This pre-solicitation announcement describes an upcoming request for proposal for construction services. The U.S. Army Corps of Engineers, Kansas City District will issue an RFP set aside for women-owned small businesses for renovations to Building 50 at Fort Leavenworth, Kansas. The scope of work includes architectural, mechanical, electrical and life safety upgrades, adding windows, a small entry addition, and optional geothermal wells and site work. The base contract performance period is 540 calendar days from notice to proceed. The estimated value is between $5-10 million. The NAICS code is 236220 and small business size standard is $39.5 million in average annual receipts. The solicitation will provide evaluation factors and instructions for proposal submissions and basis for award. The source selection will follow FAR Part 15 and DFARS Part 215 procedures. Interested vendors must register at beta.SAM.gov to view the full RFP and any amendments, which are expected to be released on or around July 24, 2020. Questions may be directed to the listed Army Corps contacts.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W58XUW01779398
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Renovate Bldg 50 located at Fort Leavenw orth, Kansas
The Purpose of this Amendment is provide changes specif ications and to update Clauses.
See SF30 Continuation Page for Complete Details.
Proposal due date remains the same: August 24, 2020, at 11:00 a.m. local Kansas City time.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 6
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 14-Aug-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DQ20R4028
X 9B. DATED (SEE ITEM 11)
23-Jul-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
14-Aug-2020
CODE
USACE, KANSAS CITY +
FEDERAL BLDG CT 601 E 12TH ST RM 647
KANSAS CITY MO 64106-2896
W912DQ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DQ20R4028
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0004
The solicitation is amended as follows:
Deleted text is shown with a strikethrough. Added text is shown with underline.
1. Specification Changes a . Section 01 11 00, Summary of Work. Paragraph 1.1.3, Occupancy of Premises, is revised as shown below.
1.1.3 Occupancy Of Premises
Building will be unoccupied during performance of work under this Contract. The building will be turned over to the contractor on or about 15 November 2020.
Before work is started, arrange with the Contracting Officer a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways.
b. Section 01 50 00, Temporary Construction Facilities and Controls. Paragraph 3.4 is revised as shown below.
3.4 AVAILABILITY AND USE OF UTILITY SERVICES
3.4.1 Payment for Utility Services
The Government will make all reasonably required utilities available to the Contractor from existing outlets and supplies, as specified in the contract. Unless otherwise provided in the contract, the amount of each utility service consumed shall be charged to or paid for by the Contractor at prevailing rates charged to the Government or, where the utility is produced by the Government, at reasonable rates determined by the Contracting Officer. The Contractor shall carefully conserve any utilities furnished without charge. If utilities are not used in a responsible manner, the Government reserves the right to terminate access to utilities.
3.4.2 Meters and Temporary Connections
The Contractor, at its expense and in a manner satisfactory to the Contracting Officer, shall provide and maintain necessary temporary connections, distribution lines, and meter bases and meters required to measure the amount of each utility used for the purpose of monitoring usage. determining charges. The Contractor shall make arrangements with the post Utilities Officer before final electrical connection is desired so that a utilities contract can be established. The Contractor shall provide a meter and and coordinate with Freestate to make final connections make the final hot connection after inspection and approval of the Contractor's temporary wiring installation. The temporary plan shall be submitted for approval in accordance with EM 385-1-1.
3.4.3 Advance Deposit
An advance deposit for utilities consisting of an estimated month's usage or a minimum of $50.00 will be required.
The last monthly bills for the fiscal year will normally be offset by the deposit and adjustments will be billed or returned as appropriate. Services to be rendered for the next fiscal year, beginning 1 October, will require a new deposit. Notification of the due date for this deposit will be mailed to the Contractor prior to the end of the current fiscal year.
3.4.4 Final Meter Reading
Before completion of the work and final acceptance of the work by the Government, the Contractor shall notify the Contracting Officer, in writing, 5 working days before termination is desired. The Government will take a final meter reading. disconnect service. and remove the meters. The Contractor shall then remove all the temporary distribution lines, meter bases, and associated paraphernalia. The Contractor shall pay all outstanding utility bills before final acceptance of the work by the Government. Contractor shall disconnect and remove all temporary infrastructure to include the meter.
3.4.5 Sanitation
The Contractor shall provide and maintain within the construction area minimum field-type sanitary facilities approved by the Contracting Officer. Government toilet facilities will not be available to Contractor's personnel.
3.4.6 Telephone
The Contractor shall make arrangements and pay all costs for telephone facilities desired.
c. Section 01 78 00, Closeout Submittals.
i. Revise paragraph 1.2.1 as shown below.
1.2.1 As-Built Drawings
As-built drawings are developed and maintained by the Contractor and depict actual conditions, including deviations from the Contract Documents. These deviations and additions may result from coordination required by, but not limited to: contract modifications; official responses to Contractor submitted Requests for Information; direction from the Contracting Officer; designs which are the responsibility of the Contractor, and differing site conditions.
Maintain the as-builts throughout construction as red-lined hard copies or red-lined PDF files on site or red-lined PDF files. These files serve as the basis for the creation of the record drawings.
ii. Revise paragraph 3.1 as shown below.
3.1 AS-BUILT DRAWINGS
Provide and maintain two black line print copies of the PDF contract drawings for As-Built Drawings. Maintain the as-builts throughout construction as red lined hard copies or red-lined pdf files on site.
