Contractor Questions as of 08 30 2021.pdf

PDF 59 KB Posted

Attached to
Harry S. Truman HVAC -Mold Mitigation
Solicitation number
W912DQ21B1022
Issued by

About this file

This document contains contractor questions and answers regarding a federal contract opportunity for HVAC and mold remediation work. The opportunity involves renovation work at an existing facility, including ceiling tiles, lighting, wood panel walls, concrete work, flooring, and other scope of work details provided in the solicitation. Questions addressed whether the government will provide power to light fixture locations or if the contractor must, whether receptacles shown are for information only or contractor scope, whether concrete will be left bare after flooring removal, which areas will receive rubber base, and whether the entrance mat will be recessed or surface mounted. The related federal contract opportunity is for mold mitigation work at the Harry S. Truman HVAC facility, with the Department of the Army Corps of Engineers Engineering District Kansas City listed as the agency. The pre-solicitation opportunity involves applying mold killer/disinfectant prior to repairs or replacement.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contractor Questions as of 08 30 2021

Question 1). For the electrical work, I understand that the government will be providing and installing the light fixtures but does that include power to the fixture locations or do you need the contractor to provide the power per the Lighting J‐Box plan.

Answer: This will be performed by the government.

Question 2). are the receptacles on EL 708 Receptacle J‐Box Plan work to be provided by the contractor or is that simply for information?

Answer: That is for information for cutting out the holes in the drywall. The government will procure the j‐boxes.

Question 3). after floorcovering removal and scarification, is it the governments intent to leave the concrete bare or to install flooring back in those areas that were removed?

Answer: It will be bare.

Question 4). What areas are to receive rubber base?

Answer: All areas where drywall is installed.

Question 5). Is the entrance mat in the foyer to be recessed or surface mounted?

Answer: It will be recessed.