This amendment modifies a solicitation for the Building 226 HVAC Replacement project at Fort Leavenworth, Kansas. The scope of work includes replacing the current variable refrigerant flow system with four-pipe fan coil units served by boilers and a chiller. The dedicated outdoor air system and storage spaces will also be converted to mechanical rooms, and the attic floor structure strengthened. The project is historic in nature and must comply with the Secretary of the Interior's Standards. A second site visit is scheduled for September 2nd at 1:00 PM local time. The commissioning standard is updated. The proposal due date of September 8th at 11:00 AM remains unchanged, and acknowledgement of all amendments is required.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

B226 HVAC Replacement, Fort Leavenw orth, Kansas

See SF30 Continuation Page for Complete Details

All other terms and conditions remain unchanged and in full force and effect.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 30-Aug-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DQ22R4016

X 9B. DATED (SEE ITEM 11)

09-Aug-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or

(c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

30-Aug-2022

CODE

USACE, KANSAS CITY +

FEDERAL BLDG. CT-M RM 647; 601 E 12TH ST

KANSAS CITY MO 64106-2896

W912DQ 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DQ22R4016

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

The following have been added by full text:

THE SOLICITATION IS AMENDED AS FOLLOWS:

Deleted text is shown with a strikethrough. Added text is shown with underline.

1. To schedule a second site visit:

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for--

Friday, Septembe 2, 2022

(c) Participants will meet at--

Building 226 south entrance, Fort Leavenworth, KS, at 1:00 PM, local time.

Site visit POC is Jeff Jensen, jeffery.k.jensen@usace.army.mil, 816-389-3648.

(d) Participants who need access to get on post will need to go the Visitor Control Center (VCC) on 4th and Metropolitan. Allow sufficient time to obtain a pass.

2. Change to Section 01 91 00.15 10, Commissioning Standard, paragraph 1.6.1.

“The CxC Contractor will comply with the requirements of the commissioning standard under which the Commissioning Firm and Specialists qualifications are approved. The acceptable standards are ACG Commissioning Guideline, NEBB Commissioning Standard, ANSI/SMACNA 014, or ASHRAE 202. Comply with applicable NETA testing standards for electrical systems.”

3. The proposal due date remains the same, 8 September 2022, 11:00 a.m. local Kansas City time.

4. Offeror is required to acknowledge receipt of this amendment. Failure to acknowledge all amendments all may cause rejection of the proposal.

5. All other terms and conditions remain unchanged and in full force and effect.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .