Geothermal Well Field Specs_VOL 3.pdf
PDF 8 MB Posted
- Solicitation number
- W912DQ20R4028
About this file
This document announces an upcoming solicitation for renovation services at Building 50, Fort Leavenworth, Kansas. The U.S. Army Corps of Engineers, Kansas City District intends to issue a single Design-Bid-Build, Firm Fixed Price contract for complete renovation of the building including architectural, mechanical, electrical and life safety upgrades, as well as adding windows and a small entry addition. Optional items include furniture, geothermal wells, and road work. The estimated period of performance is 540 calendar days from notice to proceed. The solicitation will be set aside for women-owned small businesses and issued as a request for proposal around July 24, 2020. The NAICS code is 236220 and small business size is $39.5 million. Proposals will be evaluated based on criteria in the solicitation. The source selection will follow FAR Part 15 procedures. Interested parties should monitor the beta.SAM website for the solicitation and any amendments.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W912DQ-20-R-4028
US Army Corps of Engineers Kansas City District Building Strong
Geothermal Well Field
Fort Leavenworth, Kansas
VOLUME 3 OF 4 - Division 2 through Division 33.
Construction Solicitation and Specifications
As Advertised
July 2020
This page was intentionally left blank for duplex printing.
DEPARTMENT OF THE ARMY
KANSAS CITY DISTRICT, CORPS OF ENGINEERS
757 FEDERAL BUILDING
KANSAS CITY, MISSOURI 64106
SPECIFICATIONS FOR CONSTRUCTION OF
BUILDING 50 GEOTHERMAL WELL FIELD
FORT LEAVENWORTH, KANSAS
TABLE OF CONTENTS
COVER
DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS
Section Title
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
DIVISION 03 - CONCRETE
03 15 00.00 10 CONCRETE ACCESSORIES
03 20 00.00 10 CONCRETE REINFORCING
03 30 00.00 10 CAST-IN-PLACE CONCRETE
03 35 00.00 10 CONCRETE FINISHING
03 39 00.00 10 CONCRETE CURRING
DIVISION 04 - MASONRY
04 20 00 UNIT MASONRY
04 72 00.00 48 CAST STONE
DIVISION 05 - METALS
05 12 00 STRUCTURAL STEEL
05 30 00 STEEL DECKS
05 40 00 COLD-FORMED METAL FRAMING
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 51 33 AUTOMATIC METAL FOLDING LADDERS
05 52 00 METAL RAILINGS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 11.13 BITUMINOUS DAMPROOFING
07 21 13 BOARD AND BLOCK INSULATION
07 22 00 ROOF AND DECK INSULATION
07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS
07 41 13 METAL ROOF PANELS
07 42 93 SOFFIT PANELS
07 60 00 FLASHING AND SHEET METAL
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 71 00 DOOR HARDWARE
08 91 00 METAL WALL AND DOOR LOUVERS
DIVISION 09 - FINISHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 90 00 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 44 16 FIRE EXTINGUISHERS
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC
23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING
CONTROL SYSTEMS
23 21 23 HYDRONIC PUMPS
23 81 47 WATER-LOOP AND GROUND-LOOP HEAT PUMP SYSTEMS
23 82 43.00 40 ELECTRIC UNIT HEATERS
DIVISION 26 - ELECTRICAL
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS
26 42 14.00 10 CATHODIC PROTECTION SYSTEM (SACRIFICIAL ANODE)
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
26 56 68 EXTERIOR ATHLETIC LIGHTING
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
31 11 00 CLEARING AND GRUBBING
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 16.17 COLD MILLING ASPHALT PAVING
32 11 16.16 BASE COURSE FOR RIGID AND SUBASE AND SUBASE COURSE FOR
FLEXIBLE PAVING
32 12 13 BITUMINOUS TACK COATS
32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS
32 16 13 CONCRETE SIDEWALKS AND CURBS AND GUTTERS
32 92 19 SEEDING
32 93 00 EXTERIOR PLANTS
DIVISION 33 - UTILITIES
33 11 00 WATER DISTRIBUTION
33 30 00 SANITARY SEWERS
33 40 00 STORM DRAINAGE UTILITIES
APPENDIX
Appendix A HIGH PERFORMANCE STAINABILE BUILDINGS Appendix B REGISTER
-- End of Project Table of Contents --
Geothermal Well Field W912DQ-20-R-4028 Fort Leavenworth, KS
SECTION TABLE OF CONTENTS
DIVISION 02 - EXISTING CONDITIONS
SECTION 02 41 00
DEMOLITION
PART 1 GENERAL
1.1 REFERENCES
1.2 PROJECT DESCRIPTION
1.2.1 Demolition/Deconstruction Plan
1.2.2 General Requirements
1.3 ITEMS TO REMAIN IN PLACE
1.3.1 Existing Construction Limits and Protection
1.3.2 Weather Protection
1.3.3 Trees
1.3.4 Utility Service
1.3.5 Facilities
1.4 BURNING
1.5 AVAILABILITY OF WORK AREAS
1.6 SUBMITTALS
1.7 QUALITY ASSURANCE
1.7.1 Dust and Debris Control
1.8 PROTECTION
1.8.1 Traffic Control Signs
1.8.2 Protection of Personnel
1.9 RELOCATIONS
1.10 EXISTING CONDITIONS
PART 2 PRODUCTS
2.1 FILL MATERIAL
PART 3 EXECUTION
3.1 EXISTING FACILITIES TO BE REMOVED
3.1.1 Utilities and Related Equipment
3.1.1.1 General Requirements
3.1.1.2 Disconnecting Existing Utilities
3.1.2 Paving and Slabs
3.1.3 Concrete
3.1.4 Electrical Equipment and Fixtures
3.1.4.1 Fixtures
3.1.4.2 Electrical Devices
3.1.4.3 Wiring Ducts or Troughs
3.1.4.4 Conduit and Miscellaneous Items
3.2 CONCURRENT EARTH-MOVING OPERATIONS
3.3 DISPOSITION OF MATERIAL
3.3.1 Title to Materials
3.3.2 Salvaged Materials and Equipment
3.3.3 Unsalvageable and Non-Recyclable Material
3.4 CLEANUP
02 41 00 - 1
3.5 DISPOSAL OF REMOVED MATERIALS
3.5.1 Regulation of Removed Materials
3.5.2 Burning on Government Property
3.5.3 Removal to Spoil Areas on Government Property
3.5.4 Removal from Government Property
3.6 REUSE OF SALVAGED ITEMS
-- End of Section Table of Contents --
02 41 00 - 2
SECTION 02 41 00
DEMOLITION
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS
(AASHTO)
AASHTO M 145 (1991; R 2012) Standard Specification for Classification of Soils and Soil-Aggregate Mixtures for Highway Construction Purposes
AASHTO T 180 (2017) Standard Method of Test for Moisture-Density Relations of Soils Using a 4.54-kg (10-lb) Rammer and a 457-mm (18-in.) Drop
AMERICAN SOCIETY OF SAFETY ENGINEERS (ASSE/SAFE)
ASSE/SAFE A10.6 (2006) Safety Requirements for Demolition Operations
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements Manual
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
40 CFR 61 National Emission Standards for Hazardous Air Pollutants
1.2 PROJECT DESCRIPTION
1.2.1 Demolition/Deconstruction Plan
Prepare a Demolition Plan and submit proposed salvage, demolition, and removal procedures for approval before work is started. Include in the plan procedures for careful removal and disposition of materials specified to be salvaged, coordination with other work in progress, a disconnection schedule of utility services, a detailed description of methods and equipment to be used for each operation and of the sequence of operations.
