B.08.03 W912DQ24R4007 Amendment 0003.pdf
PDF 7 MB Posted
- Attached to
- Attack Aviation Battalion Complex
- Solicitation number
- W912DQ24R4007
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Fort Riley Hangar, Fort Riley, Kansas
The purpose of this amendment is to include updated information to the Specifications and Draw ings Section of the sollicitation.
The proposal due date remains March 6, 2024 at 2:00 p.m. CST.
SEE SF 30 CONTINUATION PAGE
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 23-Feb-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DQ24R4007
X 9B. DATED (SEE ITEM 11)
19-Jan-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
23-Feb-2024
CODE
USACE, KANSAS CITY CT
FEDERAL BLDG CT-M 601 E 12TH STREET
KANSAS CITY MO 64106-2896
W912DQ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DQ24R4007
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
SUMMARY OF CHANGES
The SOLICITATION is amended as follows:
NOTE: Deleted text is shown in RED with strikethrough. Added text is shown in GREEN with underline.
1. SPECIFICATIONS.
a. 01 30 00, Administrative Requirements. Paragraph 1.12 is revised as shown below.
1.12 SUPERINTENDENCE OF SUBCONTRACTORS
a. The Contractor shall be required to furnish the following:
(1) If more than 50% and less than 70% of the value of the contract work is subcontracted, one superintendent shall be provided at the site and on the Contractor's payroll to be responsible for coordinating, directing, inspecting and expediting the subcontract work. This superintendent is an additional person above that required under the FAR Contract Clause 52.236-6.
(2) If 70% or more of the value of the work is subcontracted, the Contractor shall be required to furnish two such superintendents to be responsible for coordinating, directing, inspecting and expediting the subcontract work. These superintendents are above that required by FAR Contract Clause 52.236-6.
b. If the Contracting Officer, at any time after 50% of the subcontracted work has been completed, finds that satisfactory progress is being made, he may request to waive all or part of the above requirement for additional superintendence subject to the right of the Contracting Officer to reinstate such requirement if at any time during the progress of the remaining work he finds that satisfactory progress is not being made.
b. 07 60 00 FLASHING AND SHEET METAL. Paragraph 3.5.1, Table I. Coping row (page 1004 of
3262). Replace the hyphen (-) with “.32.”
c. 09 97 13.27 HIGH PERFORMANCE COATING FOR STEEL STRUCTURES. Paragraph 1.4.6.8 is revised as shown below.
1.4.6.8 QUALIFICATIONS OF COATING CONTRACTORS
All Contractors and Subcontractors that perform surface preparation or coating application shall be certified to either ISO 9001 or SSPC QP 1 and SSPC QS 1 prior to contract award and shall remain certified while accomplishing any surface preparation or coating application. The painting Contractors and painting Subcontractors must remain so certified for the duration of the project.
If a Contractor's or Subcontractor's certification expires, the firm will not be allowed to perform any work until the certification is reissued. Requests for extension of time for any delay to the completion of the project due to an inactive certification will not be considered and liquidated damages will apply. Notify the Contracting Officer of any change in Contractor certification status.
d. 10 51 13 METAL LOCKERS. This section is revised. A copy of the revised specification is attached.
e. 10 56 13 STEEL SHELVING is deleted.
f. 10 81 13, Bird Control Devices, is added. A copy of the specification is attached.
g. 23 09 23.01, LONWORKS DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING CONTROL SYSTEMS is deleted.
h. 23 09 23.02 – BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING CONTROL SYSTEMS is added. A copy of the specification is attached.
i. 25 05 11.10, Cybersecurity for Facility-Related Control Systems – LONWORKS Direct Digital Control for HVAC and Other Building Control Systems.
i. Change the title as shown below.
Cybersecurity for Facility-Related Control Systems – LONWORKS BACnet Direct Digital Control for HVAC and Other Building Control Systems
ii. Change paragraph 1.1 as shown below.
1.1 CONTROL SYSTEM APPLICABILITY
There are multiple versions of this Section associated with this project. Different versions have requirements applicable to different control systems. This specific Section applies only to the following control systems: LONWORKS BACnet Direct Digital Control (DDC) for HVAC. Existing UMCS system has a Confidentiality, Integrity, and Availability (CIA) rating of Low-Low-Low.
2. DRAWINGS. The drawings listed below are revised. Copies of the revised drawings are attached.
a. S-612 -FOOTINGS REQUIRING ADDITIONAL SOIL IMPROVEMENT (DEFENSIFIED
AGGREGATE PIERS) FOOTING LOADING.
b. A-600 – DOOR SCHEDULE
c. A-602 – DOOR HARDWARE SCHEDULE
d. IN201-IN204 – INTERIOR ELEVATIONS
e. IN208 – INTERIOR ELEVATIONS
f. IN211 – INTERIOR ELEVATIONS
g. IN401-IN402 – ENLARGED PLANS
h. IN500 – INTERIOR DETAILS
i. IN604 – INTERIOR MATERIALS FINISH LEGEND
j. F-112 – PARTIAL FIRST FLOOR LIFE SAFETY PLAN
k. P-600 - PLUMBING SCHEDULES
l. MI622 - HRU CONTROL DIAGRAM AND SEQUENCES
m. M-600 - MECHANICAL SCHEDULES
n. M-601 - MECHANICAL SCHEDULES
o. M-602 - MECHANICAL SCHEDULES
p. M-603 - MECHANICAL SCHEDULES
3. The time and date for submission of proposals remains the same as March 6, 2024, 2:00 PM local time.
4. Offerors are required to acknowledge receipt of this amendment. Failure to acknowledge receipt of all amendments may cause rejection of offeror’s proposal.
5. All other terms and conditions remain unchanged and in full force.
(End of Summary of Changes)
FIRE
SUPRESSION
ROOM PIT
F O
O T
IN
G
A L
O N
G G
R
ID
C
T Y
P
IC
A L
/2
C L
P
IP
E T
O E
D G
E O
F C
O N
T
IN
U O
U S
4' - 11 3/4" 149' - 1 1/2" 28' - 3 3/4" 43' - 3"
O F
C O
N T
IN
U
O U
S F
O O
T
IN
G
/4
C
L P
IP
E
T O
E D
G E
4'-0"3'-6"
1'-2" 2'-10"
DEPTH OF CL OF PIPE
TO BOTTOM OF
FOOTINGS ALONG GRID
C VARIES LINEARLY AS
SHOWN
3'-2"
3'-8"
3'-9"
3'-2"
3'-3"
THE MAXIMUM UNFACTORED
COMBINED SOIL BEARING
PRESSURE ON FOOTINGS F1, CF1a, CF1b, CF2, CF3 AND CF4 FROM
COLUMNS AND WALLS IS 1500 PSF.
THE 1500 PSF DOES NOT INCLUDE
THE WEIGHT OF THE FOOTING, SOIL
OVER FOOTING, OR CONCRETE
SLAB OVER FOOTING.
P6
P7 P9
P10
P5P4P3P2P1
P8
GENERAL SHEET NOTES
1. LOCATIONS OF ISOLATED, COMBINED AND CONTINUOUS FOOTINGS REQUIRING
ADDITIONAL SOIL IMPROVEMENT (IN ADDITION TO THE 16" OF OVEREXCAVATION /
REPLACEMENT WITH SELECT GRANULAR FILL THAT IS ALSO REQUIRED) ARE
SHOWN CROSS HATCHED IN THE PLAN. REFER TO SPECIFICATION SECTION 31 00
00 FOR THE ADDITIONAL SOIL IMPROVEMENT REQUIREMENTS (DENSIFIED
AGGREGATE PIERS). REFER TO S-111 THRU S-116 FOR THE DIMENSIONED
LOCATIONS OF THE FOOTINGS. REFER TO THE COMBINED FOOTING SCHEDULE,
CONTINUOUS FOOTING SCHEDULE AND ISOLATED FOOTING SCHEDULES ON S-610
AND S-611 FOR EXACT FOOTING WIDTHS, THICKNESSES AND ELEVATIONS.
FOOTINGS SHOWN WITHOUT CROSS HATCHING ARE NON LOAD BEARING WALL
FOOTINGS AND DO NOT REQUIRE THE ADDITIONAL SOIL IMPROVEMENT (BEYOND
THE 16" OF OVEREXCAVATION / REPLACEMENT WITH SELECT GRANULAR FILL THAT
IS REQUIRED).
2. UTILITY LINES THAT EXTEND INTO THE "NON-DISTURBANCE ZONES" OF THE
DENSIFIED AGGREGATE PIERS ARE IDENTIFIED IN THE PLAN. THE HORIZONTAL
DISTANCE OF THE CL OF THE UTILITY LINE TO THE EDGE OF THE FOOTING, AND
THE VERTICAL DISTANCE OF THE CL OF THE UTILITY LINE TO THE BOTTOM OF THE
FOOTING ARE AS SPECIFIED IN THE PLAN.
3. WHERE UTILITY LINES RUN PARALLEL AND ADJACENT TO FOOTINGS WITH
ADDITIONAL SOIL IMPROVEMENT (DENSIFIED AGGREGATE PIERS) AND MUST BE
PLACED IN THE DENSIFIED AGGREGATE PIER "NON-DISTURBANCE ZONES"
UTILIZING BOTH CRITERIA "A" AND CRITERIA "B", SPECIAL BACKFILL REQUIREMENTS
MUST BE MET PER SECTIONS A6/S-517 (CRITERIA "A") AND E6/S-517 (CRITERIA "B").
4. WHERE UTILITY LINES RUN PERPENDICULAR AND UNDER FOOTINGS WITH
ADDITIONAL SOIL IMPROVEMENT (DENSIFIED AGGREGATE PIERS) AND CAUSE
EXCAVATION OF ANY PORTION OF THE DENSIFIED AGGREGATE PIER "NON-
DISTURBANCE ZONE" AS DEFINED IN SECTION A2/S-517, SPECIAL BACKFILL
REQUIREMENTS MUST BE MET PER SECTION A2/S-517.
5. REFER TO THE WALL, COLUMN AND BEAM LOADING TABLES ON THIS SHEET FOR
WALL, COLUMN AND BEAM LOADS TO FOOTINGS.
6. BEAM LOADS P1 THRU P5 ARE CENTERED ON GRID D AT CL OF WALL.
7. BEAM LOADS P6 THRU P10 ARE CENTERED ON THE INTERSECTION OF THE WALLS.
8. REFER TO ELEVATOR FOOTING BEARING PRESSURE TABLE ON THIS SHEET FOR
THE BEARING PRESSURES ON THE ELEVATOR FOOTING.
9. THE LOADINGS IN THE TABLES ON THIS SHEET DO NOT INCLUDE WEIGHTS OF
FOOTINGS, SOIL OVER FOOTINGS, OR CONCRETE SLAB OVER FOOTINGS.
10. THE LOADS (AND PRESSURES) IN THE TABLES ON THIS SHEET MUST BE COMBINED
PER BASIC LOAD COMBINATIONS 2 THRU 6 OF SECTION 2.4.1 OF ASCE 7-16, IN
ORDER TO DETERMINE THE MAXIMUM SERVICE LOADS APPLIED TO THE FOOTINGS.
WF1
WF2
WF2
WF2
WF3
WF4
WF5
WF6
WF7
WF7
WF8
WF9
1.4 2.8 5.1 5.1 7.3 1.9 3.0 5.4 4.3 3.4 7.3 3.6
0.4 0.4 0.4 2.0
0.7 1.3 3.1 0.4 2.0
0.1 0.1 0.1 0.5
0.1 0.4
0.5 0.4
3.0 0.2 0.2 0.2 0.8
0.2 0.4
0.3 0.8 1.0
15.5 11.8 8.7
6.1
8.2
WALL FOOTING MARK DEAD LIVE LIVE SNOW WIND REMARKS
ALONG GRID 1.1
ALONG DOUBLE 8" CMU WALLS AT PLAN WEST BUILDING EXPANSION JOINT
ALONG DOUBLE 8" CMU WALLS AT PLAN EAST BUILDING EXPANSION JOINT
TYPICAL, UNO
ALONG GRIDS 14.1 AND 18.1
FLOOR ROOF
WALL DOWNWARD LOAD (KLF)
NOTE - REFER TO S-113, S-114, S-115 AND S-116 FOR LOCATIONS OF ALL CONTINUOUS WALL FOOTINGS. REFER TO THE SCHEDULE ON
S-611 FOR FOOTING WIDTH, THICKNESS AND ELEVATION.
F2 F2a F3 F4
MARK DEAD LIVE LIVE SNOW
FLOOR ROOF
COLUMN DOWNWARD LOAD (KIPS)
ISOLATED FOOTING
NOTE - REFER TO S-114, S-115 AND S-116 FOR
LOCATIONS OF ALL ISOLATED SPREAD FOOTINGS.
REFER TO THE SCHEDULE ON S-611 FOR FOOTING
SIZE, THICKNESS AND ELEVATION.
P1 P2 P3 P4 P5 P6 P7 P8 P9 P10
DEAD LIVE LIVE SNOW
FLOOR ROOF
BEAM DOWNWARD LOAD (KIPS)MARK FOR BEAM
BEARING ON CMU
WALL (S-612)
1.8 0.5 0.3
DEAD LIVE LIVE SNOW
FLOOR ROOF
ELEVATOR FOOTING BEARING
PRESSURE (KSF)
0.3
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
US Army Corps of Engineers
S O
L
IC
IT
A
T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T
E D
B Y
D A
T E
C O
N T
R A
C T
N O
C
H E
C K
E D
B Y
D R
A W
N B
Y
IS
S
U E
D A
T E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
File Path:
Plot Date:
R:\d0273859\_477687_Hangar_RVT20_S.rvt
2/15/2024 11:14:26 AM
S-612
F O
O T
IN
G
S R
E Q
U
IR
IN
G
A
D D
IT
IO
N A
L S
O
IL
IM
P
R O
V E
M E
N T
D
E N
S
IF
IE
D
A G
G R
E G
A T
E P
IE
R
S
F
O O
T
IN
G L
O A
D
IN
G
F O
R T
R
IL
E Y
K
A N
S A
S
K A
N S
A S
C
IT
Y D
IS
T
R
IC
T A
S
V
IT
A K
J M
A X
W E
L L
A S
V
IT
A K
J B
U S
H
IE
J A
N U
A R
Y
W D
Q -2
-R
-4
S E
E C
O V
E R
P A
G E
F
IL
E N
A M
E
RTA
A T
T A
C K
A V
IA
T
IO
N
B A
T T
A L
IO
N C
O M
P L E
X
P
F Y
H a n g a r_
R V
T S
.r v t
PRODUCTION DATA 4PRODUCTION DATA 3
E
T
H S
T R
E E
T
K A
N S
A S
C
IT
Y M
O
A N
S I D
3/64" = 1'-0" A1
FOOTINGS REQUIRING ADDITIONAL SOIL IMPROVEMENT (DENSIFIED
AGGREGATE PIERS) / FOOTING LOADING
A
M C
H A
N G
E T
O S
H E
E T
N O
T E
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
US Army Corps of Engineers
S O
L
IC
IT
A
T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T
E D
B Y
D A
T E
C O
N T
R A
C T
N O
C
H E
C K
E D
B Y
D R
A W
N B
Y
IS
S
U E
D A
T E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
File Path:
Plot Date:
C:\Users\G5EDDLDW\Documents\_477687_Hangar_RVT20_AI_G5EDDLDW.rvt
2/22/2024 10:11:18 AM
A-600
HANGAR
D O
O R
S C
H E
D U
L E
F O
R T
R
IL
E Y
K
A N
S A
S
K A
N S
A S
C
IT
Y D
IS
T
R
IC
T K
P
E R
S O
N
K P
E R
S O
N
C B
R O
W N
M M c C
O L L U
M
J A
N U
A R
Y
W D
Q -2
-R
-4
F
IL
E N
A M
E
RTA
A T
T A
C K
A V
IA
T
IO
N
B A
T T
A L
IO
N C
O M
P L E
X
P N
F Y
H a n g a r_
R V
T A
I.
rv t
P
E
T
H S
T R
E E
T
K A
N S
A S
C
IT
Y M
O
A N
S I D
DOOR SCHEDULE - DOORS 1 TO 151
LOCATION
LOCATION DOOR DOOR FRAME
MIN STC
RATING
FIRE
RATING
FRAME
REMARKS
DOOR NUMBER
SIZE
PAIR
TYPE
DOOR MATERIAL
FRAME
TYPE
FRAME
MATERIAL
HEAD JAMB SILL
WIDTH HEIGHT THICKNESS
CORRIDOR 100 6' - 0" 7' - 0" 1 3/4" X FV2 METAL METAL STC-34 N/A METAL A A A
VESTIBULE 100A 6' - 0" 7' - 0" 1 3/4" X FV2 METAL METAL STC-34 N/A METAL F F F
CORRIDOR 100B 6' - 0" 7' - 0" 1 3/4" X FV2 METAL METAL STC-34 N/A METAL F F F
CORRIDOR 100C 6' - 0" 7' - 0" 1 3/4" X FV2 METAL METAL STC-34 N/A METAL F F F
BREAK ROOM 101 3' - 0" 7' - 0" 1 3/4" - FV METAL METAL N/A N/A METAL C C C
LOGISTICS ASSISTANCE REPRESENTATIVES (LARS) 102 3' - 0" 7' - 0" 1 3/4" - FV METAL METAL STC-40 N/A METAL C C C
TECHNICAL LIBRARY 103 3' - 0" 7' - 0" 1 3/4" - FV METAL METAL STC-40 N/A METAL C C C
FIRE SUPPRESSION ROOM 104 3' - 0" 7' - 0" 1 3/4" - F METAL METAL STC-34 N/A METAL A A A
FIRE SUPPRESSION ROOM 104A 8' - 0" 10' - 0" 2" - C1 METAL METAL N/A N/A METAL E E E DOOR HARDWARE PROVIDED BY COILING OVERHEAD DOOR MANUFACTURER
FACILITY STORAGE 105 3' - 0" 7' - 0" 1 3/4" - F METAL METAL N/A N/A METAL D D D
ELECTRICAL ROOM 106 6' - 0" 7' - 0" 1 3/4" X F METAL METAL N/A N/A METAL A A A
MECHANICAL ROOM 107 6' - 0" 7' - 0" 1 3/4" X F METAL METAL N/A N/A METAL A A A
JANITOR CLOSET 108 3' - 0" 7' - 0" 1 3/4" - F METAL METAL STC-34 N/A METAL D D D
MEN'S RESTROOM SHOWER & LOCKER ROOM 109 3' - 0" 7' - 0" 1 3/4" - FL METAL METAL STC-34 N/A METAL C C C
WOMEN'S RESTROOM SHOWER & LOCKER ROOM 110 3' - 0" 7' - 0" 1 3/4" - FL METAL METAL STC-34 N/A METAL C C C
ELEVATOR EQUIPMENT ROOM 111 3' - 6" 7' - 0" 1 3/4" - FR1 METAL METAL STC-34 1 HR METAL D D D
TELECOM, EQUIPMENT ROOM 112 3' - 0" 7' - 0" 1 3/4" - F METAL METAL STC-34 1 HR METAL D D D UNDERCUT DOOR ONE INCH.
MC ORDERLY ROOM 113 3' - 0" 7' - 0" 1 3/4" - FV METAL METAL STC-40 N/A METAL D D D
MC COMPONENT REPAIR PLATOON OFFICE 113A 3' - 0" 7' - 0" 1 3/4" - FV METAL METAL STC-45 N/A METAL F F F
MC COMMANDER OFFICE 113B 3' - 0" 7' - 0" 1 3/4" - FV METAL METAL STC-45 N/A METAL F F F
MC 1ST SERGEANT OFFICE 113C 3' - 0" 7' - 0" 1 3/4" - FV METAL METAL STC-45 N/A METAL F F F
MC AIRFRAME REPAIR PLATOON OFFICE 113D 3' - 0" 7' - 0" 1 3/4" - FV METAL METAL STC-45 N/A METAL F F F
PNEUDRAULICS 114 4' - 0" 7' - 0" 1 3/4" - FV METAL METAL STC-40 N/A METAL D D D
PNEUDRAULICS STORAGE 114A 3' - 0" 7' - 0" 1 1/4" - WM1 WIRE MESH METAL N/A N/A METAL - - - DOOR HARDWARE PROVIDED BY WIRE PARTITION MANUFACTURER, THE DOOR LOCKS SHALL BE KEYED IN ACCORDANCE WITH THE FACILITIES KEYING SYSTEM.
COMPRESSOR ROOM 115 6' - 0" 7' - 0" 1 3/4" X F METAL METAL N/A N/A METAL A A A
MECHANICAL ROOM 116 6' - 0" 7' - 0" 1 3/4" X F METAL METAL N/A N/A METAL A A A
BLADE REPAIR SHOP 117 3' - 0" 7' - 0" 1 3/4" - FV METAL METAL STC-40 N/A METAL D D D INTERIOR DOOR, PROVIDE WEATHER STRIPPING. THIS ROOM WILL HAVE NEGATIVE PRESSURE.
BLADE REPAIR SHOP 117A 8' - 0" 10' - 0" 2" - C1 METAL METAL STC-21 1 HR METAL B B B DOOR HARDWARE PROVIDED BY COILING OVERHEA DOOR MANUFACTURER
STRUCTURAL REPAIR SHOP 118 3' - 0" 7' - 0" 1 3/4" - FV METAL METAL STC-40 1 HR METAL D D D
STRUCTURAL REPAIR SHOP STORAGE 118A 3' - 0" 7' - 0" 1 1/4" - WM1 WIRE MESH METAL N/A N/A METAL - - - DOOR HARDWARE PROVIDED BY WIRE PARTITION MANUFACTURER, THE DOOR LOCKS SHALL BE KEYED IN ACCORDANCE WITH THE FACILITIES KEYING SYSTEM.
STRUCTURAL REPAIR SHOP 118B 3' - 0" 7' - 0" 1 3/4" - FR METAL METAL STC-40 1 HR METAL B B B
STRUCTURAL REPAIR SHOP 118C 8' - 0" 12' - 0" 2" - C2 METAL METAL STC-21 1 HR METAL B B B DOOR HARDWARE PROVIDED BY COILING OVERHEAD DOOR MANUFACTURER
POWER PLANT / POWERTRAIN SHOP 119 3' - 0" 7' - 0" 1 3/4" - FV METAL METAL STC-40 1 HR METAL D D D
NON-DESTRUCTIVE INSPECTION (NDI) ROOM 119A 3' - 0" 7' - 0" 1 3/4" - F METAL METAL STC-34 N/A METAL F F F
POWER PLANT / POWERTRAIN SHOP STORAGE 119B 8' - 0" 12' - 0" 2" - C2 METAL METAL STC-21 1 HR METAL B B B DOOR HARDWARE PROVIDED BY COILING OVERHEA DOOR MANUFACTURER
POWER PLANT / POWERTRAIN SHOP 119C 3' - 0" 7' - 0" 1 3/4" - FR METAL METAL STC-40 1 HR METAL B B B
POWER PLANT / POWERTRAIN SHOP 119D 3' - 0" 7' - 0" 1 1/4" - WM1 WIRE MESH METAL N/A N/A METAL - - - DOOR HARDWARE PROVIDED BY WIRE PARTITION MANUFACTURER, THE DOOR LOCKS SHALL BE KEYED IN ACCORDANCE WITH THE FACILITIES KEYING SYSTEM.
POWER PLANT / POWERTRAIN SHOP 119E 3' - 0" 7' - 0" N/A - WM1 WIRE MESH METAL N/A N/A METAL - - - DOOR HARDWARE PROVIDED BY WIRE PARTITION MANUFACTURER, THE DOOR LOCKS SHALL BE KEYED IN ACCORDANCE WITH THE FACILITIES KEYING SYSTEM.
SYSTEMS REPAIR SHOP 120 8' - 0" 8' - 0" 1 3/4" X FV METAL METAL STC-40 NA METAL D D D
SHOP SECTION HQ 120A 3' - 0" 7' - 0" 1 3/4" - FV METAL METAL STC-40 N/A METAL D D D
COMSEC SECURE STORAGE 120B 3' - 6" 7' - 0" 1 3/4" - F1 METAL METAL N/A N/A METAL F F F
ARMS VAULT - AIRCRAFT MOUNTED WEAPONS 120C 3' - 8" 6' - 8" N/A - AR METAL METAL N/A 1 HR METAL - - - GSA CLASS 5 VAULT DOOR. HARDWARE SUPPLIED BY DOOR MANUFACTURER.
REPAIR SECTION WORKROOM 121 3' - 6" 7' - 0" 1 3/4" - F1V METAL METAL STC-40 N/A METAL C C C
REPAIR SECTION WORKROOM STORAGE 121A 3' - 0" 7' - 0" N/A - WM1 WIRE MESH METAL N/A N/A METAL - - - DOOR HARDWARE PROVIDED BY WIRE PARTITION MANUFACTURER, THE DOOR LOCKS SHALL BE KEYED IN ACCORDANCE WITH THE FACILITIES KEYING SYSTEM.
REPAIR SECTION WORKROOM 121B 3' - 0" 7' - 0" 1 3/4" - FR METAL METAL STC-40 1 HR METAL B B B
SPECIAL TOOLS ROOM 122 3' - 6" 7' - 0" 1 3/4" - F1 METAL METAL STC-40 N/A METAL C C C
SPECIAL TOOLS ROOM 122A 3' - 0" 7' - 0" 1 3/4" - FR METAL METAL STC-40 1 HR METAL B B B
SPECIAL TOOLS ROOM 122B 8' - 0" 10' - 0" 2" - C1 METAL METAL STC-21 1 HR METAL B B B DOOR HARDWARE PROVIDED BY COILING OVERHEAD DOOR MANUFACTURER
QUALITY CONTROL 123A 3' - 0" 7' - 0" 1 3/4" - FV METAL METAL STC-40 N/A METAL C C C
QUALITY CONTROL 123B 6' - 4" 7' - 1" N/A - CCD METAL METAL N/A N/A METAL H H H DOOR HARDWARE PROVIDED BY COILING COUNTER DOOR MANUFACTURER
QUALITY CONTROL 123C 3' - 0" 7' - 0" 1 3/4" - FV METAL METAL STC-40 N/A METAL C C C
QUALITY CONTROL OFFICE 123D 3' - 0" 7' - 0" 1 3/4" - FV METAL METAL STC-40 N/A METAL F F F
SIPRNET ROOM 124 3' - 0" 7' - 0" 1 3/4" - F METAL METAL STC-34 N/A METAL D D D
PRODUCTION CONTROL OFFICE 125 3' - 0" 7' - 0" 1 3/4" - FV METAL METAL STC-40 N/A METAL C C C
PRODUCTION CONTROL 125A 6' - 4" 7' - 1" N/A - CCD METAL METAL N/A N/A METAL H H H DOOR HARDWARE PROVIDED BY THE COILING COUNTER DOOR MANUFACTURER.
PRODUCTION CONTROL 125B 3' - 0" 7' - 0" 1 3/4" - FV METAL METAL STC-40 N/A METAL D D D
PRODUCTION CONTROL 125C 3' - 0" 7' - 0" 1 3/4" - FV METAL METAL STC-40 N/A METAL F F F
ULLS-A EQUIPMENT ROOM 125D 3' - 0" 7' - 0" 1 3/4" - F METAL METAL STC-40 N/A METAL F F F
CREW CHIEF WORKROOM 126 3' - 6" 7' - 0" 1 3/4" - F1 METAL METAL STC-40 N/A METAL C C C
CREW CHIEF WORKROOM 126A 3' - 6" 7' - 0" 1 3/4" - FR METAL METAL STC-40 1 HR METAL B B B
CREW CHIEF CAGED STORAGE 126B 3' - 0" 7' - 0" 1 1/4" - WM1 WIRE MESH METAL N/A N/A METAL - - - DOOR HARDWARE PROVIDED BY WIRE PARTITION MANUFACTURER, THE DOOR LOCKS SHALL BE KEYED IN ACCORDANCE WITH THE FACILITIES KEYING SYSTEM.
MAINTENANCE TEST PILOT OFFICE 127 3' - 0" 7' - 0" 1 3/4" - FV METAL METAL STC-40 N/A METAL F F F
CREW CHIEF WORKROOM 128 3' - 6" 7' - 0" 1 3/4" - F1 METAL METAL STC-40 N/A METAL C C C
CREW CHIEF WORKROOM 128A 3' - 6" 7' - 0" 1 3/4" - FR METAL METAL STC-40 1 HR METAL B B B
CREW CHIEF CAGED STORAGE 128B 3' - 0" 7' - 0" 1 1/4" - WM1 WIRE MESH METAL N/A N/A METAL - - - DOOR HARDWARE PROVIDED BY WIRE PARTITION MANUFACTURER, THE DOOR LOCKS SHALL BE KEYED IN ACCORDANCE WITH THE FACILITIES KEYING SYSTEM.
MAINTENANCE TEST PILOT OFFICE 129 3' - 0" 7' - 0" 1 3/4" - FV METAL METAL STC-40 N/A METAL F F F
CREW CHIEF WORKROOM 130 3' - 6" 7' - 0" 1 3/4" - FV METAL METAL STC-40 N/A METAL C C C
CREW CHIEF WORKROOM 130A 3' - 6" 7' - 0" 1 3/4" - FR METAL METAL STC-40 1 HR METAL B B B
CREW CHIEF CAGED STORAGE 130B 3' - 0" 7' - 0" 1 1/4" - WM1 WIRE MESH METAL N/A N/A METAL - - - DOOR HARDWARE PROVIDED BY WIRE PARTITION MANUFACTURER, THE DOOR LOCKS SHALL BE KEYED IN ACCORDANCE WITH THE FACILITIES KEYING SYSTEM.
MAINTENANCE TEST PILOT OFFICE 131 3' - 0" 7' - 0" 1 3/4" - FV METAL METAL STC-40 N/A METAL F F F
TELECOM ROOM 132 3' - 0" 7' - 0" 1 3/4" - F METAL METAL N/A N/A METAL D D D UNDERCUT DOOR ONE INCH.
RECYCLABLE STORAGE 133 3' - 0" 7' - 0" 1 3/4" - F METAL METAL STC-34 N/A METAL D D D
RECYCLABLE STORAGE 133A 0' - 0" 0' - 0" - - - - METAL - N/A METAL - - - CASED OPENING
ELECTRICAL ROOM 134 3' - 0" 7' - 0" 1 3/4" - F METAL METAL STC-34 N/A METAL D D D
MECHANICAL ROOM 135A 6' - 0" 7' - 0" 1 3/4" X F METAL METAL STC-34 N/A METAL A A A
AC ARMS VAULT 136 3' - 8" 6' - 8" N/A - AR METAL METAL N/A N/A METAL - - - GSA CLASS 5 VAULT DOOR. HARDWARE SUPPLIED BY DOOR MANUFACTURER.
AC ARMS VAULT 137 3' - 8" 6' - 8" N/A - AR METAL METAL N/A N/A METAL - - - GSA CLASS 5 VAULT DOOR. HARDWARE SUPPLIED BY DOOR MANUFACTURER.
AC ARMS VAULT 138 3' - 8" 6' - 8" N/A - AR METAL METAL N/A N/A METAL - - - GSA CLASS 5 VAULT DOOR. HARDWARE SUPPLIED BY DOOR MANUFACTURER.
MC ARMS VAULT 139 3' - 8" 6' - 8" N/A - AR METAL METAL N/A N/A METAL - - - GSA CLASS 5 VAULT DOOR. HARDWARE SUPPLIED BY DOOR MANUFACTURER.
