Amendment-0002 W912DQ24R4000 update technical and submission requirements.pdf
PDF 8 MB Posted
- Attached to
- Child Development Center Construction
- Solicitation number
- W912DQ24R4000
About this file
This solicitation document outlines requirements for the construction of a Child Development Center at Fort Leavenworth, Kansas. Key details include:
-
The U.S. Army Corps of Engineers, Kansas City District requires construction services including a playground with age-appropriate equipment and safety surfacing, cybersecurity measures, building information systems, fire protection and alarm systems, and supporting facilities such as utilities, lighting, parking and landscaping.
-
The facility is to be designed for a minimum 40-year life in accordance with DoD standards, including energy efficiencies, building envelope performance and integrated systems. Heating and air conditioning will be provided by self-contained systems, and measures will comply with DoD Minimum Antiterrorism for Buildings standards.
-
Comprehensive interior design services for building and furnishings are required. The facility must provide access for individuals with disabilities.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Child Development Center (CDC) Construction for Ft. Leavenw orth, KS
The purpose of this amendment is to update Technical Requirements and Draw ings and Proposal Submission Requirements. See SF30 Block 14 Continuation Page.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 06-Feb-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DQ24R4000
X 9B. DATED (SEE ITEM 11)
19-Jan-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
06-Feb-2024
CODE
USACE, KANSAS CITY CT
FEDERAL BLDG CT-M 601 E 12TH STREET
KANSAS CITY MO 64106-2896
W912DQ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DQ24R4000
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT-0002
THE SOLICITATION IS AMENDED A FOLLOWS:
The purpose of this amendment is to address scope Technical Specification and Drawings Materials and Submission Requirements for the Solicitation.
Deleted text is shown with a strikethrough. Added text is shown with underline.
1. Specification changes:
a. 01 91 00.15 – Building Commissioning
Paragraph 3.11.a is revised as shown below.
a. An executive summary describing the overall commissioning process, the results of the commissioning process, outstanding deficiencies and recommended resolutions, and seasonal testing that must be scheduled for a later date.
Indicate, in the executive summary, whether the systems meet the requirements of the contract documents and the Owner's Project Requirements Document.
b. 01 91 19 – Building Enclosure Commissioning
i. Paragraph 1.3.10 is revised as shown below.
1.3.10 Design Phase
The period of the project delivery process when a design supporting the Owner's Project Requirements is developed and translated into Contract Documents.
ii. The first paragraph under paragraph 3.7 is revised as shown below.
Demonstrate that all system components have been installed, that each building enclosure component operates, and that the systems operate and perform in accordance with Contract documents and the Owner's Project Requirements.
Provide all materials, services, and labor required to perform the Building Envelope Inspections.
c. 23 08 00 – Commissioning of Mechanical and Plumbing Systems
This specification has been extensively revised. A copy of the revised specification is attached.
d. 27 10 00 – Building Telecommunications Cabling System
i. Paragraph 2.6.5 – Patch Panels is revised as shown below.
2.6.5 Patch Panels
Provide ports for the number of horizontal and backbone cables terminated on the panel plus 25 50 percent spare.
Provide pre-connectorized optical fiber and copper patch cords for patch panels. Provide patch cords, as complete assemblies, with matching connectors as specified. Provide fiber optic patch cables with crossover orientation in accordance with TIA-568.3. Patch cords shall meet minimum performance requirements specified in TIA-568.1, TIA-568.2 and TIA-568.3 for cables, cable length and hardware specified.
ii. The first paragraph under paragraph 3.1.6.2 - Patch Panels is revised as shown below.
Patch panels shall be mounted in equipment racks with sufficient ports to accommodate the installed cable plant plus 25 50 percent spares.
2. Drawings. The following sheets are revised. Copies of the revised sheets are attached.
a. S-113: Detail reference correction
b. A-540: Updated gutter hanger clips spacing dimension, snow fence screw graphically showing through the metal deck and NTS text updated for F5 and E5.
c. A-601: Added General Note #7.
d. A-603: Door hardware schedule revisions.
e. IN110, IN112, IN113, IN114, IN403: Flipped Toilet Door Swing
f. IN111, IN401, IN402, Relocated Fixtures
g. IN501, IN504, IN506: Updated Dimensions; also added water cooler to IN501.
h. IN801: Updated Detail
i. IN802, IN810: Updated Signage Locations
j. P-111, P-112, P-113, P-114: Adjusted minimum sanitary drain size.
k. P-115, P-116, P-117, P-118: Plumbing keynote added for branch piping isolation valves and extended
DHWR lines in classrooms.
l. MP410: Updated Hot Water Buffer Tank Piping.
m. MI610: Added ECM to Primary Boiler loop on schematic. Updated Hydronic Hot Water Sequencing
Language. Updated Buffer Tank piping schematic.
n. ED101, ED105, ES101, ES105: Revised manhole numbers.
o. E-601: Revised notes.
3. Solicitation Submission Requirement changes.
3.1 ITEM 1:
Section 00 21 16: INSTRUCTIONS TO PROPOSERS
APPENDIX C. SECTION 00 21 16: INSTRUCTION TO PROPOSERS.
3. Proposal Format and Submittal Requirements
Offerors shall limit the proposal to the following page limits:
Factor 1: Performance Confidence – 3 pages per project, maximum 15 pages Factor 2: Technical Approach – 6 pages. 10 pages; tabs and sub tabs do not count against the page limit.
Factor 3: Small Business Commitment – 2 pages. 6 pages
3.2 ITEM 2:
PERFORMANCE CONFIDENCE SUBMISSION REQUIREMENTS.
1.3 Quality of Past Performance Assessment
For each of the projects submitted, provide a copy of the Contractor Performance Assessment Reporting System (CPARS) report. If CPARS does not exist, please provide a Past Performance Questionnaire (PPQ) (Attachment B) to a representative of the owner. The Past Performance Questionnaire included in the solicitation is provided for the offeror or its team members to submit to the client for each project the offeror includes in its proposal for Factor 1, Performance Confidence. Ensure correct phone numbers and email addresses are provided for the client point of contact. CPARS and PPQs will not count against the page limitation for this factor.