2. Revised Building 50 Specifications.
New specification 07 42 13, Metal Wall Panels, is added. A copy of the new specification is attached.
3. Revised Geothermal Specifications.
Specification 07 41 13, Metal Roof Panels, has been revised. A copy of the revised specification is attached.
2. Revised Building 50 Drawings
a. Drawing A-102. Added whiteboard information. Revised drawing attached.
b. Drawing IN404. Added marker board information. Revised drawing attached.
c. IN602, Interior Finish Schedule. Change east wall of room 153 to PWT-2.
3. Offerors are required to acknowledge receipt of this amendment on the Bidding Form in the space provided.
Failure to acknowledge all amendments may cause rejection of the bid.
4. Include updated clauses 52.204-24 and 52.204-25. Ensure that you complete certifications requested in FAR 52.204-24 and 52.204-26 (in the original solicitation). These provisions are updated as of August 2020 and are not yet part of your representations and certifications listed in your SAM registration.
5. Proposal due date remains the same: August 24, 2020, at 11:00 a.m. local Kansas City time.
6. All other terms and conditions remain unchanged and in full force and effect.
52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND
VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (DEC 2019)
52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment (AUG 2020)
The Offeror shall not complete the representation at paragraph (d)(1) of this provision if the Offeror has represented that it “does not provide covered telecommunications equipment or services as a part of its offered products or services to the Government in the performance of any contract, subcontract, or other contractual instrument” in the provision at 52.204-26, Covered Telecommunications Equipment or Services—Representation, or in paragraph (v) of the provision at 52.212-3, Offeror Representations and Certifications-Commercial Items.
(a) Definitions. As used in this provision-
Backhaul, covered telecommunications equipment or services, critical technology, interconnection arrangements, reasonable inquiry, roaming, and substantial or essential component have the meanings provided in the clause 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.
(b) Prohibition. (1) Section 889(a)(1)(A) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Pub. L. 115-232) prohibits the head of an executive agency on or after August 13, 2019, from procuring or obtaining, or extending or renewing a contract to procure or obtain, any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system. Nothing in the prohibition shall be construed to—
(i) Prohibit the head of an executive agency from procuring with an entity to provide a service that connects to the facilities of a third-party, such as backhaul, roaming, or interconnection arrangements; or
(ii) Cover telecommunications equipment that cannot route or redirect user data traffic or cannot permit visibility into any user data or packets that such equipment transmits or otherwise handles.
(2) Section 889(a)(1)(B) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Pub. L. 115-232) prohibits the head of an executive agency on or after August 13, 2020, from entering into a contract or extending or renewing a contract with an entity that uses any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system. This prohibition applies to the use of covered telecommunications equipment or services, regardless of whether that use is in performance of work under a Federal contract. Nothing in the prohibition shall be construed to—
(i) Prohibit the head of an executive agency from procuring with an entity to provide a service that connects to the facilities of a third-party, such as backhaul, roaming, or interconnection arrangements; or
(ii) Cover telecommunications equipment that cannot route or redirect user data traffic or cannot permit visibility into any user data or packets that such equipment transmits or otherwise handles.
(c) Procedures. The Offeror shall review the list of excluded parties in the System for Award Management (SAM) (https://www.sam.gov) for entities excluded from receiving federal awards for “covered telecommunications equipment or services.”
(d) Representations. The Offeror represents that—
(1) It [ ] will, [ ] will not provide covered telecommunications equipment or services to the Government in the performance of any contract, subcontract or other contractual instrument resulting from this solicitation. The Offeror shall provide the additional disclosure information required at paragraph (e)(1) of this section if the Offeror responds “will” in paragraph (d)(1) of this section; and
(2) After conducting a reasonable inquiry, for purposes of this representation, the Offeror represents that—
It [ ] does, [ ] does not use covered telecommunications equipment or services, or use any equipment, system, or service that uses covered telecommunications equipment or services. The Offeror shall provide the additional disclosure information required at paragraph (e)(2) of this section if the Offeror responds “does” in paragraph (d)(2) of this section.
(e) Disclosures. (1) Disclosure for the representation in paragraph (d)(1) of this provision. If the Offeror has responded “will” in the representation in paragraph (d)(1) of this provision, the Offeror shall provide the following information as part of the offer:
(i) For covered equipment—
(A) The entity that produced the covered telecommunications equipment (include entity name, unique entity identifier, CAGE code, and whether the entity was the original equipment manufacturer (OEM) or a distributor, if known);
(B) A description of all covered telecommunications equipment offered (include brand; model number, such as OEM number, manufacturer part number, or wholesaler number; and item description, as applicable); and
(C) Explanation of the proposed use of covered telecommunications equipment and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b)(1) of this provision.
(ii) For covered services—
(A) If the service is related to item maintenance: A description of all covered telecommunications services offered (include on the item being maintained: Brand; model number, such as OEM number, manufacturer part number, or wholesaler number; and item description, as applicable); or
(B) If not associated with maintenance, the Product Service Code (PSC) of the service being provided; and explanation of the proposed use of covered telecommunications services and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b)(1) of this provision.
(2) Disclosure for the representation in paragraph (d)(2) of this provision. If the Offeror has responded “does” in the representation in paragraph (d)(2) of this provision, the Offeror shall provide the following information as part of the offer:
(i) For covered equipment—
(A) The entity that produced the covered telecommunications equipment (include entity name, unique entity identifier, CAGE code, and whether the entity was the OEM or a distributor, if known);
(B) A description of all covered telecommunications equipment offered (include brand; model number, such as OEM number, manufacturer part number, or wholesaler number; and item description, as applicable); and
(C) Explanation of the proposed use of covered telecommunications equipment and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b)(2) of this provision.
