BH_Dredging_2016.pdf
PDF 17 MB Posted
- Solicitation number
- W912DR-16-B-0018
About this file
Plans
View the file
Other files
| File | Type | Posted |
|---|---|---|
| G24_Bid_Abstract_.xlsx | XLSX spreadsheet | |
| W912DR-16-B-0018-0004.pdf | ||
| W912DR-16-B-0018-03.pdf | ||
| W912DR-16-B-0018-02.pdf | ||
| W912DR-16-B-0018-01.pdf | ||
| Cox_Creek_Plans_.pdf | ||
| W912DR-16-B-0018.pdf | ||
| Specs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UntitledSHEET 1 - COVER SHEET
| SHEET 2 - PLAN SHEET |
| SHEET 3 - MAINTENANCE DREDGING BREWERTON ANGLE STATION 62+700 TO 89+000 |
| SHEET 4 - CONDITION SURVEY, COX CREEK PLACEMENT SITE ACCESS CHANNEL |
| SHEET 5 - MAINTENANCE DREDGING, FERRY BAR CHANNEL STATION 0+000 TO 7+900 |
| SHEET 6 - MAINTENANCE DREDGING MASONVILLE MARINE TERMINAL DREDGING AREA LOCATION |
| SHEET 7 - CONDITION SURVEY MASONVILLE MARINE TERMINAL DREDGING CROSS SECTIONS |
| SHEET 8 - CONDITION SURVEY MASONVILLE MARINE TERMINAL DREDGING CROSS SECTIONS |
| SHEET 9 - CONDITION SURVEY MASONVILLE MARINE TERMINAL DREDGING LONGITUDNAL SECTIONS |
| SHEET 10 - MAINTENANCE DREDGING MASONVILLE MARINE TERMINAL PLAN AND ELEVATION SHIP MOORING ARRANGEMENT |
| SHEET 11 - MAINTENANCE DREDGING CRAIGHILL ANGLE STATION 36+800 TO 4+600 |
| SHEET 12 - MAINTENANCE DREDGING CRAIGHILL ANGLE STATION 41+700 TO 46+800 |
| SHEET 13 - MAINTENANCE DREDGING - POPLAR ISLAND SOUTHERN ACCESS CHANNEL |
| SHEET 14 - POPLAR ISLAND INFLOW LOCATIONS |
| SHEET 15 - POPLAR ISLAND GENERAL INFORMATION |
File details come from the government source that posted it. Updated .