AC UNIT STORAGE 140 3' - 6" 7' - 0" 1 3/4" - FV METAL METAL STC-34 N/A METAL C C C
AC NBC STORAGE 140A 3' - 0" 7' - 0" 1 1/4" - WM1 WIRE MESH METAL N/A N/A METAL - - - DOOR HARDWARE PROVIDED BY WIRE PARTITION MANUFACTURER, THE DOOR LOCKS SHALL BE KEYED IN ACCORDANCE WITH THE FACILITIES KEYING SYSTEM.
AC NON-SENSITIVE SECURE STORAGE 140B 3' - 6" 7' - 0" 1 3/4" - F METAL METAL N/A 90 MIN METAL F F F
AC COMMUNICATIONS STORAGE 140C 3' - 0" 7' - 0" 1 1/4" - WM1 WIRE MESH METAL N/A N/A METAL - - - DOOR HARDWARE PROVIDED BY WIRE PARTITION MANUFACTURER, THE DOOR LOCKS SHALL BE KEYED IN ACCORDANCE WITH THE FACILITIES KEYING SYSTEM.
AC UNIT STORAGE 141 3' - 6" 7' - 0" 1 3/4" - FV METAL METAL STC-34 N/A METAL C C C
AC NBC STORAGE 141A 3' - 0" 7' - 0" N/A - WM1 WIRE MESH METAL N/A N/A METAL - - - DOOR HARDWARE PROVIDED BY WIRE PARTITION MANUFACTURER, THE DOOR LOCKS SHALL BE KEYED IN ACCORDANCE WITH THE FACILITIES KEYING SYSTEM.
AC NON-SENSITIVE SECURE STORAGE 141B 3' - 6" 7' - 0" 1 3/4" - F1 METAL METAL N/A 90 MIN METAL F F F
AC COMMUNICATIONS STORAGE 141C 3' - 0" 7' - 0" 1 1/4" - WM1 WIRE MESH METAL N/A N/A METAL - - - DOOR HARDWARE PROVIDED BY WIRE PARTITION MANUFACTURER, THE DOOR LOCKS SHALL BE KEYED IN ACCORDANCE WITH THE FACILITIES KEYING SYSTEM.
AC UNIT STORAGE 142 3' - 6" 7' - 0" 1 3/4" - FV METAL METAL STC-34 N/A METAL C C C
AC NBC STORAGE 142A 3' - 0" 7' - 0" N/A - WM1 WIRE MESH METAL N/A N/A METAL - - - DOOR HARDWARE PROVIDED BY WIRE PARTITION MANUFACTURER, THE DOOR LOCKS SHALL BE KEYED IN ACCORDANCE WITH THE FACILITIES KEYING SYSTEM.
AC NON-SENSITIVE SECURE STORAGE 142B 3' - 6" 7' - 0" 1 3/4" - F1 METAL METAL N/A 90 MIN METAL F F F DOOR HARDWARE PROVIDED BY WIRE PARTITION MANUFACTURER, THE DOOR LOCKS SHALL BE KEYED IN ACCORDANCE WITH THE FACILITIES KEYING SYSTEM.
AC COMMUNICATIONS STORAGE 142C 3' - 0" 7' - 0" N/A - WM1 WIRE MESH METAL N/A N/A METAL - - - DOOR HARDWARE PROVIDED BY WIRE PARTITION MANUFACTURER, THE DOOR LOCKS SHALL BE KEYED IN ACCORDANCE WITH THE FACILITIES KEYING SYSTEM.
MC UNIT STORAGE 143 3' - 6" 7' - 0" 1 3/4" - FV METAL METAL STC-34 N/A METAL C C C
MC NBC STORAGE 143A 3' - 0" 7' - 0" N/A - WM1 WIRE MESH METAL N/A N/A METAL - - - DOOR HARDWARE PROVIDED BY WIRE PARTITION MANUFACTURER, THE DOOR LOCKS SHALL BE KEYED IN ACCORDANCE WITH THE FACILITIES KEYING SYSTEM.
MC NON-SENSITIVE SECURE STORAGE 143B 3' - 6" 7' - 0" 1 3/4" - F1 METAL METAL N/A 90 MIN METAL F F F
MC COMMUNICATIONS STORAGE 143C 3' - 0" 7' - 0" N/A - WM1 WIRE MESH METAL N/A N/A METAL - - - DOOR HARDWARE PROVIDED BY WIRE PARTITION MANUFACTURER, THE DOOR LOCKS SHALL BE KEYED IN ACCORDANCE WITH THE FACILITIES KEYING SYSTEM.
CONTRACTOR LOGISTICS SUPPORT (CLS) 144 3' - 6" 7' - 0" 1 3/4" - FV METAL METAL STC-34 N/A METAL C C C
CLS STORAGE 144A 3' - 0" 7' - 0" 1 1/4" - WM1 WIRE MESH METAL N/A N/A METAL - - - DOOR HARDWARE PROVIDED BY WIRE PARTITION MANUFACTURER, THE DOOR LOCKS SHALL BE KEYED IN ACCORDANCE WITH THE FACILITIES KEYING SYSTEM.
LOGISTICS ASSISTANCE REPRESENTATIVES (LARS) 145 3' - 0" 7' - 0" 1 3/4" - FV METAL METAL STC-40 N/A METAL C C C
MOTHER'S ROOM 146 3' - 0" 7' - 0" 1 3/4" - FV METAL METAL STC-40 N/A METAL F F F
JANITOR CLOSET 147 3' - 0" 7' - 0" 1 3/4" - F METAL METAL N/A N/A METAL F F F
MEN'S RESTROOM 148 3' - 0" 7' - 0" 1 3/4" - FL METAL METAL STC-34 N/A METAL F F F
WOMEN'S RESTROOM 149 3' - 0" 7' - 0" 1 3/4" - FL METAL METAL STC-34 N/A METAL F F F
TELECOM ROOM (TR) 150 3' - 0" 7' - 0" 1 3/4" - F METAL METAL N/A N/A METAL D D D
AIRCRAFT PARTS SUPPLY 151 3' - 0" 7' - 0" 1 3/4" - F METAL METAL STC-34 N/A METAL A A A
AIRCRAFT PARTS SUPPLY 151A 10' - 0" 14' - 0" 2" - C4 METAL METAL N/A N/A METAL A A A DOOR HARDWARE PROVIDED BY COILING OVERHEA DOOR MANUFACTURER
AIRCRAFT PARTS SUPPLY OFFICE 151B 3' - 0" 7' - 0" 1 3/4" - N METAL METAL STC-40 N/A METAL F F F
AIRCRAFT PARTS SUPPLY OFFICE 151C 3' - 0" 7' - 0" 1 3/4" - N METAL METAL STC-40 N/A METAL F F F
AIRCRAFT PARTS SUPPLY 151D 10' - 0" 14' - 0" 2" - C4 METAL METAL N/A N/A METAL B B B DOOR HARDWARE PROVIDED BY COILING OVERHEAD DOOR MANUFACTURER
R
E V
IS
E
S T
C R
A T
IN
G
T O
R E
A D
S T
C
F E
B
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
US Army Corps of Engineers
S O
L
IC
IT
A
T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T
E D
B Y
D A
T E
C O
N T
R A
C T
N O
C
H E
C K
E D
B Y
D R
A W
N B
Y
IS
S
U E
D A
T E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
File Path:
Plot Date:
C:\Users\G5EDDLDW\Documents\_477687_Hangar_RVT20_AI_G5EDDLDW.rvt
2/22/2024 10:11:18 AM
A-602
HANGAR
D O
O R
H A
R D
W A
R E
S C
H E
D U
L E
F O
R T
R
IL
E Y
K
A N
S A
S
K A
N S
A S
C
IT
Y D
IS
T
R
IC
T K
P
E R
S O
N
K P
E R
S O
N
C B
R O
W N
M M c C
O L L U
M
J A
N U
A R
Y
W D
Q -2
-R
-4
F
IL
E N
A M
E
RTA
A T
T A
C K
A V
IA
T
IO
N
B A
T T
A L
IO
N C
O M
P L E
X
P N
F Y
H a n g a r_
R V
T A
I.
rv t
P
E
T
H S
T R
E E
T
K A
N S
A S
C
IT
Y M
O
A N
S I D
DOOR HARDWARE SCHEDULE Doors 100 - 140
D O
O R
N U
M B
E R
LOCATION C
A
R D
R E
A D
E R
S
W
IP
E E
L E
C T
R
IC
E
M E
C H
A N
IC
A
L P
U S
H B
U T
T O
N C
IP
H
E R
L O
C K
X -1
L
O C
K
S E
E R
E M
A R
K S
MORTISE LOCKS HINGES EXIT DEVICES CLOSER ARCHITECTURAL TRIM AUXILARY HARDWARE THRESHOLDS EDGE SEALS
M
IN
S T
C R
A T
IN
G
REMARKSP
U
R P
O S
E
F U
N C
T
IO
N
L E
V E
R
H
IN
G E
S A
N O
N -R
E M
O V
A B
L E
H
IN
G E
E X
IT
D
E V
IC
E
T Y
P E
P U
S H
P A
D
F
N A
R R
O W
S T
Y L E
E X
IT
D
E V
IC
E
P
U S
H P
A D
W
IT
H A
L A
R M
E
C O
O R
D
IN
A T
O R
T Y
P E
A
C L O
S E
R C
C L O
S E
R C
C L O
S E
R C
O P
T
IO
N P
T -4
C
O P
T
IO
N P
T -4
H
K E
Y P
A D
R E
E
L E
C T
R
IC
A L
K
IC
K P
L A
T E
J
M O
P P
L A
T E
J
P U
S H
P L
A T
E J
P U
L L
J
W A
L L
S T
O P
L
'U
B O
L L
A R
D D
O O
R S
T O
P R
E A
-5
H E
A V
Y D
U T
Y D
O O
R
F
L O
O R
S T
O P
B U
R N
S
O R
E Q
U A
L
S
IL
E N
C E
R S
L
F L U
S H
B O
L T
T H
R E
S H
O L
D J
T H
R E
S H
O L
D J
T H
R E
S H
O L
D J
D O
O R
D R
IP
H
A N
G E
R
S M
IL
O
R E
Q U
A L
D O
O R
S W
E E
P R
O Y
A S
T R
A G
A L P
E M
K O
P
W S
O R
E Q
U A
L
D O
O R
S H
O E
R O
Y
S
T C
W E
A T
H E
R G
A S
K E
T R
Y
S O
U N
D G
A S
K E
T R
O Y
100 CORRIDOR X EXIT F08 X 6 X X X X X X X X STC-34
100A VESTIBULE EXIT F01 X 6 X X X X X X STC-34
100B CORRIDOR EXIT F01 X 6 X X X X X X X STC-34
100C CORRIDOR EXIT F01 X 6 X X X X X X X STC-34
101 BREAK ROOM PASSAGE F01 3 X X X N/A
102 LOGISTICS ASSISTANCE
REPRESENTATIVES (LARS)
OFFICE F05 X 3 X X X X STC-40
103 TECHNICAL LIBRARY OFFICE F05 X 3 X X X X STC-40
104 FIRE SUPPRESSION ROOM STOREROOM F07 3 X X X X X X X STC-34
104A FIRE SUPPRESSION ROOM STOREROOM - - - N/A DOOR HARDWARE PROVIDED BY COILING OVERHEAD DOOR MANUFACTURER
105 FACILITY STORAGE STOREROOM F07 X 3 X X X N/A
106 ELECTRICAL ROOM STOREROOM F07 X 6 X X X X X X X X X N/A
107 MECHANICAL ROOM STOREROOM F07 X 6 X X X X X X X X N/A
108 JANITOR CLOSET STOREROOM F07 X 3 X X X X STC-34
109 MEN'S RESTROOM SHOWER & LOCKER
ROOM
PASSAGE F01 X 3 X X X X X X X STC-34
110 WOMEN'S RESTROOM SHOWER &
LOCKER ROOM
PASSAGE F01 X 3 X X X STC-34
111 ELEVATOR EQUIPMENT ROOM STOREROOM F07 X 3 X X X X STC-34
112 TELECOM, EQUIPMENT ROOM STOREROOM F07 X 3 X X X STC-34 UNDERCUT DOOR ONE INCH.
113 MC ORDERLY ROOM CLASSROOM F05 X 3 X X X STC-40
113A MC COMPONENT REPAIR PLATOON
OFFICE
OFFICE F05 X 3 X X X X X STC-45
113B MC COMMANDER OFFICE OFFICE F05 X 3 X X X X X STC-45
113C MC 1ST SERGEANT OFFICE OFFICE F05 X 3 X X X X X STC-45
113D MC AIRFRAME REPAIR PLATOON
OFFICE
F05 X 3 X X X X X STC-45
114 PNEUDRAULICS CLASSROOM F05 X 3 X X X STC-40
114A PNEUDRAULICS STORAGE STOREROOM N/A DOOR HARDWARE PROVIDED BY WIRE PARTITION MANUFACTURER, THE DOOR LOCKS SHALL BE KEYED IN ACCORDANCE WITH THE FACILITIES KEYING SYSTEM.
115 COMPRESSOR ROOM STOREROOM F07 X X X X X X X X X N/A
116 MECHANICAL ROOM STOREROOM F07 X X X X X X X X X N/A
117 BLADE REPAIR SHOP CLASSROOM F05 X 3 X X X X X STC-40 INTERIOR DOOR, PROVIDE WEATHER STRIPPING. THIS ROOM WILL HAVE NEGATIVE PRESSURE.
117A BLADE REPAIR SHOP - - - - STC-21 DOOR HARDWARE PROVIDED BY COILING OVERHEA DOOR MANUFACTURER
118 STRUCTURAL REPAIR SHOP CLASSROOM F05 X 3 X X X STC-40
118A STRUCTURAL REPAIR SHOP STORAGE STOREROOM N/A DOOR HARDWARE PROVIDED BY WIRE PARTITION MANUFACTURER, THE DOOR LOCKS SHALL BE KEYED IN ACCORDANCE WITH THE FACILITIES KEYING SYSTEM.
118B STRUCTURAL REPAIR SHOP CLASSROOM F05 X 3 X X X X STC-40
118C STRUCTURAL REPAIR SHOP CLASSROOM STC-21 DOOR HARDWARE PROVIDED BY COILING OVERHEAD DOOR MANUFACTURER
119 POWER PLANT / POWERTRAIN SHOP CLASSROOM F05 X 3 X X X STC-40
119A NON-DESTRUCTIVE INSPECTION (NDI)
ROOM
STOREROOM F07 X 3 X X X STC-34
119B POWER PLANT / POWERTRAIN SHOP
STORAGE
CLASSROOM - - - STC-21 DOOR HARDWARE PROVIDED BY COILING OVERHEA DOOR MANUFACTURER
119C POWER PLANT / POWERTRAIN SHOP CLASSROOM F04 3 X X X X X STC-40
119D POWER PLANT / POWERTRAIN SHOP STOREROOM N/A DOOR HARDWARE PROVIDED BY WIRE PARTITION MANUFACTURER, THE DOOR LOCKS SHALL BE KEYED IN ACCORDANCE WITH THE FACILITIES KEYING SYSTEM.
119E POWER PLANT / POWERTRAIN SHOP STOREROOM N/A DOOR HARDWARE PROVIDED BY WIRE PARTITION MANUFACTURER, THE DOOR LOCKS SHALL BE KEYED IN ACCORDANCE WITH THE FACILITIES KEYING SYSTEM.
120 SYSTEMS REPAIR SHOP CLASSROOM F05 X 6 X X X STC-40
120A SHOP SECTION HQ CLASSROOM F05 X 3 X X X X STC-40
120B COMSEC SECURE STORAGE X STOREROOM F07 X 3 X X X N/A
120C ARMS VAULT - AIRCRAFT MOUNTED
WEAPONS
ARMS VAULT N/A GSA CLASS 5 VAULT DOOR. HARDWARE SUPPLIED BY DOOR MANUFACTURER.
121 REPAIR SECTION WORKROOM CLASSROOM X STC-40
121A REPAIR SECTION WORKROOM
STORAGE
STOREROOM N/A DOOR HARDWARE PROVIDED BY WIRE PARTITION MANUFACTURER, THE DOOR LOCKS SHALL BE KEYED IN ACCORDANCE WITH THE FACILITIES KEYING SYSTEM.
121B REPAIR SECTION WORKROOM CLASSROOM F05 X 3 X X X X X STC-40
122 SPECIAL TOOLS ROOM CLASSROOM F05 X 3 X X X X STC-40
122A SPECIAL TOOLS ROOM CLASSROOM F05 3 X X X X STC-40
122B SPECIAL TOOLS ROOM CLASSROOM STC-21 DOOR HARDWARE PROVIDED BY COILING OVERHEAD DOOR MANUFACTURER
123A QUALITY CONTROL CLASSROOM F05 X 3 X X X X STC-40
123B QUALITY CONTROL CLASSROOM N/A DOOR HARDWARE PROVIDED BY COILING COUNTER DOOR MANUFACTURER
123C QUALITY CONTROL CLASSROOM F05 X 3 X X X X STC-40
123D QUALITY CONTROL OFFICE OFFICE F04 X 3 X X X X X STC-40
124 SIPRNET ROOM X STOREROOM F07 X 3 X X X STC-34
125 PRODUCTION CONTROL OFFICE CLASSROOM F05 X 3 X X X X STC-40
125A PRODUCTION CONTROL CLASSROOM N/A DOOR HARDWARE PROVIDED BY THE COILING COUNTER DOOR MANUFACTURER.
125B PRODUCTION CONTROL CLASSROOM F05 X 3 X X X X STC-40
125C PRODUCTION CONTROL OFFICE F04 X 3 X X X X STC-40
125D ULLS-A EQUIPMENT ROOM STOREROOM F07 X 3 X X STC-40
126 CREW CHIEF WORKROOM CLASSROOM F05 X 3 X X X X STC-40
126A CREW CHIEF WORKROOM CLASSROOM F05 X 3 X X X X X X STC-40
126B CREW CHIEF CAGED STORAGE STOREROOM N/A DOOR HARDWARE PROVIDED BY WIRE PARTITION MANUFACTURER, THE DOOR LOCKS SHALL BE KEYED IN ACCORDANCE WITH THE FACILITIES KEYING SYSTEM.
127 MAINTENANCE TEST PILOT OFFICE OFFICE F04 X 3 X X X X X STC-40
128 CREW CHIEF WORKROOM CLASSROOM X STC-40
128A CREW CHIEF WORKROOM CLASSROOM F05 X 3 X X X X X X STC-40
128B CREW CHIEF CAGED STORAGE STOREROOM N/A DOOR HARDWARE PROVIDED BY WIRE PARTITION MANUFACTURER, THE DOOR LOCKS SHALL BE KEYED IN ACCORDANCE WITH THE FACILITIES KEYING SYSTEM.
129 MAINTENANCE TEST PILOT OFFICE OFFICE F04 X 3 X X X X X STC-40
130 CREW CHIEF WORKROOM CLASSROOM X STC-40
130A CREW CHIEF WORKROOM CLASSROOM F05 X 3 X X X X X STC-40
130B CREW CHIEF CAGED STORAGE STOREROOM N/A DOOR HARDWARE PROVIDED BY WIRE PARTITION MANUFACTURER, THE DOOR LOCKS SHALL BE KEYED IN ACCORDANCE WITH THE FACILITIES KEYING SYSTEM.
131 MAINTENANCE TEST PILOT OFFICE OFFICE F04 X 3 X X X X STC-40
132 TELECOM ROOM STOREROOM F07 X 3 X X N/A UNDERCUT DOOR ONE INCH.
133 RECYCLABLE STORAGE STOREROOM F07 X 3 X X X STC-34
133A RECYCLABLE STORAGE STOREROOM - - - - - - - - - CASED OPENING
134 ELECTRICAL ROOM STOREROOM F07 X 3 X X X STC-34
135A MECHANICAL ROOM STOREROOM F07 X 6 X X X X X X X STC-34
136 AC ARMS VAULT ARMS VAULT N/A GSA CLASS 5 VAULT DOOR. HARDWARE SUPPLIED BY DOOR MANUFACTURER.
137 AC ARMS VAULT ARMS VAULT N/A GSA CLASS 5 VAULT DOOR. HARDWARE SUPPLIED BY DOOR MANUFACTURER.
138 AC ARMS VAULT ARMS VAULT N/A GSA CLASS 5 VAULT DOOR. HARDWARE SUPPLIED BY DOOR MANUFACTURER.
139 MC ARMS VAULT ARMS VAULT N/A GSA CLASS 5 VAULT DOOR. HARDWARE SUPPLIED BY DOOR MANUFACTURER.
R
E V
IS
E
S T
C R
A T
IN
G
T O
R E
A D
S T
C
F E
B
1' - 6" 1' - 10 1/2" 1' - 6"
SEAMLESS RESINOUS
FLOORING WALL BASE
(SRWB-3)
WALL MOUNTED
LAVATORY;
SEE PLUMBING
ELECTRICAL DEVICES;
SEE ELECTRICAL
URINAL (U) WATER CLOSET (WC)
PORCELAIN WALL
TILE (PWT-2)
(TYPICAL 12" X 24")
PORCELAIN WALL
TILE (PWT-3)
(TYPICAL 12" X 24")
PTD/WR
WM WM
SD
UPUP
TP TPTP
OPEN TO
BEYOND
OPEN TO
BEYOND
3' - 0"
SOLID SURFACE
SHOWER SURROUND
(SSM-2)
PORCELAIN WALL
TILE (PWT-2)
(TYPICAL 12" X 24")
PORCELAIN WALL
TILE (PWT-3)
(TYPICAL 12" X 24")
SEAMLESS RESINOUS
FLOORING WALL BASE
(SRWB-3)
BH
SCR/SCSCR/SC
CH
PTD/WR PTD/WR
UP
1' - 4" 2' - 0"
SOLID SURFACE
SHOWER SURROUND
(SSM-2)
PORCELAIN WALL
TILE (PWT-3)
(TYPICAL 12" X 24")
PORCELAIN WALL
TILE (PWT-2)
(TYPICAL 12" X 24")
SEAMLESS RESINOUS
FLOORING WALL BASE
(SRWB-3)
3' - 0"
OPEN TO
BEYOND
BH
TP
SCR/SCSCR/SC
PRE-CAST TERRAZZO
SHOWER BASE (TRZ-1);
RE:PLUMBING
1. UNLESS OTHERWISE NOTED, VERTICAL DIMENSIONS ARE A TAKEN FROM
FINISH FLOOR.
2. MOUNT ALL MARKERBOARDS, TACKBOARDS, AND MAPBOARDS 7'-0" AFF TO
TOP OF FRAME UNLESS NOTED OTHERWISE
SHEET NOTES:
OPEN TO
BEYOND
SEAMLESS RESINOUS
FLOORING WALL BASE
(SRWB-3)
PORCELAIN WALL
TILE (PWT-3)
(TYPICAL 12" X 24")
PORCELAIN WALL
TILE (PWT-2)
(TYPICAL 12" X 24")
EQEQ
FWM
TOILET ACCESSORIES LEGEND:
CODE DESCRIPTION:
CH
CH-B
GB
LK6
PTD/WR
SCR/SC
SD
SH
SND
TTD
U
WC
WM
COAT HOOK
COAT HOOK - BARRIER FREE
GRAB BAR
LOCKERS
PAPER TOWEL DISPENSER / WASTE RECEPTACLE
SHOWER CURTAIN ROD / SHOWER CURTAIN
SOAP DISPENSER
SHOWER SEAT
SANITARY NAPKIN DISPOSAL
TOILET TISSUE DISPENSER
URINAL
WATER CLOSET
WALL MIRROR
BH LOCKER BENCH
SS SOAP SHELF
TP TOILET PARTITION
UP URINAL PARTITION
FWM FULL LENGTH WALL MIRROR
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
US Army Corps of Engineers
S O
L
IC
IT
A
T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T
E D
B Y
D A
T E
C O
N T
R A
C T
N O
C
H E
C K
E D
B Y
D R
A W
N B
Y
IS
S
U E
D A
T E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
File Path:
Plot Date:
R:\d0273859\_477687_Hangar_RVT20_AI.rvt
2/22/2024 9:40:51 AM
IN201
HANGAR
IN
T
E R
IO
R
E L E
V A
T
IO
N S
F O
R T
R
IL
E Y
K
A N
S A
S
K A
N S
A S
C
IT
Y D
IS
T
R
IC
T C
F
O R
D
C F
O R
D
C B
R O
W N
C G
A T
E W
O O
D
J A
N U
A R
Y
W D
Q -2
-R
-4
F
IL
E N
A M
E
RTA
A T
T A
C K
A V
IA
T
IO
N
B A
T T
A L
IO
N C
O M
P L E
X
P N
F Y
H a n g a r_
R V
T A
I.
rv t
PRODUCTION DATA 4PROD DATA 3
P
E
T
H S
T R
E E
T
K A
N S
A S
C
IT
Y M
O
A N
S I D
3/8" = 1'-0"A1
MENS RESTROOM, SHOWER & LOCKER ROOM - EAST WALL
3/8" = 1'-0"A6
MENS RESTROOM, SHOWER & LOCKER ROOM - NORTH WALL
3/8" = 1'-0"C1
MENS RESTROOM, SHOWER & LOCKER - SOUTH WALL
3/8" = 1'-0"E1
MENS RESTROOM, SHOWER & LOCKER ROOM - WING WALL
0 2' 4' 8'
SCALE: 3/8" = 1'-0"
0 2' 4' 8'
SCALE: 3/8" = 1'-0"
0 2' 4' 8'
SCALE: 3/8" = 1'-0"
0 2' 4' 8'
SCALE: 3/8" = 1'-0"
U
P D
A T
E T
O
IL
E T
A C
C E
S S
O R
IE
S
L E
G E
N D
F E
B
SOLID SURFACE
SHOWER SURROUND
(SSM-2)
PRE-CAST TERRAZZO
SHOWER BASE
(TRZ-1); RE:PLUMBING
SEAMLESS RESINOUS
FLOORING WALL BASE
(SRWB-3)
PORCELAIN WALL
TILE (PWT-3)
(TYPICAL 12" X 24")
PORCELAIN WALL
TILE (PWT-2)
(TYPICAL 12" X 24")
SH
SCR/SC
TYP.
A1
IN501
Sim
A5
IN501
Sim
1. UNLESS OTHERWISE NOTED, VERTICAL DIMENSIONS ARE A TAKEN FROM
FINISH FLOOR.
2. MOUNT ALL MARKERBOARDS, TACKBOARDS, AND MAPBOARDS 7'-0" AFF TO
TOP OF FRAME UNLESS NOTED OTHERWISE
SHEET NOTES:
SEAMLESS RESINOUS
FLOORING WALL BASE
(SRWB-3)
PORCELAIN WALL
TILE (PWT-3)
(TYPICAL 12" X 24")
PORCELAIN WALL
TILE (PWT-2)
(TYPICAL 12" X 24")
OPEN TO
BEYOND
TYP.
TYP.
BH
LK6
SEAMLESS RESINOUS
FLOORING WALL BASE
(SSM-2)
PORCELIN WALL
TILE (PWT-3)
(TYPICAL 12" X 24")
PORCELAIN WALL
TILE (PWT-1)
(TYPICAL 12" X 24")
DOOR FRAME (PT-6)
PTD/WR5
2' - 6"
FWM
TOILET ACCESSORIES LEGEND:
CODE DESCRIPTION:
CH
CH-B
GB
LK6
PTD/WR
SCR/SC
SD
SH
SND
TTD
U
WC
WM
COAT HOOK
COAT HOOK - BARRIER FREE
GRAB BAR
LOCKERS
PAPER TOWEL DISPENSER / WASTE RECEPTACLE
SHOWER CURTAIN ROD / SHOWER CURTAIN
SOAP DISPENSER
SHOWER SEAT
SANITARY NAPKIN DISPOSAL
TOILET TISSUE DISPENSER
URINAL
WATER CLOSET
WALL MIRROR
BH LOCKER BENCH
SS SOAP SHELF
TP TOILET PARTITION
UP URINAL PARTITION
FWM FULL LENGTH WALL MIRROR
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
US Army Corps of Engineers
S O
L
IC
IT
A
T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T
E D
B Y
D A
T E
C O
N T
R A
C T
N O
C
H E
C K
E D
B Y
D R
A W
N B
Y
IS
S
U E
D A
T E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
File Path:
Plot Date:
R:\d0273859\_477687_Hangar_RVT20_AI.rvt
2/22/2024 10:32:25 AM
IN202
HANGAR
IN
T
E R
IO
R
E L E
V A
T
IO
N S
F O
R T
R
IL
E Y
K
A N
S A
S
K A
N S
A S
C
IT
Y D
IS
T
R
IC
T C
F
O R
D
C F
O R
D
C B
R O
W N
C G
A T
E W
O O
D
J A
N U
A R
Y
W D
Q -2
-R
-4
F
IL
E N
A M
E
RTA
A T
T A
C K
A V
IA
T
IO
N
B A
T T
A L
IO
N C
O M
P L E
X
P N
F Y
H a n g a r_
R V
T A
I.
rv t
PRODUCTION DATA 4PROD DATA 3
P
E
T
H S
T R
E E
T
K A
N S
A S
C
IT
Y M
O
A N
S I D
3/8" = 1'-0"A1
MENS RESTROOM, SHOWER & LOCKER ROOM - WEST WALL
3/8" = 1'-0"D1
MENS RESTROOM, SHOWER & LOCKER ROOM - EAST LOCKER WALL
0 2' 4' 8'
SCALE: 3/8" = 1'-0"
0 2' 4' 8'
SCALE: 3/8" = 1'-0"
3/8" = 1'-0"A7
SHOWER & LOCKER ROOM - NORTH WALL
WOMENS RESTROOM,
0 2' 4' 8'
SCALE: 3/8" = 1'-0"
U
P D
A T
E T
O
IL
E T
A C
C E
S S
O R
IE
S
L E
G E
N D
F E
B
U
P D
A T
E L
O C
K E
R T
Y P
E F
E B
SEAMLESS RESINOUS
FLOORING WALL BASE
(SRWB-3)
SOLID SURFACE
MATERIAL SHOWER
SURROUND (SSM-2)
WATER CLOSET (WC)
PORCELAIN WALL
TILE (PWT-3)
(TYPICAL 12" X 24")
PORCELAIN WALL
TILE (PWT-1)
(TYPICAL 12" X 24")
PRE-CAST TERRAZZO
SHOWER BASE (TRZ-1);
RE:PLUMBING
TPTPTP
SCR/SC
SH
A1
IN501
Sim
A5
IN501
Sim
OPEN TO
BEYOND
PRE-CAST TERRAZZO
SHOWER BASE; RE:PLUMBING
SOLID SURFACE MATERIAL
SHOWER SURROUND (SSM-2)
PORCELAIN WALL
TILE (PWT-1)
(TYPICAL 12" X 24")
PORCELAIN WALL
TILE (PWT-3)
(TYPICAL 12" X 24")
BH
SCR/SCSCR/SC
WOMENS RESTROOM,
MECH. EQUIP.
