W912DQ21B1003 - Attachment 01 - Supplemental Bid Schedule.pdf

PDF 428 KB Posted

Attached to
Levee Rehab Abilene Levee, Left and Right Bank, Abilene, Kansas
Solicitation number
W912DQ21B1003
Issued by

About this file

This document contains a supplemental bid schedule and details for a federal contract opportunity to perform construction activities for levee repair on the Abilene Levee in Dickinson County, Kansas. The US Army Corps of Engineers, Kansas City District is seeking bids to repair damages from 2019 flooding, which includes regrading channel banks and placing riprap along the left and right banks of Mud Creek. The supplemental bid schedule lists line items for various construction tasks including quarry run stone, soil excavation, and construction of low water crossings and access ramps. Prime contractors are asked to provide quotes from any subcontractors not performing self-work, along with their own proposed markups for overhead, profit, and bonding. This is a 100% small business set-aside contract for the USACE Kansas City District.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Subcontractor 1 Subcontractor 2 Subcontractor 3 CLIN # Description Quantity Unit Unit Price Subtotal Subtotal Subtotal Subtotal

0001 Levee Repair 1 JOB -$

All Stationing is Approximate

Quarry Run Stone Sta. 43+40 RB 330 Ton $ $ $ $

Soil Excavation Sta. 38+50 LB 200 CY $ $ $ $

Construct Low Water X-Ing Sta. 38+40 LB 1 Job -$ $ $ $ $

Quarry Run Stone Sta. 48+60 RB 450 Ton $ $ $ $

Soil Excavation Sta. 42+00 LB 275 CY $ $ $ $

Construct Low Water X-Ing Sta. 46+75 LB 1 Job -$ $ $ $ $

Construct Access Ramp Sta. 45+80 LB 300 Ton $ $ $ $

Quarry Run Stone Sta. 68+00 LB 660 Ton $ $ $ $

Soil Excavation Sta. 68+00 RB 400 CY $ $ $ $

Construct Low Water X-Ing Sta. 74+00 LB 1 Job -$ $ $ $ $

Construct Access Ramp Sta. 71+60 RB 225 Ton $ $ $ $

Haul Route Sweeping/Maintenance 1 Job -$ $ $ $ $

Haul Route Repair 1 Job -$ $ $ $ $

Seeding 1 Job -$ $ $ $ $

SUBTOTAL $

CONTRACT TOTAL (including all markups) $

Note: Any work not specifically noted shall be priced with the most closely related CLIN.

SUPPLEMENTAL BID SCHEDULE

The contractor shall complete the following Supplemental Bid Schedule in addition to the Bid Schedule. This Supplemental Bid Schedule is not contractually binding. The Government will use this Supplemental Bid Schedule to assist in the evaluation of prices. Note to Contractor: If the supplemental bid schedule doesn't match your estimate/bid, please try to match your items/costs to the nearest item. If the Item doesn't apply to your assumptions, don't use it. The individual supplemental bid items should add up to the prices for the bid schedule.

SUBCONTRACTOR QUOTES

**Provide any quotes for all items not self-performed.

PRIME CONTRACTOR MARKUPS (include these in costs above)

JOOH % %

HOOH % %

Profit % % Bonding % %

File details come from the government source that posted it. Updated .