(ii) For covered services—
(A) If the service is related to item maintenance: A description of all covered telecommunications services offered (include on the item being maintained: Brand; model number, such as OEM number, manufacturer part number, or wholesaler number; and item description, as applicable); or
(B) If not associated with maintenance, the PSC of the service being provided; and explanation of the proposed use of covered telecommunications services and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b)(2) of this provision.
(End of provision)
INCORPORATED BY REFERENCE (IBR)
52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. AUG 2019
52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. AUG 2020
(End of Summary of Changes)
Geothermal Well Field W912DQ-20-R-4028 Fort Leavenworth, Kansas
SECTION 07 41 13
METAL ROOF PANELS
05/11
* * Amendment 0004* *
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ALUMINUM ASSOCIATION (AA)
AA ADM (2015) Aluminum Design Manual
AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)
AISC 341 (2016) Seismic Provisions for Structural Steel Buildings
AMERICAN IRON AND STEEL INSTITUTE (AISI)
AISI S100 (2012) North American Specification for the Design of Cold-Formed Steel Structural Members
AISI SG03-3 (2002; Suppl 2001-2004; R 2008) Cold-Formed Steel Design Manual Set
AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE)
ASCE 7 (2017) Minimum Design Loads for Buildings and Other Structures
AMERICAN WELDING SOCIETY (AWS)
AWS A5.1/A5.1M (2012) Specification for Carbon Steel Electrodes for Shielded Metal Arc Welding
AWS D1.1/D1.1M (2015; Errata 1 2015; Errata 2 2016) Structural Welding Code - Steel
AWS D1.2/D1.2M (2014) Structural Welding Code - Aluminum
ASTM INTERNATIONAL (ASTM)
ASTM A1008/A1008M (2016) Standard Specification for Steel, Sheet, Cold-Rolled, Carbon, Structural, High-Strength Low-Alloy, High-Strength Low-Alloy with Improved Formability, Solution Hardened, and Bake Hardenable
ASTM A123/A123M (2017) Standard Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and
SECTION 07 41 13 Page 1
Steel Products
ASTM A36/A36M (2014) Standard Specification for Carbon Structural Steel
ASTM A424/A424M (2009a; R 2016) Standard Specification for Steel Sheet for Porcelain Enameling
ASTM A463/A463M (2010; R 2015) Standard Specification for Steel Sheet, Aluminum-Coated, by the Hot-Dip Process
ASTM A653/A653M (2017) Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process
ASTM A755/A755M (2016; E 2016) Standard Specification for Steel Sheet, Metallic Coated by the Hot-Dip Process and Prepainted by the Coil-Coating Process for Exterior Exposed Building Products
ASTM A792/A792M (2010) Standard Specification for Steel Sheet, 55% Aluminum-Zinc Alloy-Coated by the Hot-Dip Process
ASTM A924/A924M (2017a) Standard Specification for General Requirements for Steel Sheet, Metallic-Coated by the Hot-Dip Process
ASTM B117 (2016) Standard Practice for Operating Salt Spray (Fog) Apparatus
ASTM B209 (2014) Standard Specification for Aluminum and Aluminum-Alloy Sheet and Plate
ASTM B209M (2014) Standard Specification for Aluminum and Aluminum-Alloy Sheet and Plate (Metric)
ASTM C286 (1999; R 2017) Standard Terminology Relating to Porcelain Enamel and Ceramic-Metal Systems
ASTM C552 (2016a) Standard Specification for Cellular Glass Thermal Insulation
ASTM C553 (2013) Standard Specification for Mineral Fiber Blanket Thermal Insulation for Commercial and Industrial Applications
ASTM C792 (2004; R 2008) Effects of Heat Aging on Weight Loss, Cracking, and Chalking of Elastomeric Sealants
ASTM C920 (2014a) Standard Specification for Elastomeric Joint Sealants
ASTM D1056 (2014) Standard Specification for Flexible
SECTION 07 41 13 Page 2
Cellular Materials - Sponge or Expanded Rubber
ASTM D1308 (2013) Effect of Household Chemicals on Clear and Pigmented Organic Finishes
ASTM D1654 (2008; R 2016; E 2017) Standard Test Method for Evaluation of Painted or Coated Specimens Subjected to Corrosive Environments
ASTM D1667 (2017) Standard Specification for Flexible Cellular Materials - Poly (Vinyl Chloride) Foam (Closed-Cell)
ASTM D1970/D1970M (2017) Standard Specification for Self-Adhering Polymer Modified Bituminous Sheet Materials Used as Steep Roofing Underlayment for Ice Dam Protection
ASTM D2244 (2016) Standard Practice for Calculation of Color Tolerances and Color Differences from Instrumentally Measured Color Coordinates
ASTM D2247 (2015) Testing Water Resistance of Coatings in 100% Relative Humidity
ASTM D226/D226M (2017) Standard Specification for Asphalt-Saturated Organic Felt Used in Roofing and Waterproofing
ASTM D2794 (1993; R 2010) Resistance of Organic Coatings to the Effects of Rapid Deformation (Impact)
ASTM D3359 (2017) Standard Test Methods for Rating Adhesion by Tape Test
ASTM D3363 (2005; E 2011; R 2011; E 2012) Film Hardness by Pencil Test
ASTM D4214 (2007; R 2015) Standard Test Method for Evaluating the Degree of Chalking of Exterior Paint Films
ASTM D4587 (2011) Standard Practice for Fluorescent UV-Condensation Exposures of Paint and Related Coatings