4. The time and date for submission of proposals is not changed and remains February 28, 2024 at 11:00 AM local Time.
5. Offerors are required to acknowledge receipt of this amendment. Failure to acknowledge receipt of all amendments may cause rejection of offeror’s proposal.
6. All other terms and conditions remain unchanged and in full force.
(End of Amendment)
(End of Summary of Changes)
504741LVNCDC W912DQ24R4000
Ft. Leavenworth, KS
SECTION TABLE OF CONTENTS
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
SECTION 23 08 00
COMMISSIONING OF MECHANICAL AND PLUMBING SYSTEMS
PART 1 GENERAL
1.1 SEQUENCING AND SCHEDULING
1.2 SUBMITTALS
1.3 ACCESSIBILITY REQUIREMENTS
1.4 COORDINATION
1.5 PIPE FLUSHING, TESTING, AND WATER TREATMENT REPORTS
1.6 CERTIFICATE OF READINESS
PART 2 PRODUCTS
2.1 TEST EQUIPMENT
2.1.1 Proprietary Equipment
2.1.2 Calibration and Accuracy
PART 3 EXECUTION
3.1 MEETINGS
3.2 COMMISSIONING CONSTRUCTION OBSERVATION CHECKLISTS
3.2.1 Pre-Functional Checklists
3.2.2 Functional Performance Test Checklists
3.2.3 Integrated Systems Test Checklists
3.3 PRE-FUNCTIONAL CHECKS
3.4 STARTUP AND INITIAL CHECKOUT
3.5 DUCT AIR LEAKAGE TEST (DALT) REPORT REVIEW AND VERIFICATION
3.5.1 Duct Air Leakage Test (DALT) Report Review
3.5.2 Duct Air Leakage Test (DALT) Report Verification
3.6 TESTING, ADJUSTING, AND BALANCING REPORT REVIEW AND VERIFICATION
3.6.1 Testing, Adjusting, and Balancing (TAB) Report Review
3.6.2 Testing, Adjusting, and Balancing (TAB) Report Verification
3.7 HVAC CONTROLS START-UP AND PERFORMANCE VERIFICATION TEST REVIEW
3.8 FUNCTIONAL PERFORMANCE AND INTEGRATED SYSTEMS TESTING
3.8.1 Test Scheduling and Coordination
3.8.2 Preparation
3.8.3 Testing Procedures
3.8.4 Simulating Conditions
3.8.5 Manufacturer's Representative
3.8.6 Integrated Systems Tests
3.8.7 Sample Strategy
3.8.7.1 100 Percent Sample Procedures
3.9 INTEGRATED SYSTEMS TEST
3.10 RETESTING REQUIREMENTS
3.11 SYSTEM ACCEPTANCE
3.12 SEASONAL TESTS
3.13 FULL-LOAD TESTS
3.14 TRAINING
23 08 00 - 1
3.15 COMMISSIONING REPORT
3.16 POST-CONSTRUCTION ENDURANCE TEST
-- End of Section Table of Contents --
23 08 00 - 2
SECTION 23 08 00
COMMISSIONING OF MECHANICAL AND PLUMBING SYSTEMS
PART 1 GENERAL
Building Commissioning is a systematic, quality-focused process for enhancing the delivery of a project that focuses on verifying and documenting that all of the commissioned systems and assemblies are planned, designed, installed, tested, operated, and maintained to meet the project requirements. The purpose is to reduce the cost and performance risks associated with delivering facilities projects, and to increase value to owners, occupants, and users. Comply with specification Section
01 91 00.15 BUILDING COMMISSIONING.
1.1 SEQUENCING AND SCHEDULING
Complete the following prior to starting Functional Performance Tests of mechanical systems:
a. All equipment and systems completed, cleaned, flushed, disinfected, calibrated, tested, and operate in accordance with contract documents and construction plans and specifications
b. Final DALT Report submitted and approved in accordance with Section
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
c. Pre-final Testing, Adjusting, and Balancing Report submitted in accordance with Section 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR
HVAC
d. Performance Verification Tests of the controls systems have been completed and the Performance Verification Test Report has been submitted and approved in accordance with Section 23 09 00
INSTRUMENTATION AND CONTROL FOR HVAC.
e. The Certificate of Readiness submitted and approved in accordance with Section 01 91 00.15 BUILDING COMMISSIONING
g. Tests, Flushing, and Disinfection in accordance with Section 22 00 00
PLUMBING, GENERAL PURPOSE
1.2 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-03 Product Data
Test Equipment; G , DO
SD-06 Test Reports
23 08 00 - 3
Pipe Flushing, Testing, And Water Treatment Reports; G , DO
Completed Pre-Functional Checklists; G , , DO
Seasonal Test Report; G , DO
Full-Load Test Report; G , DO
Post-Construction Trend Log Report; G , RO
SD-07 Certificates
Certificate Of Readiness; G , RO
1.3 ACCESSIBILITY REQUIREMENTS
Equipment, systems, and devices for commissioned systems must be accessible. Make necessary modifications if systems and devices are not accessible for inspections and testing.
Assist commissioning team in testing by removing equipment covers, opening access panels, and other required activities that assist with visual oversight. Furnish ladders, flashlights, meters, gauges, or other inspection equipment as necessary.
1.4 COORDINATION
Refer to Section 01 91 00.15 BUILDING COMMISSIONING for requirements pertaining to coordination during the commissioning process. Coordinate with the Lead Commissioning Specialist in accordance with Section 01 91 00.15 and in accordance with the Commissioning Plan to schedule inspections as required to support the commissioning process. Furnish additional information requested by the Lead Commissioning Specialist .
Coordinate scheduling of Functional Performance Testing with the commissioning team. Provide plans, reports, notes, and other documentation to the Lead Commissioning Specialist as specified in the commissioning plan, as it is completed.
1.5 PIPE FLUSHING, TESTING, AND WATER TREATMENT REPORTS
Test requirements are specified in Division 22 and 23 piping Sections.
Prepare a pipe system cleaning, flushing, and hydrostatic testing log.
Provide cleaning, flushing, testing, and water treatment log and final reports.
Include the following in the pipe system cleaning, flushing, and hydrostatic testing log:
a. Minimum flushing water velocity.
b. Water treatment reports.
c. Tracking checklist for managing and ensuring that all pipe sections have been cleaned, flushed, hydrostatically tested, and chemically treated.
23 08 00 - 4
1.6 CERTIFICATE OF READINESS
Submit Certificate of Readiness documentation in accordance with Section 01 91 00.15 BUILDING COMMISSIONING for all equipment and systems including start-up reports; completed Pre-Functional Checklists; Testing, Adjusting, and Balancing (TAB) Report; Issues Log; HVAC Controls Start-Up Reports ;
Performance Verification Test Reports; and the building envelope Air Leakage Test Reports and Diagnostic Test Reports . Do not schedule Functional Performance Tests for the system until the Certificate of Readiness for that system receives approval by the Government. The CQC System Manager, and the Mechanical, Electrical, Controls, and TAB subcontractor representatives must sign and date the Certificate of Readiness.
PART 2 PRODUCTS
2.1 TEST EQUIPMENT
Provide all testing equipment required to perform testing for the systems to be commissioned, except for equipment specific to and used by TAB as required by Section 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC.
Provide a sufficient quantity of two-way radios for each subcontractor.
Submit list of Test Equipment and instrumentation to be used for testing including equipment/instrument identification number, equipment application or planned use, manufacturer, make, model, and serial number, and calibration history with certificates. Also list special equipment and proprietary tools specific to a piece of equipment required for testing.
2.1.1 Proprietary Equipment
Provide manufacturer's proprietary test equipment and software required by any equipment manufacturer for programming and start-up, whether specified or not. Provide manufacturer test equipment, demonstrate its use, and assist in the commissioning process as needed. Provide data logging equipment and software required to test equipment.
2.1.2 Calibration and Accuracy
Comply with equipment manufacturer's test equipment calibration procedures and intervals. Recalibrate test instruments immediately after instruments have been repaired resulting from being dropped or damaged. Affix calibration tags to test instruments. Furnish calibration records to Contracting Officer upon request.
Provide all testing equipment of sufficient quality and accuracy to test and measure system performance with the tolerances specified. Unless otherwise noted, the following minimum requirements apply: Provide temperature sensors and digital thermometers with a certified calibration within the past year to an accuracy of 0.5 degrees F and a resolution of plus or minus 0.1 degrees F. Provide pressure sensors with an accuracy of plus or minus 2.0 percent of the value range being measured (not full range of meter) and calibrated within the last year.
PART 3 EXECUTION
3.1 MEETINGS
Attend all meetings in accordance with Section 01 91 00.15 BUILDING
23 08 00 - 5
COMMISSIONING.
Provide timely updates on construction schedule changes to allow the Lead Commissioning Specialist to execute commissioning process efficiently.
Notify Contracting Officer of anticipated construction delays to commissioning activities not yet performed or not yet scheduled.
3.2 COMMISSIONING CONSTRUCTION OBSERVATION CHECKLISTS
Commissioning construction observation checklists include Pre-Functional Checklists , Integrated Systems Test Checklists, and Functional Performance Test Checklists. Provide commissioning construction observation checklists for the Interim and Final Construction Phase Commissioning Plan in accordance with Section 01 91 00.15 BUILDING COMMISSIONING.
Download example Pre-Functional Checklists , Integrated Systems Test Checklists, and Functional Performance Test Checklists for Section 01 91 00.15 BUILDING COMMISSIONING at the following location:
http://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/ forms-graphics-tables . The checklists submitted in the Interim and Final Construction Phase Commissioning Plans must contain the same level of detail shown in the examples. The submitted checklists are not required to match the format of the examples.
3.2.1 Pre-Functional Checklists
The Pre-Functional Checklists must include items for physical inspection or testing that demonstrate that installation and start-up of equipment and systems is complete. Refer to paragraph PRE-FUNCTIONAL CHECKS.
Pre-functional checklists must be tailored to verify the specific installation requirements and details of the construction documents and manufacturer's instructions.
Use the Pre-Functional Checklists prepared by the CxC for physical inspection or testing to demonstrate that installation and start-up of equipment and systems is complete. Refer to paragraph PRE-FUNCTIONAL
CHECKS.
3.2.2 Functional Performance Test Checklists
Functional Performance Test Checklists must include procedures that explain, step-by-step, the actions and expected results that will demonstrate that the system performs in accordance with the contract. Refer to paragraph FUNCTIONAL PERFORMANCE AND INTEGRATED SYSTEMS TESTING. Include the following sections and details appropriate to the systems being tested in the Functional Performance Test Checklists:
a. Notable system features including information about controls to facilitate understanding of system operation and maintenance
b. Conclusions and recommendations. Conclusions must clearly indicate if system does or does not perform in accordance with contract requirements and specifications.Recommendation must clearly indicate that the system should or should not be approved by the Government.
c. Test conditions including date, beginning and ending time, and beginning and ending outdoor air conditions
d. Attendees
23 08 00 - 6
e. Identification of the equipment involved in the test
f. System feature identification
g. Point-to-point observations including demonstrating system flow meters and sensors have been calibrated and are correctly displayed on the Operator work station
h. Actuator operation observations demonstrating actuator responses to commands from the control system
i. As-found condition of the system operation
j. List of test items with step numbers along with the corresponding feature or control operation, intended test procedure, expected system response, and pass/fail indication.
k. Space for comments for each test item.
Use the Functional Performance Test Checklists prepared by the CxC that list, step-by-step, the actions and expected results that will demonstrate that the system performs in accordance with the contract. Refer to paragraph FUNCTIONAL PERFORMANCE AND INTEGRATED SYSTEMS TESTING.
3.2.3 Integrated Systems Test Checklists
Integrated Systems Test Checklists must include test procedures that SECTION 23 08 00 Page 10 explain, step-by-step, the actions and expected results that will demonstrate that the interactive operations between systems performs in accordance with the contract.
Refer to paragraph FUNCTIONAL PERFORMANCE AND INTEGRATED SYSTEMS TESTING.