SEE MECHANICAL
OPEN TO
BEYOND
SEAMLESS RESINOUS
FLOORING WALL BASE
(SRWB-3)
PORCELAIN WALL
TILE (PWT-1)
(TYPICAL 12" X 24")
PORCELAIN WALL
TILE (PWT-3)
(TYPICAL 12" X 24")
PRE-CAST TERRAZZO SHOWER
BASE (TRZ-1); RE:PLUMBING
SOLID SURFACE MATERIAL
SHOWER SURROUND (SSM-2)
BH
SCR/SC
CH
SCR/SC
WOMENS RESTROOM,
SEAMLESS RESINOUS
FLOORING WALL BASE
(SRWB-3)
WALL MOUNTED
LAVATORY;
SEE PLUMBING
ELECTRICAL DEVICES;
SEE ELECTRICAL
PORCELAIN WALL
TILE (PWT-1)
(TYPICAL 12" X 24")
PORCELAIN WALL
TILE (PWT-3)
(TYPICAL 12" X 24")
1' - 11" 1' - 11" 4' - 10 1/2"1' - 11"
PTD/WR PTD/WR
SDSD BH
LK6
TYP.
TYP.
1. UNLESS OTHERWISE NOTED, VERTICAL DIMENSIONS ARE A TAKEN FROM
FINISH FLOOR.
2. MOUNT ALL MARKERBOARDS, TACKBOARDS, AND MAPBOARDS 7'-0" AFF TO
TOP OF FRAME UNLESS NOTED OTHERWISE
SHEET NOTES:
TOILET ACCESSORIES LEGEND:
CODE DESCRIPTION:
CH
CH-B
GB
LK6
PTD/WR
SCR/SC
SD
SH
SND
TTD
U
WC
WM
COAT HOOK
COAT HOOK - BARRIER FREE
GRAB BAR
LOCKERS
PAPER TOWEL DISPENSER / WASTE RECEPTACLE
SHOWER CURTAIN ROD / SHOWER CURTAIN
SOAP DISPENSER
SHOWER SEAT
SANITARY NAPKIN DISPOSAL
TOILET TISSUE DISPENSER
URINAL
WATER CLOSET
WALL MIRROR
BH LOCKER BENCH
SS SOAP SHELF
TP TOILET PARTITION
UP URINAL PARTITION
FWM FULL LENGTH WALL MIRROR
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
US Army Corps of Engineers
S O
L
IC
IT
A
T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T
E D
B Y
D A
T E
C O
N T
R A
C T
N O
C
H E
C K
E D
B Y
D R
A W
N B
Y
IS
S
U E
D A
T E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
File Path:
Plot Date:
R:\d0273859\_477687_Hangar_RVT20_AI.rvt
2/22/2024 10:32:28 AM
IN203
HANGAR
IN
T
E R
IO
R
E L E
V A
T
IO
N S
F O
R T
R
IL
E Y
K
A N
S A
S
K A
N S
A S
C
IT
Y D
IS
T
R
IC
T C
F
O R
D
C F
O R
D
C B
R O
W N
C G
A T
E W
O O
D
J A
N U
A R
Y
W D
Q -2
-R
-4
F
IL
E N
A M
E
RTA
A T
T A
C K
A V
IA
T
IO
N
B A
T T
A L
IO
N C
O M
P L E
X
P N
F Y
H a n g a r_
R V
T A
I.
rv t
PRODUCTION DATA 4PROD DATA 3
P
E
T
H S
T R
E E
T
K A
N S
A S
C
IT
Y M
O
A N
S I D
3/8" = 1'-0"A1
WOMENS RESTROOM, SHOWER & LOCKER ROOM - WEST WALL
3/8" = 1'-0"A7
SHOWER & LOCKER ROOM - SOUTH WALL
3/8" = 1'-0"E1
SHOWER & LOCKER ROOM - NORTH SHOWER WALL
3/8" = 1'-0"C1
WOMENS RESTROOM, SHOWER & LOCKER ROOM - EAST WALL
0 2' 4' 8'
SCALE: 3/8" = 1'-0"
0 2' 4' 8'
SCALE: 3/8" = 1'-0"
0 2' 4' 8'
SCALE: 3/8" = 1'-0"
0 2' 4' 8'
SCALE: 3/8" = 1'-0"
U
P D
A T
E T
O
IL
E T
A C
C E
S S
O R
IE
S
L E
G E
N D
F E
B
U
P D
A T
E L
O C
K E
R T
Y P
E F
E B
(SRWB-3)
PROCELAIN WALL
TILE (PWT-2)
(TYPICAL 12" X 24")
PORCELAIN WALL
TILE (PWT-3)
(TYPICAL 12" X 24")
WATER CLOSET
(WC)
URINAL (U)
5' - 0"
TP
PTD/WR
PTD/WR
PORCELAIN WALL
TILE (PWT-3)
(TYPICAL 12" X 24")
PORCELAIN WALL
TILE (PWT-2)
(TYPICAL 12" X 24")
SEAMLESS RESINOUS
FLOORING WALL
BASE (SRWB-3)
WATER CLOSET (WC)
URINAL (U)
DOOR FRAME
(PT-6)
TP TP
SEAMLESS RESINOUS
FLOORING WALL BASE
(SRWB-3)
WALL MOUNTED
LAVATORY;
SEE PLUMBING
PORCELAIN WALL
TILE (PWT-2)
(TYPICAL 12" X 24")
PORCELAIN WALL
TILE (PWT-3)
(TYPICAL 12" X 24")
2' - 0"1' - 6"2' - 9"1' - 6 1/2"
WM WM
PTD/WR
SD
PTD/WR MECH. EQUIP.
SEE MECHANICAL
SEAMLESS RESINOUS
FLOORING WALL BASE
(SRWB-3)
URINAL (U)
PORCELAIN WALL
TILE (PWT-3)
(TYPICAL 12" X 24")
PORCELAIN WALL
TILE (PWT-2)
(TYPICAL 12" X 24")
1. UNLESS OTHERWISE NOTED, VERTICAL DIMENSIONS ARE A TAKEN FROM
FINISH FLOOR.
2. MOUNT ALL MARKERBOARDS, TACKBOARDS, AND MAPBOARDS 7'-0" AFF TO
TOP OF FRAME UNLESS NOTED OTHERWISE
SHEET NOTES:
WATER
CLOSET (WC)
SEAMLESS RESINOUS
FLOORING WALL BASE
(SRWB-3)
PORCELAIN WALL
TILE (PWT-3)
(TYPICAL 12" X 24")
WALL MOUNTED
LAVATORY; SEE
PLUMBING
PORCELAIN WALL
TILE (PWT-1)
(TYPICAL 12" X 24")
4' - 5 1/2"
SD
TP
PTD/WR
OPEN TO
BEYOND
SEAMLESS RESIONUS
FLOORING WALL BASE
(SRWB-3)
WALL MOUNTED
LAVATORY; SEE
PLUMBING
WATER CLOSET (WC)
PORCELAIN WALL
TILE (PWT-3)
(TYPICAL 12" X 24")
PORCELAIN WALL
TILE (PWT-1)
(TYPICAL 12" X 24")
WM
SDGBGB
SND
TTD
SEAMLESS RESINOUS
FLOORING WALL BASE
(SRWB-3)
WALL MOUNTED
LAVATORY;
SEE PLUMBING
PORCELAIN WALL
TILE (PWT-1)
(TYPICAL 12" X 24")
PORCELAIN WALL
TILE (PWT-3)
(TYPICAL 12" X 24")
2' - 0" 1' - 6"2' - 9"1' - 6"
WM WM
PTD/WRPTD/WR
SD
PORCELAIN WALL
TILE (PWT-3)
(TYPICAL 12" X 24")
PORCELAIN WALL
TILE (PWT-1)
(TYPICAL 12" X 24")
SEAMLESS RESINOUS
FLOORING WALL BASE
(SRWB-3)
WATER CLOSET (WC)
TP TP
DOOR FRAME (PT-6)
TOILET ACCESSORIES LEGEND:
CODE DESCRIPTION:
CH
CH-B
GB
LK6
PTD/WR
SCR/SC
SD
SH
SND
TTD
U
WC
WM
COAT HOOK
COAT HOOK - BARRIER FREE
GRAB BAR
LOCKERS
PAPER TOWEL DISPENSER / WASTE RECEPTACLE
SHOWER CURTAIN ROD / SHOWER CURTAIN
SOAP DISPENSER
SHOWER SEAT
SANITARY NAPKIN DISPOSAL
TOILET TISSUE DISPENSER
URINAL
WATER CLOSET
WALL MIRROR
BH LOCKER BENCH
SS SOAP SHELF
TP TOILET PARTITION
UP URINAL PARTITION
FWM FULL LENGTH WALL MIRROR
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
US Army Corps of Engineers
S O
L
IC
IT
A
T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T
E D
B Y
D A
T E
C O
N T
R A
C T
N O
C
H E
C K
E D
B Y
D R
A W
N B
Y
IS
S
U E
D A
T E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
File Path:
Plot Date:
R:\d0273859\_477687_Hangar_RVT20_AI.rvt
2/22/2024 9:41:14 AM
IN204
HANGAR
IN
T
E R
IO
R
E L E
V A
T
IO
N S
F O
R T
R
IL
E Y
K
A N
S A
S
K A
N S
A S
C
IT
Y D
IS
T
R
IC
T C
F
O R
D
C F
O R
D
C B
R O
W N
C G
A T
E W
O O
D
J A
N U
A R
Y
W D
Q -2
-R
-4
F
IL
E N
A M
E
RTA
A T
T A
C K
A V
IA
T
IO
N
B A
T T
A L
IO
N C
O M
P L E
X
P N
F Y
H a n g a r_
R V
T A
I.