Coordinate with Waste Management Plan. Provide procedures for safe conduct of the work in accordance with EM 385-1-1. Plan shall be approved by Contracting Officer prior to work beginning.
02 41 00 - 3
1.2.2 General Requirements
Do not begin demolition or deconstruction until authorization is received from the Contracting Officer. The work includes demolition,, salvage of identified items and materials, and removal of resulting rubbish and debris. Remove rubbish and debris from Government property daily, unless otherwise directed. Store materials that cannot be removed daily in areas specified by the Contracting Officer. In the interest of occupational safety and health, perform the work in accordance with EM 385-1-1, Section 23, Demolition, and other applicable Sections.
1.3 ITEMS TO REMAIN IN PLACE
Take necessary precautions to avoid damage to existing items to remain in place, to be reused, or to remain the property of the Government. Repair or replace damaged items as approved by the Contracting Officer.
Coordinate the work of this section with all other work indicated. Do not overload pavements to remain. Provide new supports and reinforcement for existing construction weakened by demolition, or removal work. Repairs, reinforcement, or structural replacement require approval by the Contracting Officer prior to performing such work.
1.3.1 Existing Construction Limits and Protection
Do not disturb existing construction beyond the extent indicated or necessary for installation of new construction. Provide temporary shoring and bracing for support of building components to prevent settlement or other movement. Provide protective measures to control accumulation and migration of dust and dirt in all work areas. Remove snow, dust, dirt, and debris from work areas daily.
1.3.2 Weather Protection
For portions of the building to remain, protect building interior and materials and equipment from the weather at all times. Where removal of existing roofing is necessary to accomplish work, have materials and workmen ready to provide adequate and temporary covering of exposed areas.
1.3.3 Trees
Protect trees within the project site which might be damaged during demolition or deconstruction, and which are indicated to be left in place, by a 6 foot high fence. Erect and secure fence a minimum of 5 feet from the trunk of individual trees or follow the outer perimeter of branches or clumps of trees. Replace any tree designated to remain that is damaged during the work under this contract with like-kind or as approved by the Contracting Officer.
1.3.4 Utility Service
Maintain existing utilities indicated to stay in service and protect against damage during demolition and deconstruction operations. Prior to start of work, utilities serving each area of alteration or removal will be shut off by the Government or utility owner and disconnected and sealed by the Contractor.
1.3.5 Facilities
Protect electrical and mechanical services and utilities. Where removal of
02 41 00 - 4 existing utilities and pavement is specified or indicated, provide approved barricades, temporary covering of exposed areas, and temporary services or connections for electrical and mechanical utilities. Ensure that no elements determined to be unstable are left unsupported and place and secure bracing, shoring, or lateral supports as may be required as a result of any cutting, removal, or demolition work performed under this contract.
1.4 BURNING
The use of burning at the project site for the disposal of refuse and debris will not be permitted.
1.5 AVAILABILITY OF WORK AREAS
Areas in which the work is to be accomplished will be available in accordance with the following schedule:
Schedule
Area Date
TBD TBD
1.6 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. All submittals shall be submitted in conformance with Section 01 33 29 SUSTAINABILITY REPORTING.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-01 Preconstruction Submittals
Demolition Plan; G, RO Existing Conditions; G,RO
SD-07 Certificates
Notification; G, RO
1.7 QUALITY ASSURANCE
Submit timely notification of demolition projects to Federal, State, regional, and local authorities in accordance with 40 CFR 61, Subpart M.
Notify the State's environmental protection agency and the Contracting Officer in writing 10 working days prior to the commencement of work in accordance with 40 CFR 61, Subpart M. Comply with federal, state, and local hauling and disposal regulations. In addition to the requirements of the "Contract Clauses," conform to the safety requirements contained in ASSE/SAFE A10.6. Comply with the Environmental Protection Agency requirements specified. Use of explosives will not be permitted.
1.7.1 Dust and Debris Control
Prevent the spread of dust and debris and avoid the creation of a nuisance or hazard in the surrounding area. Do not use water if it results in
02 41 00 - 5 hazardous or objectionable conditions such as, but not limited to, ice, flooding, or pollution. Sweep pavements as often as necessary to control the spread of debris that may result in foreign object damage potential to aircraft or vehicles.
1.8 PROTECTION
1.8.1 Traffic Control Signs
a. Where pedestrian and driver safety is endangered in the area of removal work, use traffic barricades with flashing lights. Anchor barricades in a manner to prevent displacement by wind. Notify the Contracting Officer prior to beginning such work.
1.8.2 Protection of Personnel
Before, during and after the demolition work continuously evaluate the condition of the structure/site being demolished and take immediate action to protect all personnel working in and around the project site.
1.9 RELOCATIONS
Perform the removal and reinstallation of relocated items as indicated with workmen skilled in the trades involved. Repair or replace items to be relocated which are damaged by the Contractor with new undamaged items as approved by the Contracting Officer.
1.10 EXISTING CONDITIONS
Before beginning any demolition work, survey the site and examine the drawings and specifications to determine the extent of the work. Record existing conditions in the presence of the Contracting Officer showing the condition of structures and other facilities adjacent to areas of alteration or removal. Photographs sized 4 inch will be acceptable as a record of existing conditions. Include in the record the elevation of the top of foundation walls, finish floor elevations, possible conflicting electrical conduits, plumbing lines, alarms systems, the location and extent of existing cracks and other damage and description of surface conditions that exist prior to before starting work. It is the Contractor's responsibility to verify and document all required outages which will be required during the course of work, and to note these outages on the record document. Submit survey results.
PART 2 PRODUCTS
2.1 FILL MATERIAL
a. Comply with excavating, backfilling, and compacting procedures for soils used as backfill material to fill basements, voids, depressions or excavations resulting from demolition of structures.
b. Fill material shall conform to the definition of satisfactory soil material as defined in AASHTO M 145, Soil Classification Groups A-1, A-2-4, A-2-5 and A-3. In addition, fill material shall be free from roots and other organic matter, trash, debris, frozen materials, and stones larger than 2 inches in any dimension.
c. Proposed fill material must be sampled and tested by an approved soil testing laboratory, as follows:
02 41 00 - 6
Soil classification AASHTO M 145
Moisture-density relations AASHTO T 180, Method B or D
PART 3 EXECUTION
3.1 EXISTING FACILITIES TO BE REMOVED
Inspect and evaluate existing structures onsite for reuse. Existing construction scheduled to be removed for reuse shall be disassembled.
Dismantled and removed materials are to be separated, set aside, and prepared as specified, and stored or delivered to a collection point for reuse, remanufacture, recycling, or other disposal, as specified.
Materials shall be designated for reuse onsite whenever possible.
3.1.1 Utilities and Related Equipment
3.1.1.1 General Requirements
Do not interrupt existing utilities serving occupied or used facilities, except when authorized in writing by the Contracting Officer. Do not interrupt existing utilities serving facilities occupied and used by the Government except when approved in writing and then only after temporary utility services have been approved and provided. Do not begin demolition or deconstruction work until all utility disconnections have been made.
Shut off and cap utilities for future use, as indicated.
3.1.1.2 Disconnecting Existing Utilities
Remove existing utilities , as indicated and terminate in a manner conforming to the nationally recognized code covering the specific utility and approved by the Contracting Officer and utility company. When utility lines are encountered but are not indicated on the drawings, notify the Contracting Officer prior to further work in that area. Remove meters and related equipment and deliver to a location in accordance with instructions of the Contracting Officer.
3.1.2 Paving and Slabs
Remove concrete and asphaltic concrete paving and slabs including aggregate base completely. Provide neat sawcuts at limits of pavement removal as indicated. Pavement and slabs designated to be recycled and utilized in this project shall be moved, ground and stored as directed by the Contracting Officer. Pavement and slabs not to be used in this project shall be removed from the Installation at Contractor's expense.
3.1.3 Concrete
Saw concrete along straight lines to a depth of a minimum 2 inch. Make each cut in walls perpendicular to the face and in alignment with the cut in the opposite face. Break out the remainder of the concrete provided that the broken area is concealed in the finished work, and the remaining concrete is sound. At locations where the broken face cannot be concealed, grind smooth or saw cut entirely through the concrete. Salvage removed concrete.
02 41 00 - 7
3.1.4 Electrical Equipment and Fixtures
3.1.4.1 Fixtures
Remove and salvage electrical fixtures. Salvage unprotected glassware from the fixture and salvage separately. Salvage incandescent, mercury-vapor, and fluorescent lamps and fluorescent ballasts manufactured prior to 1978, boxed and tagged for identification, and protected from breakage.
3.1.4.2 Electrical Devices
Remove and salvage switches, switchgear, transformers, conductors including wire and nonmetallic sheathed and flexible armored cable, regulators, meters, instruments, plates, circuit breakers, panelboards, outlet boxes, and similar items. Box and tag these items for identification according to type and size.
3.1.4.3 Wiring Ducts or Troughs
Remove and salvage wiring ducts or troughs. Dismantle plug-in ducts and wiring troughs into unit lengths. Remove plug-in or disconnecting devices from the busway and store separately.
3.1.4.4 Conduit and Miscellaneous Items
Salvage conduit except where embedded in concrete or masonry. Consider corroded, bent, or damaged conduit as scrap metal. Sort straight and undamaged lengths of conduit according to size and type. Classify supports, knobs, tubes, cleats, and straps as debris to be removed and disposed.
3.2 CONCURRENT EARTH-MOVING OPERATIONS
Do not begin excavation, filling, and other earth-moving operations that are sequential to demolition work in areas occupied by structures to be demolished or deconstructed until all demolition and deconstruction in the area has been completed and debris removed. Fill holes, open basements and other hazardous openings.
3.3 DISPOSITION OF MATERIAL
3.3.1 Title to Materials
Except for salvaged items specified in related Sections, and for materials or equipment scheduled for salvage, all materials and equipment removed and not reused or salvaged, shall become the property of the Contractor and shall be removed from Government property. Title to materials resulting from demolition, and materials and equipment to be removed, is vested in the Contractor upon approval by the Contracting Officer of the Contractor's demolition, and removal procedures, and authorization by the Contracting Officer to begin demolition and deconstruction. The Government will not be responsible for the condition or loss of, or damage to, such property after contract award. Showing for sale or selling materials and equipment on site is prohibited.
3.3.2 Salvaged Materials and Equipment
Remove materials and equipment that are indicated on the drawings to be removed by the Contractor and that are to remain the property of the
02 41 00 - 8
Government, and deliver to a storage site , as directed within 10 miles of the work site.
a. Remove salvaged items to remain the property of the Government in a manner to prevent damage, and packed or crated to protect the items from damage while in storage or during shipment. Items damaged during removal or storage must be repaired or replaced to match existing items. Properly identify the contents of containers. Deliver the following items reserved as property of the Government to the areas designated: TBD and coordinated with the Government.
3.3.3 Unsalvageable and Non-Recyclable Material
Dispose of unsalvageable and non-recyclable non combustible and combustible material in the sanitary fill area located off the site.
3.4 CLEANUP
Remove debris and rubbish from Government property. Remove and transport the debris in a manner that prevents spillage on streets or adjacent areas. Apply local regulations regarding hauling and disposal.
3.5 DISPOSAL OF REMOVED MATERIALS
3.5.1 Regulation of Removed Materials
Dispose of debris, rubbish, scrap, and other nonsalvageable materials resulting from removal operations with all applicable federal, state and local regulations as contractually specified off the site as identified in the Waste Management Plan..
3.5.2 Burning on Government Property
Burning of materials removed from demolished and deconstructed structures will not be permitted on Government property.
3.5.3 Removal to Spoil Areas on Government Property
Transport noncombustible materials removed from demolition structures to designated spoil areas on Government property.
3.5.4 Removal from Government Property
Transport waste materials removed from demolished and deconstructed structures, except waste soil, from Government property for legal disposal. Dispose of waste soil as directed.
3.6 REUSE OF SALVAGED ITEMS
Recondition salvaged materials and equipment designated for reuse before installation. Replace items damaged during removal and salvage operations or restore them as necessary to usable condition.
-- End of Section --
02 41 00 - 9
FINAL
ENVIRONMENTAL INVESTIGATION SERVICES REPORT
BUILDING 50
FORT LEAVENWORTH, KANSAS
Prepared For:
YAEGER ARCHITECTURE, INC.
7780 West 119th Street
Overland Park, KS 66213
Prepared by:
TEHAMA, LLC
1600 Genessee Street, Suite 754
Kansas City, MO 64102
PROJECT NO. F0087.00
May 2018
SECTION I ASBESTOS CONTAINING MATERIALS (ACM)
1.0 INTRODUCTION
2.0 FIELD INVESTIGATION PROCEDURES AND SAMPLE ANALYSIS METHODS
3.0 INSPECTION SCOPE AND MATERIAL ASSESSMENT
4.0 INSPECTION RESULTS
5.0 CONDITION AND FRIABLITY ASSESSMENT
6.0 AREAS NOT ACCESSIBLE
7.0 POLYCHLORINATED BIPHENYLS
8.0 UNIVERSAL WASTES
9.0 CONCLUSIONS AND RECOMMENDATIONS
10.0 LIMITATIONS, EXCEPTIONS AND ASSUMPTIONS
11.0 REPORT CERTIFICATIONS
SECTION II LEAD-BASED PAINT (LBP)
1.0 INTRODUCTION
2.0 FIELD SURVEY PROCEDURES AND SAMPLE ANALYSIS METHODS
3.0 SUMMARY OF INSPECTION
4.0 INSPECTION RESULTS
5.0 CONCLUSIONS AND RECOMMENDATIONS
6.0 LIMITATIONS, EXCEPTIONS AND ASSUMPTIONS
7.0 REPORT CERTIFICATIONS
SECTION III MICROBIAL SURVEY
1.0 INTRODUCTION
2.0 METHODS AND SAMPLING
3.0 MICROBIAL SURVEY DATA ANALYSIS AND INTERPRETATION
4.0 CONCLUSIONS
5.0 REFRENCES
APPENDICES
APPENDIX A TEHAMA PERSONNEL CERTIFICATIONS
APPENDIX B LABORATORY CERTIFICATIONS
APPENDIX C FIGURES
APPENDIX D SAMPLE CHAIN OF CUSTODIES, LABORATORY RESULTS & XRF
RESULTS
SECTION I
ASBESTOS CONTAINING MATERIALS
(ACM)
Environmental Investigation Services Report for Building 50, Fort Leavenworth, Kansas
1.0 INTRODUCTION
Tehama, LLC (Tehama) has performed a full interior and exterior inspection for the presence or absence of Asbestos-Containing Materials (ACM), for Building 50 at Fort Leavenworth, Kansas. The inspection was conducted at the request of Yaeger Architecture, Inc. (Yaeger) for use in their design-build package for renovation of Building 50. The scope of work for this project was based on Yaeger’s scope of work, drawings and emails, and Tehama’s proposal dated September 6, 2017. The intent of this inspection was to locate, identify and quantify ACM that will be impacted during the upcoming renovation project.
Anne Eiseman, a certified Environmental Protection Agency (EPA) Asbestos Hazard Emergency Response Act (AHERA) Asbestos Inspector with Tehama, performed the inspection on October 18th, 2017. Anne Eiseman and Jerrett Domling, also a certified EPA AHERA Asbestos Inspector with Tehama, returned to Building 50 on November 15th, 2017 to inspect the crawl space. Certifications for inspectors are located in Appendix A.
2.0 FIELD INVESTIGATION PROCEDURES AND SAMPLE ANALYSIS METHODS
Guidelines used for the inspection were established by the EPA in the “Guidance for Controlling Asbestos Containing Materials in Buildings”, 40 CFR 763, 29 CFR 1926.1101, 40 CFR 61, 29 CFR 1910.134, AHERA, National Emission Standards for Hazardous Air Pollutants (NESHAP) regulations, and where applicable Kansas Statutes Annotated (K.S.A Chapter 65, Article 53), Kansas Administrative Regulations (K.A.R. 28-50-1 to 28-50-14).
Field information was organized in accordance with the AHERA methodology of homogenous area (HA).
A HA contains material that is uniform in texture and color and appears to be identical in every other respect. Building materials that were installed at different times or that do not appear to be similar in any other way are considered separate homogenous materials/areas. Bulk sampling for each HA was completed and specific sampling locations were chosen at random.
All bulk samples were sent to EMLab P&K and analyzed by Polarized Light Microscopy (PLM) coupled with dispersion staining techniques as outlined in the EPA 600/R-93/116 Method. The laboratory provides the approximate percentage of asbestos fibers in the sample and also identifies the crystal form of the asbestos. The EPA considers materials to be ACM if they contain greater than one-percent (1%) asbestos fibers. Occupational Safety and Health Administration (OSHA) regulations cover materials containing asbestos in any concentration.
The EPA considers the following materials to be non-suspect ACM, and consequently, they were not sampled:
• Glass • Fiberglass
• Metal • Rubber
• Concrete
• Brick
Tehama subcontracted laboratory analysis procedures to EMLab P&K located at 10900 Brittmoore Park Drive, Suite G, Houston, Texas 77041. The laboratory maintains accreditation from the following agencies:
• National Voluntary Laboratory Accreditation Program (Lab Code 600122-0)
• American Industrial Hygiene Association Accredited Laboratory (Lab No. 193549)
Laboratory certifications are presented in Appendix B of this report.
3.0 INSPECTION SCOPE AND MATERIAL ASSESSMENT
This survey was conducted to determine whether asbestos is present in interior and exterior areas of the building, in preparation for building renovation activities. The sampler’s discretion was used for determining the number of samples to be taken of suspect ACM in each HA.
The inspection was characterized by observations of accessible areas. Suspect materials examined and quantified during the inspection included:
• 12x12 Beige Floor Tile
• Grey Window Caulk
• Yellow Tile Mastic
• White Ceiling Tile
• Yellow Pipe Insulation
• Silver Pipe Wrap
• Yellow Elbow Insulation
• Yellow Glue
• Cream Insulation Wrap
• Light Brown Floor Tile
• Grey Insulation
• Pink Insulation
• Brown Baseboard
• Brown Mastic with Paper
• Grey Ceiling Tile with White Surface
• Blue Foam
• Green Non-fibrous Material
• White Sealant
• Black Pipe Wrap
• White Drywall with Brown Wallpaper and
Blue Paint
• White Drywall with Brown Paper
• Brown Floor Board
• Yellow Linoleum
• Turquoise Baseboard
• 1”x1” Solid Turquoise Ceramic Tile
• Grey Grout
• 1”x1” Speckled Light Blue Ceramic Tile
• 1”x1” Speckled Dark Blue Ceramic Tile
• 4”x4” Turquoise Ceramic Tile with Plaster
• Grey Mortar
• Grey Plaster
• Brown Stair Tread
• 12x12 Light Tan Floor Tile
• Black Glue
• Beige Tape
• Yellow Woven Material
• Black Pipe Wrap
• Dry Wall
• 12x12 Green Floor Tile
• Black Mastic
• Grey and Black Floor Insulation
• 12x12 Off-White Floor Tile
• 12x12 Eggshell Floor Tile
• Black Baseboard
• White Plaster
• Grey Ceiling Tile
• White Sealant
• Black Insulation
• Black Baseboard
• 12x12 Grey Ceiling Tile
• Silver Pipe Wrap with Red and Blue Paint
• Tan Stair Tread
• 12x12 Dark Tan Floor Tile
• Grey Stair Caulk
• White Leveling Compound
• Grey Leveling Compound
• Green Weaved Wallpaper
• Off-White Linoleum
• Light Brown Piping Sealant
• Black Carpet Tread
• 12x12 White Floor Tile
• Light Brown Stair Tread
• Grey Baseboard
• Black Stair Tread
• 12 x 12 White Sound Suppression Tile
• Transparent Mastic
• Grey/White Insulation
• Black Vent Caulk
• Black Tar
• Roofing Tar
• White Caulk
• Roofing Shingle
• Transparent Caulk
• Orange Adhesive • Grey Floor Tile
A total of 62 bulk samples were collected from suspect ACM during the survey at Building 50. Bulk sample locations are presented on Figures 01 through 03 in Appendix C of this report.
4.0 INSPECTION RESULTS
Analytical results of the bulk samples collected indicate that the following materials contain greater than 1% asbestos and are considered ACM:
• Non-Friable 12x12 Beige Floor Tile
• Non-Friable 12x12 Light Brown Floor Tile
• Non-Friable 12x12 Green Floor Tile with Black Mastic
• Non-Friable 12x12 Off-White Floor Tile
• Non-Friable 12x12 Eggshell Floor Tile (Floating Floor)
The following table details the locations and quantities of the ACM identified:
ACM Material Location Quantity 12x12 Beige Floor Tile Entry 2 225 ft2 12x12 Green Floor Tile with Black Mastic Offices (3, 4, 9, and 10) 920 ft2 12x12 Off-White Floor Tile Offices (6, 11, 13, 14), Hall (1, 2, 4), Docking Area, Wash Room (Next to Men’s Restroom on Top Floor), Conference Room, West Entry
2,560 ft2
12x12 Eggshell Floor Tile (Floating Floor) Main Office and Basement Crawl Space 2,000 ft2
Complete laboratory analytical results are presented in Appendix D. No photographs were taken due to security restrictions within the building.
5.0 CONDITION AND FRIABLITY ASSESSMENT
For each inspection conducted, the inspector classifies ACM materials by friability and condition. This helps to determine the extent of damage in certain areas as well as the potential for further damage and asbestos release due to disturbance of the material.
All positive materials appeared to be in good condition, meaning there was no apparent damage to ACM.
6.0 AREAS NOT ACCESSIBLE
Void Spaces within Walls and Ceilings: No destructive sampling was performed on concealed spaces on walls to access plenum or chases. Due to the nature and outcome of the materials sampled Tehama did not observe any “suspect” materials continuing into plenums, etc. Tehama cannot account for all plenums/void spaces that exist in these facilities without selected demolition of existing walls, floors, ceilings, etc.
Tehama recommends periodic oversight during demolition in order to assess any hidden/unforeseen materials that might be revealed.
7.0 POLYCHLORINATED BIPHENYLS
Polychlorinated biphenyls (PCBs) are regulated pursuant to the United States Environmental Protection Agency Code of Federal Regulations (40 CFR 761) and the Toxic Substances Control Act (TSCA – 15 U.S.C. 2605).
