B.08.03 W912DQ24R4007 Amendment 0005.pdf

PDF 2 MB Posted

Attached to
Attack Aviation Battalion Complex
Solicitation number
W912DQ24R4007
Issued by

About this file

This solicitation package includes plans and specifications for the construction of an Attack Aviation Battalion Complex. Work includes an aircraft hangar, maintenance shops, administrative space, storage facilities for parts, tools, hazardous materials and fuel, paved aprons for aircraft washing and hangar access, cybersecurity measures, fire protection and alarm systems, and utility connections for electric, gas, water and wastewater. Supporting site work involves development, paving, parking, drainage and landscaping. Heating and air conditioning will be provided by self-contained systems. The solicitation number is W912DQ24R4007 and was issued by the Department of the Army Corps of Engineers Engineering District Kansas City. The response due date is not provided in the document.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Fort Riley Hangar, Fort Riley, Kansas

The purpose of this amendment is to include updated information to the Specifications and Draw ings.

The proposal due date remains March 25, 2024 at 11:00 a.m. CST.

SEE SF30-BLOCK 14 CONTINUATION PAGE

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 15-Mar-2024

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DQ24R4007

X 9B. DATED (SEE ITEM 11)

19-Jan-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

15-Mar-2024

CODE

USACE, KANSAS CITY CT

FEDERAL BLDG CT-M 601 E 12TH STREET

KANSAS CITY MO 64106-2896

W912DQ 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DQ24R4007

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

SUMMARY OF CHANGES

SUMMARY OF CHANGES

The SOLICITATION is amended as follows:

NOTE: Deleted text is shown in RED with strikethrough. Added text is shown in GREEN with underline.

1. SPECIFICATIONS.

a. 05 12 00, Structural Steel.

i. Delete the first sentence in 3.5.1 Field Priming

Field prime steel exposed to the weather, or located in building areas without HVAC for control of relative humidity.

ii. Add the following subparagraph:

3.7 Field Painting

The topcoat for all exposed interior ferrous metal primary and secondary steel framing inside Aircraft Maintenance Bays is applied in the shop per UFGS 09 97 13.27 HIGH PERFORMANCE COATING FOR STEEL STRUCTURES. Primary and secondary steel framing includes all structural steel framing specified in the Contract Documents.

Field paint all other structural steel framing per UFGS 09 90 00 PAINTS AND COATINGS: Interior Metal, Ferrous and Non-ferrous Paint Table.

b. 05 21 00, Steel Joist Framing. Paragraph 3.2.2 Field Painting is revised as shown below.

3.2.2 Field Painting

The topcoat for Field paint all exposed interior ferrous metal primary and secondary steel framing inside Aircraft Maintenance Bays is applied in the shop per UFGS 09 97 13.27 HIGH PERFORMANCE COATING FOR STEEL STRUCTURES. Primary and secondary steel framing includes all structural steel framing and steel joist framing specified in the Contract Documents, and includes all joist accessories such as bridging members.

Field paint all other steel joist framing per UFGS 09 90 00 PAINTS AND COATINGS: Interior Metal, Ferrous and Non-ferrous Paint Table.

c. 09 97 13.27, High Performance Coating for Steel Structures. Add paragraph 2.2.4, shown below.

2.2.4 Class A Slip Coefficient

The faying surfaces of slip critical connections must be masked during coating application to preserve clean mill

W912DQ24R4007

scale finish if testing indicates a Class A slip coefficient will not be achieved with the specified coating system.

Clean mill scale finish must be preserved until immediately prior to assembly of the structural steel.

d. 32 12 13, Bituminous Tack and Prime Coats. This specification is deleted in its entirety.

e. 32 12 16.16, Road-Mix Asphalt Paving. This specification is deleted in its entirety.

2. DRAWINGS. The drawings listed below are revised. Copies of the revised drawings are attached.

a. A-111

b. A-600

c. IN601

d. IN602

e. IN603

f. IN604

g. PS111

h. PS112

i. PS113

j. P600

k. ES503

3. The time and date for submission of proposals has not changed and remains March 25, 2024, 11:00 AM local time.

4. Offerors are required to acknowledge receipt of this amendment. Failure to acknowledge receipt of all amendments may cause rejection of offeror’s proposal.

5. All other terms and conditions remain unchanged and in full force.

(End of Summary of Changes)

C1

A-300

A1

A-300

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

5 61M8S1/2

A5

A-431

152C

152A

152B

L

F

2 3 4 5 6 7

K

J

H

G

E

TYP.

M

11' - 4"

8' - 7 1/2"

5' - 0" 5' - 0"

/2

5' - 0"

3' - 0"

9' - 11 1/2" 3' - 10" 29' - 7 1/2" 3' - 10" 29' - 7 1/2" 3' - 10" 30' - 0" 6' - 4"

A-520

A1

TYP.

D1

A-304

A1

A-304

A1

A-305

6" 10' - 0" 6"

5' - 3"

53' - 0"

6" 10' - 0" 6"

31' - 9" 6" 31' - 6" 6" 31' - 6" 6" 31' - 6" 6"

S E

E S

H E

E T

A -1

F O

R M

A T

C H

L

IN

E A

A

1. RE: A-110 FOR GENERAL SHEET NOTES.

GENERAL SHEET NOTES:

1. ROLLING AIRCRAFT HANGAR DOOR

2. ROLLING AIRCRAFT HANGAR DOOR FLOOR RAIL

3. 5'-0" SAFETY ZONE: PROVIDE A 6" PAINT STRIP 5'-0" FROM THE PERIMETER

HANGAR BAY WALLS. SHADING IS PROVIDED TO ILLUSTRATE THE 5'-0"

SAFETY CLEAREENCE ZONE.

4. WORK BAY FLOOR STRIPING RE: UFC 4-211-01, 5-3.2

5. EMERGENCY EYEWASH / DELUGE SHOWER

6. HAND WASH STATION

7. ELECTRICAL POWER PEDESTAL

8. DOOR STOP BOLLARD

9. PIPE BOLLARD

10. FIRE EXTINGUISHER CABINET

11. TRENCH DRAIN

SHEET KEYNOTES

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

US Army Corps of Engineers

S O

L

IC

IT

A

T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T

E D

B Y

D A

T E

C O

N T

R A

C T

N O

C

H E

C K

E D

B Y

D R

A W

N B

Y

IS

S

U E

D A

T E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

File Path:

Plot Date:

KEY PLAN

A B C

D E F

KEY PLAN

C:\Users\G5EDDLDW\Documents\_477687_Hangar_RVT20_AI_G5EDDLDW.rvt

3/7/2024 12:05:16 PM

A-111

HANGAR

P A

R T

IA

L F

IR

S

T F

L O

O R

P L A

N

A

F O

R T

R

IL

E Y

K

A N

S A

S

K A

N S

A S

C

IT

Y D

IS

T

R

IC

T K

P

E R

S O

N

K P

E R

S O

N

C B

R O

W N

M M c C

O L L U

M

J A

N U

A R

Y

W D

Q -2

-R

-4

F

IL

E N

A M

E

RTA

A T

T A

C K

A V

IA

T

IO

N

B A

T T

A L

IO

N C

O M

P L E

X

P N

F Y

H a n g a r_

R V

T A

I.

rv t

P

E

T

H S

T R

E E

T

K A

N S

A S

C

IT

Y M

O

A N

S I D

1/8" = 1'-0"A1

PARTIAL FIRST FLOOR PLAN "A"

PLAN

NORTH

8'4' 16'0

SCALE: 1/8"=1'-0"

ROOM SCHEDULE - FIRST FLOOR - AREA "A"

NUMBER NAME AREA

152 AIRCRAFT MAINTENANCE BAY 43794 SF

E

D

IT

K E

Y N

O T

E M

A R

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

US Army Corps of Engineers

S O

L

IC

IT

A

T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T

E D

B Y

D A

T E

C O

N T

R A

C T

N O

C

H E

C K

E D

B Y

D R

A W

N B

Y

IS

S

U E

D A

T E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

File Path:

Plot Date:

C:\Users\G5EDDLDW\Documents\_477687_Hangar_RVT20_AI_G5EDDLDW.rvt

3/12/2024 1:24:06 PM

A-600

HANGAR

D O

O R

S C

H E

D U

L E

F O

R T

R

IL

E Y

K

A N

S A

S

K A

N S

A S

C

IT

Y D

IS

T

R

IC

T K

P

E R

S O

N

K P

E R

S O

N

C B

R O

W N

M M c C

O L L U

M

J A

N U

A R

Y

W D

Q -2

-R

-4

F

IL

E N

A M

E

RTA

A T

T A

C K

A V

IA

T

IO

N

B A

T T

A L

IO

N C

O M

P L E

X

P N

F Y

H a n g a r_

R V

T A

I.

rv t

P

E

T

H S

T R

E E

T

K A

N S

A S

C

IT

Y M

O

A N

S I D

DOOR SCHEDULE - DOORS 1 TO 151

LOCATION

LOCATION DOOR DOOR FRAME

MIN STC

RATING

FIRE

RATING

FRAME

REMARKS

DOOR NUMBER

SIZE

PAIR

TYPE

DOOR MATERIAL

FRAME

TYPE

FRAME

MATERIAL

HEAD JAMB SILL

WIDTH HEIGHT THICKNESS

CORRIDOR 100 6' - 0" 7' - 0" 1 3/4" X FV2 METAL METAL STC-34 N/A METAL A A A

VESTIBULE 100A 6' - 0" 7' - 0" 1 3/4" X FV2 METAL METAL STC-34 N/A METAL F F F

CORRIDOR 100B 6' - 0" 7' - 0" 1 3/4" X FV2 METAL METAL STC-34 N/A METAL F F F

CORRIDOR 100C 6' - 0" 7' - 0" 1 3/4" X FV2 METAL METAL STC-34 N/A METAL F F F

BREAK ROOM 101 3' - 0" 7' - 0" 1 3/4" - FV METAL METAL N/A N/A METAL C C C

LOGISTICS ASSISTANCE REPRESENTATIVES (LARS) 102 3' - 0" 7' - 0" 1 3/4" - FV METAL METAL STC-40 N/A METAL C C C

TECHNICAL LIBRARY 103 3' - 0" 7' - 0" 1 3/4" - FV METAL METAL STC-40 N/A METAL C C C

FIRE SUPPRESSION ROOM 104 3' - 0" 7' - 0" 1 3/4" - F METAL METAL STC-34 N/A METAL A A A

FIRE SUPPRESSION ROOM 104A 8' - 0" 10' - 0" 2" - C1 METAL METAL N/A N/A METAL E E E DOOR HARDWARE PROVIDED BY COILING OVERHEAD DOOR MANUFACTURER

FACILITY STORAGE 105 3' - 0" 7' - 0" 1 3/4" - F METAL METAL N/A N/A METAL D D D

ELECTRICAL ROOM 106 6' - 0" 7' - 0" 1 3/4" X F METAL METAL N/A N/A METAL A A A

MECHANICAL ROOM 107 6' - 0" 7' - 0" 1 3/4" X F METAL METAL N/A N/A METAL A A A

JANITOR CLOSET 108 3' - 0" 7' - 0" 1 3/4" - F METAL METAL STC-34 N/A METAL D D D

MEN'S RESTROOM SHOWER & LOCKER ROOM 109 3' - 0" 7' - 0" 1 3/4" - FL METAL METAL STC-34 N/A METAL C C C

WOMEN'S RESTROOM SHOWER & LOCKER ROOM 110 3' - 0" 7' - 0" 1 3/4" - FL METAL METAL STC-34 N/A METAL C C C

ELEVATOR EQUIPMENT ROOM 111 3' - 6" 7' - 0" 1 3/4" - FR1 METAL METAL STC-34 1 HR METAL D D D

TELECOM, EQUIPMENT ROOM 112 3' - 0" 7' - 0" 1 3/4" - F METAL METAL STC-34 1 HR METAL D D D UNDERCUT DOOR ONE INCH.

MC ORDERLY ROOM 113 3' - 0" 7' - 0" 1 3/4" - FV METAL METAL STC-40 N/A METAL D D D

MC COMPONENT REPAIR PLATOON OFFICE 113A 3' - 0" 7' - 0" 1 3/4" - FV METAL METAL STC-45 N/A METAL F F F

MC COMMANDER OFFICE 113B 3' - 0" 7' - 0" 1 3/4" - FV METAL METAL STC-45 N/A METAL F F F

MC 1ST SERGEANT OFFICE 113C 3' - 0" 7' - 0" 1 3/4" - FV METAL METAL STC-45 N/A METAL F F F

MC AIRFRAME REPAIR PLATOON OFFICE 113D 3' - 0" 7' - 0" 1 3/4" - FV METAL METAL STC-45 N/A METAL F F F

PNEUDRAULICS 114 4' - 0" 7' - 0" 1 3/4" - FV METAL METAL STC-40 N/A METAL D D D

PNEUDRAULICS STORAGE 114A 3' - 0" 7' - 0" 1 1/4" - WM1 WIRE MESH METAL N/A N/A METAL - - - DOOR HARDWARE PROVIDED BY WIRE PARTITION MANUFACTURER, THE DOOR LOCKS SHALL BE KEYED IN ACCORDANCE WITH THE FACILITIES KEYING SYSTEM.

COMPRESSOR ROOM 115 6' - 0" 7' - 0" 1 3/4" X F METAL METAL N/A N/A METAL A A A

MECHANICAL ROOM 116 6' - 0" 7' - 0" 1 3/4" X F METAL METAL N/A N/A METAL A A A

BLADE REPAIR SHOP 117 3' - 0" 7' - 0" 1 3/4" - FV METAL METAL STC-40 N/A METAL D D D INTERIOR DOOR, PROVIDE WEATHER STRIPPING. THIS ROOM WILL HAVE NEGATIVE PRESSURE.

BLADE REPAIR SHOP 117A 8' - 0" 10' - 0" 2" - C1 METAL METAL STC-21 1 HR METAL B B B DOOR HARDWARE PROVIDED BY COILING OVERHEA DOOR MANUFACTURER

STRUCTURAL REPAIR SHOP 118 3' - 0" 7' - 0" 1 3/4" - FV METAL METAL STC-40 1 HR METAL D D D

STRUCTURAL REPAIR SHOP STORAGE 118A 3' - 0" 7' - 0" 1 1/4" - WM1 WIRE MESH METAL N/A N/A METAL - - - DOOR HARDWARE PROVIDED BY WIRE PARTITION MANUFACTURER, THE DOOR LOCKS SHALL BE KEYED IN ACCORDANCE WITH THE FACILITIES KEYING SYSTEM.

STRUCTURAL REPAIR SHOP 118B 3' - 0" 7' - 0" 1 3/4" - FR METAL METAL STC-40 1 HR METAL B B B

STRUCTURAL REPAIR SHOP 118C 8' - 0" 12' - 0" 2" - C2 METAL METAL STC-21 1 HR METAL B B B DOOR HARDWARE PROVIDED BY COILING OVERHEAD DOOR MANUFACTURER

POWER PLANT / POWERTRAIN SHOP 119 3' - 0" 7' - 0" 1 3/4" - FV METAL METAL STC-40 1 HR METAL D D D

NON-DESTRUCTIVE INSPECTION (NDI) ROOM 119A 3' - 0" 7' - 0" 1 3/4" - F METAL METAL STC-34 N/A METAL F F F

POWER PLANT / POWERTRAIN SHOP STORAGE 119B 8' - 0" 12' - 0" 2" - C2 METAL METAL STC-21 1 HR METAL B B B DOOR HARDWARE PROVIDED BY COILING OVERHEA DOOR MANUFACTURER

POWER PLANT / POWERTRAIN SHOP 119C 3' - 0" 7' - 0" 1 3/4" - FR METAL METAL STC-40 1 HR METAL B B B

POWER PLANT / POWERTRAIN SHOP 119D 3' - 0" 7' - 0" 1 1/4" - WM1 WIRE MESH METAL N/A N/A METAL - - - DOOR HARDWARE PROVIDED BY WIRE PARTITION MANUFACTURER, THE DOOR LOCKS SHALL BE KEYED IN ACCORDANCE WITH THE FACILITIES KEYING SYSTEM.

POWER PLANT / POWERTRAIN SHOP 119E 3' - 0" 7' - 0" N/A - WM1 WIRE MESH METAL N/A N/A METAL - - - DOOR HARDWARE PROVIDED BY WIRE PARTITION MANUFACTURER, THE DOOR LOCKS SHALL BE KEYED IN ACCORDANCE WITH THE FACILITIES KEYING SYSTEM.

SYSTEMS REPAIR SHOP 120 8' - 0" 8' - 0" 1 3/4" X FV METAL METAL STC-40 NA METAL D D D

SHOP SECTION HQ 120A 3' - 0" 7' - 0" 1 3/4" - FV METAL METAL STC-40 N/A METAL D D D

COMSEC SECURE STORAGE 120B 3' - 6" 7' - 0" 1 3/4" - F1 METAL METAL N/A N/A METAL F F F

ARMS VAULT - AIRCRAFT MOUNTED WEAPONS 120C 3' - 4" 6' - 6" N/A - AR METAL METAL N/A 1 HR METAL - - - GSA CLASS 5 VAULT DOOR. HARDWARE SUPPLIED BY DOOR MANUFACTURER.

REPAIR SECTION WORKROOM 121 3' - 6" 7' - 0" 1 3/4" - F1V METAL METAL STC-40 N/A METAL C C C

REPAIR SECTION WORKROOM STORAGE 121A 3' - 0" 7' - 0" N/A - WM1 WIRE MESH METAL N/A N/A METAL - - - DOOR HARDWARE PROVIDED BY WIRE PARTITION MANUFACTURER, THE DOOR LOCKS SHALL BE KEYED IN ACCORDANCE WITH THE FACILITIES KEYING SYSTEM.

REPAIR SECTION WORKROOM 121B 3' - 0" 7' - 0" 1 3/4" - FR METAL METAL STC-40 1 HR METAL B B B

SPECIAL TOOLS ROOM 122 3' - 6" 7' - 0" 1 3/4" - F1 METAL METAL STC-40 N/A METAL C C C

SPECIAL TOOLS ROOM 122A 3' - 0" 7' - 0" 1 3/4" - FR METAL METAL STC-40 1 HR METAL B B B

SPECIAL TOOLS ROOM 122B 8' - 0" 10' - 0" 2" - C1 METAL METAL STC-21 1 HR METAL B B B DOOR HARDWARE PROVIDED BY COILING OVERHEAD DOOR MANUFACTURER

QUALITY CONTROL 123A 3' - 0" 7' - 0" 1 3/4" - FV METAL METAL STC-40 N/A METAL C C C

QUALITY CONTROL 123B 6' - 4" 7' - 1" N/A - CCD METAL METAL N/A N/A METAL H H H DOOR HARDWARE PROVIDED BY COILING COUNTER DOOR MANUFACTURER

QUALITY CONTROL 123C 3' - 0" 7' - 0" 1 3/4" - FV METAL METAL STC-40 N/A METAL C C C

QUALITY CONTROL OFFICE 123D 3' - 0" 7' - 0" 1 3/4" - FV METAL METAL STC-40 N/A METAL F F F

SIPRNET ROOM 124 3' - 0" 7' - 0" 1 3/4" - F METAL METAL STC-34 N/A METAL D D D

PRODUCTION CONTROL OFFICE 125 3' - 0" 7' - 0" 1 3/4" - FV METAL METAL STC-40 N/A METAL C C C

PRODUCTION CONTROL 125A 6' - 4" 7' - 1" N/A - CCD METAL METAL N/A N/A METAL H H H DOOR HARDWARE PROVIDED BY THE COILING COUNTER DOOR MANUFACTURER.

PRODUCTION CONTROL 125B 3' - 0" 7' - 0" 1 3/4" - FV METAL METAL STC-40 N/A METAL D D D

PRODUCTION CONTROL 125C 3' - 0" 7' - 0" 1 3/4" - FV METAL METAL STC-40 N/A METAL F F F

ULLS-A EQUIPMENT ROOM 125D 3' - 0" 7' - 0" 1 3/4" - F METAL METAL STC-40 N/A METAL F F F

CREW CHIEF WORKROOM 126 3' - 6" 7' - 0" 1 3/4" - F1 METAL METAL STC-40 N/A METAL C C C

CREW CHIEF WORKROOM 126A 3' - 6" 7' - 0" 1 3/4" - FR METAL METAL STC-40 1 HR METAL B B B

CREW CHIEF CAGED STORAGE 126B 3' - 0" 7' - 0" 1 1/4" - WM1 WIRE MESH METAL N/A N/A METAL - - - DOOR HARDWARE PROVIDED BY WIRE PARTITION MANUFACTURER, THE DOOR LOCKS SHALL BE KEYED IN ACCORDANCE WITH THE FACILITIES KEYING SYSTEM.

MAINTENANCE TEST PILOT OFFICE 127 3' - 0" 7' - 0" 1 3/4" - FV METAL METAL STC-40 N/A METAL F F F

CREW CHIEF WORKROOM 128 3' - 6" 7' - 0" 1 3/4" - F1 METAL METAL STC-40 N/A METAL C C C

CREW CHIEF WORKROOM 128A 3' - 6" 7' - 0" 1 3/4" - FR METAL METAL STC-40 1 HR METAL B B B

CREW CHIEF CAGED STORAGE 128B 3' - 0" 7' - 0" 1 1/4" - WM1 WIRE MESH METAL N/A N/A METAL - - - DOOR HARDWARE PROVIDED BY WIRE PARTITION MANUFACTURER, THE DOOR LOCKS SHALL BE KEYED IN ACCORDANCE WITH THE FACILITIES KEYING SYSTEM.

MAINTENANCE TEST PILOT OFFICE 129 3' - 0" 7' - 0" 1 3/4" - FV METAL METAL STC-40 N/A METAL F F F

CREW CHIEF WORKROOM 130 3' - 6" 7' - 0" 1 3/4" - FV METAL METAL STC-40 N/A METAL C C C

CREW CHIEF WORKROOM 130A 3' - 6" 7' - 0" 1 3/4" - FR METAL METAL STC-40 1 HR METAL B B B

CREW CHIEF CAGED STORAGE 130B 3' - 0" 7' - 0" 1 1/4" - WM1 WIRE MESH METAL N/A N/A METAL - - - DOOR HARDWARE PROVIDED BY WIRE PARTITION MANUFACTURER, THE DOOR LOCKS SHALL BE KEYED IN ACCORDANCE WITH THE FACILITIES KEYING SYSTEM.

MAINTENANCE TEST PILOT OFFICE 131 3' - 0" 7' - 0" 1 3/4" - FV METAL METAL STC-40 N/A METAL F F F

TELECOM ROOM 132 3' - 0" 7' - 0" 1 3/4" - F METAL METAL N/A N/A METAL D D D UNDERCUT DOOR ONE INCH.

RECYCLABLE STORAGE 133 3' - 0" 7' - 0" 1 3/4" - F METAL METAL STC-34 N/A METAL D D D

RECYCLABLE STORAGE 133A 0' - 0" 0' - 0" - - - - METAL - N/A METAL - - - CASED OPENING

ELECTRICAL ROOM 134 3' - 0" 7' - 0" 1 3/4" - F METAL METAL STC-34 N/A METAL D D D

MECHANICAL ROOM 135A 6' - 0" 7' - 0" 1 3/4" X F METAL METAL STC-34 N/A METAL A A A

AC ARMS VAULT 136 3' - 4" 6' - 6" N/A - AR METAL METAL N/A N/A METAL - - - GSA CLASS 5 VAULT DOOR. HARDWARE SUPPLIED BY DOOR MANUFACTURER.

AC ARMS VAULT 137 3' - 4" 6' - 6" N/A - AR METAL METAL N/A N/A METAL - - - GSA CLASS 5 VAULT DOOR. HARDWARE SUPPLIED BY DOOR MANUFACTURER.

AC ARMS VAULT 138 3' - 4" 6' - 6" N/A - AR METAL METAL N/A N/A METAL - - - GSA CLASS 5 VAULT DOOR. HARDWARE SUPPLIED BY DOOR MANUFACTURER.

MC ARMS VAULT 139 3' - 4" 6' - 6" N/A - AR METAL METAL N/A N/A METAL - - - GSA CLASS 5 VAULT DOOR. HARDWARE SUPPLIED BY DOOR MANUFACTURER.

AC UNIT STORAGE 140 3' - 6" 7' - 0" 1 3/4" - FV METAL METAL STC-34 N/A METAL C C C

AC NBC STORAGE 140A 3' - 0" 7' - 0" 1 1/4" - WM1 WIRE MESH METAL N/A N/A METAL - - - DOOR HARDWARE PROVIDED BY WIRE PARTITION MANUFACTURER, THE DOOR LOCKS SHALL BE KEYED IN ACCORDANCE WITH THE FACILITIES KEYING SYSTEM.

AC NON-SENSITIVE SECURE STORAGE 140B 3' - 6" 7' - 0" 1 3/4" - F METAL METAL N/A 90 MIN METAL F F F

AC COMMUNICATIONS STORAGE 140C 3' - 0" 7' - 0" 1 1/4" - WM1 WIRE MESH METAL N/A N/A METAL - - - DOOR HARDWARE PROVIDED BY WIRE PARTITION MANUFACTURER, THE DOOR LOCKS SHALL BE KEYED IN ACCORDANCE WITH THE FACILITIES KEYING SYSTEM.

AC UNIT STORAGE 141 3' - 6" 7' - 0" 1 3/4" - FV METAL METAL STC-34 N/A METAL C C C

AC NBC STORAGE 141A 3' - 0" 7' - 0" N/A - WM1 WIRE MESH METAL N/A N/A METAL - - - DOOR HARDWARE PROVIDED BY WIRE PARTITION MANUFACTURER, THE DOOR LOCKS SHALL BE KEYED IN ACCORDANCE WITH THE FACILITIES KEYING SYSTEM.

AC NON-SENSITIVE SECURE STORAGE 141B 3' - 6" 7' - 0" 1 3/4" - F1 METAL METAL N/A 90 MIN METAL F F F

AC COMMUNICATIONS STORAGE 141C 3' - 0" 7' - 0" 1 1/4" - WM1 WIRE MESH METAL N/A N/A METAL - - - DOOR HARDWARE PROVIDED BY WIRE PARTITION MANUFACTURER, THE DOOR LOCKS SHALL BE KEYED IN ACCORDANCE WITH THE FACILITIES KEYING SYSTEM.

AC UNIT STORAGE 142 3' - 6" 7' - 0" 1 3/4" - FV METAL METAL STC-34 N/A METAL C C C

AC NBC STORAGE 142A 3' - 0" 7' - 0" N/A - WM1 WIRE MESH METAL N/A N/A METAL - - - DOOR HARDWARE PROVIDED BY WIRE PARTITION MANUFACTURER, THE DOOR LOCKS SHALL BE KEYED IN ACCORDANCE WITH THE FACILITIES KEYING SYSTEM.

AC NON-SENSITIVE SECURE STORAGE 142B 3' - 6" 7' - 0" 1 3/4" - F1 METAL METAL N/A 90 MIN METAL F F F DOOR HARDWARE PROVIDED BY WIRE PARTITION MANUFACTURER, THE DOOR LOCKS SHALL BE KEYED IN ACCORDANCE WITH THE FACILITIES KEYING SYSTEM.

AC COMMUNICATIONS STORAGE 142C 3' - 0" 7' - 0" N/A - WM1 WIRE MESH METAL N/A N/A METAL - - - DOOR HARDWARE PROVIDED BY WIRE PARTITION MANUFACTURER, THE DOOR LOCKS SHALL BE KEYED IN ACCORDANCE WITH THE FACILITIES KEYING SYSTEM.

MC UNIT STORAGE 143 3' - 6" 7' - 0" 1 3/4" - FV METAL METAL STC-34 N/A METAL C C C

MC NBC STORAGE 143A 3' - 0" 7' - 0" N/A - WM1 WIRE MESH METAL N/A N/A METAL - - - DOOR HARDWARE PROVIDED BY WIRE PARTITION MANUFACTURER, THE DOOR LOCKS SHALL BE KEYED IN ACCORDANCE WITH THE FACILITIES KEYING SYSTEM.

MC NON-SENSITIVE SECURE STORAGE 143B 3' - 6" 7' - 0" 1 3/4" - F1 METAL METAL N/A 90 MIN METAL F F F

MC COMMUNICATIONS STORAGE 143C 3' - 0" 7' - 0" N/A - WM1 WIRE MESH METAL N/A N/A METAL - - - DOOR HARDWARE PROVIDED BY WIRE PARTITION MANUFACTURER, THE DOOR LOCKS SHALL BE KEYED IN ACCORDANCE WITH THE FACILITIES KEYING SYSTEM.

CONTRACTOR LOGISTICS SUPPORT (CLS) 144 3' - 6" 7' - 0" 1 3/4" - FV METAL METAL STC-34 N/A METAL C C C

CLS STORAGE 144A 3' - 0" 7' - 0" 1 1/4" - WM1 WIRE MESH METAL N/A N/A METAL - - - DOOR HARDWARE PROVIDED BY WIRE PARTITION MANUFACTURER, THE DOOR LOCKS SHALL BE KEYED IN ACCORDANCE WITH THE FACILITIES KEYING SYSTEM.

LOGISTICS ASSISTANCE REPRESENTATIVES (LARS) 145 3' - 0" 7' - 0" 1 3/4" - FV METAL METAL STC-40 N/A METAL C C C

MOTHER'S ROOM 146 3' - 0" 7' - 0" 1 3/4" - FV METAL METAL STC-40 N/A METAL F F F

JANITOR CLOSET 147 3' - 0" 7' - 0" 1 3/4" - F METAL METAL N/A N/A METAL F F F

MEN'S RESTROOM 148 3' - 0" 7' - 0" 1 3/4" - FL METAL METAL STC-34 N/A METAL F F F

WOMEN'S RESTROOM 149 3' - 0" 7' - 0" 1 3/4" - FL METAL METAL STC-34 N/A METAL F F F

TELECOM ROOM (TR) 150 3' - 0" 7' - 0" 1 3/4" - F METAL METAL N/A N/A METAL D D D

AIRCRAFT PARTS SUPPLY 151 3' - 0" 7' - 0" 1 3/4" - F METAL METAL STC-34 N/A METAL A A A

AIRCRAFT PARTS SUPPLY 151A 10' - 0" 14' - 0" 2" - C4 METAL METAL N/A N/A METAL A A A DOOR HARDWARE PROVIDED BY COILING OVERHEA DOOR MANUFACTURER

AIRCRAFT PARTS SUPPLY OFFICE 151B 3' - 0" 7' - 0" 1 3/4" - N METAL METAL STC-40 N/A METAL F F F

AIRCRAFT PARTS SUPPLY OFFICE 151C 3' - 0" 7' - 0" 1 3/4" - N METAL METAL STC-40 N/A METAL F F F

AIRCRAFT PARTS SUPPLY 151D 10' - 0" 14' - 0" 2" - C4 METAL METAL N/A N/A METAL B B B DOOR HARDWARE PROVIDED BY COILING OVERHEAD DOOR MANUFACTURER

R

E V

IS

E

S T

C R

A T

IN

G

T O

R E

A D

S T

C

F E

B

R

E V

IS

E

D A

R M

S V

A U

L T

D O

O R

D

IM

E N

S

IO

N S

M A

R

1. REFERENCE IN600 SERIES SHEETS FOR THE INTERIOR MATERIALS FINISH

LEGEND.

2. NORTH, SOUTH, EAST, AND WEST, AS NOTED ON THE INTERIOR FINISH

SCHEDULE SHALL BE IN ACCORDANCE WITH PLAN NORTH AS INDICATED ON

THE ARCHITECTURAL FLOOR PLANS.

3. PAINT ALL INTERIOR WALL AND CEILING MOUNTED ITEMS SUCH AS VENTS,

GRILL COVERS, LIGHT FIXTURE TRIM RINGS, ETC. TO MATCH THE SURFACE

COLOR ON WHICH THEY APPEAR.

4. ALL CARPET SEAMS ARE TO BE PROPERLY BLENDED, USING MANUFACTURER'S

RECOMMENDATIONS.

5. PRODUCTS LISTED BY MANUFACTURER ARE FOR IDENTIFICATION AND

PERFORMANCE PURPOSES ONLY. THEY ARE NOT INTENDED TO LIMIT

SELECTION FROM OTHER MANUFACTURERS. HOWEVER, COLORS, PATTERNS,

TEXTURES, AND PROFILES SHALL COORDINATE WITH THOSE LISTED ON THIS

LEGEND IN ORDER TO MAINTAIN COLOR COORDINATION AND VISUAL DESIGN

INTEGRITY.

6. ALL FLOOR FINISH CHANGES ARE TO BE PROVIDED PROPER TRANSITION

STRIPS AND FLOOR LEVELING AS REQUIRED. SEE FINISH SCHEDULE FOR

TRANSITION STRIP TYPES.

7. REFER TO INTERIOR ELEVATION DRAWINGS FOR WALLS WITH "VARIOUS"

FINISHES.

8. PAINT IN RESTROOMS AND WET AREAS SHALL BE EPOXY BASED PAINT.

9. PROVIDE NO HARDERNER OR SEALER TO FLOORS RECEIVING SEAMLESS

RESINOUS FLOORING (SRF).

SHEET NOTES:

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

US Army Corps of Engineers

S O

L

IC

IT

A

T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T

E D

B Y

D A

T E

C O

N T

R A

C T

N O

C

H E

C K

E D

B Y

D R

A W

N B

Y

IS

S

U E

D A

T E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

File Path:

Plot Date:

C:\Users\g5eddwcf\Documents\_477687_Hangar_RVT20_AI_g5eddwcf.rvt

3/12/2024 2:05:58 PM

IN601

HANGAR

IN

T

E R

IO

R

F

IN

IS

H

S C

H E

D U

L E

F O

R T

R

IL

E Y

K

A N

S A

S

K A

N S

A S

C

IT

Y D

IS

T

R

IC

T C

F

O R

D

C F

O R

D

C B

R O

W N

C G

A T

E W

O O

D

J A

N U

A R

Y

W D

Q -2

-R

-4

F

IL

E N

A M

E

RTA

A T

T A

C K

A V

IA

T

IO

N

B A

T T

A L

IO

N C

O M

P L E

X

P N

F Y

H a n g a r_

R V

T A

I.