Include the following sections in the Integrated Systems Test Checklists:
a. Notable features of the interconnected systems organized by discipline including information to facilitate understanding of system operation
b. Conclusions and recommendations. Conclusions must clearly indicate if the systems do or do not perform in accordance with contract requirements and specifications.Recommendation must clearly indicate that the systems should or should not be approved by the Government
c. Test conditions including date and beginning and ending time
d. Identification of the equipment and systems involved in the test
e. List of test items with step numbers along with the corresponding feature or control operation, intended test procedure, expected system response, and pass/fail indication.
f. Space for comments for each test item.Use the Integrated Systems Test Checklists prepared by the CxC that list,step-by-step, the actions and expected results that will demonstrate that the interactive operations between systems performs in accordance with the contract. Refer to paragraph
FUNCTIONAL PERFORMANCE AND INTEGRATED
SYSTEMS TESTING.
23 08 00 - 7
3.3 PRE-FUNCTIONAL CHECKS
Pre-Functional Checks are a type of Commissioning Inspection in accordance with Section 01 91 00.15 BUILDING COMMISSIONING. Complete one Pre-Functional Checklist for each individual item of equipment or system for each system required to be commissioned including, but not limited to, ductwork, piping, equipment, fixtures, and controls. Include manufacturer start-up checklists associated with equipment with the submission of the Pre-Functional Checklists. Provide manufacturer's installation manual for each type of unit. Indicate commissioning team member inspection and validation of each Pre-Functional Checklist item by initials. Validation of each Pre-Functional Checklist item by each team member indicates that item conforms to the contract documents and validated design in their area of responsibility. Validation of each item by each team member must occur immediately following completion of their respective duties related to the item. Commissioning Specialist validation of each Pre-Functional Checklist item indicates that each item has been installed correctly and in accordance with contract documents . Required commissioning team members for Pre-Functional Checks includes the CxC, Mechanical Commissioning Specialist, CQC System Manager, sub-contractor representative for each trade responsible for construction/installation of the checklist item, and the TAB representative (for items impacting TAB).
Submit the initialed and Completed Pre-Functional Checklists no later than 7 calendar days after completion of inspection of all checklists items for each system.
3.4 STARTUP AND INITIAL CHECKOUT
Document start-up and initial testing procedures, and include in the Completed Pre-Functional Checklists submittal, including:
a. Startup tests and factory testing reports.
b. Manufacturer's representative start-up, operating, troubleshooting and maintenance procedures.
c. Additional documentation necessary for third party certification programs.
d. Perform and clearly document system operational checks and quality control checks as they are completed, and providing a copy to the commissioning team.
e. Correct deficiencies and sign the Certificate of Readiness for each system before functional performance testing
3.5 DUCT AIR LEAKAGE TEST (DALT) REPORT REVIEW AND VERIFICATION
3.5.1 Duct Air Leakage Test (DALT) Report Review
The Mechanical System Technical Commissioning Specialist must review the pre-final DALT Report required by Section 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC. Identify any deficiencies to the Contracting Officer's Representative and the Contractor's Quality Control Personnel and include in the issues log. The Commissioning Specialist is responsible for reviewing the pre-final DALT Report required by Section 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC and identifying any deficiencies to the Contracting Officer's Representative and the Contractor's Quality Control Personnel. All deficiencies must be resolved
23 08 00 - 8 prior to DALT Report approval.
3.5.2 Duct Air Leakage Test (DALT) Report Verification
The Mechanical System Technical Commissioning Specialist must witness the DALT Field Acceptance Testing specified by Section 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC and identify any deficiencies to the Contracting Officer's Representative and the Contractor's Quality Control Personnel and include in the issues log. The Commissioning Specialist is responsible for witnessing the DALT Field Acceptance Testing specified by Section 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC and identifying any deficiencies to the Contracting Officer's Representative and the Contractor's Quality Control Personnel. All deficiencies must be resolved prior to DALT Report approval.
3.6 TESTING, ADJUSTING, AND BALANCING REPORT REVIEW AND VERIFICATION
3.6.1 Testing, Adjusting, and Balancing (TAB) Report Review
The Mechanical System Technical Commissioning Specialist must review the pre-final TAB Report required by Section 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC and identify any deficiencies to the Contracting Officer's Representative and the Contractor's Quality Control Personnel and include in the issues log. The Commissioning Specialist is responsible for reviewing the pre-final TAB Report required by Section 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC and identifying any deficiencies to the Contracting Officer's Representative and the Contractor's Quality Control Personnel. All deficiencies must be resolved prior to TAB Report approval.
3.6.2 Testing, Adjusting, and Balancing (TAB) Report Verification
The Mechanical System Technical Commissioning Specialist must witness the TAB Field Acceptance Testing specified by Section 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC and identify any deficiencies to the Contracting Officer's Representative and the Contractor's Quality Control Personnel and include in the issues log. The Commissioning Specialist is responsible for witnessing the TAB Field Acceptance Testing specified by Section 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC and identifying any deficiencies to the Contracting Officer's Representative and the Contractor's Quality Control Personnel. All deficiencies must be resolved prior to TAB Report approval.
3.7 HVAC CONTROLS START-UP AND PERFORMANCE VERIFICATION TEST REVIEW
The Mechanical System Technical Commissioning Specialist must review the Start-Up Testing Report, PVT Procedures and PVT Reports, including endurance testing trend submittals, required by Section 23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC and Section 25 10 10 UTILITY MONITORING AND CONTROL SYSTEM (UMCS) FRONT END AND INTEGRATION. The Mechanical System Technical Commissioning Specialist must review each submittal and identify any deficiencies to the Contracting Officer's Representative and the Contractor's Quality Control Personnel and include in the issues log. The Commissioning Specialist is responsible for
23 08 00 - 9 reviewing the Start-Up Testing Report, PVT Procedures and PVT Reports including endurance testing trend data required by Section 23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC and Section 25 10 10 UTILITY MONITORING AND CONTROL SYSTEM (UMCS) FRONT END AND INTEGRATION and identifying any deficiencies to the Contracting Officer's Representative and the Contractor's Quality Control Personnel. All deficiencies must be resolved prior to final acceptance.
3.8 FUNCTIONAL PERFORMANCE AND INTEGRATED SYSTEMS TESTING
Functional Performance and Integrated Systems Testing are a type of Commissioning Testing in accordance with Section 01 91 00.15 BUILDING COMMISSIONING. Conduct Functional Performance Testing in accordance with Section 01 91 00.15 BUILDING COMMISSIONING and requirements in this Section. Prior to Functional Performance Testing, complete all prerequisites in accordance with paragraph SEQUENCING AND SCHEDULING.
Demonstrate that all system components have been installed, that each control device and item of equipment operates, and that the systems operate and perform, including interactive operation between systems, in accordance with contract documents.
Perform Integrated Systems Tests only after the Functional Performance Tests for each associated system are completed with all deficiencies resolved and after the related Functional Performance Test Checklists have been signed by each commissioning team member.
3.8.1 Test Scheduling and Coordination
Schedule and conduct Initial Functional Performance Tests. Develop and implement means of artificial loading to demonstrate, to a reasonable level of confidence, the ability of the HVAC systems to handle peak seasonal loads. Schedule Functional Performance Tests for each system only after the Certificate of Readiness has been approved by the Government for the system. Correct all deficiencies identified through any prior review, inspection, or test activity before the start of Functional Performance Tests.
Functional Performance Tests and Integrated Systems Tests must be performed with the CxC present. Government reserves the right to witness all tests. Coordinate test schedule with Government representatives.
3.8.2 Preparation
Put equipment and systems into operation and continue operation during each working day of functional performance and integrated systems testing, as required. Verify temperature and pressure taps in accordance with Contract Documents. Provide a pressure/temperature plug at each water sensor which is an input point to control system.
Perform minor adjustments to equipment and systems during Functional Performance Tests as deemed necessary by the commissioning team. Where calibrated DDC sensors cannot be used to record test data, provide measuring instruments, logging devices, and data acquisition equipment to record data for the complete range of test data for the required test period.
23 08 00 - 10
3.8.3 Testing Procedures
Provide all necessary materials and system modifications to produce the necessary flows, pressures, temperatures, and other conditions necessary to execute the test according to the specified conditions. At completion of the test, return the affected building equipment and systems to their pre-test condition.
Follow the Functional Performance Test from the approved Final Construction Phase Commissioning Plan. Perform Functional Performance Tests for each item of equipment and each system required to be commissioned. Verify all sensor calibrations, control responses, safeties, interlocks, operating modes, sequences of operation, capacities, and all other performance requirements comply with contract, regardless of the specific items listed within the checklists provided. In general, testing must progress from equipment or components to subsystems to systems to interlocks and connections between systems. Commissioning Specialists are responsible for determining the order of components and systems to be tested.
Indicate validation of each item of equipment and systems tested by signature of each commissioning team member for each test. The Quality Control Representative, Commissioning Specialists, and Contracting Officer's Representative, if present, must indicate validation after the equipment and systems are free of deficiencies.
3.8.4 Simulating Conditions
Functional performance testing is conducted by simulating conditions at control devices to initiate a control system response. Before testing, calibrate all sensors, transducers and devices. Over-writing control input values through the control system is not acceptable unless approved by the Contracting Officer. Perform each test under conditions that simulate actual conditions as close as is practically possible. Specific examples of simulating conditions are provided below. Do not simulate conditions when damage to the system or building may result.
a. When varying static pressures inside ductwork cannot be simulated within the duct, and where a sensor signals the controls system to initiate sequences at various duct static pressures, it is acceptable to simulate the various pressures with a Pneumatic Squeeze-Bulb Type Signaling Device with gauge temporarily attached to the sensing tube leading to the transmitter. It is not acceptable to reset the various set-points, nor to simulate an electric analog signal (unless approved as noted above).
b. Dirty filter pressure drops can be simulated by partially blocking filter face.
c. Freeze-stat safeties can be simulated by packing portion of sensor with ice.
d. High outside air temperatures can be simulated with a hair blower.
e. Raising entering cooling coil temperatures by activating a heating/preheat coil can be used to simulate entering cooling coil conditions.
f. Do not use signal generators to simulate sensor signals unless
23 08 00 - 11 approved by the Contracting Officer, as noted above, for special cases.
g. Control set points can be altered. For example, to see the air conditioning compressor lockout work at an outside air temperature below 55 degrees F, when the outside air temperature is above 55 degrees F, temporarily change the lockout set point to be 0 degrees F above the current outside air temperature. Caution: Set points are not to be raised or lowered to a point to cause damage to the components, systems, or the building structure and contents.
h. Test duct mounted smoke detectors in accordance with the manufacturer's recommendations. Perform the tests with air system at minimum airflow condition.
i. Test current sensing relays used for fan and pump status signals to control system to indicate unit failure and run status by resetting the set point on the relay to simulate a lost belt or unit failure while the unit is running. Confirm that the failure alarm was generated and received at the control system. After the test is conducted, return the set point to its original set-point or a set-point as indicated by the Contracting Officer.
3.8.5 Manufacturer's Representative
Provide a factory trained representative authorized by the equipment manufacturer to perform Functional Performance Testing for the following equipment:
Chillers Air Handling Units, Custom Air Terminal Units, Unitary Heaters Boilers Packaged Direct-Expansion Refrigeration Equipment, including variable refrigerant flow (VRF) systems Packaged Air Cooled Split Systems
Ensure the test representative reviews, approves, and signs the completed field test report. Include person's name with signatures.
3.8.6 Integrated Systems Tests
Follow the Integrated Systems Test Checklists from the approved Final Construction Phase Commissioning Plan. Integrated Systems Tests must be performed for the interactive operation between HVAC systems and other systems such as fire protection systems, smoke control systems, or back-up electrical supply. Verify correct interactive operation, acceptable speed of response, and other contract requirements for both normal and failure modes. Examples of Integrated Systems Tests include the correct operation of HVAC systems during emergency system activation or correct operation of uninterruptible power supplies or energy generators and connected systems.
3.8.7 Sample Strategy
Perform Functional Performance Tests using the following sample strategy.
Complete a Functional Performance Test Checklist for each item of equipment or system to be tested. During testing, Government representatives may select the specific equipment or system to be tested for sample sizes less than 100 percent. Equipment Identifiers are as
23 08 00 - 12 indicated on the design drawings:
Equipment Identifier Sample Size (Percent)
AHU 100
VAV 100
CUH 100
CWP 100
DWH 100
Perform Integrated Systems Tests and complete an Integrated Systems Test Checklist for for all (100 percent) systems and equipment having interactive operation.