rv t
PRODUCTION DATA 4PROD DATA 3
P
E
T
H S
T R
E E
T
K A
N S
A S
C
IT
Y M
O
A N
S I D
3/8" = 1'-0"A1
MENS 148 - EAST WALL
3/8" = 1'-0"A4
MENS 148 - NORTH WALL
3/8" = 1'-0"C1
MENS 148 - SOUTH WALL
3/8" = 1'-0"A8
MENS 148 - WEST WALL
3/8" = 1'-0"C8
WOMENS 149 - EAST WALL
3/8" = 1'-0"E1
WOMENS 149 - WEST WALL
3/8" = 1'-0"E4
WOMENS 149 - NORTH WALL
3/8" = 1'-0"C5
WOMENS 149 - SOUTH WALL
0 2' 4' 8'
SCALE: 3/8" = 1'-0"
0 2' 4' 8'
SCALE: 3/8" = 1'-0"
0 2' 4' 8'
SCALE: 3/8" = 1'-0"
0 2' 4' 8'
SCALE: 3/8" = 1'-0"
0 2' 4' 8'
SCALE: 3/8" = 1'-0"
0 2' 4' 8'
SCALE: 3/8" = 1'-0"
0 2' 4' 8'
SCALE: 3/8" = 1'-0"
0 2' 4' 8'
SCALE: 3/8" = 1'-0"
U
P D
A T
E T
O
IL
E T
A C
C E
S S
O R
IE
S
L E
G E
N D
F E
B
WALL MOUNTED
LAVATORY; SEE
PLUMBING
PORCELAIN WALL
TILE (PWT-3)
(TYPICAL 12" X 24")
PORCELAIN WALL
TILE (PWT-2)
(TYPICAL 12" X 24")
WATER CLOSET
(WC)
URINAL (U)
SEAMLESS RESINOUS
FLOORING WALL BASE
(SRWB-3)
PTD/WR
PTD/WR
TP
4' - 5 1/2"
DOOR FRAME
(PT-6)
ELECTRICAL DEVICES;
SEE ELECTRICAL
(TYPICAL)
SEAMLESS RESINOUS
FLOORING WALL BASE
(SRWB-3)
WATER CLOSET (WC)URINAL (U)
PORCELAIN WALL
TILE (PWT-2)
(TYPICAL 12" X 24")
PORCELAIN WALL
TILE (PWT-3)
(TYPICAL 12" X 24")
UPUP
TP TP
PTD/WR
1' - 6 1/2"
2' - 6"2' - 9 1/2"
10' - 0 1/2"
SEAMLESS
RESINOUS
FLOORING
WALL BASE
(SRWB-3)
WALL MOUNTED
LAVATORY; SEE
PLUMBING
(TYPICAL)
PORCELAIN WALL
TILE (PWT-3)
(TYPICAL 12" X 24")
PORCELAIN WALL
TILE (PWT-2)
(TYPICAL 12" X 24")
2' - 6"
2' - 6" 2' - 6" 1' - 3" 2' - 3"
2' - 3"
WM WM WM
SDSDSD
PTD/WR
PTD/WR
MECH. EQUIP.
SEE MECHANICAL
PORCELAIN WALL
TILE (PWT-3)
(TYPICAL 12" X 24")
SEAMLESS
RESINOUS
FLOORING WALL
BASE (SRWB-3)
ELECTRICAL
DEVICES; SEE
ELECTRICAL
UP
PORCELAIN WALL
TILE (PWT-2)
(TYPICAL 12" X 24")
SEAMLESS
RESINOUS
FLOORING
WALL BASE
(SRWB-3)
WALL MOUNTED
LAVATORY; SEE
PLUMBING
WATER
CLOSET (WC)
PORCELAIN WALL
TILE (PWT-3)
(TYPICAL 12" X 24")
PORCELAIN WALL
TILE (PWT-1)
(TYPICAL 12" X 24")
PTD/WR
TP
SD
WM
11"
1' - 6"2' - 7 1/2"1' - 6"
SEAMLESS RESINOUS
FLOORING WALL BASE
(SRWB-3)
PORCELAIN WALL
TILE (PWT-3)
(TYPICAL 12" X 24') PORCELAIN WALL
TILE (PWT-1)
(TYPICAL 12" X 24")
LAVATORY;
SEE PLUMBING
ELECTRICAL DEVICES;
SEE ELECTRICAL
WMWM
SD
PTD/WR
PTD/WR
SEAMLESS RESINOUS
FLOORING WALL BASE
(SRWB-3)
PORCELAIN WALL
TILE (PWT-3)
(TYPICAL 12" X 24")
PORCELAIN WALL
TILE (PWT-1)
(TYPICAL 12" X 24")
ELECTRICAL DEVICES;
SEE ELECTRICAL
(TYPICAL)
DOOR FRAME (PT-6)
WATER CLOSET
(WC)
TP TP
PTD/WR WATER CLOSET
(WC)
SEAMLESS RESINOUS
FLOORING WALL BASE
(SRWB-3)
ELECTRICAL DEVICES;
SEE ELECTRICAL
PORCELAIN WALL
TILE (PWT-3)
(TYPICAL 12" X 24")
PORCELAIN WALL
TILE (PWT-1)
(TYPICAL 12" X 24")
TP
SND
TTD
1. UNLESS OTHERWISE NOTED, VERTICAL DIMENSIONS ARE A TAKEN FROM
FINISH FLOOR.
2. MOUNT ALL MARKERBOARDS, TACKBOARDS, AND MAPBOARDS 7'-0" AFF TO
TOP OF FRAME UNLESS NOTED OTHERWISE
SHEET NOTES: TOILET ACCESSORIES LEGEND:
CODE DESCRIPTION:
CH
CH-B
GB
LK6
PTD/WR
SCR/SC
SD
SH
SND
TTD
U
WC
WM
COAT HOOK
COAT HOOK - BARRIER FREE
GRAB BAR
LOCKERS
PAPER TOWEL DISPENSER / WASTE RECEPTACLE
SHOWER CURTAIN ROD / SHOWER CURTAIN
SOAP DISPENSER
SHOWER SEAT
SANITARY NAPKIN DISPOSAL
TOILET TISSUE DISPENSER
URINAL
WATER CLOSET
WALL MIRROR
BH LOCKER BENCH
SS SOAP SHELF
TP TOILET PARTITION
UP URINAL PARTITION
FWM FULL LENGTH WALL MIRROR
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
US Army Corps of Engineers
S O
L
IC
IT
A
T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T
E D
B Y
D A
T E
C O
N T
R A
C T
N O
C
H E
C K
E D
B Y
D R
A W
N B
Y
IS
S
U E
D A
T E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
File Path:
Plot Date:
R:\d0273859\_477687_Hangar_RVT20_AI.rvt
2/22/2024 9:41:24 AM
IN208
HANGAR
IN
T
E R
IO
R
E L E
V A
T
IO
N S
F O
R T
R
IL
E Y
K
A N
S A
S
K A
N S
A S
C
IT
Y D
IS
T
R
IC
T C
F
O R
D
C F
O R
D
C B
R O
W N
C G
A T
E W
O O
D
J A
N U
A R
Y
W D
Q -2
-R
-4
F
IL
E N
A M
E
RTA
A T
T A
C K
A V
IA
T
IO
N
B A
T T
A L
IO
N C
O M
P L E
X
P N
F Y
H a n g a r_
R V
T A
I.
rv t
PRODUCTION DATA 4PROD DATA 3
P
E
T
H S
T R
E E
T
K A
N S
A S
C
IT
Y M
O
A N
S I D
3/8" = 1'-0"A1
MENS 232 - EAST WALL
3/8" = 1'-0"A4
MENS 232 - NORTH WALL
3/8" = 1'-0"C1
MENS 232 - SOUTH WALL
3/8" = 1'-0"A8
MENS 232 - WEST WALL
3/8" = 1'-0"C8
WOMENS 231 - EAST WALL
3/8" = 1'-0"C5
WOMENS 231 - NORTH WALL
3/8" = 1'-0"E1
WOMENS 231 - SOUTH WALL
3/8" = 1'-0"E5
WOMENS 231 - WEST WALL
0 2' 4' 8'
SCALE: 3/8" = 1'-0"
0 2' 4' 8'
SCALE: 3/8" = 1'-0"
0 2' 4' 8'
SCALE: 3/8" = 1'-0"
0 2' 4' 8'
SCALE: 3/8" = 1'-0"
0 2' 4' 8'
SCALE: 3/8" = 1'-0"
0 2' 4' 8'
SCALE: 3/8" = 1'-0"
0 2' 4' 8'
SCALE: 3/8" = 1'-0"
0 2' 4' 8'
SCALE: 3/8" = 1'-0" 1
U
P D
A T
E T
O
IL
E T
A C
C E
S S
O R
IE
S
L E
G E
N D
F E
B
(SRWB-3)
PORCELAIN WALL
TILE (PWT-3)
(TYPICAL 12" X 24")
PORCELAIN WALL
TILE (PWT-2)
(TYPICAL)
WATER CLOSET
(WC)
TTD
6 1/2"
UNISEX 204 -
ELECTRICAL
DEVICES;
SEE ELECTRICAL
DOOR FRAME (PT-6)
SEAMLESS RESINOUS
FLOORING WALL
BASE (SRWB-3)
PORCELAIN WALL
TILE (PWT-2)
(TYPICAL 12" X 24")
PORCELAIN WALL
TILE (PWT-3)
(TYPICAL 12" X 24")
UNISEX 204 -
1' - 6"
SEAMLESS RESINOUS
FLOORING WALL BASE
(SRWB-3)
LAVATORY; SEE
PLUMBING
WATER CLOSET
(WC)
ELECTRICAL DEVICE;
SEE ELECTRICAL
PORCELAIN WALL
TILE (PWT-2)
(TYPICAL 12" X 24")
PORCELAIN WALL
TILE (PWT-3)
(TYPICAL 12" X 24")
SD
WM
TTD
UNISEX 204 -
1' - 3 1/2"
SEAMLESS RESINOUS
FLOORING WALL BASE
(SRWB-3)
LAVATORY; SEE
PLUMBING
PORCELAIN WALL
TILE (PWT-2)
(TYPICAL 12" X 24")
PORCELAIN WALL
TILE (PWT-3)
(TYPICAL 12" X 24")
SD
WM
PTD/WR
UNISEX 204 -
1' - 3 1/2"
SEAMLESS RESINOUS
FLOORING WALL BASE
(SRWB-3)
LAVATORY; SEE
PLUMBING
PORCELAIN WALL
TILE (PWT-2)
(TYPICAL 12" X 24")
PORCELAIN WALL
TILE (PWT-3)
(TYPICAL 12" X 24")
PTD/WR
WM
SD
SEAMLESS RESINOUS
FLOORING WALL BASE
(SRWB-3)
DOOR FRAME
(PT-6)
ELECTRICAL DEVICES;
SEE ELECTRICAL
PORCELAIN WALL
TILE (PWT-2)
(TYPICAL 12" X 24")
PORCELAIN WALL
TILE (PWT-3)
(TYPICAL 12" X 24")
PTD/WR
UNISEX 205 -
1' - 6"
SEAMLESS RESINOUS
FLOORING WALL BASE
(SRWB-3) WATER CLOSET (WC)
LAVATORY; SEE
PLUMBING
ELECTRICAL DEVICES;
SEE ELECTRICAL
PORCELAIN WALL
TILE (PWT-3)
(TYPICAL 12" X 24")
PORCELAIN WALL
TILE (PWT-2)
(TYPICAL 12" X 24")
WM
SD
TTD
UNISEX 205 -
SEAMLESS RESINOUS
FLOORING WALL BASE
(SRWB-3)
WATER CLOSET
(WC)
PORCELAIN WALL
TILE (PWT-3)
(TYPICAL 12" X 24")
PORCELAIN WALL
TILE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .