B.01.01.02 - Questions and Answers #2.docx

DOCX document 16 KB Posted

Attached to
ODF-H FY26 Asbestos Abatement and Demolition
Solicitation number
W912DQ26QA075
Issued by

About this file

This file is a Questions and Answers document providing clarifications on project specifications for the ODF-H FY26 Asbestos Abatement and Demolition solicitation (W912DQ26QA075). The project involves a one-level residential structure of 1,702 square feet with 8-foot side walls, a 640 square foot basement with 7-foot ceilings, and 166 linear feet of footings standing 38 inches tall. The garage concrete slab contains mesh wire reinforcement. Contractors must complete soil compaction verification using a proof roll method (dump truck with dirt load) rather than standard compaction testing, and should seed the area with warm season grass per seed company instructions.

Additional clarifications address site conditions and contractor responsibilities, including the removal of existing trees to a designated pile 200 feet north of the house, site photography availability through SAM.gov, and utility management. Power and gas have been disconnected but abandoned lines remain on-site. The contractor is responsible for cutting and capping the existing sewer line. This Q&A document provides essential technical and logistical information to support bid preparation for this Army Corps of Engineers demolition and abatement project.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers #2 Question: What is the total square footage, height, number of levels, and basement/footing measurements for the house and garage.

Answer: One level. 1,702 Sq ft. The side walls are 8’. The basement is 640 sq ft 7’ tall. The footings are 166 liner ft 38’’ tall. There is mesh wire in garage concrete slab.

Question: Are clear interior and exterior site photos available?

Answer: See ‘A.03.09 - Site Photos’ on SAM.gov

Question: Could you confirm if a specific test method (e.g., Standard Proctor) applies to the 90% compaction standard?

Answer: We are only needing a proof roll for this test. (Dump truck with dirt load driving over the area will work)

Question: Are there specific seed/grass specifications, or requirements for surrounding trees and shrubbery?

Answer: Seeding of warm season grass is fine according to seed company instructions. Trees that need to be removed can be placed on existing pile 200’ to the north of house.

Question: What is the status of power, gas, and well/septic? Will USACE handle utility disconnects prior to start, or is the contractor responsible?

Answer: Power and Gas has been unhooked. The abandon lines are still there. There is a sewar line running to the house. It will have to be cut and capped.

File details come from the government source that posted it. Updated .