have been added by full text:
RFI QUESTIONS
Contractors are encouraged to submit Requests for Information (RFI) regarding the solicitation documents. Prospective offerors may submit RFIs at any time; however, the cutoff date for RFIs is 28 July 2016 at 11:00 A.M. EST, unless the Contracting Officer determines an extension is necessary, to be performed by amendment. RFIs received after the cutoff date stated above may or may not be answered by the Government.
1. Prospective bidders/offerors must submit RFI inquiries relating to this solicitation only to Contract Specialist, Robert Jackson: Email: robert.n.jackson@usace.army.mil
2. IMPORTANT NOTE***When submitting your RFIs, please provide the project name, location and solicitation number in the subject line of the email. ALL INQUIRIES MUST BE IN WRITING. Please submit RFIs as email body text or as an attached word document. RFIs received as other file formats may be not considered. Offerors are encouraged to submit RFIs as soon as they become available and not to wait until the cutoff dated to submit all at once.
RFI QUESTIONS & RESPONSES
Question 0001: We request that Bid Item 0006: Dredging – Brewerton Angle – 1 foot Additional Overdepth may be exercised within 15 calendar days of the contract award, instead of 60 days. With the current specification to award the item within 60 days of award, a situation could arise in which the Contractor has already begun work at Brewerton Angle under the direction to only dig 1 foot of Overdepth material.
Response: Please refer to changes in Price Schedule.
The following have been modified:
PRICE SCHEDULE
PRICE SCHEDULE
Item Estimated No. Description Quantity Unit Price Amount
0001 Reimbursement of
Performance and Payment Bonds
JOB
Lump Sum
0002 Mobilization and
Demobilization
JOB
Lump Sum
0003 Dredging – Ferry Bar
Channel – Acceptance Section 1
72,584
C.Y.
0004 Dredging – Brewerton
Angle – Acceptance Section 2 to a depth of 51 plus 1 foot overdepth
398,810
0005 Tipping Fee 398,810 C.Y. $9.53 $_________
TOTAL ESTIMATED BASE BID AMOUNT $ ___________________
OPTIONAL ITEMS
0006 Dredging – Brewerton Angle – 1 foot additional overdepth
139,442
0007 Dredging - Craighill
Angle Acceptance Section 3
455,766
0008 Standby Time 10 HR $_______ $_________
TOTAL ESTIMATED BID AMOUNT $_____________________
(BASE BID AND OPTIONAL ITEMS)
NOTES TO BIDDERS
Bidders must quote on all items including Optional Items. Failure to quote on all items may be cause for rejection of the bid. Optional Items may be exercised at any time within 60 calendar days after contract award. The Contracting Officer may exercise the Optional Items by written notice to the Contractor, postmarked within the period specified above. Bid Item 0006 may be awarded anytime within 60 calendar days after award and prior to the start of dredging in Brewerton Angle. The Government may exercise any, all or none of the listed Optional Items in any order. Additional Time for exercised optional items will be allowed as outlined in Section 35 20 23, Paragraph 1.2.
SECTION 00010 - SUPPLIES OR SERVICES AND PRICES
EVALUATION OF OPTIONS: Except when it is determined not to be in the Government's best interest, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirements. Evaluation of options will not obligate the Government to exercise the option(s).
Any bid may be rejected if the prices for any line items or subline items are materially unbalanced.
An offer is mathematically unbalanced if it is based on prices which are significantly less than the cost for some contract line items and significantly overstated in relation to cost for others. An offer is materially unbalanced if it is mathematically unbalanced, and if –
1. There is a reasonable doubt that the offer would result in the lowest overall cost to the Government, even though it is the lowest evaluated offer; or
2. The offer is so grossly unbalanced that its acceptance would be tantamount to allowing an advance payment.
52.211-18 Variation in Estimated Quantity (Apr 1984)
If the quantity of a unit-priced item in this contract is an estimated quantity and the actual quantity of the unit-priced item varies more than 15 percent above or below the estimated quantity, an equitable adjustment in the contract price shall be made upon demand of either party. The equitable adjustment shall be based upon any increase or decrease in costs due solely to the variation above 115 percent or below 85 percent of the estimated quantity. If the quantity variation is such as to cause an increase in the time necessary for completion, the Contractor may request, in writing, an extension of time, to be received by the Contracting Officer within 10 days from the beginning of the delay, or within such further period as may be granted by the Contracting Officer before the date of final settlement of the contract. Upon the receipt of a written request for an extension, the Contracting Officer shall ascertain the facts and make an adjustment for extending the completion date as, in the judgement of the Contracting Officer, is justified.
(End of clause)
(End of Summary of Changes)