These regulations require certain testing and reporting requirements to determine management, recycling and disposal options for PCBs. Please see the below table itemizing the number of assumed PCB-containing Fluorescent Lighting Ballasts:
Facility (Floor/Level) Ballast Quantity Basement 189 1st Floor 46
APPROX. TOTALS 235
8.0 UNIVERSAL WASTES
Universal Wastes (i.e., batteries, thermostats, lamps, mercury-containing equipment, and pesticides) are regulated pursuant to the EPA Universal Waste Requirements (40 CFR Part 273). Similarly, these sampling procedures may also be used to determine disposal/management or clean-up options for Universal Wastes.
Typical equipment that might contain universal wastes are emergency light batteries, CFC containing refrigerators, water fountains, mercury containing bulbs, thermostats and thermometers. Please see the below table itemizing the number of assumed universal wastes:
Facility
(Floor/Level) Fluorescent
Bulbs
CFC
Containing Equipment Mercury Containing
Equipment Water
Fountains AC Units
Basement 108 2 0 2 0 1st Floor 512 2 36 Thermostats 1 0 TOTALS 620 4 36 Thermostats 3 0
At various locations within the building, Tehama noted other wastes that could potentially be considered hazardous if disposed of incorrectly. The following is a list of materials observed:
• 2-Gallon Pesticide Bottles in Mechanical Room (Approx. 10)
• 1 lb. Propane Bottles Scattered throughout Mechanical Room (Approx. 5)
• 32 oz. Bottles of Cleaning Supplies in Restrooms and Docking Area
• 2-Gallon EvapPow’r-C Coil Cleaning Product in Crawl Space
• 5 lb. compressed air cylinders: Oxygen (2) and Acetylene (2) in Mechanical Room
9.0 CONCLUSIONS AND RECOMMENDATIONS
Multiple forms of ACM have been identified that will be impacted by the renovation project in Building
50. These materials, reported in Section 4.0 of this report, will require complete abatement prior to the start of the renovation project as per all federal and state regulations.
The asbestos inspection was based on the scope of work proposed by Yaeger for use in their design-build project. Any change in the scope of work beyond what was identified in the scope of work drawings and subsequent emails will require further investigation to accurately classify any additional ACM/Hazardous Materials resulting from the modified or updated scope of work.
10.0 LIMITATIONS, EXCEPTIONS AND ASSUMPTIONS
Opinions and recommendations presented in this report apply to site conditions and features as they existed at the time of Tehama’s site visit, and those reasonably foreseeable. They cannot necessarily apply to conditions and features of which Tehama is unaware and has not had the opportunity to evaluate.
It is important to recognize that even the most comprehensive scope of services may fail to detect all ACM that may be associated with the property. Therefore, Tehama cannot act as insurers and cannot “certify” that all ACM associated with the property has been identified, and no expressed or implied representation or warranty is included or intended in our reports, except that our services were performed, within the limits prescribed by our client, with the customary thoroughness and competence of our profession.
11.0 REPORT CERTIFICATIONS
This report, and the supporting data, findings, conclusions, opinions, and recommendations it contains represents the result of Tehama’s efforts for the asbestos survey work as per the scope of work as described in the scope of work drawings and emails.
Opinions and recommendations presented in this report apply to site conditions and features as they existed at the time of Tehama’s site visit, and those reasonably foreseeable. They cannot necessarily apply to conditions and features of which Tehama is unaware and has not had the opportunity to evaluate.
The conclusions presented in this report are professional opinions based solely upon Tehama’s visual observations of accessible areas, laboratory test data, and current regulatory requirements. These conclusions are intended exclusively for the purpose stated herein, at the site indicated, and for the project indicated.
If you have any questions concerning this report, please feel free to contact Anne Eiseman at (816) 832- 6797.
Prepared by: Reviewed by:
Anne Eiseman Megan Perez-Utter
SECTION II
LEAD-BASED PAINT (LBP)
1.0 INTRODUCTION
Tehama has performed a full interior and exterior inspection for the presence or absence of Lead-Based Paint (LBP) for Building 50 at Fort Leavenworth, Kansas. The scope of work for this project was based on Yaeger’s scope of work, drawings and emails, and Tehama’s proposal dated September 6, 2017. The intent of this inspection was to locate, identify and quantify LBP that will be impacted during renovation of the building.
Inspectors Megan Perez-Utter and Anne Eiseman performed the inspection from October 18 – 19, 2017.
Megan Perez-Utter and Anne Eiseman are certified Lead Inspectors by the Kansas Department of Health and Environment. Certifications for inspectors are located in Appendix A.
2.0 FIELD SURVEY PROCEDURES AND SAMPLE ANALYSIS METHODS
The purpose of the LBP survey was to conduct a surface-by-surface investigation of painted components inside and outside of the building in an effort to identify which painted surfaces contain lead.
Some of the test locations exhibited lead-in-paint levels below the level that EPA identifies as LBP, specifically 0.5% by weight or 1.0 mg/cm2. Such surfaces could create dust-lead or soil-lead hazards if the paint is turned into dust by abrasion, scraping, or sanding. Should these or any lead containing components or surfaces be disturbed in any manner that generates dust, care should be taken to limit worker exposure and the spread of dust.
The lead regulatory levels provided below are those used when preparing this LBP evaluation or when evaluating data collected. The EPA regulatory levels are the same as the state regulatory levels provided in the following table:
EPA Levels
Lead-Based Paint
1.0 mg/cm2 or 0.5% by weight (or 5,000 pm)
Testing was accomplished through the use of an Olympus DELTA Series handheld x-ray fluorescence (XRF) to collect lead levels on painted surfaces. The XRF determines the chemistry of a sample by measuring the fluorescent x-rays emitted from the sample that returns to the XRF after irradiated energy is released onto the sample. A total of 273 XRF tests were performed on different paint variations on the interior and exterior of the structures. Field validation checks of the XRF were also performed at the beginning and end of test operations on the day of testing. Validation checks were performed through a series of three tests on a NIST SRM paint film. Results of the validation checks indicated that the XRF unit was calibrated properly.
Tehama also collected paint chip samples that were submitted to the subcontracted laboratory, EMSL Labs, to compare concentrations with field XRF readings. All samples were analyzed by Flame Atomic Absorption as outlined in NIOSH 7082 Pb-FLAA Method. EMSL is located at 3029 South Jefferson, St.
Louis, MO 63118. The laboratory maintains accreditation from the following agencies:
• National Voluntary Laboratory Accreditation Program (Lab Code 200742-0))
• American Industrial Hygiene Association Accredited Laboratory (Lab No. 102636)
Laboratory accreditations are presented in Appendix B of this report.
3.0 SUMMARY OF INSPECTION
A visual assessment of each unique combination of suspect LBP was completed. Unique sampling combinations of suspect LBP were then analyzed using a handheld XRF. The inspection was characterized by observations of accessible areas.
XRF results indicated that the following materials contained LBP greater than or equal to 1.0 mg/cm2:
• Green Metal Railing- Interior
• Green Wood Stairs- Interior
• Yellow Metal Sink- Interior
• Green Wallpaper– Interior
• White Wallpaper- Interior
• Tan Metal Railing- Interior
• Tan Wood Stairs- Interior
• Red Metal Railing- Exterior
• Red Metal Support Beam- Exterior
• White Metal Dock- Exterior
4.0 INSPECTION RESULTS
The LBP inspection involved a thorough visual examination of accessible areas, field XRF testing of painted surfaces, and laboratory analysis of select paint chips. XRF results presented in Appendix D of this report provide information on test locations, substrate tested, condition of paint, and concentration.
Inspection locations with lead are detailed on Figures 04 through 06 located in Appendix C of this report.
In total, two paint chip samples were collected and analyzed, of which both tested positive for LBP. Painted surfaces where chip samples were collected were found to be in fair condition as defined by the EPA and Housing and Urban Development (HUD) guidelines. In general, the paint chip samples correlated well with concentrations taken by XRF, indicating the XRF was working properly.
Some of the test locations exhibited lead-in-paint levels below the level that EPA identifies as LBP, specifically 0.5% by weight or 1.0 mg/cm2. Such surfaces could create dust-lead or soil-lead hazards if the paint is turned into dust by abrasion, scraping, or sanding. Should these or any lead containing components or surfaces be disturbed in any manner that generates dust, care should be taken to limit worker exposure and the spread of dust.
5.0 CONCLUSIONS AND RECOMMENDATIONS
Any work which disturbs painted surfaces containing lead shall be performed in accordance with the OSHA, 29 CFR 1926.62 (Lead in Construction Standard) and EPA’s 40 CFR 745 regulation. Personal air monitoring should be conducted when disturbing lead based paints and lead containing materials as per 29
CFR 1926.62 (OSHA).
In addition, all waste generated as part of the project, regardless of the lead content in the paint, shall be tested in accordance with the EPA Resource Conservation and Recovery Act (RCRA) to determine the classification of the waste. Under RCRA, any waste material that when tested by Toxicity Characteristics Leaching Procedure (TCLP) results in a leachate lead concentration of five (5) parts per million or greater must be disposed of at an EPA licensed hazardous waste facility.
6.0 LIMITATIONS, EXCEPTIONS AND ASSUMPTIONS
Opinions and recommendations presented in this report apply to site conditions and features as they existed at the time of Tehama’s site visit, and those reasonably foreseeable. They cannot necessarily apply to conditions and features of which Tehama is unaware and has not had the opportunity to evaluate.
Tehama has completed a thorough assessment of each unique painted surface within the interior and exterior areas of the buildings. If a different painted surface is identified during demolition that has not been tested, it should be assumed positive for LBP. Additional testing may be completed to determine the presence or absence of LBP.
The conclusions presented in this report are professional opinions based solely upon Tehama’s visual observations of accessible areas, laboratory test data, and current regulatory requirements. These conclusions are intended exclusively for the purpose stated herein, at the site indicated, and for the project indicated.
7.0 REPORT CERTIFICATIONS
This report, and the supporting data, findings, conclusions, opinions, and the recommendations it contains, represents the result of Tehama’s efforts. This report is not a lead abatement specification and should not be used for specifying removal methods or techniques.
It is important to recognize that even the most comprehensive scope of services may fail to detect all LBP containing materials that may be associated with the structure. Therefore, Tehama cannot act as insurers and cannot “certify” that all LBP associated with the property has been identified, and no expressed or implied representation or warranty is included or intended in our reports, except that our services were performed, within the limits prescribed by our client, with the customary thoroughness and competence of our profession.
If you have any questions concerning this report, please feel free to contact Anne Eiseman at (816) 832- 6797 or Megan Perez-Utter at (816) 533-2246.
Prepared By: Reviewed by:
Anne Eiseman Megan Perez-Utter
SECTION III
MICROBIAL SURVEY
1.0 INTRODUCTION
This report documents the findings, opinions, and conclusions of an indoor air investigation of Building 50 located at Fort Leavenworth, Kansas. The scope of work for this project was based on Yaeger’s scope of work, drawings and emails, and Tehama’s proposal dated September 6, 2017.
Ongoing issues with water infiltration and flooding have been documented in the building; therefore, a microbial survey was conducted to identify the types and concentrations of mold present within the structure.
2.0 METHODS AND SAMPLING
Five samples were collected, with four being collected inside and one being collected outdoors as a background sample. The four indoor sampling locations were located in the basement and on the first floor, with one on each side of each floor. The samples were collected using a 12 liter-per-minute pump and a 0.45 micron polycarbonate filter, with a 10 minute duration for each sample. Each filter was then labeled with an identification number, documented on a chain-of-custody form, and submitted to the laboratory for analysis. The samples were submitted ALS Environmental, an American Industrial Hygiene Association (AIHA) Industrial Hygiene Accredited Laboratory. Speciation was completed by Deoxyribonucleic acid (DNA) detection using the quantitative polymerase chain reaction (QPCR) method. Laboratory certifications are presented in Appendix B and analytical reports are presented in Appendix D.
3.0 MICROBIAL SURVEY DATA ANALYSIS AND INTERPRETATION
This section discusses the interpretation of the data. The results of the laboratory data are provided in Appendix D.
Microbial sample results for fungi and endotoxins within Building 50 are presented in Table 2 below:
Table 2 - Fungal and Endotoxin Concentrations
Sample Number and Location Fungal Concentration Spore Count/m3
FLW-50-1 – Office 2 1,700 FLW-50-2 – Hall 5 700 FLW-50-3 – Hall 6 1,500 FLW-50-4 – Outside Office 34 5,200 FLW-50-5 – Outside Front Entryway – Background Sample 5,900
OSHA has not established regulatory threshold values for fungal concentrations for worker protection. The American Conference of Governmental Industrial Hygienists (Air Sampling Instruments for Evaluation of Atmospheric Contaminants 1995) recommends the following guidelines: 100 colony forming units (cfu) or less per cubic meter of air indicates low risk. An intermediate risk is indicated by 100 cfu to 1000 cfu per cubic meter of air, while 1000 or more cfu per cubic meter of air indicates a high risk.
The National Institute for Occupational Safety and Health (NIOSH), ASHRAE, and EPA all agree that while associations between mold and adverse health effects have been observed, relationships between microbial exposure, and health effects cannot be measured. However, it is believed the most effective course is to limit the potential for microbial growth indoors by reducing the causes of persistent dampness.
Labortatory analysis of fungal samples indicates that various types of mold exist within Building 50. The following discussion describes the types of mold identified and their hazards to human health:
• Alternaria:
o Type I allergies (hay fever, asthma) and a Type III hypersensitivity pneumonitis:
Woodworker's lung, Apple store hypersensitivity. (EMLab P&K).
o Toxin Alternariol (used as an antifungal) produced by A. alternata. Other metabolites produced include AME (alternariol monomethylether), tenuazonic acid, and altertoxins (mutagenic).
o Presents unique human risks (as pathogen, opportunist or contaminant). It can affect respiratory system, skin, and nails. Presents greatest risk to immunosuppressed and wound injury individuals.
• Ascospores:
o Considered to be an allergen.
o Can produce toxins, dependent upon genus and species.
o Presents a human health risk but few have been reported to cause disease.
• Aspergillis/Penicillium:
o Type I allergies (hay fever, asthma) and a Type III hypersensitivity pneumonitis:
Humidifier lung, Malt worker's lung, Compost lung, Wood trimmer's disease, Straw hypersensitivity, Farmer's lung, and Oat grain hypersensitivity.
o Can produce mycotoxins, however these are often found in contaminated food and are hazardous to the consumer.
o Potential pathogen for respiratory, invasive, cutaneous, ear, and corneal diseases. Severe, invasive disease is usually associated with immunosuppressed hosts. Many species grow at 37°C (body temperature).
• Basidiospores:
o Acts as an allergen. Some people may experience hay fever, asthma, hypersensitivity pneumonitis: cheese washer's lung, woodman's lung, moldy wall hypersensitivity.
o Produces toxins and poisoning is usually a result of ingestion of the following toxins:
amanitins, monomethyl-hydrazine, muscarine, ibotenic acid, psilocybin.
o It is rare that this mold is a pathogen that presents risk to humans.
• Bipolaris/Drechslera:
o Type I allergies (hay fever, asthma).
o Most commonly reported cause of allergic fungal sinusitis.
• Cladosporium o Common and important allergen. Type I allergies (hay fever, asthma) and Type III hypersensitivity pneumonitis: Hot tub lung, Moldy wall hypersensitivity.
o Toxins produced are not highly toxic, cladosporin and emodin.
o Not a human health risk.
• Curvulaira:
o Type I allergies (hay fever, asthma).
o Most commonly reported cause of allergic fungal sinusitis.
o Occasionally a cause of onychomycosis, ocular keratitis, sinusitis, mycetoma, pneumonia, endocarditis, cerebral abscess, and disseminated infection. Most cases are from immunocompromised patients.
• Epicoccum:
o Type I allergies (hay fever, asthma).
o No cases of infection have been reported in humans or animals.
• Nigrospora:
o Type I allergies (hay fever, asthma).
o No known toxins.
• Aspergillis/Penicillium:
o Type I allergies (hay fever, asthma) and a Type III hypersensitivity pneumonitis:
Humidifier lung, Malt worker's lung, Compost lung, Wood trimmer's disease, Straw hypersensitivity, Farmer's lung, and Oat grain hypersensitivity, o Can produce mycotoxins, however these are often found in contaminated food and are hazardous to the consumer.
o Potential pathogen for respiratory, invasive, cutaneous, ear, and corneal diseases. Severe, invasive disease is usually associated with immunosuppressed hosts. Many species grow at 37°C (body temperature).
• Smuts/Myxomycetes/Periconia/Rusts o Type I allergies (hay fever, asthma).
o No known toxins.
o Not a threat to human health.
• Pithomyces o Not Studied
4.0 CONCLUSIONS
Tehama investigated microbial levels in the air in Building 50 and compared those concentrations with outdoor, background conditions. Each sample collected represents the location sampled at that date and time. Microbial levels are constantly changing and will vary with location and time.
Microbial levels in air samples collected from Building 50 were within an intermediate and high health risk range according to OSHA recommendations. However, the background sample collected outside the building contained the highest spore count of all samples collected, and likely influenced the microbial levels inside the building. In addition, regional mold levels were at 4,304 m3, with the top three mold species being cladosporium, ascospores, and basidiospores (Children's Mercy, 2017). Mold levels outside can be directly related to mold levels inside a building. Health experts indicate that, depending on the type of mold present, the amount and degree of exposure, and the health condition of the occupant, the health effects of mold can range from being insignificant to causing allergic reactions and illness.
5.0 REFRENCES
"EMLab P&K,” Testing Lab Analysis: Mold, Asbestos, Bacteria, Legionella, USP 797, PCR, Radon, Allergens | Environmental Microbiology Laboratory.
"United States Department of Labor." OSHA Annotated PELs | Occupational Safety and Health Administration
Thursday October 19, 2017 https://www.childrensmercy.org/pollen/Default.aspx?page
APPENDIX A
TEHAMA PERSONNEL CERTIFICATIONS
APPENDIX B
LABORATORY CERTIFICATIONS
AIHA Laboratory Accreditation Programs, LLC acknowledges that
EMLab P&K, LLC.
6310 Rothway Street, Houston,…
This is the start of the file's text. The full file is on GovTribe.