ASTM D4637/D4637M (2015) EPDM Sheet Used in Single-Ply Roof Membrane
ASTM D4869/D4869M (2016a) Standard Specification for Asphalt-Saturated Organic Felt Underlayment Used in Steep Slope Roofing
ASTM D522/D522M (2014) Mandrel Bend Test of Attached Organic Coatings
SECTION 07 41 13 Page 3
ASTM D523 (2014) Standard Test Method for Specular Gloss
ASTM D5894 (2016) Standard Practice for Cyclic Salt Fog/UV Exposure of Painted Metal, (Alternating Exposures in a Fog/Dry Cabinet and a UV/Condensation Cabinet)
ASTM D610 (2008; R 2012) Evaluating Degree of Rusting on Painted Steel Surfaces
ASTM D714 (2002; R 2009) Evaluating Degree of Blistering of Paints
ASTM D822 (2013) Filtered Open-Flame Carbon-Arc Exposures of Paint and Related Coatings
ASTM D968 (2017) Standard Test Methods for Abrasion Resistance of Organic Coatings by Falling Abrasive
ASTM E1592 (2005; R 2012) Structural Performance of Sheet Metal Roof and Siding Systems by Uniform Static Air Pressure Difference
ASTM E2140 (2001; R 2017) Standard Test Method for Water Penetration of Metal Roof Panel Systems by Static Water Pressure Head
ASTM E84 (2017) Standard Test Method for Surface Burning Characteristics of Building Materials
ASTM G152 (2013) Operating Open Flame Carbon Arc Light Apparatus for Exposure of Nonmetallic Materials
ASTM G153 (2013) Operating Enclosed Carbon Arc Light Apparatus for Exposure of Nonmetallic Materials
FM GLOBAL (FM)
FM 4471 (2010) Class I Panel Roofs
METAL BUILDING MANUFACTURERS ASSOCIATION (MBMA)
MBMA RSDM (2000) Metal Roofing Systems Design Manual
NATIONAL ROOFING CONTRACTORS ASSOCIATION (NRCA)
NRCA 0420 (2010) Architectural Metal Flashing, Condensation Control and Reroofing
NRCA RoofMan (2011 thru 2014) The NRCA Roofing Manual
SECTION 07 41 13 Page 4
PORCELAIN ENAMEL INSTITUTE (PEI)
PEI 1001 (1996) Specification for Architectural Porcelain Enamel (ALS-100)
PEI CG-3 (2005) Color Guide for Architectural Porcelain Enamel
SHEET METAL AND AIR CONDITIONING CONTRACTORS' NATIONAL ASSOCIATION
(SMACNA)
SMACNA 1793 (2012) Architectural Sheet Metal Manual, 7th Edition
UNDERWRITERS LABORATORIES (UL)
UL 2218 ( 2010; Repr i nt Jan 2018) UL St andar d f or Saf et y I mpact Resi st ance of Pr epar ed Roof Cover i ng Mat er i al s
UL 580 (2006; Reprint Oct 2013) Tests for Uplift Resistance of Roof Assemblies
UL Bld Mat Dir (updated continuously online) Building Materials Directory
1.2 DESCRIPTION OF METAL ROOF SYSTEM
1.2.1 Performance Requirements
Steel panels and accessory components must conform to the following standards:
ASTM A1008/A1008M
ASTM A123/A123M
ASTM A36/A36M
ASTM D522/D522M for applied coatings UL Bld Mat Dir
1.2.1.1 Hydrostatic Head Resistance
No water penetration when tested according to ASTM E2140. Submit leakage test report upon completion of installation.
1.2.1.2 Wind Uplift Resistance
Provide metal roof panel system that conform to the requirements of ASTM E1592 and UL 580 . Uplift force due to wind action governs the design for panels. Submit wind uplift test report prior to commencing installation.
Roof system and attachments must resist the wind loads as determined by ASCE 7, in pounds per square foot. Metal roof panels and component materials must also comply with the requirements in FM 4471 as part of a panel roofing system as listed in Factory Mutual Guide (FMG) "Approval Guide" for class 1 or noncombustible construction, as applicable.
Identify all materials with FMG markings.
SECTION 07 41 13 Page 5
1.2.1.3 I mpact Resi st ance
Pr ovi de met al r oof panel syst em t hat conf or ms t o t he r equi r ement s of UL 2218 cl ass 4 r at i ng.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. All submittals shall be submitted in conformance with Section 01 33 29 SUSTAINABILITY REPORTING.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-02 Shop Drawings
Roofing Panels ; G, AE
Flashing and Accessories ; G, AE
SD-03 Product Data
Submit manufacturer's catalog data for the following items:
Roof Panels ; G, AE
Factory-Applied Color Finish ; G, AE
Accessories ; G, AE
Fasteners ; G, AE
Pressure Sensitive Tape ; G, AE
Underlayments ; G, AE
Gaskets and Sealing/Insulating Compounds ; G, AE
SD-04 Samples
Roof Panels ; G, AE
Factory-applied Color Finish , Samples, 9 inch lengths, full width;
G, AE
SD-05 Design Data
Wind Uplift Resistance ; G, AE
SD-06 Test Reports
Leakage Test Report ; G, AE
Wind Uplift Test Report ; G, AE
Factory Finish and Color Performance Requirements ; G, AE
SD-07 Certificates
SECTION 07 41 13 Page 6
Qualification of Manufacturer ; G, RO
Qualification of Applicator ; G, RO
SD-08 Manufacturer's Instructions
Installation Manual ; G, AE
SD-09 Manufacturer's Field Reports
Manufacturer's Field Inspection Reports ; G, RO
SD-11 Closeout Submittals
Warranties ; G, RO
Information Card ; G, RO
1.4 QUALITY ASSURANCE
1.4.1 Qualification of Manufacturer
Submit documentation verifying metal roof panel manufacturer has been in the business of manufacturing metal roof panels for a period of not less than 5 years.
Manufacturer must also provide engineering services by an authorized engineer, currently licensed in the geographic area of the project, with a minimum of five (5) years experience as an engineer knowledgeable in roof wind design analysis, protocols and procedures for MBMA RSDM, ASCE 7, UL 580 , and FM 4471 . Engineer must provide certified engineering calculations for the project conforming to the stated references.
1.4.1.1 Manufacturer's Technical Representative
The manufacturer's technical representative must be thoroughly familiar with the products to be installed, installation requirements and practices, and with any special considerations in the geographical area of the project. The representative must perform field inspections and attend meetings as specified.
1.4.1.2 Single Source
Roofing panels, clips, closures, and other accessories must be standard products of the same manufacturer, and the most recent design of the manufacturer to operate as a complete system for the intended use.
1.4.2 Qualification of Applicator
Metal roof system applicator must be approved, authorized, or licensed in writing by the roof panel manufacturer and have a minimum of three years experience as an approved, authorized, or licensed applicator with that manufacturer, approved at a level capable of providing the specified warranty. Supply the names, locations and client contact information of 5 projects of similar size and scope constructed by applicator using the manufacturer's roofing products submitted for this project within the previous three years.
SECTION 07 41 13 Page 7
1.4.3 Field Verification
Prior to the preparation of drawings and fabrication, verify location of roof framing, roof openings and penetrations, and any other special conditions. Indicate all special conditions and measurements on final shop drawings.
1.4.4 Qualifications for Welding Work
Welding procedures must conform to AWS D1.1/D1.1M for steel or AWS D1.2/D1.2M for aluminum.
Operators are permitted to make only those types of weldments for which each is specifically qualified.
1.4.4 Pre-roofing Conference
After approval of submittals and before performing roofing system installation work, hold a pre-roofing conference to review the following:
a. Drawings, specifications, and submittals related to the roof work.
Submit, as a minimum; sample profiles of roofing panels , with factory-applied color finish samples, flashing and accessories , typical fasteners and pressure sensitive tape , sample gaskets and sealant insulating compounds. Also include technical data on coil stock and coil stock compatibility, and manufacturer's installation manual .
b. Roof system components installation;
c. Procedure for the roof manufacturer's technical representative's onsite inspection and acceptance of the roofing substrate, the name of the manufacturer's technical representatives, the frequency of the onsite visits, distribution of copies of the inspection reports from the manufacturer's technical representative;
d. Contractor's plan for coordination of the work of the various trades involved in providing the roofing system and other components secured to the roofing; and
e. Quality control plan for the roof system installation;
f. Safety requirements.
Coordinate pre-roofing conference scheduling with the Contracting Officer. Attendance is mandatory for the Contractor, the Contracting Officer's designated personnel, personnel directly responsible for the installation of metal roof system, flashing and sheet metal work, mechanical and electrical work, other trades interfacing with the roof work, and representative of the metal roofing manufacturer. Before beginning roofing work, provide a copy of meeting notes and action items to all attending parties. Note action items requiring resolution prior to start of roof work.
1.5 DELIVERY, HANDLING, AND STORAGE
Deliver, store, and handle panel materials, bulk roofing products, accessories, and other manufactured items in a manner to prevent damage and deformation, as recommended by the manufacturer, and as specified.
SECTION 07 41 13 Page 8
1.5.1 Delivery
Package and deliver materials to the site in undamaged condition. Provide adequate packaging to protect materials during shipment. Do not uncrate materials until ready for use, except for inspection. Immediately upon arrival of materials at jobsite, inspect materials for damage, deformation, dampness, and staining. Remove affected materials from the site and immediately replace. Remove moisture from wet materials not otherwise affected, restack and protect from further moisture exposure.
1.5.2 Handling
Handle materials in a manner to avoid damage. Select and operate material handling equipment so as not to damage materials or applied roofing.
1.5.3 Storage
Stack materials stored on site on platforms or pallets, and cover with tarpaulins or other weathertight covering which prevents trapping of water or condensation under the covering. Store roof panels so that water which may have accumulated during transit or storage will drain off. Do not store panels in contact with materials that might cause staining. Secure coverings and stored items to protect from wind displacement.
1.6 PROJECT CONDITIONS
Weather Limitations: Proceed with installation only when existing and forecast weather conditions permit metal roof panel work to be performed according to manufacturer's written instructions and warranty requirements, and specified safety requirements.
1.7 FABRICATION
Fabricate and finish metal roof panels and accessories on a factory stationary industrial type rolling mill to the greatest extent possible, per manufacturer's standard procedures and processes, and as necessary to fulfill indicated performance requirements. Comply with indicated profiles, dimensional and structural requirements.
Provide panel profile, as indicated on drawings including major ribs and intermediate stiffening ribs for full length of panel. Fabricate panel side laps with factory installed captive gaskets providing a weather tight seal and preventing metal-to metal contact, and minimizing noise from movements within the panel assembly.
1.7.1 Finishes
Finish quality and application processes must conform to the related standards specified within this section. Noticeable variations within the same piece are not acceptable. Variations in appearance of adjoining components are acceptable if they are within the range of approved samples and are assembled or installed to minimize any contrasting variations.
1.7.2 Accessories
Fabricate flashing and trim to comply with recommendations in SMACNA 1793 as applicable to the design, dimensions, metal, and other characteristics of the item indicated.
SECTION 07 41 13 Page 9
a. Form exposed sheet metal accessories which are free from excessive oil canning, buckling, and tool marks, and are true to line and levels indicated, with exposed edges folded back to form hems.
b. End Seams: Fabricate nonmoving seams with flat-lock seams. Form seams and seal with epoxy seam sealer.
c. Sealed Joints: Form non-expansion, but movable joints in metal to accommodate elastomeric sealant to comply with SMACNA 1793.
d. Conceal fasteners and expansion provisions where possible. Exposed fasteners are not allowed.
e. Fabricate cleats and attachments devices of size and metal thickness recommended by SMACNA or by metal roof panel manufacturer for application, but not less than the thickness of the metal being secured.
1.8 WARRANTIES
Provide metal roof system material and workmanship warranties meeting specified requirements. Provide revision or amendment to manufacturer's standard warranty as required to comply with the specified requirements.
1.8.1 Metal Roof Panel Manufacturer Warranty
Furnish the metal roof panel manufacturer's 20-year no dollar limit roof system materials and installation workmanship warranty, including flashing, insulation, components, trim, and accessories necessary for a watertight roof system construction. Make warranty directly to the Government, commencing at time of Government's acceptance of the roof work. The warranty must state that:
a. If within the warranty period, the metal roof system, as installed for its intended use in the normal climatic and environmental conditions of the facility, becomes non-watertight, shows evidence of moisture intrusion within the assembly, displaces, corrodes, perforates, separates at the seams, or shows evidence of excessive weathering due to defective materials or installation workmanship, the repair or replacement of the defective and damaged materials of the metal roof system and correction of defective workmanship is the responsibility of the metal roof panel manufacturer. All costs associated with the repair or replacement work are the responsibility of the metal roof panel manufacturer.
b. If the manufacturer or his approved applicator fail to perform the repairs within 48 hours of notification, emergency temporary repairs performed by others does not void the warranty.
1.8.2 Manufacturer's Finish Warranty
Provide a manufacturer's no-dollar-limit 20 year warranty for the roofing system. Issue the warranty directly to the Government at the date of Government acceptance.warranting that the factory color finish, under normal atmospheric conditions at the site, will not crack, peel, or delaminate; chalk in excess of a numerical rating of 8 when measured in accordance with ASTM D4214; or fade or change colors in excess of 5 NBS units as measured in accordance with ASTM D2244.
SECTION 07 41 13 Page 10
1.8.3 Continuance of Warranty
Repair or replacement work that becomes necessary within the warranty period must be approved, as required, and accomplished in a manner so as to restore the integrity of the roof system assembly and validity of the metal roof system manufacturer warranty for the remainder of the manufacturer warranty period.
1.9 CONFORMANCE AND COMPATIBILITY
The entire metal roofing and flashing system must be in accordance with specified and indicated requirements, including wind resistance and seismic per AISC 341 requirements. Work not specifically addressed and any deviation from specified requirements must be in general accordance with recommendations of the MBMA RSDM, NRCA RoofMan, the metal panel manufacturer's published recommendations and details, and compatible with surrounding components and construction. Submit any deviation from specified or indicated requirements to the Contracting Officer for approval prior to installation.
PART 2 PRODUCTS
2.1 ROOF PANELS
2.1.1 Steel Sheet Panels
Roll-form steel sheet roof panels to the specified profile, with fy = 30 ksi,22 gauge and depth as indicated.
Material must be plumb and true, and within the tolerances listed:
a. Aluminum-Zinc alloy coated steel sheet conforming to ASTM A792/A792M and AISI SG03-3 .
b. Individual panels to have continuous length sufficient to cover the entire length of any unbroken roof slope with no joints or seams and formed without warping, waviness, or ripples that are not a part of the panel profile and free from damage to the finish coating system.
c. Provide panels with thermal expansion and contraction consistent with the type of system specified, and the following profile:
d. profile to be a 2 inch high standing seam, 12 inch coverage with mechanical crimping seams with concealed clips and fasteners. * * Pr ovi de panel s wi t h i nt er l ocki ng r i bs f or secur i ng adj acent sheet s wi t h conceal ed cl i p f ast eni ng syst em f or secur i ng t he r oof cover i ng t o st r uct ur al f r ami ng member s. Seams of panel s shal l be conf i gur ed so t hat when adj acent sheet s ar e i nst al l ed t he seam i s seal ed ut i l i z i ng mechani cal or hand seamer s. * *
2.2 FACTORY FINISH AND COLOR PERFORMANCE REQUIREMENTS
All panels are to receive a factory applied Kynar 500/Hylar 5000 finish consisting of a baked topcoat with a manufacturer's recommended prime coat conforming to the following:
a. Metal Preparation: All metal is to have the surfaces carefully prepared for painting on a continuous process coil coating line by alkali cleaning, hot water rinsing, application of chemical conversion
SECTION 07 41 13 Page 11 coating, cold water rinsing, sealing with an acid rinse, and thorough drying.
b. Prime Coating: A base coat of epoxy paint, specifically formulated to interact with the top-coat, is to be applied to the prepared surfaces by roll coating to a dry film thickness of 0.20 plus 0.05 mils. The prime coat must be oven cured prior to application of the finish coat.
c. Exterior Finish Coating: Apply the exterior finish coating over the primer by roll coating to a dry film thickness of 0.80 plus 0.05 mils (3.80 plus 0.05 mils for Vinyl Plastisol) for a total dry film thickness of 1.00 plus 0.10 mils (4.00 plus 0.10 mils for Vinyl Plastisol). This exterior finish coat must be oven-cured.
d. Interior finish coating: Apply a wash coat on the reverse side over primer by roll coating to a dry film thickness of 0.30 plus 0.05 mils for a total dry fill thickness of 0.50 plus 0.10 mils. The wash coat must be oven cured.
e. Color: As indicated on drawings.
f. Physical Properties: Coating must conform to the industry and manufacturer's standard performance criteria as listed by the following certified test reports:
General: ASTM D5894 and ASTM D4587
Abrasion: ASTM D968
Adhesion: ASTM D3359
Chalking: ASTM D4214
Chemical Pollution: ASTM D1308
Color Change and Conformity: ASTM D2244
Creepage: ASTM D1654
Cyclic Corrosion Test: ASTM D5894
Flame Spread: ASTM E84
Flexibility: ASTM D522/D522M
Formability: ASTM D522/D522M
Gloss at 60 and 85 degrees: ASTM D523
Humidity: ASTM D2247 and ASTM D714
Oxidation: ASTM D610
Pencil Hardness: ASTM D3363
SECTION 07 41 13 Page 12
Reverse Impact: ASTM D2794
Salt Spray: ASTM B117
Weatherometer: ASTM G152, ASTM G153 and ASTM D822
2.2.1 Specular Gloss
Finished roof surfaces to have a specular gloss value of 30 plus or minus 5 at an angle of 60 degrees when measured in accordance with ASTM D523.
2.3 MISCELLANEOUS METAL FRAMING
2.3.1 General
Provide cold formed metallic-coated steel sheet conforming to ASTM A653/A653M , AISI S100 , and as specified in 05 40 00 COLD-FORMED METAL FRAMING unless otherwise indicated.
2.3.2 Fasteners and Miscellaneous Metal Framing
Provide compatible type, corrosion resistant, of sufficient size and length to penetrate the supporting element a minimum of one inch with other required properties to fasten miscellaneous metal framing members to substrates in accordance with the roof panel manufacturer's and ASCE 7 requirements.
2.3.2.1 Screws
Provide corrosion resistant screws, stainless steel of the type and size recommended by the manufacturer to meet the performance requirements.
2.3.2.2 Rivets
Provide closed-end type rivets, corrosion resistant coated steel where watertight connections are required.
2.3.2.2 **Concealed** Attachment Clips
Provide hot-dip galvanized, conforming to ASTM A653/A653M , clips. Size, shape, thickness and capacity must meet the thickness and design load criteria specified.
2.3.3 Electrodes for Manual, Shielded Metal Arc Welding
Electrodes for manual, shielded metal arc welding must meet the requirements of AWS D1.1/D1.1M , and be covered, mild-steel electrodes conforming to AWS A5.1/A5.1M .
2.4 ACCESSORIES
Accessories must be compatible with the metal roof panels. Sheet metal flashing, trim, metal closure strips, caps, and similar metal accessories must be not less than the minimum thicknesses specified for roof panels.
Provide exposed metal accessories to match the panels furnished. Molded foam rib, ridge and other closure strips must be closed-cell or solid-cell
SECTION 07 41 13 Page 13 synthetic rubber or neoprene premolded to match configuration of the panels and not absorb or retain water.
2.4.1 Pre-manufactured Accessories
Pre-manufactured accessories must be manufacturer's standard for intended purpose, comply with applicable specification section, compatible with the metal roof system and approved for use by the metal roof panel manufacturer. Construct curbs to match roof slope.
2.4.2 Rubber Closure Strips
Provide closed-cell, expanded cellular rubber closure strips conforming to ASTM D1056 and ASTM D1667, extruded or molded to the configuration of the specified roof panel profile and in lengths supplied by roof panel manufacturer.
2.5 JOINT SEALANTS
2.5.1 Sealants
Sealants are to be an approved gun type for use in hand or air pressure caulking guns at temperatures above 40 degrees F (or frost-free application at temperatures above 10 degrees F ) with a minimum solid content of 85 percent of the total volume. Sealant must dry with a tough, durable surface skin which permits it to remain soft and pliable underneath, providing a weather tight joint. No migratory staining, in conformance with to ASTM C792, is permitted on painted or unpainted metal, stone, glass, vinyl or wood.
Prime all joints to receive sealants with a compatible one-component or two-component primer as recommended by the roof panel manufacturer.
2.5.1.1 Shop Applied Sealants
Sealant for shop-applied caulking must be an approved gun grade, non-sag one-component polysulfide or silicone conforming to ASTM C792 and ASTM C920, Type II, with a curing time which ensures the sealants plasticity at the time of field erection. Color to match panel color.
2.5.1.2 Field Applied Sealants
Sealants for field-applied caulking must be an approved gun grade, non-sag on-component polysulfide or two component polyurethane with an initial maximum Shore A durometer hardness of 25, conforming to ASTM C920, Type II. Color to match panel color.
2.5.1.3 Tape Sealants
Provide pressure sensitive, 100 percent solid tape sealant with a release paper backing; permanently elastic, non-sagging, non-toxic and non-staining as approved by the roof panel manufacturer.
2.5.2 Sheet Metal Flashing and Trim
2.5.2.1 Fabrication, General
Custom fabricate sheet metal flashing and trim to comply with recommendations within the SMACNA 1793 that apply to design, dimensions, SECTION 07 41 13 Page 14 metal type, and other characteristics of design indicated. Shop fabricate items to the greatest extent possible. Obtain and verify field measurements for accurate fit prior to shop fabrication. Fabricate flashing and trim without excessive oil canning, buckling, and tool marks, true to line and levels indicated, with exposed edges folded back to form hems.
2.5.2.2 Roof Drainage Sheet Metal Fabrications
See Section 07 60 00 FLASHING AND SHEET METAL.
2.6 INSULATION
See Section 07 22 00 ROOF AND DECK INSULATION.
2.7 UNDERLAYMENTS
2.7.1 Self-Adhering Modified Bitumen Underlayment
Provide self-adhering modified bitumen membrane underlayment material in compliance with ASTM D1970/D1970M , suitable for use as underlayment for metal roofing. Use membrane resistant to cyclical elevated temperatures for extended period of time in high heat service conditions. Provide membrane with integral non-tacking top surface of polyethylene film or other surface material to serve as separator between bituminous material and metal products to be applied above.
2.8 GASKETS AND SEALING/INSULATING COMPOUNDS
Gaskets and sealing/insulating compounds must be nonabsorptive and suitable for insulating contact points of incompatible materials.
Sealing/insulating compounds must be non-running after drying.
2.9 FINISH REPAIR MATERIAL
Only use repair and touch-up paint supplied by the roof panel manufacturer and is compatible with the specified system.
PART 3 EXECUTION
3.1 EXAMINATION
Examine substrates, areas, and conditions, with installer present, for compliance with requirements for installation tolerances, metal roof panel supports, and other conditions affecting performance of the work. Ensure surfaces are suitable, dry and free of defects and projections which might affect the installation.
Examine primary and secondary roof framing to verify that rafters, purlins, angels, channels, and other structural support members for panels and anchorages have been installed within alignment tolerances required by metal roof panel manufacturer, UL, ASTM, and ASCE 7 and applicable seismic requirements.
Examine solid roof sheathing to verify that sheathing joints are supported by framing or blocking; and that installation is within flatness tolerances required by metal roof panel manufacturer.
Examine rough-in for components and systems penetrating metal roof panels
SECTION 07 41 13 Page 15 to verify actual locations of penetrations relative to seam locations of panels prior to installation.
Submit a written report to the Contracting Officer, endorsed by the installer, listing conditions detrimental to the performance of the work.
Proceed with installation only after defects have been corrected.
3.2 INSTALLATION
Installation must meet specified requirements and be in accordance with the manufacturer's installation instructions and approved shop drawings.
Do not install damaged materials. Dissimilar materials which are not compatible when contacting each other must be insulated by means of gaskets or sealing/insulating compounds. Keep all exposed surfaces and edges clean and free from sealant, metal cuttings, hazardous burrs, and other foreign material. Remove stained, discolored, or damaged materials from the site.
3.2.1 Preparation
Clean all substrate substances which may be harmful to insulation,and roof panels including removing projections capable of interfering with with insulation, and roof panel attachment.
Install sub-purlins, eave angles, furring, and other miscellaneous roof panel support members and anchorage according to metal roof panel manufacturer's written instructions.
3.2.2 Underlayment
Install underlayment according to roof panel manufacturer's written recommendations and recommendation in NRCA "The NRCA Roofing and Waterproofing Manual".
3.2.2.1 Self-Adhering Sheet Underlayment
Install self-adhering sheet underlayment; wrinkle free on roof deck.
Comply with low-temperature installation restrictions of manufacturer where applicable. Install at locations indicated on project drawings, lapped in a direction to shed water. Lap sides not less than 3-1/2 inches .
Lap ends not less than 6 inches staggered 24 inches between courses. Roll laps with roller. Cover underlayment within seven days.
3.3 INSULATION INSTALLATION
Install insulation concurrently with metal roof panel installation, in thickness indicated, to cover entire roof, according to manufacturer's written instructions.
3.4 PROTECTION OF APPLIED MATERIALS
Do not permit storing, walking, wheeling, and trucking directly on applied roofing/insulation materials. Provide temporary walkways, runways, and platforms of smooth clean boards or planks as necessary to avoid damage to applied roofing/insulation materials, and to distribute weight to conform to indicated live load limits of roof construction.
SECTION 07 41 13 Page 16
3.5 FASTENER* * ROOF PANEL* * INSTALLATION
Anchor metal roof panels and other components of the Work securely in place, using approved fasteners according to manufacturer's written instructions. * * Appl y r oof i ng panel s wi t h t he seams par al l el t o t he s l ope of t he r oof .