rv t

PRODUCTION DATA 4PROD DATA 3

P

E

T

H S

T R

E E

T

K A

N S

A S

C

IT

Y M

O

A N

S I D

INTERIOR FINISH SCHEDULE ROOMS 100-141C

ROOM

NUMBER

ROOM NAME

FLOOR BASE NORTH WALL EAST WALL WEST WALL SOUTH WALL CEILING

MAT COL MAT COL MAT FIN COL MAT FIN COL MAT FIN COL MAT FIN COL MAT COL

100 CORRIDOR SC -- RB 1 GYP PT 1 GYP PT 1 GYP PT 1 GYP PT 1 ACT 1

100A CORRIDOR SC -- RB 1 GYP PT 1 GYP -- -- GYP PT 1 GYP PT 1 GYP PT-4

100B CORRIDOR SRF 2 SRWB 2 GYP PT 1 GYP PT 1 -- -- -- GYP PT 1 ACT 1

101 BREAKROOM PC -- RB 1 GYP WC 1 GYP PT 1 GYP PT 1 GYP PT 1 ACT 1

102 LARS LVT 1 RB 2 GYP PT 1 GYP PT 1 GYP PT 1 GYP PT 1 ACT 1

103 TECHNICAL LIBRARY LVT 1 RB 2 GYP PT 1 GYP PT 1 GYP PT 1 GYP PT 1 ACT 1

104 FIRE SUPPRESSION ROOM SC -- RB 1 GYP PT 2 CMU PT 2 CMU PT 2 CMU PT 2 OTS PT-4

105 FACILITY STORAGE SC -- RB 1 GYP PT 2 CMU PT 2 CMU PT 2 GYP PT 2 OTS PT-4

106 ELECTRICAL ROOM SC -- RB 1 GYP PT 2 CMU PT 2 CMU PT 2 CMU PT 2 OTS PT-4

107 MECHANICAL ROOM SC -- RB 1 GYP PT 2 GYP PT 2 CMU PT 2 CMU PT 2 OTS PT-4

108 JANITOR CLOSET SC -- RB 1 GYP PT 2 GYP PT 2 GYP PT 2 GYP PT 2 OTS PT-4

109 MEN'S RESTROOM SHOWER & LOCKER ROOM SRF 3 SRWB 3 GYP PWT 2 / 3 GYP PWT 2 / 3 GYP PWT 2 / 3 GYP PWT 2 / 3 GYP PT-5

110 WOMEN'S RESTROOM SHOWER & LOCKER ROOM SRF 3 SRWB 3 GYP PWT 1 / 3 GYP PWT 1 / 3 GYP PWT 1 / 3 CMU PWT 1 / 3 GYP PT-5

111 ELEVATOR EQUIPMENT ROOM SC -- RB 1 CMU PT 2 CMU PT 2 CMU PT 2 CMU PT 2 GYP PT-4

112 TELECOM EQUIPMENT ROOM SC -- RB 1 CMU PT 2 CMU PT 2 CMU PT 2 CMU PT 2 OTS PT-4

113 MC ORDERLY ROOM LVT 1 RB 2 GYP PT 1 GYP PT 1 GYP PT 1 GYP PT 1 ACT 1

113A MC COMPONET REPAIR PLATOON OFFICE LVT 1 RB 2 GYP PT 1 GYP PT 1 GYP PT 3 GYP PT 1 ACT 1

113B MC COMMANDER OFFICE LVT 1 RB 2 GYP PT 1 GYP PT 1 GYP PT 3 GYP PT 1 ACT 1

113C MC 1ST SERGEANT OFFICE LVT 1 RB 2 GYP PT 1 CMU PT 3 GYP PT 1 GYP PT 1 ACT 1

113D MC AIRFRAME REPAIR PLATOON OFFICE LVT 1 RB 2 GYP PT 1 CMU PT 3 GYP PT 1 GYP PT 1 ACT 1

114 PNEUDRAULICS SRF 2 SRWB 2 CMU PT 1 CMU PT 1 CMU PT 1 CMU PT 1 OTS PT-4

114A PNEUDRAULICS STORAGE SRF 2 SRWB 2 CMU PT 1 CMU PT 1 CAGE -- -- CMU PT 1 OTS PT-4

115 COMPRESSOR ROOM SC -- RB 1 CMU PT 2 CMU PT 2 CMU PT 2 CMU PT 2 OTS PT-4

116 MECHANICAL ROOM SC -- RB 1 CMU PT 2 CMU PT 2 CMU PT 2 CMU PT 2 OTS PT-4

117 BLADE REPAIR SHOP SRF 2 SRWB 2 GYP PT 2 CMU PT 2 CMU PT 2 CMU PT 2 OTS PT-4

118 STRUCTURAL REPAIR SHOP SRF 2 SRWB 2 GYP PT 2 GYP PT 2 CMU PT 2 CMU PT 2 OTS PT-4

118A STRUCTURAL REPAIR SHOP STORAGE SRF 2 SRWB 2 CAGE -- -- CAGE -- -- CMU PT 2 CMU PT 2 OTS PT-4

119 POWER PLANT / POWERTRAIN SHOP SRF 2 SRWB 2 GYP PT 2 CMU PT 2 GYP PT 2 CMU PT 2 OTS PT-4

119A NON-DESTRUCTIVE INSPECTION (NDI) ROOM SRF 2 SRWB 2 GYP PT 2 CMU PT 2 GYP PT 2 CMU PT 2 GYP PT-4

119B POWER PLANT / POWERTRAIN SHOP STORAGE SRF 2 SRWB 2 CAGE -- -- CMU PT 2 CAGE -- -- CMU PT 2 OTS PT-4

119C POWER PLANT / POWERTRAIN SHOP STORAGE SRF 2 SRWB 2 CAGE -- -- CMU PT 2 CAGE -- -- CAGE -- -- OTS PT-4

120 SYSTEMS REPAIR SHOP SDT 1 RB 3 CMU PT 1 VARIES PT 1 VARIES PT 1 CMU PT 1 OTS PT-4

120A SHOP SECTION HQ LVT 1 RB 2 GYP PT 1 CMU PT 1 GYP PT 1 GYP PT 1 ACT 1

120B COMSEC SECURE STORAGE SDT 1 RB 3 GYP PT 1 GYP PT 1 GYP PT 1 CONC PT 1 GYP PT-4

120C ARMS VAULT - AIRCRAFT MOUNTED WEAPONS SDT 1 RB 3 CONC PT 2 CONC PT 2 CONC PT 2 CMU PT 2 CONC PT-4

121 REPAIR SECTION WORKROOM SC -- RB 1 GYP PT 1 GYP PT 1 GYP PT 1 GYP PT 1 OTS PT-4

121A REPAIR SECTION WORKROOM STORAGE SC -- RB 1 CAGE -- -- GYP PT 1 CAGE -- -- GYP PT 1 OTS PT-4

122 SPECIAL TOOLS ROOM SC -- RB 1 GYP PT 1 CMU PT 1 GYP PT 1 GYP PT 1 OTS PT-4

123 QUALITY CONTROL LVT 1 RB 2 GYP PT 1 GYP PT 1 GYP PT 1 GYP PT 1 ACT 1

123A QUALITY CONTROL OFFICE LVT 1 RB 2 GYP PT 3 GYP PT 2 GYP PT 2 GYP PT 2 ACT 1

124 SIPRNET ROOM SC -- RB 1 GYP PT 2 GYP PT 2 GYP PT 2 GYP PT 2 OTS PT-4

125 PRODUCTION CONTROL LVT 1 RB 2 GYP PT 1 GYP PT 1 GYP PT 1 GYP PT 1 ACT 1

125A PRODUCTION CONTROL OFFICE LVT 1 RB 2 GYP PT 3 GYP PT 1 GYP PT 1 GYP PT 1 ACT 1

125B ULLS-A EQUIPMENT ROOM LVT 1 RB 2 GYP PT 2 GYP PT 2 GYP PT 2 GYP PT 2 ACT 1

126 CREW CHIEF WORKROOM SC -- RB 1 GYP PT 1 GYP PT 1 GYP PT 1 GYP PT 1 OTS PT-4

127 MAINTENANCE TEST PILOT OFFICE SC -- RB 1 GYP PT 2 GYP PT 2 GYP PT 2 GYP PT 3 ACT 1

128 CREW CHIEF WORKROOM SC -- RB 1 GYP PT 1 GYP PT 1 GYP PT 1 GYP PT 1 OTS PT-4

128A CREW CHIEF CAGED STORAGE CAGE -- -- CAGE -- -- GYP GYP

129 MAINTENANCE TEST PILOT OFFICE SC -- RB 1 GYP PT 2 GYP PT 2 GYP PT 2 GYP PT 3 ACT 1

130 CREW CHIEF WORKROOM SC -- RB 1 GYP PT 1 GYP PT 1 GYP PT 1 GYP PT 1 OTS PT-4

130A CREW CHIEF CAGED STORAGE CAGE -- -- CAGE -- -- GYP GYP

131 MAINTENANCE TEST PILOT OFFICE SC -- RB 1 GYP PT 2 GYP PT 2 GYP PT 2 GYP PT 3 ACT 1

132 TR SC -- RB 1 GYP PT 2 CMU PT 2 GYP PT 2 GYP PT 2 OTS PT-4

133 RECYCLABLE STORAGE SC -- RB 1 GYP PT 2 GYP PT 2 GYP PT 2 GYP PT 2 GYP PT-4

134 ELECTRICAL ROOM SC -- RB 1 GYP PT 2 GYP PT 2 CMU PT 2 GYP PT 2 OTS PT-4

135 MECHANICAL ROOM SC -- RB 1 CMU PT 2 CMU PT 2 CMU PT 2 GYP PT 2 OTS PT-4

136 AC ARMS VAULT SC -- RB 1 CONC PT 2 CONC PT 2 CONC PT 2 CONC PT 2 CONC PT-4

137 AC ARMS VAULT SC -- RB 1 CONC PT 2 CONC PT 2 CONC PT 2 CONC PT 2 CONC PT-4

138 AC ARMS VAULT SC -- RB 1 CONC PT 2 CONC PT 2 CONC PT 2 CONC PT 2 CONC PT-4

139 MC ARMS VAULT SC -- RB 1 CONC PT 2 CONC PT 2 CONC PT 2 CONC PT 2 CONC PT-4

140 AC UNIT STORAGE SC -- RB 1 GYP PT 2 GYP PT 2 GYP PT 2 CAGE PT 2 OTS PT-4

140A AC NBC STORAGE SC -- RB 1 GYP PT 2 CAGE -- -- GYP PT 2 GYP PT 2 OTS PT-4

140B AC NON-SENSTIVE SECURE STORAGE SC -- RB 1 GYP PT 2 GYP PT 2 GYP PT 2 GYP PT 2 GYP PT-4

140C AC COMMUNICATIONS STORAGE SC -- RB 1 CAGE -- -- GYP PT 2 GYP PT 2 GYP PT 2 OTS PT-4

ELEVATOR ELEVATOR LVT 1 -- -- STEEL -- -- STEEL -- -- STEEL -- -- STEEL -- -- STEEL --

E

D

IT

G E

N E

R A

L N

O T

E M

A R

2. NORTH, SOUTH, EAST, AND WEST, AS NOTED ON THE INTERIOR FINISH

SCHEDULE SHALL BE IN ACCORDANCE WITH PLAN NORTH AS INDICATED ON

THE ARCHITECTURAL FLOOR PLANS.

3. PAINT ALL INTERIOR WALL AND CEILING MOUNTED ITEMS SUCH AS VENTS,

GRILL COVERS, LIGHT FIXTURE TRIM RINGS, ETC. TO MATCH THE SURFACE

COLOR ON WHICH THEY APPEAR.

4. ALL CARPET SEAMS ARE TO BE PROPERLY BLENDED, USING MANUFACTURER'S

RECOMMENDATIONS.

5. PRODUCTS LISTED BY MANUFACTURER ARE FOR IDENTIFICATION AND

PERFORMANCE PURPOSES ONLY. THEY ARE NOT INTENDED TO LIMIT

SELECTION FROM OTHER MANUFACTURERS. HOWEVER, COLORS, PATTERNS,

TEXTURES, AND PROFILES SHALL COORDINATE WITH THOSE LISTED ON THIS

LEGEND IN ORDER TO MAINTAIN COLOR COORDINATION AND VISUAL DESIGN

INTEGRITY.

6. ALL FLOOR FINISH CHANGES ARE TO BE PROVIDED PROPER TRANSITION

STRIPS AND FLOOR LEVELING AS REQUIRED. SEE FINISH SCHEDULE FOR

TRANSITION STRIP TYPES.

7. REFER TO INTERIOR ELEVATION DRAWINGS FOR WALLS WITH "VARIOUS"

FINISHES.

8. PAINT IN RESTROOMS AND WET AREAS SHALL BE EPOXY BASED PAINT.

9. PROVIDE NO HARDERNER OR SEALER TO FLOORS RECEIVING SEAMLESS

RESINOUS FLOORING (SRF).

SHEET NOTES:

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

US Army Corps of Engineers

S O

L

IC

IT

A

T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T

E D

B Y

D A

T E

C O

N T

R A

C T

N O

C

H E

C K

E D

B Y

D R

A W

N B

Y

IS

S

U E

D A

T E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

File Path:

Plot Date:

C:\Users\g5eddwcf\Documents\_477687_Hangar_RVT20_AI_g5eddwcf.rvt

3/12/2024 2:06:01 PM

IN602

HANGAR

IN

T

E R

IO

R

F

IN

IS

H

S C

H E

D U

L E

F O

R T

R

IL

E Y

K

A N

S A

S

K A

N S

A S

C

IT

Y D

IS

T

R

IC

T C

F

O R

D

C F

O R

D

C B

R O

W N

C G

A T

E W

O O

D

J A

N U

A R

Y

W D

Q -2

-R

-4

F

IL

E N

A M

E

RTA

A T

T A

C K

A V

IA

T

IO

N

B A

T T

A L

IO

N C

O M

P L E

X

P N

F Y

H a n g a r_

R V

T A

I.

rv t

PRODUCTION DATA 4PROD DATA 3

P

E

T

H S

T R

E E

T

K A

N S

A S

C

IT

Y M

O

A N

S I D

INTERIOR FINISH SCHEDULE ROOMS 142-211

ROOM

NUMBER

ROOM NAME

FLOOR BASE NORTH WALL EAST WALL WEST WALL SOUTH WALL CEILING

MAT COL MAT COL MAT FIN COL MAT FIN COL MAT FIN COL MAT FIN COL MAT COL

141 AC UNIT STORAGE SC -- RB 1 GYP PT 2 CMU PT 2 GYP PT 2 CAGE PT 2 OTS PT-4

141A AC NBC STORAGE SC -- RB 1 GYP PT 2 CAGE -- -- CMU PT 2 GYP PT 2 OTS PT-4

141B AC NON-SENSTIVE SECURE

STORAGE

SC -- RB 1 GYP PT 2 GYP PT 2 CMU PT 2 GYP PT 2 GYP PT-4

141C AC COMMUNICATIONS

STORAGE

SC -- RB 1 CAGE -- -- CMU PT 2 GYP PT 2 GYP PT 2 OTS PT-4

142 AC UNIT STORAGE SC -- RB 1 GYP PT 2 CMU PT 2 GYP PT 2 CAGE PT 2 OTS PT-4

142A AC NBC STORAGE SC -- RB 1 GYP PT 2 CAGE -- -- CMU PT 2 GYP PT 2 OTS PT-4

142B AC NON-SENSTIVE SECURE

STORAGE

SC -- RB 1 GYP PT 2 GYP PT 2 CMU PT 2 GYP PT 2 GYP PT-4

142C AC COMMUNICATIONS

STORAGE

SC -- RB 1 CAGE -- -- CMU PT 2 GYP PT 2 GYP PT 2 OTS PT-4

143 MC UNIT STORAGE SC -- RB 1 GYP PT 2 CMU PT 2 GYP PT 2 CAGE -- -- OTS PT-4

143A MC NBC STORAGE SC -- RB 1 GYP PT 2 CAGE -- -- CMU PT 2 GYP PT 2 OTS PT-4

143B MC NON-SENSITIVE SECURE

STORAGE

SC -- RB 1 GYP PT 2 GYP PT 2 CMU PT 2 GYP PT 2 GYP PT-4

143C MC COMMUNICATIONS

STORAGE

SC -- RB 1 CAGE -- -- CMU PT 2 GYP PT 2 GYP PT 2 OTS PT-4

144 CLS LVT 1 RB 2 GYP PT 1 GYP PT 1 CMU PT 1 GYP PT 1 ACT 1

144A CLS STORAGE LVT 1 RB 2 GYP PT 1 GYP PT 1 CAGE -- -- CAGE -- -- ACT 1

145 LARS LVT 1 RB 2 GYP PT 1 GYP PT 1 GYP PT 1 GYP PT 1 ACT 1

146 MOTHER'S ROOM LVT 1 RB 2 GYP PT 1 GYP WC 1 GYP PT 1 GYP PT 1 ACT 1

147 JANITOR CLOSET SC RB 1 GYP PT 2 GYP PT 2 GYP PT 2 CMU PT 2 GYP PT-4

148 MEN'S RESTROOM SRF 3 SRWB 3 GYP PWT 2 / 3 CMU PWT 2 / 3 GYP PWT 2 / 3 CMU PWT 2 / 3 GYP PT-5

149 WOMEN'S RESTROOM SRF 3 SRWB 3 GYP PWT 1 / 3 CMU PWT 1 / 3 GYP PWT 1 / 3 GYP PWT 1 / 3 GYP PT-5

150 TR SC -- RB 1 GYP PT 2 GYP PT 2 GYP PT 2 GYP PT 2 GYP PT-4

151 AIRCRAFT PARTS SUPPLY SC -- RB 1 CMU PT 1 CMU PT 1 CMU PT 1 CMU PT 1 OTS PT-4

151A AIRCRAFT PARTS SUPPLY

OFFICE

LVT 1 RB 2 CMU PT 2 CMU PT 2 CMU PT 2 CMU PT 2 ACT 1

152 AIRCRAFT MAINTENANCE BAY SRF 1 -- -- CMU PT 1 CMU PT 1 CMU PT 1 CMU PT 1 OTS PT-4

153 VESTIBULE EM | EMT 1 RB 1 GYP PT 1 GYP PT 1 GYP PT 1 CMU PT 1 GYP PT-4

154 VESTIBULE EM | EMT 1 RB 1 GYP PT 1 GYP PT 1 GYP PT 1 GYP PT 1 GYP PT-4

155 VESTIBULE EM | EMT 1 RB 1 GYP PT 1 GYP PT 1 GYP PT 1 GYP PT 1 GYP PT-4

156 VESTIBULE EM | EMT 1 RB 1 GYP PT 1 GYP PT 1 GYP PT 1 GYP PT 1 GYP PT-4

157 VESTIBULE EM | EMT 1 RB 1 GYP PT 1 GYP PT 1 GYP PT 1 GYP PT 1 GYP PT-4

158 VESTIBULE EM | EMT 1 RB 1 GYP PT 1 GYP PT 1 GYP PT 1 GYP PT 1 GYP PT-4

159 VESTIBULE EM | EMT 1 RB 1 GYP PT 1 GYP PT 1 GYP PT 1 GYP PT 1 GYP PT-4

200 CORRIDOR PC -- RB 1 GYP PT 1 CMU PT 1 CMU PT 1 GYP PT 1 ACT 1

200A CORRIDOR PC -- RB 1 GYP PT 1 GYP PT 1 GYP PT 1 GYP PT 1 ACT 1

201 AC ORDERLY ROOM LVT 2 RB 4 GYP PT 1 GYP PT 1 GYP PT 1 GYP PT 1 ACT 1

201A AC 1ST SERGEANT OFFICE LVT 3 RB 4 GYP PT 3 GYP PT 2 GYP PT 2 GYP PT 2 ACT 1

201B AC COMMANDER OFFICE LVT 3 RB 4 GYP PT 3 GYP PT 2 GYP PT 2 GYP PT 2 ACT 1

202 AC PILOT WORKROOM LVT 2 RB 4 GYP PT 1 GYP PT 1 GYP PT 1 GYP PT 1 ACT 1

202A AC TACTICAL OPERATION

OFFICE

LVT 2 RB 4 GYP PT 2 GYP PT 2 GYP PT 3 GYP PT 2 ACT 1

202B AC AVIATION SAFETY OFFICE LVT 2 RB 4 GYP PT 2 GYP PT 2 GYP PT 3 GYP PT 2 ACT 1

202C AC PLATOON OFFICE LVT 2 RB 4 GYP PT 1 GYP PT 1 GYP PT 1 GYP PT 1 ACT 1

202D AC STANDARDIZATION OFFICE LVT 2 RB 4 GYP PT 1 GYP PT 1 GYP PT 1 GYP PT 1 ACT 1

203 BREAKROOM PC -- RB 1 VARIES -- -- GYP PT 1 GYP PT 1 GYP PT 1 ACT 1

204 UNISEX RESTROOM SRF 3 SRWB 3 GYP PWT 2 / 3 GYP PWT 2 / 3 GYP PWT 2 / 3 GYP PWT 2 / 3 GYP PT-5

205 UNISEX RESTROOM SRF 3 SRWB 3 GYP PWT 2 / 3 GYP PWT 2 / 3 GYP PWT 2 / 3 GYP PWT 2 / 3 GYP PT-5

206 FLIGHT PLANNING LVT 2 RB 4 GYP PT 1 GYP PT 1 GYP PT 1 GYP PT 1 ACT 1

206A SECURE PLANNING ROOM LVT 3 RB 4 GYP PT 1 GYP PT 1 GYP PT 1 GYP PT 1 ACT 1

207 ELECTRICAL ROOM SC -- RB 1 CMU PT 2 GYP PT 2 GYP PT 2 GYP PT 2 OTS PT-4

208 TR SC -- RB 1 GYP PT 2 GYP PT 2 GYP PT 2 CMU PT 2 OTS PT-4

209 MECHANICAL ROOM SC -- RB 1 GYP PT 2 CMU PT 2 GYP PT 2 GYP PT 2 OTS PT-4

210 ALSE STORAGE LVT 1 RB 2 GYP PT 2 GYP PT 2 GYP PT 2 GYP PT 2 ACT 1

211 ALSE SHOP LVT 1 RB 2 GYP PT 2 GYP PT 2 GYP PT 2 GYP PT 2 ACT 1

E

D

IT

G E

N E

R A

L N

O T

E M

A R

2. NORTH, SOUTH, EAST, AND WEST, AS NOTED ON THE INTERIOR FINISH

SCHEDULE SHALL BE IN ACCORDANCE WITH PLAN NORTH AS INDICATED ON

THE ARCHITECTURAL FLOOR PLANS.

3. PAINT ALL INTERIOR WALL AND CEILING MOUNTED ITEMS SUCH AS VENTS,

GRILL COVERS, LIGHT FIXTURE TRIM RINGS, ETC. TO MATCH THE SURFACE

COLOR ON WHICH THEY APPEAR.

4. ALL CARPET SEAMS ARE TO BE PROPERLY BLENDED, USING MANUFACTURER'S

RECOMMENDATIONS.

5. PRODUCTS LISTED BY MANUFACTURER ARE FOR IDENTIFICATION AND

PERFORMANCE PURPOSES ONLY. THEY ARE NOT INTENDED TO LIMIT

SELECTION FROM OTHER MANUFACTURERS. HOWEVER, COLORS, PATTERNS,

TEXTURES, AND PROFILES SHALL COORDINATE WITH THOSE LISTED ON THIS

LEGEND IN ORDER TO MAINTAIN COLOR COORDINATION AND VISUAL DESIGN

INTEGRITY.

6. ALL FLOOR FINISH CHANGES ARE TO BE PROVIDED PROPER TRANSITION

STRIPS AND FLOOR LEVELING AS REQUIRED. SEE FINISH SCHEDULE FOR

TRANSITION STRIP TYPES.

7. REFER TO INTERIOR ELEVATION DRAWINGS FOR WALLS WITH "VARIOUS"

FINISHES.

8. PAINT IN RESTROOMS AND WET AREAS SHALL BE EPOXY BASED PAINT.

9. PROVIDE NO HARDERNER OR SEALER TO FLOORS RECEIVING SEAMLESS

RESINOUS FLOORING (SRF).

SHEET NOTES:

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

US Army Corps of Engineers

S O

L

IC

IT

A

T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T

E D

B Y

D A

T E

C O

N T

R A

C T

N O

C

H E

C K

E D

B Y

D R

A W

N B

Y

IS

S

U E

D A

T E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

File Path:

Plot Date:

C:\Users\g5eddwcf\Documents\_477687_Hangar_RVT20_AI_g5eddwcf.rvt

3/12/2024 2:06:03 PM

IN603

HANGAR

IN

T

E R

IO

R

F

IN

IS

H

S C

H E

D U

L E

F O

R T

R

IL

E Y

K

A N

S A

S

K A

N S

A S

C

IT

Y D

IS

T

R

IC

T C

F

O R

D

C F

O R

D

C B

R O

W N

C G

A T

E W

O O

D

J A

N U

A R

Y

W D

Q -2

-R

-4

F

IL

E N

A M

E

RTA

A T

T A

C K

A V

IA

T

IO

N

B A

T T

A L

IO

N C

O M

P L E

X

P N

F Y

H a n g a r_

R V

T A

I.

rv t

PRODUCTION DATA 4PROD DATA 3

P

E

T

H S

T R

E E

T

K A

N S

A S

C

IT

Y M

O

A N

S I D

INTERIOR FINISH SCHEDULE ROOMS 212-S203

ROOM

NUMBER

ROOM NAME

FLOOR BASE NORTH WALL EAST WALL WEST WALL SOUTH WALL CEILING

MAT COL MAT COL MAT FIN COL MAT FIN COL MAT FIN COL MAT FIN COL MAT COL

212 JANITOR / FACILITY STORAGE SC -- RB 1 GYP PT 2 GYP PT 2 GYP PT 2 GYP PT 2 GYP PT-4

213 FLIGHT OPERATIONS LVT 2 RB 4 CMU PT 1 GYP PT 1 CMU PT 1 GYP PT 1 ACT 1

213A FLIGHT OPERATION OFFICE LVT 3 RB 4 GYP PT 2 GYP PT 3 GYP PT 2 GYP PT 2 ACT 1

213B FLIGHT OPERATIONS SECURE

STORAGE

LVT 2 RB 4 GYP PT 1 GYP PT 1 GYP PT 1 GYP PT 1 GYP PT-4

214 DT/CBT ROOM LVT 2 RB 4 GYP PT 1 CMU PT 1 GYP PT 1 GYP PT 1 ACT 1

215 PILOT LOCKER ROOM PC -- RB 1 GYP PT 2 GYP PT 2 GYP PT 2 GYP PT 2 ACT 1

216 CONFERENCE / TRAINING

ROOM

LVT 3 RB 4 GYP PT 3 GYP PT 1 GYP PT 1 GYP PT 1 ACT 1

217 CONFERENCE / TRAINING

ROOM

LVT 3 RB 4 GYP PT 1 GYP PT 3 GYP PT 1 GYP PT 1 ACT 1

218 SIPRNET ROOM SC -- RB 1 GYP PT 2 GYP PT 2 GYP PT 2 GYP PT 2 OTS PT-4

219 PILOT BRIEFING ROOM LVT 2 RB 4 GYP PT 1 GYP PT 1 GYP PT 1 GYP PT 1 ACT 1

219A PILOT BRIEFING ROOM

STORAGE

LVT 2 RB 4 GYP PT 1 GYP PT 1 GYP PT 1 GYP PT 1 ACT 1

220 TA-50 LOCKER ROOM (AC) PC -- RB 1 GYP PT 2 CMU PT 2 GYP PT 2 GYP PT 2 OTS 1

221 TA-50 LOCKER ROOM (MC) PC -- RB 1 GYP PT 2 CMU PT 2 GYP PT 2 GYP PT 2 OTS 1

222 ELECTRICAL ROOM SC -- RB 1 GYP PT 2 CMU PT 2 GYP PT 2 GYP PT 2 OTS PT-4

223 MECHANICAL ROOM SC -- RB 1 VARIES PT 2 VARIES PT 2 VARIES PT 2 GYP PT 2 OTS PT-4

224 TELECOM ROOM SC -- RB 1 GYP PT 2 GYP PT 2 CMU PT 2 GYP PT 2 OTS PT-4

225 TA-50 LOCKER ROOM (AC) PC -- RB 1 CMU PT 2 GYP PT 2 CAGE -- -- GYP PT 2 OTS 1

226 TA-50 LOCKER ROOM (AC) PC -- RB 1 CMU PT 2 CAGE -- -- CMU PT 2 GYP PT 2 OTS 1

227 AC ORDERLY ROOM LVT 2 RB 4 GYP PT 1 GYP PT 1 GYP PT 1 GYP PT 1 ACT 1

227A AC 1ST SERGEANT OFFICE LVT 3 RB 4 GYP PT 3 GYP PT 2 CMU PT 2 GYP PT 2 ACT 1

227B AC COMMANDER OFFICE LVT 3 RB 4 GYP PT 3 GYP PT 2 CMU PT 2 GYP PT 2 ACT 1

228 AC PILOT WORKROOM LVT 2 RB 4 GYP PT 1 GYP PT 1 GYP PT 1 GYP PT 1 ACT 1

228A AC TACTICAL OPERATION

OFFICE

LVT 2 RB 4 GYP PT 2 GYP PT 2 GYP PT 3 GYP PT 2 ACT 1

228B AC AVIATION SAFETY OFFICE LVT 2 RB 4 GYP PT 2 GYP PT 2 GYP PT 3 GYP PT 2 ACT 1

228C AC PLATOON OFFICE LVT 2 RB 4 GYP PT 1 GYP PT 1 GYP PT 1 GYP PT 1 ACT 1

228D AC STANDARDIZATION OFFICE LVT 2 RB 4 GYP PT 1 GYP PT 1 GYP PT 1 GYP PT 1 ACT 1

229 AC ORDERLY ROOM LVT 2 RB 4 GYP PT 1 GYP PT 1 GYP PT 1 GYP PT 1 ACT 1

229A AC 1ST SERGEANT OFFICE LVT 3 RB 4 GYP PT 3 GYP PT 2 GYP PT 2 GYP PT 2 ACT 1

229B AC COMMANDER OFFICE LVT 3 RB 4 GYP PT 3 GYP PT 2 GYP PT 2 GYP PT 2 ACT 1

230 AC PILOT WORKROOM LVT 2 RB 4 GYP PT 1 GYP PT 1 GYP PT 1 GYP PT 1 ACT 1

230A AC TACTICAL OPERATION

OFFICE

LVT 2 RB 4 GYP PT 2 GYP PT 2 GYP PT 3 GYP PT 2 ACT 1

230B AC AVIATION SAFETY OFFICE LVT 2 RB 4 GYP PT 2 GYP PT 2 GYP PT 3 GYP PT 2 ACT 1

230C AC PLATOON OFFICE LVT 2 RB 4 GYP PT 1 GYP PT 1 GYP PT 1 GYP PT 1 ACT 1

230D AC STANDARDIZATION OFFICE LVT 2 RB 4 GYP PT 1 GYP PT 1 GYP PT 1 GYP PT 1 ACT 1

231 WOMEN'S RESTROOM SRF 3 SRWB 1 GYP PWT 1 / 3 CMU PWT 1 / 3 GYP PWT 1 / 3 GYP PWT 1 / 3 GYP PT-4

232 MEN'S RESTROOM SRF 3 SRWB 2 GYP PWT 2 / 3 CMU PWT 2 / 3 GYP PWT 2 / 3 GYP PWT 2 / 3 GYP PT-4

233 TR SC -- RB 1 GYP PT 2 CMU PT 2 CMU PT 2 CMU PT 2 OTS PT-4

S101 STAIRWELL PC 1 RB 5 CMU PT 2 GYP PT 2 CMU PT 2 CMU PT 2 GYP PT-4

S102 STAIRWELL PC 1 RB 5 GYP PT 2 CMU PT 2 CMU PT 2 CMU PT 2 GYP PT-4

S103 STAIRWELL PC 1 RB 5 CMU PT 2 CMU PT 2 CMU PT 2 CMU PT 2 GYP PT-4

S201 STAIRWELL PC 1 RB 5 CMU PT 2 CMU PT 2 CMU PT 2 CMU PT 2 GYP PT-4

S202 STAIRWELL PC 1 RB 5 GYP PT 2 CMU PT 2 CMU PT 2 CMU PT 2 GYP PT-4

S203 STAIRWELL PC 1 RB 5 CMU PT 2 CMU PT 2 CMU PT 2 CMU PT 2 GYP PT-4

E

D

IT

G E

N E

R A

L N

O T

E M

A R

1. IN ACCORDANCE WITH LEED, FINISHES THAT HAVE DOCUMENTATION THAT

CONTRIBUTE TO THE FOLLOWING MATERIALS AND RESOURCES CREDITS:

ENVIRONMENTAL PRODUCT DECLARATIONS

MATERIAL INGREDIENTS

ARE INDICATED UNDER THE LEED COLUMN ON THE INTERIOR MATERIALS

FINISH LEGEND. INFORMATION PROVIDED IN THIS INTERIOR MATERIALS FINISH

LEGEND REPRESENT THE MINIMUM REQUIREMENTS FOR THESE CREDITS. ANY

ALTERNATIVES CHOSEN SHALL SUPPLEMENT THE AFOREMENTIONED CREDITS.

2. NORTH, SOUTH, EAST, AND WEST, AS NOTED ON THE INTERIOR FINISH

SCHEDULE SHALL BE IN ACCORDANCE WITH PLAN NORTH AS INDICATED ON

THE ARCHITECTURAL FLOOR PLANS.

3. PAINT ALL INTERIOR WALL AND CEILING MOUNTED ITEMS SUCH AS VENTS,

GRILL COVERS, LIGHT FIXTURE TRIM RINGS, ETC. TO MATCH THE SURFACE

COLOR ON WHICH THEY APPEAR.

4. ALL CARPET SEAMS ARE TO BE PROPERLY BLENDED, USING MANUFACTURER'S

RECOMMENDATIONS.

5. PRODUCTS LISTED BY MANUFACTURER ARE FOR IDENTIFICATION AND

PERFORMANCE PURPOSES ONLY. THEY ARE NOT INTENDED TO LIMIT

SELECTION FROM OTHER MANUFACTURERS. HOWEVER, COLORS, PATTERNS,

TEXTURES, AND PROFILES SHALL COORDINATE WITH THOSE LISTED ON THIS

LEGEND IN ORDER TO MAINTAIN COLOR COORDINATION AND VISUAL DESIGN

INTEGRITY.

6. ALL FLOOR FINISH CHANGES ARE TO BE PROVIDED PROPER TRANSITION

STRIPS AND FLOOR LEVELING AS REQUIRED. SEE FINISH SCHEDULE FOR

TRANSITION STRIP TYPES.

7. REFER TO INTERIOR ELEVATION DRAWINGS FOR WALLS WITH "VARIOUS"

FINISHES.

8. PAINT IN RESTROOMS AND WET AREAS SHALL BE EPOXY BASED PAINT.

9. PROVIDE NO HARDENER OR SEALER TO FLOORS RECEIVING SEAMLESS

RESINOUS FLOORING (SRF).

10. PROVIDE WINDOW SILLS AT ALL EXTERIOR WINDOW LOCATIONS OF 1/2" THICK

SOLID SURFACE MATERIAL (SSM-1).

11. UNLESS OTHERWISE SPECIFIED, FINISH ALL GYPSUM BOARD WALLS,

PARTITIONS, AND CEILINGS TO LEVEL 5 IN ACCORDANCE WITH SPECIFICATION

SECTION 09 29 00.

12. WALLS FINISHED WITH A WALL COVERING (WC-1) SHALL RECIEVE A LEVEL 5

GYPSUM BOARD FINISH IN ACCORDANCE WITH SPECIFICATION SECTION

09 29 00.

13. WALLS BEHIND ITEMS SUCH AS LOCKERS, SOLID SURFACE PANELS, AND TILE

SHALL RECIEVE A LEVEL 2 GYPSUM BOARD FINISH IN ACCORDANCE WITH

SPECIFICATION SECTION 09 29 00.

SHEET NOTES:

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

US Army Corps of Engineers

S O

L

IC

IT

A

T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T

E D

B Y

D A

T E

C O

N T

R A

C T

N O

C

H E

C K

E D

B Y

D R

A W

N B

Y

IS

S

U E

D A

T E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

File Path:

Plot Date:

C:\Users\g5eddwcf\Documents\_477687_Hangar_RVT20_AI_g5eddwcf.rvt

3/12/2024 2:06:05 PM

IN604

HANGAR

IN

T

E R

IO

R

M A

T E

R

IA

L S

F

IN

IS

H

L E

G E

N D

F O

R T

R

IL

E Y

K

A N

S A

S

K A

N S

A S

C

IT

Y D

IS

T

R

IC

T C

F

O R

D

C F

O R

D

C B

R O

W N

C G

A T

E W

O O

D

J A

N U

A R

Y

W D

Q -2

-R

-4

F

IL

E N

A M

E

RTA

A T

T A

C K

A V

IA

T

IO

N

B A

T T

A L

IO

N C

O M

P L E

X

P N

F Y

H a n g a r_

R V

T A

I.

rv t

PRODUCTION DATA 4PROD DATA 3

P

E

T

H S

T R

E E

T

K A

N S

A S

C

IT

Y M

O

A N

S I D

INTERIOR MATERIALS FINISH LEGEND

SPEC

SECTION CODE ITEM MANUFACTURER NAME / COLOR

MFGRS.

NO.

LEED

REMARKSEPD MI

CASEWORK / MILLWORK

06 41 16 PL-1 HIGH PRESSURE DECORATIVE LAMINATE WILSONART UPTOWN WALNUT 7971K-12 Yes Yes CASEWORK

12 36 00 QTZ-1 QUARTZ SURFACE WILSONART TELLARO Q4025 Yes COUNTERTOP

06 61 16 SSM-1 SOLID SURFACE MATERIAL WILSONART CASHMERE MIRAGE 9135MG

(2)

Yes WINDOW SILLS / COUNTER TOP

12 36 00 WD-1 WOOD COUNTER TOP -- -- -- SHOP COUNTER TOP

CEILINGS

09 51 00 ACT-1 ACOUSTIC CEILING TILE -- MANUFACTURERS STANDARD COLOR: WHITE -- Yes Yes 24" X 24"; SQUARE LAY-IN 15/16

09 90 00 PT-4 PAINT SHERWIN WILLIAMS PURE WHITE SW7005 Yes Yes EGGSHELL LUSTER; SEE: SPEC INTERIOR PAINT TABLES

09 90 00 PT-5 PAINT SHERWIN WILLIAMS PURE WHITE SW7005 Yes Yes EPOXY BASED; EGGSHELL LUSTER; SEE: SPEC INTERIOR PAINT TABLES

DOORS

08 11 16 HM HOLLOW METAL DOOR SHERWIN WILLIAMS ROCKWOOD MEDIUM BROWN SW2807 Yes Yes SEMIGLOSS LUSTER; SEE: SPEC INTERIOR PAINT TABLES

09 90 00 PT-6 PAINT SHERWIN WILLIAMS ROCKWOOD MEDIUM BROWN SW2807 Yes Yes SEMIGLOSS LUSTER; SEE: SPEC INTERIOR PAINT TABLES

FLOOR TRANSITION STRIP

09 65 00 FTS-1 FLOOR TRANSITION STRIP -- MANUFACTURERS STANDARD COLOR: STAINLESS

STEEL

-- SLOPPED FLOOR TRANSITIONS

09 65 00 FTS-2 FLOOR TRANSITION STRIP -- MANUFACTURERS STANDARD COLOR: STAINLESS

STEEL

-- SAME HEIGHT FLOOR TRANSITIONS

FLOORING

12 48 13 EM-1 ENTRANCE MAT CONSTRUCTION

SPECIALTIES

PEDIMAT AA M2 / GRAPHITE 9325 3/4" LEVEL BASE

12 48 13 EMT-1 ENTRANCE WALK OFF TILE PATCRAFT WALK RIGHT IN / CHARCOAL 00590 Yes Yes 24" X 24"; MONOLITHIC INSTALLATION; GLUE-DOWN

09 65 00 LVT-1 LUXURY VINYL TILE PATCRAFT LETTERPRESS / SCRIPT 00530 Yes Yes 24" X 24"; RANDOM INSTALLATION; GLUE-DOWN

09 68 00 LVT-2 LUXURY VINYL TILE PATCRAFT LETTERPRESS / SERIF 00500 Yes Yes 24" X 24"; RANDOM INSTALLATION; GLUE-DOWN

09 68 00 LVT-3 LUXURY VINYL TILE PATCRAFT PAINTED WEFT / HEDDLE 00500 Yes Yes 9" X 36"; MONOLITHIC INSTALLATION; GLUE DOWN

03 30 00 PC POLISHED CONCRETE -- -- -- --

09 65 00 RT-1 RUBBER TILE ROPPE MARBLEIZED / SLATE M175 Yes Yes 995 HAMMERED DESIGN WITH MONOLITHIC INSTALLATION

03 30 00 SC SEALED CONCRETE -- -- -- --

09 62 38 SDT-1 STATIC DISSIPITATIVE TILE ROPPE ESD RUBBER / CAMELLO F401 No Yes 24" X 24"; MONOLITHIC INSTALLATION; GLUE-DOWN

09 67 23.16 SRF-1 SEAMLESS RESINOUS FLOOR COATING STONHARD STONCLAD / SILVER GREY GS 4"H; 5-PART FUEL RESISTIVE RESINOUS FLOORING

09 67 23.15 SRF-2 SEAMLESS RESINOUS FLOOR COATING SHERWIN WILLIAMS RESUFLOR / STEEL GRAY 4"H; 3-PART FURL RESISTIVE RESINOUS FLOORING

09 67 23.13 SRF-3 SEAMLESS RESINOUS FLOOR COATING STONHARD STONTEC / GLACIER PEAK ERF 4"H; STANDARD DECORATIVE RESINOUS FLOORING

22 00 00 TRZ-1 TERRAZZO SHOWER BASIN FIAT GIBRALTER / WHITE PORTLAND CEMENT W/ BLACK

AND WHITE CHIPS

081 36" X 36" WITH STAINLESS STEEL STRAINER PLATE

LOCKER

10 51 13 LK1 SINGLE TIER FLIGHT GEAR LOCKER -- MANUFACTURERS STANDARD: METAL - GRAY --

10 51 13 LK2 DOUBLE TIER FLIGHT GEAR LOCKER -- MANUFACTURERS STANDARD: METAL - GRAY --

10 51 13 LK3 ASLE LOCKER -- MANUFACTURERS STANDARD: WIRE MESH --

10 51 13 LK5 DOUBLE TIER METAL LOCKER -- MANUFACTURERS STANDARD: METAL - GRAY --

STAIRS

05 51 00 PT-7 PAINT SHERWIN WILLIAMS ROCKWOOD MEDIUM BROWN SW2807 Yes Yes SEMIGLOSS LUSTER; SEE: SPEC INTERIOR PAINT TABLES

TOILET PARTITIONS

10 51 13 LK6 LOCKERS SCRANTON TUFFTEC LOCKERS / GREY -- Yes

10 21 13 TP TOILET PARTITIONS SCRANTON HINY HIDERS / GREY -- No Yes TEXTURE: ORANGE PEEL

WALL BASE

09 65 00 RB-1 RUBBER BASE ROPPE WALL BASE / SLATE 175 Yes STANDARD TOE; THERMOSET

09 65 00 RB-2 RUBBER BASE ROPPE WALL BASE / DOLPHIN 129 Yes STANDARD TOE; THERMOSET

09 65 00 RB-3 RUBBER BASE ROPPE WALL BASE / LIGHT GRAY 195 Yes STANDARD TOE; THERMOSET

09 67 23.16 SRWB-1 SEAMLESS RESINOUS WALL BASE STONHARD STONCHEM / GREY -- 4"H; 5-PART FUEL RESISTIVE RESINOUS FLOORING

09 67 23.15 SRWB-2 SEAMLESS RESINOUS WALL BASE STONHARD STONCLAD / SILVER GREY HT 4"H; 3-PART FURL RESISTIVE RESINOUS FLOORING

09 67 23.13 SRWB-3 SEAMLESS RESINOUS WALL BASE STONHARD STONTEC / GLACIER PEAK ERF 4"H; STANDARD DECORATIVE RESINOUS FLOORING

WALL PROTECTION

10 26 00 CG-1 CORNER GUARD CONSTRUCTION

SPECIALTIES

FS-20-N / OYSTER GRAY 929 Yes 72"H; FLUSH MOUNTED

10 26 00 CR-1 CHAIR RAIL CONSTRUCTION

SPECIALTIES

BG-30N / OYSTER GRAY 929 Yes TOP OF RAIL 32" AFF

10 26 00 CR-2 CRASH RAIL CONSTRUCTION

SPECIALTIES

ECR-32A / SILVER 407 No TOP OF RAIL 32" AFF; Z-BRACKET

10 26 00 WP-1 WALL PROTECTION CONSTRUCTION

SPECIALTIES

ACROVYN WALL PANEL W/ PICTURE FRAME TRIM /

OYSTER GRAY

929 No TOP OF FRAME 48" AFF; FRENCH CLEAT MOUNT

WALL TRANSITION MOLDINGS

09 30 10 WTM-1 WALL TRANSITION MOLDING -- MANUFACTURERS STANDARD COLOR: STAINLESS

STEEL

-- PROFILE FOR EXPOSED PORCELAIN WALL TILE EDGES

09 30 10 WTM-2 WALL TRANSITION MOLDING -- MANUFACTURERS STANDARD COLOR: STAINLESS

STEEL

-- PROFILE FOR CORNER TRIM ON PORCELAIN WALL TILE

WALLS

03 33 00 CMU CONCRETE MASONRY BLOCK -- -- -- --

03 30 00 CONC CONCRETE WALL -- -- -- --

09 29 00 GYP GYPSUM BOARD -- -- -- Yes --

09 90 00 PT-1 PAINT SHERWIN WILLIAMS ARGOS SW7065 Yes Yes EGGSHELL LUSTER; SEE: SPEC INTERIOR PAINT TABLES

09 90 00 PT-2 PAINT SHERWIN WILLIAMS DRIT OF MIST SW9166 Yes Yes EGGSHELL LUSTER; SEE: SPEC INTERIOR PAINT TABLES

09 90 00 PT-3 PAINT SHERWIN WILLIAMS OUTERSPACE SW6251 Yes Yes EGGSHELL LUSTER; SEE: SPEC INTERIOR PAINT TABLES

09 90 00 PT-8 PAINT SHERWIN WILLIAMS STOP SW6869 Yes Yes EGGSHELL LUSTER; SEE: SPEC INTERIOR PAINT TABLES

09 30 10 PWT-1 PORCELAIN WALL TILE CROSSVILLE RETRO ACTIVE 2.0 / GULF BREEZE RET11 Yes 12" X 24"; FINISH: UNPOLISHED; SHADE VARIATION: V1

09 30 10 PWT-2 PORCELAIN WALL TILE CROSSVILLE RETRO ACTIVE 2.0 / ROYAL NAVY RET13 Yes 12" X 24"; FINISH: UNPOLISHED; SHADE VARIATION: V1

09 30 10 PWT-3 PORCELAIN WALL TILE CROSSVILLE RETRO ACTIVE 2.0 / EMPRESS WHITE RET04 Yes 12" X 24"; FINISH: UNPOLISHED; SHADE VARIATION: V1

06 61 16 SSM-2 SOLID SURFACE MATERIAL WILSONART DESIGNER WHITE D354SL Yes 84"H SHOWER WALL PANELS

09 72 00 WC-1 WALL COVERING GENON EPIC / DUNE W2-EP-07 Yes Yes MATCH: REVERSE RANDOM

WINDOW COVERINGS

12 24 13 WB WINDOW BLINDS -- MANUFACTURERS STANDARD COLOR: BRONZE -- INSIDE MOUNT; COORDLESS OPERATING SYSTEM

U

P D

A T

E T

O

IL

E T

A C

C E

S S

O R

IE

S

L E

G E

N D

F E

B

A

D D

L O

C K

E R

S F

E B

U

P D

A T

E D

S R

F -2

F E

B

E

D

IT

G E

N E

R A

L N

O T

E M

A R

1 2 3 4 5 6 7

M

L

K

J

H

G

F

E

2.1 4.1 7.2

LAV-B

EWS

/2 "ø

I N

W

1.1 3.5

"ø

I N

W

"ø

I N

W

4"ø INW

FD-AFD-A

EWS

2 1/2"ø V

FFCO

"ø

I N

W

4"ø INW

"ø

I N

W

4"ø INW

1 1/4"ø V 2 1/2"ø V

8"ø INW 8"ø INW

FFCO

FFCO

FFCO

"ø

S

"ø

S

"ø

S

"ø

S

"ø

S

"ø

S

"ø

S

"ø

S

"ø

S

"ø

S

"ø

S

"ø

S

"ø

S

"ø

S

4 4 4 4 4 4 4 4 4 4 4 4 4 4

GENERAL SHEET NOTES

1. FOR ABBREVIATIONS, LEGENDS AND GENERAL NOTES, SEE M-001.

SHEET KEYNOTES

1 SEE TRENCH DRAIN DETAIL A7/P501.

2 VENT THROUGH ROOF.

3 COORDINATE P-TRAP PLACEMENT WITH STRUCTURAL CONTRACTOR.

4 2" SAN FROM RAIL SYSTEM TO TRENCH DRAIN. SEE DETAIL A3 ON S-310

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

US Army Corps of Engineers

S O

L

IC

IT

A

T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T

E D

B Y

D A

T E

C O

N T

R A

C T

N O

C

H E

C K

E D

B Y

D R

A W

N B

Y

IS

S

U E

D A

T E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

File Path:

Plot Date:

KEY PLAN

A B C

D E F

KEY PLAN

C:\Users\G5EDDWAC\Documents\_477687_Hangar_RVT20_MP_Wade.A.Cunningham@usace.army.mil.rvt

3/14/2024 2:22:41 PM

PS111

P A

R T

IA

L F

IR

S

T F

L O

O R

S A

N

IT

A R

Y P

L A

N

A

F O

R T

R

IL

E Y

K

A N

S A

S

K A

N S

A S

C

IT

Y D

IS

T

R

IC

T J B

A R

C L A

Y

C D

A V

IS

T S

W A

N S

O N

M L

IT

T L E

J A

N U

A R

Y

W D

Q -2

-R

-4

S E

E C

O V

E R

P A

G E

F

IL

E N

A M

E

RTA

A T

T A

C K

A V

IA

T

IO

N

B A

T T

A L

IO

N C

O M

P L E

X

P N

F Y

H a n g a…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .