This document contains a supplemental bid schedule for a federal construction contract to perform levee repair work along the left and right banks of Mud Creek in Abilene, Kansas. The work includes placing quarry run stone and excavating soil at various stations along the banks, constructing low water crossings and access ramps. The schedule provides line items for these tasks with units of measure, quantities, and space for three subcontractors to provide unit prices and extended costs. It specifies that the contractor shall complete this supplemental schedule in addition to the main bid schedule. The purpose is to assist the government in evaluating prices. The contractor is instructed to match line items and costs to their own estimates and assumptions as closely as possible. The schedule also includes spaces for the prime contractor to include markups for overhead, profit, bonding, and other costs.
This opportunity is a 100% small business set-aside solicitation issued by the US Army Corps of Engineers, Kansas City District, for construction services to repair damages to the Abilene Levee sustained during 2019 flooding. The scope of work involves grading channel banks and placing riprap along segments of the left and right banks of Mud Creek.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Subcontractor 1 Subcontractor 2 Subcontractor 3 CLIN # Description Quantity Unit Unit Price Subtotal Subtotal Subtotal Subtotal
0001 Levee Repair Left Bank 1 JOB -$
All Stationing is Approximate
Quarry Run Stone Sta. 68+00 LB 2000 Ton $ $ $ $
Soil Excavation Sta. 68+00 RB 1125 CY $ $ $ $
Construct Low Water X-Ing Sta. 74+00 LB 1 Job -$ $ $ $ $
Construct Access Ramp Sta. 71+60 RB 225 Ton $ $ $ $
Seeding 1 Job -$ $ $ $ $
SUBTOTAL $
0002 Levee Repair Right Bank 1 JOB -$
All Stationing is Approximate
Quarry Run Stone Sta. 43+40 RB 825 Ton $ $ $ $
Soil Excavation Sta. 38+50 LB 430 CY $ $ $ $
Construct Low Water X-Ing Sta. 38+40 LB 1 Job -$ $ $ $ $
Quarry Run Stone Sta. 48+60 RB 1500 Ton $ $ $ $
Soil Excavation Sta. 42+00 LB 975 CY $ $ $ $
Construct Low Water X-Ing Sta. 46+75 LB 1 Job -$ $ $ $ $
Construct Access Ramp Sta. 45+80 LB 300 Ton $ $ $ $
Haul Route Sweeping/Maintenance 1 Job -$ $ $ $ $
Haul Route Repair 1 Job -$ $ $ $ $
SUPPLEMENTAL BID SCHEDULE
The contractor shall complete the following Supplemental Bid Schedule in addition to the Bid Schedule. This Supplemental Bid Schedule is not contractually binding. The Government will use this Supplemental Bid Schedule to assist in the evaluation of prices. Note to Contractor: If the supplemental bid schedule doesn't match your estimate/bid, please try to match your items/costs to the nearest item. If the Item doesn't apply to your assumptions, don't use it. The individual supplemental bid items should add up to the prices for the bid schedule.
SUBCONTRACTOR QUOTES
**Provide any quotes for all items not self-performed.
Seeding 1 Job -$ $ $ $ $
SUBTOTAL $
CONTRACT TOTAL (including all markups) $
Note: Any work not specifically noted shall be priced with the most closely related CLIN.
PRIME CONTRACTOR MARKUPS (include these in costs above)
JOOH % %
HOOH % %
Profit % % Bonding % %