W912DR-16-B-0018-01.pdf

PDF 135 KB Posted

Attached to
BALTIMORE HARBOR AND CHANNELS, CHESAPEAKE BAY, MARYLAND
Solicitation number
W912DR-16-B-0018
Issued by

About this file

Amendment 01

View the file

Other files

File Type Posted
G24_Bid_Abstract_.xlsx XLSX spreadsheet
W912DR-16-B-0018-0004.pdf PDF
W912DR-16-B-0018-03.pdf PDF
W912DR-16-B-0018-02.pdf PDF
Cox_Creek_Plans_.pdf PDF
BH_Dredging_2016.pdf PDF
W912DR-16-B-0018.pdf PDF
Specs.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to do the follow ing:

1. Update Block 10 on the 1442.

2. Replace the Price Schedule.

3. Revise the SOW.

1. CONTRACT ID CODE PAGE OF PAGES

1 7

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 15-Jul-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DR-16-B-0018

X 9B. DATED (SEE ITEM 11)

05-Jul-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

15-Jul-2016

CODE

U.S. ARMY CORPS OF ENGINEERS, BALTIMORE

10 S. HOWARD STREET

ROOM 7000

BALTIMORE MD 21201

W912DR 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DR-16-B-0018

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00010 - SOLICITATION CONTRACT FORM

The required performance has changed from PROJECT TITLE: Baltimore Harbor and Various Channel

Sections, Chesapeake Bay, MDNAICS CODE : 237990SIZE STANDARDS : $27.5 MillionDESCRIPTION OF

WORK:The project will consist of maintenance dredging of approximately 1,000,000 cubic yards (CY) of material from various Federal Channels serving Baltimore Harbor, including the Chesapeake & Delaware Approach

Channels and maintenance dredging of approximately 500,000 cubic yards of material from various Federal channels in Baltimore Harbor. to PROJECT TITLE: Baltimore Harbor and Various Channel Sections, Chesapeake

Bay, MDNAICS CODE : 237990SIZE STANDARDS : $27.5 Million.

The following have been modified:

PRICE SCHEDULE

PRICE SCHEDULE

Item Estimated

No. Description Quantity Unit Price Amount

0001 Reimbursement of

Performance and Payment

Bonds

JOB

Lump Sum

0002 Mobilization and

Demobilization

JOB

Lump Sum

0003 Dredging – Ferry Bar

Channel – Acceptance

Section 1

72,584

C.Y.

0004 Dredging – Brewerton

Angle – Acceptance

Section 2 to a depth of

51 plus 1 foot overdepth

398,810

0005 Tipping Fee 398,810 C.Y. $9.53 $_________

TOTAL ESTIMATED BASE BID AMOUNT $ ___________________

OPTIONAL ITEMS

0006 Dredging – Brewerton

Angle – 1 foot additional overdepth

139,442

0007 Dredging - Craighill

Angle Acceptance

Section 3

455,766

0008 Standby Time 10 HR $_______ $_________

TOTAL ESTIMATED BID AMOUNT $_____________________

(BASE BID AND OPTIONAL ITEMS)

NOTES TO BIDDERS

Bidders must quote on all items including Optional Items. Failure to quote on all items may be cause for rejection of the bid. Optional Items may be exercised at any time within 60 calendar days after contract award. The

Contracting Officer may exercise the Optional Items by written notice to the

Contractor, postmarked within the period specified above. The Government may exercise any, all or none of the listed Optional Items in any order.

Additional Time for exercised optional items will be allowed as outlined in

Section 35 20 23, Paragraph 1.2.

SECTION 00010 - SUPPLIES OR SERVICES AND PRICES

EVALUATION OF OPTIONS: Except when it is determined not to be in the

Government's best interest, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirements. Evaluation of options will not obligate the Government to exercise the option(s).

Any bid may be rejected if the prices for any line items or subline items are materially unbalanced.

An offer is mathematically unbalanced if it is based on prices which are significantly less than the cost for some contract line items and significantly overstated in relation to cost for others. An offer is materially unbalanced if it is mathematically unbalanced, and if –

1. There is a reasonable doubt that the offer would result in the lowest overall cost to the Government, even though it is the lowest evaluated offer; or

2. The offer is so grossly unbalanced that its acceptance would be tantamount to allowing an advance payment.

52.211-18 Variation in Estimated Quantity (Apr 1984)

If the quantity of a unit-priced item in this contract is an estimated quantity and the actual quantity of the unit-priced item varies more than 15 percent above or below the estimated quantity, an equitable adjustment in the contract price shall be made upon demand of either party. The equitable adjustment shall be based upon any increase or decrease in costs due solely to the variation above 115 percent or below 85 percent of the estimated quantity. If the quantity variation is such as to cause an increase in the time necessary for completion, the Contractor may request, in writing, an extension of time, to be received by the Contracting Officer within 10 days from the beginning of the delay, or within such further period as may be granted by the Contracting Officer before the date of final settlement of the contract. Upon the receipt of a written request for an extension, the

Contracting Officer shall ascertain the facts and make an adjustment for extending the completion date as, in the judgement of the Contracting

Officer, is justified.

(End of clause)

00010-4

STATEMENT OF WORK

Project Description: It is anticipated the work would be performed in the Fall-Winter of 2016-2017. The project will consist of maintenance dredging of approximately 1,000,000 cubic yards of material from various Federal channels serving Baltimore Harbor, including Maryland Approach Channels and maintenance dredging of approximately 500,000 cubic yards of material from various Federal channels in

Baltimore Harbor. The channels vary in depth from 42 to 50 feet, and in width from 600 feet to 1,870 feet. The material will be dredged by clamshell and scow and be placed in the Cox Creek Dredged

Material Containment Facility, (400,000 CY), at the Paul S. Sarbanes Ecosystems Restoration Project at

Poplar Island (500,000 CY), and in a Confined Aquatic Disposal Cell (100,000 CY). The following channels will be dredged: Ferry Bar Channel, Brewerton Angle, and Craighill Angle. A large portion of the work may be performed during the winter months when weather conditions are most severe. Work will also be accomplished in a heavy commercial waterway supporting the Port of Baltimore. The equipment required for this work commonly consists of two 40 plus cubic yard clamshell dredges, one

24-30 inch hydraulic unloader, six to eight large tugs, six to eight 2,500 - 5,000 cubic yard material scows, and appropriate attendant plant and pipeline. The material will be dredged by clamshell and scow and placed within an anticipated performance period of no more than 140 calendar days from receipt of

Notice-to-Proceed.

The following have been deleted:

RFI QUESTIONS

(End of Summary of Changes)