Responses to Requests for Information (RFI's) are included in the attached Amendment 0004.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912DR-13-R-0033-0003.pdf | ||
| W912DR-13-R-0033-0002.pdf | ||
| W912DR-13-R-0033-0001.pdf | ||
| Contractor_Format_for_RFIs(1).xlsx | XLSX spreadsheet | |
| W912DR-13-R-0033_Western_States.pdf | ||
| Division_1_Specs.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The above referenced solicitation is hereby amended to provide the follow ing in Amendment 0004:
1) Responses to Requests for Information (RFI's).
2) The proposal submission date remains 11 June 2013 at 11am.
All other terms and conditions shall remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 07-Jun-2013
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DR-13-R-0033
X 9B. DATED (SEE ITEM 11)
03-May-2013
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
06-Jun-2013
CODE
US ARMY CORPS OF ENGINEERS BALTIMORE DIS
10 SOUTH HOWARD STREET
BALTIMORE MD 21201-2536
W912DR 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DR-13-R-0033
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
RFI'S AMENDMENT 0004
Q163: Coefficient Factors, section 2.4, requires LEED requirements be met for Design-Build task orders.
There are separate LEED costs associated with the Design and Build portions of the work. The Means estimating software to be provided per section 6.1 does not include the Green Building Cost manual.
How will construction cost pricing be determined for LEED certified projects?
Answer: Construction pricing with regards to LEED is not required.
Q164: Please confirm that there will be no LEED coefficient factor for Design-Bid-Build (DBB) task orders.
Answer: No LEED coefficient factor for Design-Bid-Build (DBB) task orders will be required.
Q165: Please clarify if any cost associated with obtaining future Top Secret clearances required for this contract should be included in our coefficient.
Answer: The proposal states the successful awardees must have A Top Secret clearance in place prior to be awarded the contract. The coefficient for the project is a standard 1.0 across the board, regardless of the location. A top secret may not be needed on all jobs. Some jobs may is classified as secret or classified only.
(End of Summary of Changes)