3.8.7.1 100 Percent Sample Procedures
Systems or equipment for which 100 percent sample size are tested fail if one or more of the test procedures results in discovery of a deficiency and the deficiency cannot be resolved within 5 minutes during the test.
Re-test to the extent necessary to confirm that the deficiencies have been corrected without negatively impacting the performance of the rest of the system.
3.9 INTEGRATED SYSTEMS TEST
Perform Integrated Systems Tests only after the Functional Performance Tests for each associated system are completed with all deficiencies resolved and after the related Functional Performance Test Checklists have been signed by each commissioning team member.
3.10 RETESTING REQUIREMENTS
Abort tests if any deficiency prevents successful completion of the test or if any required commissioning team member is not present for the test.
Re-test only after all deficiencies identified during the original tests have been corrected.
Contracting Officer may withhold payment equivalent to lost time, re-testing, and aborted tests. These costs may include salary, travel costs, and per diem for Government team members. Correct deficiencies as identified by the commissioning team and retest the systems to be commissioned.
3.11 SYSTEM ACCEPTANCE
Systems may be partially accepted prior to seasonal testing if they comply with all construction contract and accepted design requirements that can be tested during initial Functional Performance Tests. All test procedures must be successful completed prior to full systems acceptance.
3.12 SEASONAL TESTS
Perform Initial Functional Performance Tests as soon as all contract work is completed, but prior to facility turnover, regardless of the season.
23 08 00 - 13
In addition to the Initial Functional Performance Tests, perform Functional Performance Tests of HVAC systems during peak heating and cooling seasons during outdoor air condition design extremes under full-load conditions. Schedule Seasonal Functional Performance Tests in coordination with the Contracting Officer. Submit Seasonal Test Report within 14 days of test completion. Include seasonal test report in the Updated Final Commissioning Report as specified in Section 01 91 00.15
BUILDING COMMISSIONING
Execute seasonal functional performance testing, witnessed by the Contracting Officer. Correct deficiencies and make adjustments to O&M manuals and as-built drawings for applicable issues identified in any seasonal testing.Season of maximum heating load: The time of year when the outdoor temperature at the project site remains within plus or minus 30 degrees Fahrenheit of the project site's winter outdoor design temperature, throughout the period of TAB data recording. Season of maximum cooling load: The time of year when the outdoor temperature at the project site remains within plus or minus 5 degrees Fahrenheit of the project site's summer outdoor design temperature, throughout the period of TAB data recording
3.13 FULL-LOAD TESTS
Perform Initial Functional Performance Tests as soon as all contract work is completed, but prior to facility turnover. In addition to the Initial Functional Performance Tests, perform Functional Performance Tests of HVAC systems under full-load conditions. Schedule Full-Load Functional Performance Tests in coordination with the Contracting Officer. Submit Full-Load Test Report within 14 days of test completion.
Execute full-load functional performance testing, witnessed by the Contracting Officer. Correct deficiencies and make adjustments to O&M manuals and as-built drawings for applicable issues identified in any full load testing.
3.14 TRAINING
3.15 COMMISSIONING REPORT
Include all completed Pre-Functional Checklists and Functional Performance and Integrated Systems Test Checklists in the Commissioning Report as specified in Section 01 91 00.15 BUILDING COMMISSIONING. Include the approved TAB Report.
3.16 POST-CONSTRUCTION ENDURANCE TEST
Perform an Endurance Test in accordance with the paragraph ENDURANCE TEST in Section 23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC once during the peak heating season and once during the peak cooling season during outdoor air condition extremes with the exception that network bandwidth usage measurement and recording is not required.
The Mechanical System Commissioning Specialists must review the trend logs from the Endurance Tests to ensure that the systems have stable operation and operate as required by the construction contract and the accepted design. The Commissioning Specialists must provide a Post-Construction Trend Log Report that identifies any deficiencies noted in operation, recommendations for correction, and includes a graphical representation of
23 08 00 - 14 the trends.
Provide one Trend Log Report for the peak cooling season and one Trend Log Report for the peak heating season. Submit the Post-Construction Trend Log Reports no later than 14 calendar days following receipt of the trend log data by the Commissioning Specialist. Provide a Post-Construction Trend Log Report meeting the same requirements as the Endurance Testing Results Format in Section 23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC.
Provide one Trend Log Report for the peak cooling season and one Trend Log Report for the peak heating season. Submit the Post-Construction Trend Log Reports no later than 14 calendar days following download of the trended data.
Include thepost-construction trend log report Post-Construction Trend Log Reports in the Updated Final Commissioning Report as specified in Section
01 91 00.15 BUILDING COMMISSIONING
-- End of Section --
23 08 00 - 15
1. REFER TO S-002 FOR STRUCTURAL ABBREVIATIONS.
2. REFER TO S-002 FOR SYMBOL LEGEND FOR F, WF, BP,
C, AND P CALLOUTS.
3. REFER TO ARCHITECTURAL PLANS FOR DIMENSIONED
LOCATIONS OF ALL INTERIOR PARTITION WALLS
EXCEPT THOSE DIMENSIONED ON THESE PLANS.
4. ALL DIMENSIONS ARE TO WALL METAL STUD OR
COLUMN CENTER LINE.
5. BOLLARD TYPICAL DETAILS E8/S-510 AND F1/S-511.
LOCATIONS SHOWN ON THE CIVIL DRAWINGS.
POTENTIAL FOOTING MODIFICATIONS SHOWN IN THE
DETAILS ARE NOT SHOWN ON THIS FOUNDATION PLAN.
GENERAL SHEET NOTES
1. 5" REINFORCED SLAB-ON-GRADE W/ #4 BARS AT 16" ON
CENTER PLACED 2" FROM TOP OF SLAB. TOP OF SLAB
ELEVATION = 100'-0".
2. CONSTRUCTION JOINT OR CONTRACTION JOINT PER
S-511.
3. EXTERIOR EQUIPMENT PAD PER S-511.
4. CONCRETE DOOR STOOP. SEE TYPICAL DETAILS ON
S-510.
5. CONCRETE CURB AT MECHANICAL ROOM PER C8/S-510.
6. PROVIDE LIGHT FRAMED BLOCKED SHEAR WALL
SEGMENTS AS NOTED ON THE SHEAR WALL
ELEVATIONS. THE LIGHT FRAMED SHEAR WALLS SHALL
CONSIST OF 7/16" OSB SHEATING ON THE EXTERIOR
FACE FOR EXTERIOR WALLS AND AS MARKED FOR
INTERIOR WALLS. ATTACH SHEATHING WITH #8
SCREWS (MINIMUM) TO THE CFMF WALL STUDS. REFER
TO SHEAR WALL SCHEDULE FOR SHEATHING
ATTACHMENT CRITERIA AND ANCHORAGE TO THE
FOUNDATION. REFER TO E7/S-530 FOR REQUIRED
LATERAL BRACING.
7. HOUSEKEEPING PAD PER A7/S-511.
8. BACK-TO-BACK STUDS PER SHEAR WALL ELEVATIONS
AND SCHEDULE. BRACE BACK-TO-BACK STUD PER
E7/S-530.
9. BACK-TO-BACK STUDS PER SHEAR WALL ELEVATIONS
AND SCHEDULE.
SHEET KEY NOTES
A4
S-311
A R
E A
B A
R E
A
C
8 9 10
D
E
TYP.
TYP.
/2
43' - 7 3/4" 43' - 3 1/4"
6 6 6 6
E4
S-310
10' - 11 1/4" 24' - 1"
WF1
WF1
/2
/2
WF2
WF1
WF1
S-530
C7
OH
S-530
C7
E7
S-310
E7
S-310 ____________________________________________________S-530
A7
S-530
C7
C4
C4
E1
S-311
TYP
E1
S-310
TYP ALONG
GRID E
TYP
UNO
/2
P2
P2
S-413A
A1
S-412A
A1
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
US Army Corps of Engineers
S O
L
IC
IT
A
T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T
E D
B Y
D A
T E
C O
N T
R A
C T
N O
C
H E
C K
E D
B Y
D R
A W
N B
Y
IS
S
U E
D A
T E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
File Path:
Plot Date:
KEY PLAN
A B C
D
C:\Users\G5EDDLDW\Documents\504741_Child_Development_Center_CM_RVT20_S_G5EDDKRK.rvt
2/2/2024 11:19:34 AM
/2
/2
S-113
F O
U N
D A
T
IO
N P
L A
N
A R
E A
C
F O
R T
L E
A V
E N
W O
R T
H K
A N
S A
S
K A
N S
A S
C
IT
Y D
IS
T
R
IC
T L S
C H
U S
T E
R
L S
C H
U S
T E
R
A S
V
IT
A K
J B
U S
H
IE
F E
B R
U A
R Y
W D
Q R
F
IL
E N
A M
E
RTA
C H
IL
D
D E
V E
L O
P M
E N
T C
E N
T E
R
P N
F
Y
C
D
C
C
M R
V T
S
.r v t
E
T
H S
T R
E E
T
K A
N S
A S
C
IT
Y M
O
A N
S I D
0 4' 8' 16'
PLAN NORTH
1/8" = 1'-0" B1
FOUNDATION PLAN - AREA C
D E
T A
IL
R
E F
E R
E N
C E
C O
R R
E C
T
IO
N
LAP UNDERLAYMENT OVER
FLASHING OR SEAL UPPER
FLANGE TO UNDERLAYMENT
WITH ROOF CEMENT
SEALANT
PIPE / VENT PENETRATION
FLASHING
HIGH-TEMPERATURE
UNDERLAYMENT (SELF-
ADHERING ICE AND
MOISTURE BARRIER)
SEALING STRIP
SOFT-METAL FLASHING
SLEEVE 3/4 ROLL INTO
PIPE APPROX. 1"
SEALANT UNDER
SHINGLES
LAP UNDERLAYMENT OVER
TOP OF FLASHING FLANGE
OR SEAL UPPER FLANGE TO
UNDERLAYMENT WITH ROOF
CEMENT
SEALING STRIP
ASPHALT SHINGLES
S
LO
P E
SELF-TAPPING
SCREWS
1/4" X 1/8" SLOTTED
HOLE EA. SIDE
#14 S.S. SHEET
METAL SCREWS - 1
EA. SIDE AND
FRONT.
3.75" X 4.75" DOWN
SPOUT
0' - 4"
0' - 4"
0' - 7".
24" M
AX. F
OR H
ANGER C
LIP
S
EQ
EQ
STRAP HANGER
W7" X D5.5" GUTTER
3.75" X 4.75" DOWNSPOUT
EXPANSION JOINT
PER SMACNA - BUTT
TYPE GUTTER E.J.
STRAP HANGER
COVER PLATE
ENDS
TRUSS BEARING ELEV
111' - 0"
E
BENT PLATE BETWEEN
TRUSSES RE: STRUCTURAL
HSS TRUSS & CFMF ATTACHMENT
RE: STRUCTURAL
CONTINUOUS BENT PLATE
RE: STRUCTURAL
ASPHALT SHINGLES (NAILED TO OSB
THROUGH THE UNDERLAYMENT)
MIN R=35 C.I. HIGH DENSITY
POLYISOCYANURATE RIGID 6"
INSULATION
7/16” COMPOSITE OSB/RIGID
INSULATION SHEATHING (SCREWED
TO METAL DECK BELOW PER WIND
UPLIFT REQUIREMENTS)
½” GLASS MAT GYPSUM ROOF BOARD
THERMAL BARRIER (SCREWED TO
METAL DECK)
SELF-ADHERING AIR BARRIER/VAPOR
RETARDER MEMBRANE OVER THE ½”
GYPSUM SHEATHING
METAL DECK
RE: STRUCTURAL
2 - LAYERS 3/4" CDX PLYWOOD
FASCIA WRAPPED WITH ALUMINUM
4" BRICK VENEER WITH AIR SPACE
POLYISOCYANURATE RIGID
INSULATION R-18.75 C.I.
CONTINUOUS FLUID APPLIED AIR
BARRIER ON 7/16" ORIENTED STRAND
BOARD (OSB) SHEATING
A-540
A7
SPRAY ON FOAM INSULATION
COVERED WITH GWB
CONT. SOUND
ATTENUATION BATTS
GYP BOARD AT UNDERSIDE OF
TRUSS PER RCP TO MEET THE
ROOM STC RATING (TYP.)
7/16" ORIENTED STRAND
BOARD (OSB) AND RIGID
INSULATION BOARD
5/8" GYP BOARD ON MEATL STUD
VARIES
2' - 0" OR 4' - 0"
TRUSS EXTENDS TO EDGE BEYOND
BETWEEN INSULATION.
TWO PIPE
SNOW GUARD
METAL DECK
AIR BARRIER BELLOWS AND
GAPS AT BOTH SHEATHING
AND GYP B.D. TO ALLOW FOR
MOVEMENT AND KEEP THE
AIR BARRIER FROM DAMAGE.
3' - 4" AND 5' - 4" (VARIES)
HIGH-TEMPERATURE
UNDERLAYMENT (SELF-ADHERING
ICE AND MOISTURE BARRIER)
EXTERIOR LIGHT FIXTURE RE:
ELECTRICAL
STAINLESS STEEL FASTENER
THROUGH THE METAL DECK
NOTE: PLACE SNOW/ICE GUARD DIRECTLY
OVER THE BEARING WALL AS SHOWN.
TRIMFIELD FRAMED LIGHT GAGE 3 5/8"
METAL STUDS
FILL FLUTES AT TOP OF
WALL CAVITY WITH BLOCK
INSULATION OF THERMAL
BARRIER
SELF-ADHERED
MEMBRANE IN
CORNER (TYP.)
WATER AND ICE-DAM
PROTECTION MEMBRANE 24"
FROM THE INSIDE FACE OF WALL
TRUSS BEARING ELEV
111' - 0"
PRE-FINISHED ALUMINUM GUTTER AND
DOWNSPOUT
2 - LAYERS 3/4" CDX PLYWOOD FASCIA
WRAPPED WITH ALUMINUM (ATTACHED
THRU BENT METAL PLATE)
PRE-FINISHED ALUMINUM DRIP EDGE
WITH CONTINUOUS CLEAT
ASPHALT SHINGLES (NAILED TO OSB
THROUGH THE UNDERLAYMENT)
SELF-ADHERING HIGH-TEMPRATURE VAPOR
PERMEABLE ROOF UNDERLAYMENT /
WATER SHEDDER
CONTINUOUS FLUID APPLIED AIR
BARRIER ON 7/16" ORIENTED STRAND
BOARD (OSB) SHEATING
PREFINISHED NON-VENTED METAL
SOFFIT SYSTEM ON BOTTOM OF FIELD
FRAMED LIGHT GAGE 3-5/8" METAL
STUDS
NOTE:
PRE-FORMED RIBBED ALUMINUM FASCIA CLADDING SHALL BE INSTALLED IN ACCORDANCE WITH
THE MANUFACTURER RECOMMENDATIONS AND ASCE7 WIND LOADS REQUIREMENT FASCIA
CLADDING AND SOFFIT SHALL HAVE CONCEALED CORROSION RESISTANT FASTENERS.
REFER TO STRUCTURAL SHEET S-701 FOR GROSS C&C WIND PRESSURE DIAGRAM. COMPLY WITH
ASCE 7 WIND REQUIREMENTS. PROVIDE FASTENER TYPES AND SPACING, BLOCKING, AND
REQUIRED ASSEMBLIES THAT CAN CARRY THE LOADS TO THE FRAMING AT ROOF EDGE /
PERIMETER.
WATER AND ICE-DAM PROTECTION
MEMBRANE 24" FROM THE INSIDE
FACE OF WALL
3" MIN.
CONTINUOUS SELF-ADHERING
AIR BARRIER/VAPOR
RETARDER MEMBRANE OVER
THE ½” GYPSUM SHEATHING
TRUSS BEARING ELEV
111' - 0"
6ASPHALT SHINGLES
(NAILED TO OSB THROUGH
THE UNDERLAYMENT)
7/16" COMPOSITE OSB/RIGID
INSULATION SHEATHING
(SCREWED TO METAL DECK
BELOW PER WIND UPLIFT
REQUIREMENTS)
HIGH-TEMPERATURE
UNDERLAYMENT (SELF-ADHERING
ICE AND MOISTURE BARRIER)
MIN R=35 C.I. HIGH DENSITY
POLYISOCYANURATE RIGID 6"
INSULATION
SELF-ADHERING AIR
BARRIER/VAPOR
RETARDER MEMBRANE
OVER THE ½” GYPSUM
SHEATHING
BENT PLATE
RE: STRUCTURAL
ACT CEILING
CONT. EXTRUDED FLEXIBLE
GASKET
CONT. EXTERUDED ALUM.
FRAME
0' - 2".
5/8" GYP. BOARD ON LIGHT
GAGE METAL FRAMING
CORNER BEAD
CONT. EXTRUDED ALUM.
COVER PLATE WITH GASKET
CONT. EXTRUDED
ALUM. CENTER
PLATE
0' - 2".
SHEET METAL EXPANSION
JOINT COVER WITH T-TYPE
CLEAT. OVERLAP CHANNEL
FLASHING MIN. 2"
4" x 4" SHEET METAL STEP
FLASHING AT EACH COURSE
2 1/2" METAL STUDS 20
GA. AT 16" O.C. WITH 2
1/2" TRACKS TOP AND
BOTTOM WITH
BLANKET INSULATION
ROOF
TRUSSES
RE: STRUCT.
METAL DECK
RE: STRUCTURAL
½” GLASS MAT GYPSUM ROOF
BOARD THERMAL BARRIER
(SCREWED TO METAL DECK)
FLEXIBLE LINER WITH
COMPRESSIBLE
INSULATION
0' - 2" MIN.
FLEXIBLE WEATHERPROOF
MEMBRANE CLOSURE
0' - 4"
CL
0' - 2"
7/8" OSB
SHEATHING ON
BOTH SIDE
STEP FLASHING B/N
ASPHALT
GUTTER BAFFLE AT
VALLEY (TYP.) AS PER
MANUFACTURER
DOWNSPOUT
GUTTR INSIDE
CORNER AT VALLEY
GUTTER
0' - 1 1/2"
/4
RIBBED FASCIA TRIM (TYP.)
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .