This pre-solicitation announcement describes a forthcoming solicitation for construction services. The U.S. Army Corps of Engineers, Kansas City District, will issue a request for proposal set aside for women-owned small businesses for renovations to Building 50 located at Fort Leavenworth, Kansas. The general scope of work includes architectural, mechanical, electrical, life safety, communications and window installations, as well as a small building addition. Optional line items include furniture, geothermal wells, and roadwork. The estimated performance period is 540 calendar days from notice to proceed. The NAICS code is 236220 and size standard is $39.5 million. The estimated value is between $5-10 million. The solicitation is expected to be released on or around July 24, 2020 and will include evaluation criteria and instructions for proposal submission.

View the file

Other files

File Type Posted
Bldg 50 sign-in_roster.pdf PDF
Bldg 50 sign-in_roster(2).pdf PDF
W912DQ20R40280004 Amend 0004.pdf PDF
W912DQ20R4028 Amend 0003.pdf PDF
W912DQ20R4028 Amend 0002.pdf PDF
Gibbon 2018-08-06_LVN_Drawings.pdf PDF
B50 Specs_VOL 2.PDF PDF
Geothermal 2018-09-07_LVN_Drawings.pdf PDF
B50 2018-09-07_LVN_Drawings.pdf PDF
B50 Specs_VOL 1.PDF PDF
W912DQ20R4028 Amend 0001.pdf PDF
Geothermal Well Field Specs_VOL 3.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W912DQ-20-R-4028

US Army Corps of Engineers Kansas City District Building Strong

Gibbon Avenue

Fort Leavenworth, Kansas

VOLUME 4 OF 4- Division 7 through Division 33.

Construction Solicitation and Specifications

As Advertised

July 2020

This page was intentionally left blank for duplex printing.

DEPARTMENT OF THE ARMY

KANSAS CITY DISTRICT, CORPS OF ENGINEERS

757 FEDERAL BUILDING

KANSAS CITY, MISSOURI 64106

SPECIFICATIONS FOR CONSTRUCTION OF

BUILDING 50 GIBBON AVENUE

FORT LEAVENWORTH, KANSAS

TABLE OF CONTENTS

COVER

TABLE OF CONTENTS

DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS

Section Title

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 92 00 JOINT SEALANTS

DIVISION 31 - EARTHWORK

31 00 00 EARTHWORK

31 11 00 CLEARING AND GRUBBING

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 05 33 LANDSCAPE ESTABLISHMENT

32 11 10 DRAINAGE LAYER

32 11.16.01 SEPARATION LAYER (SUBBASE)

32 12 10 BITUMINOUS TACK AND PRIMCE COATS

32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS

32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE

FACILITIES

32 16 13 CONCRETE SIDEWALKS AND CURBS AND GUTTERS

32 92 23 SODDING

32 93 00 EXTERIOR PLANTS

DIVISION 33 - UTILITIES

33 40 00 STORM DRAINAGE UTILITIES

APPENDIX

Appendix A HIGH PERFORMANCE SUSTAIBABILE BUILDINGS Appendix B REGISTER

-- End of Project Table of Contents --

Gibbon Avenue W912DQ-20-R-4028 Fort Leavenworth, KS

SECTION TABLE OF CONTENTS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

SECTION 07 92 00

JOINT SEALANTS

PART 1 GENERAL

1.1 REFERENCES

1.2 SUBMITTALS

1.3 ENVIRONMENTAL CONDITIONS

1.4 DELIVERY AND STORAGE

1.5 QUALITY ASSURANCE

1.5.1 Compatibility with Substrate

1.5.2 Joint Tolerance

1.5.3 Mock-Up

1.6 SPECIAL WARRANTY

PART 2 PRODUCTS

2.1 SEALANTS

2.1.1 Interior Sealant

2.1.2 Exterior Sealant

2.1.3 Floor Joint Sealant

2.1.4 Acoustical Sealant

2.1.5 Preformed Sealant

2.1.5.1 Foam Strip

2.2 PRIMERS

2.3 BOND BREAKERS

2.4 BACKSTOPS

2.4.1 Rubber

2.4.2 Synthetic Rubber

2.4.3 Neoprene

2.4.4 Butyl Rubber Based

2.4.5 Silicon Rubber Base

2.5 CLEANING SOLVENTS

PART 3 EXECUTION

3.1 SURFACE PREPARATION

3.1.1 Steel Surfaces

3.1.2 Aluminum or Bronze Surfaces

3.1.3 Concrete and Masonry Surfaces

3.1.4 Wood Surfaces

3.2 SEALANT PREPARATION

3.3 APPLICATION

3.3.1 Joint Width-To-Depth Ratios

3.3.2 Masking Tape

3.3.3 Backstops

3.3.4 Primer

3.3.5 Bond Breaker

3.3.6 Sealants

07 92 00 - 1

3.4 PROTECTION AND CLEANING

3.4.1 Protection

3.4.2 Final Cleaning

-- End of Section Table of Contents --

07 92 00 - 2

SECTION 07 92 00

JOINT SEALANTS

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM C1311 (2014) Standard Specification for Solvent Release Agents

ASTM C509 (2006; R 2015) Elastomeric Cellular Preformed Gasket and Sealing Material

ASTM C734 (2006; R 2012) Low-Temperature Flexibility of Latex Sealants After Artificial Weathering

ASTM C834 (2014) Latex Sealants

ASTM C919 (2012) Use of Sealants in Acoustical Applications

ASTM C920 (2014a) Standard Specification for Elastomeric Joint Sealants

ASTM D1056 (2014) Standard Specification for Flexible Cellular Materials - Sponge or Expanded Rubber

ASTM D217 (2010) Cone Penetration of Lubricating Grease

ASTM E84 (2016) Standard Test Method for Surface Burning Characteristics of Building Materials

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability Notebook. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-03 Product Data

Sealants

07 92 00 - 3

Primers

Bond breakers

Backstops

Manufacturer's descriptive data including storage requirements, shelf life, curing time, instructions for mixing and application, and primer data (if required). Provide a copy of the Material Safety Data Sheet for each solvent, primer or sealant material.

SD-07 Certificates

Sealant

Certificates of compliance stating that the materials conform to the specified requirements.

1.3 ENVIRONMENTAL CONDITIONS

Apply sealant when the ambient temperature is between 40 and 90 degrees F.

1.4 DELIVERY AND STORAGE

Deliver materials to the job site in unopened manufacturers' external shipping containers, with brand names, date of manufacture, color, and material designation clearly marked thereon. Label elastomeric sealant containers to identify type, class, grade, and use. Carefully handle and store materials to prevent inclusion of foreign materials or subjection to sustained temperatures exceeding 90 degrees F or less than 0 degrees F.

1.5 QUALITY ASSURANCE

1.5.1 Compatibility with Substrate

Verify that each of the sealants are compatible for use with joint substrates.

1.5.2 Joint Tolerance

Provide joint tolerances in accordance with manufacturer's printed instructions.

1.5.3 Mock-Up

Project personnel is responsible for installing sealants in mock-up prepared by other trades, using materials and techniques approved for use on the project.

1.6 SPECIAL WARRANTY

Guarantee sealant joint against failure of sealant and against water penetration through each sealed joint for five years.

PART 2 PRODUCTS

2.1 SEALANTS

Provide sealant that has been tested and found suitable for the substrates

07 92 00 - 4 to which it will be applied.

2.1.1 Interior Sealant

Provide ASTM C834, ASTM C920, Type S or M, Grade NS, Class 12.5, Use NT.

Location(s) and color(s) of sealant for the following:

LOCATION COLOR

a. Small voids between walls or partitions and adjacent lockers, casework, shelving, door frames, built-in or surface-mounted equipment and fixtures, and similar items.

As selected

b. Perimeter of frames at doors, windows, and access panels which adjoin exposed interior concrete and masonry surfaces.

Match adjacent surface color

c. Joints of interior masonry walls and partitions which adjoin columns, pilasters, concrete walls, and exterior walls unless otherwise detailed.

Match adjacent surface color

d. Joints between edge members for acoustical tile and adjoining vertical surfaces.

Match adjacent surface color

e. Interior locations, not otherwise indicated or specified, where small voids exist between materials specified to be painted.

Match adjacent surface color

g. Joints formed between tile floors and tile base cove;

joints between tile and dissimilar materials; joints occurring where substrates change.

Match adjacent surface color

2.1.2 Exterior Sealant

For joints in vertical surfaces, provide ASTM C920, Type S or M, Grade NS, Class 25, Use NT. For joints in horizontal surfaces, provide ASTM C920, Type S or M, Grade P, Class 25, Use T. Provide location(s) and color(s) of sealant as follows:

07 92 00 - 5

LOCATION COLOR

a. Joints and recesses formed where frames and subsills of windows, doors, louvers, and vents adjoin masonry, concrete, or metal frames. Use sealant at both exterior and interior surfaces of exterior wall penetrations.

Match adjacent surface color

g. Voids where items pass through exterior walls.

Match adjacent surface color

h. Metal reglets, where flashing is inserted into masonry joints, and where flashing is penetrated by coping dowels.

Match adjacent surface color

i. Metal-to-metal joints where sealant is indicated or specified.

Match adjacent surface color

j. Joints between ends of gravel stops, fascias, copings, and adjacent walls.

Match adjacent surface color

2.1.3 Floor Joint Sealant

ASTM C920, Type S or M, Grade P, Class 25, Use T. Provide location(s) and color(s) of sealant as follows:

LOCATION COLOR

a. Seats of metal thresholds for exterior doors.

Match adjacent surface color

07 92 00 - 6

LOCATION COLOR

2.1.4 Acoustical Sealant

Rubber or polymer-based acoustical sealant conforming to ASTM C919 must have a flame spread of 25 or less and a smoke developed rating of 50 or less when tested in accordance with ASTM E84. Acoustical sealant must have a consistency of 250 to 310 when tested in accordance with ASTM D217, and must remain flexible and adhesive after 500 hours of accelerated weathering as specified in ASTM C734, and must be non-staining.

2.1.5 Preformed Sealant

Provide preformed sealant of polybutylene or isoprene-butylene based pressure sensitive weather resistant tape or bead sealant capable of sealing out moisture, air and dust when installed as recommended by the manufacturer. At temperatures from minus 30 to plus 160 degrees F, the sealant must be non-bleeding and no loss of adhesion.

2.1.5.1 Foam Strip

Provide foam strip of polyurethane foam; with cross-section dimensions of 1/4". Provide foam strip capable of sealing out moisture, air, and dust when installed and compressed as recommended by the manufacturer. Service temperature must beminus 40 to plus 275 degrees F. Furnish untreated strips with adhesive to hold them in place. Do not allow adhesive to stain or bleed into adjacent finishes. Saturate treated strips with butylene waterproofing or impregnated with asphalt.

2.2 PRIMERS

Provide a nonstaining, quick-drying type and consistency recommended by the sealant manufacturer for the particular application.

2.3 BOND BREAKERS

Provide the type and consistency recommended by the sealant manufacturer to prevent adhesion of the sealant to backing or to bottom of the joint.

2.4 BACKSTOPS

Provide glass fiber roving or neoprene, butyl, polyurethane, or polyethylene foams free from oil or other staining elements as recommended by sealant manufacturer. Provide 25 to 33 percent oversized backing for closed cell and 40 to 50 percent oversized backing for open cell material, unless otherwise indicated. Make backstop material compatible with sealant. Do not use oakum and other types of absorptive materials as backstops.

2.4.1 Rubber

Conform to ASTM D1056, Type 2, closed cell, Class A, Grade, round cross section for cellular rubber sponge backing.

07 92 00 - 7

2.4.2 Synthetic Rubber

Conform to ASTM C509, Option I, Type Ipreformed rods or tubes for Synthetic rubber backing.

2.4.3 Neoprene

Conform to ASTM D1056, closed cell expanded neoprene cord Type 2, Class C, Grade 2C for Neoprene backing.

2.4.4 Butyl Rubber Based

Provide Butyl Rubber Based Sealants of single component, solvent release, color as selected, conforming to ASTM C1311.

2.4.5 Silicon Rubber Base

Provide Silicon Rubber Based Sealants of single component, solvent release, color as selected, conforming to ASTM C920, Non-sag, Type , Grade 1, Class 25.

2.5 CLEANING SOLVENTS

Provide type(s) recommended by the sealant manufacturer except for aluminum and bronze surfaces that will be in contact with sealant.

PART 3 EXECUTION

3.1 SURFACE PREPARATION

Clean surfaces from dirt frost, moisture, grease, oil, wax, lacquer, paint, or other foreign matter that would tend to destroy or impair adhesion.

Remove oil and grease with solvent. Surfaces must be wiped dry with clean cloths. When resealing an existing joint, remove existing caulk or sealant prior to applying new sealant. For surface types not listed below, contact sealant manufacturer for specific recommendations.

3.1.1 Steel Surfaces

Remove loose mill scale by sandblasting or, if sandblasting is impractical or would damage finish work, scraping and wire brushing. Remove protective coatings by sandblasting or using a residue-free solvent.

3.1.2 Aluminum or Bronze Surfaces

Remove temporary protective coatings from surfaces that will be in contact with sealant. When masking tape is used as a protective coating, remove tape and any residual adhesive just prior to sealant application. For removing protective coatings and final cleaning, use nonstaining solvents recommended by the manufacturer of the item(s) containing aluminum or bronze surfaces.

3.1.3 Concrete and Masonry Surfaces

Where surfaces have been treated with curing compounds, oil, or other such materials, remove materials by sandblasting or wire brushing. Remove laitance, efflorescence and loose mortar from the joint cavity.

07 92 00 - 8

3.1.4 Wood Surfaces

Keep wood surfaces to be in contact with sealants free of splinters and sawdust or other loose particles.

3.2 SEALANT PREPARATION

Do not add liquids, solvents, or powders to the sealant. Mix multicomponent elastomeric sealants in accordance with manufacturer's instructions.

3.3 APPLICATION

3.3.1 Joint Width-To-Depth Ratios

a. Acceptable Ratios:

JOINT WIDTH JOINT DEPTH

Minimum Maximum

For metal, glass, or other nonporous surfaces:

1/4 inch (minimum) 1/4 inch 1/4 inch over 1/4 inch 1/2 of width Equal to width

For wood, concrete, masonry, stone:

1/4 inch (minimum) 1/4 inch 1/4 inch over 1/4 inch to 1/2 inch 1/4 inch Equal to width over 1/2 inch to 2 inch 1/2 inch 5/8 inch

Over 2 inch As recommended by sealant manufacturer

b. Unacceptable Ratios: Where joints of acceptable width-to-depth ratios have not been provided, clean out joints to acceptable depths and grind or cut to acceptable widths without damage to the adjoining work.

Grinding is not required on metal surfaces.

3.3.2 Masking Tape

Place masking tape on the finish surface on one or both sides of a joint cavity to protect adjacent finish surfaces from primer or sealant smears.

Remove masking tape within 10 minutes after joint has been filled and tooled.

3.3.3 Backstops

Install backstops dry and free of tears or holes. Tightly pack the back or bottom of joint cavities with backstop material to provide a joint of the depth specified. Install backstops in the following locations:

a. Where indicated.

07 92 00 - 9

b. Where backstop is not indicated but joint cavities exceed the acceptable maximum depths specified in paragraph entitled, "Joint Width-to-Depth Ratios".

3.3.4 Primer

Immediately prior to application of the sealant, clean out loose particles from joints. Where recommended by sealant manufacturer, apply primer to joints in concrete masonry units, wood, and other porous surfaces in accordance with sealant manufacturer's instructions. Do not apply primer to exposed finish surfaces.

3.3.5 Bond Breaker

Provide bond breakers to the back or bottom of joint cavities, as recommended by the sealant manufacturer for each type of joint and sealant used, to prevent sealant from adhering to these surfaces. Carefully apply the bond breaker to avoid contamination of adjoining surfaces or breaking bond with surfaces other than those covered by the bond breaker.

3.3.6 Sealants

Provide a sealant compatible with the material(s) to which it is applied.

Do not use a sealant that has exceeded shelf life or has jelled and can not be discharged in a continuous flow from the gun. Apply the sealant in accordance with the manufacturer's printed instructions with a gun having a nozzle that fits the joint width. Force sealant into joints to fill the joints solidly without air pockets. Tool sealant after application to ensure adhesion. Make sealant uniformly smooth and free of wrinkles. Upon completion of sealant application, roughen partially filled or unfilled joints, apply sealant, and tool smooth as specified. Apply sealer over the sealant when and as specified by the sealant manufacturer.

3.4 PROTECTION AND CLEANING

3.4.1 Protection

Protect areas adjacent to joints from sealant smears. Masking tape may be used for this purpose if removed 5 to 10 minutes after the joint is filled.

3.4.2 Final Cleaning

Upon completion of sealant application, remove remaining smears and stains and leave the work in a clean and neat condition.

a. Masonry and Other Porous Surfaces: Immediately scrape off fresh sealant that has been smeared on masonry and rub clean with a solvent as recommended by the sealant manufacturer. Allow excess sealant to cure for 24 hour then remove by wire brushing or sanding.

b. Metal and Other Non-Porous Surfaces: Remove excess sealant with a solvent-moistened cloth.

-- End of Section --

07 92 00 - 10

SECTION TABLE OF CONTENTS

DIVISION 31 - EARTHWORK

SECTION 31 00 00

EARTHWORK

PART 1 GENERAL

1.1 REFERENCES

1.2 DEFINITIONS

1.2.1 Satisfactory Materials

1.2.2 Unsatisfactory Materials

1.2.3 Cohesionless and Cohesive Materials

1.2.4 Degree of Compaction

1.2.5 Topsoil

1.2.6 Hard/Unyielding Materials

1.2.7 Unstable Material

1.2.8 Expansive Soils

1.3 SYSTEM DESCRIPTION

1.3.1 Classification of Excavation

1.3.2 Blasting

1.4 SUBMITTALS

PART 2 PRODUCTS

2.1 REQUIREMENTS FOR OFFSITE SOILS

PART 3 EXECUTION

3.1 STRIPPING OF TOPSOIL

3.2 GENERAL EXCAVATION

3.2.1 Ditches, Gutters, and Channel Changes

3.2.2 Drainage

3.2.3 Underground Utilities

3.3 SELECTION OF BORROW MATERIAL

3.4 OPENING AND DRAINAGE OF EXCAVATION AND BORROW PITS

3.5 FINAL GRADE OF SURFACES TO SUPPORT CONCRETE

3.6 GROUND SURFACE PREPARATION

3.6.1 General Requirements

3.6.2 Frozen Material

3.7 UTILIZATION OF EXCAVATED MATERIALS

3.8 SPECIAL REQUIREMENTS

3.8.1 Gas Distribution

3.8.2 Water Lines

3.8.3 Heat Distribution System

3.8.4 Electrical Distribution System

3.8.5 Sewage Absorption Trenches or Pits

3.9 SUBGRADE PREPARATION

3.9.1 Construction

3.9.2 Compaction

3.9.2.1 Subgrade for Pavements

3.10 FINISHING

31 00 00 - 1

3.11 TESTING

3.11.1 Fill and Backfill Material Gradation

3.11.2 In-Place Densities

3.11.2.1 Method

3.11.2.2 Confirmation

3.11.2.3 Testing Frequency

3.11.3 Check Tests on In-Place Densities

3.11.4 Moisture Contents

3.11.5 Optimum Moisture and Laboratory Maximum Density

3.11.6 Tolerance Tests for Subgrades

3.11.7 Displacement of Pipes

3.12 DISPOSITION OF SURPLUS MATERIAL

31 00 00 - 2

SECTION 31 00 00

EARTHWORK

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS

(AASHTO)

AASHTO T 180 (2015) Standard Method of Test for Moisture-Density Relations of Soils Using a 4.54-kg (10-lb) Rammer and a 457-mm (18-in.) Drop

AASHTO T 224 (2010) Standard Method of Test for Correction for Coarse Particles in the Soil Compaction Test

ASTM INTERNATIONAL (ASTM)

ASTM C136 (2006) Standard Test Method for Sieve Analysis of Fine and Coarse Aggregates

ASTM D1140 (2014) Amount of Material in Soils Finer than the No. 200 (75-micrometer) Sieve

ASTM D1556 (2007) Density and Unit Weight of Soil in Place by the Sand-Cone Method

ASTM D1557 (2012) Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Modified Effort (56,000 ft-lbf/ft3) (2700 kN-m/m3)

ASTM D2167 (2008) Density and Unit Weight of Soil in Place by the Rubber Balloon Method

ASTM D2487 (2011) Soils for Engineering Purposes (Unified Soil Classification System)

ASTM D422 (1963; R 2007; E 2014; E 2014)

Particle-Size Analysis of Soils

ASTM D4318 (2010; E 2014) Liquid Limit, Plastic Limit, and Plasticity Index of Soils

ASTM D6938 (2010) Standard Test Method for In-Place Density and Water Content of Soil and Soil-Aggregate by Nuclear Methods (Shallow

31 00 00 - 3

Depth)

U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA)

EPA 600/4-79/020 (1983) Methods for Chemical Analysis of Water and Wastes

EPA SW-846.3-3 (1999, Third Edition, Update III-A) Test Methods for Evaluating Solid Waste:

Physical/Chemical Methods

1.2 DEFINITIONS

1.2.1 Satisfactory Materials

Satisfactory materials comprise any materials classified by ASTM D2487 as

GW, GP, GP-GC, SW, SP, SM, SW-SM, SC, SW-SC, SP-SM, SP-SC, CL, ML, CL-ML.

Satisfactory materials for grading comprise stones less than 3 inches.

On-site material is to be used to the maximum extent practical as borrow for this project. Borrow materials in excess of that available from on-site excavations required for the construction of engineered fills must be obtained from an approved source.

1.2.2 Unsatisfactory Materials

Materials which do not comply with the requirements for satisfactory materials are unsatisfactory and shall not be used for any earthwork.

Unsatisfactory materials include the USCS designation MH, PT, OH and OL.

Unsatisfactory materials also include man-made fills, trash, refuse, backfills from previous construction, material classified as satisfactory which contains root and other organic matter or frozen material, organic materials such as limestone, sandstone, dolomite, or shale are also considered unsatisfactory for construction. The contracting officer shall be notified if contaminated materials are encountered.

1.2.3 Cohesionless and Cohesive Materials

Cohesionless materials include materials classified in ASTM D2487 as GW, GP, SW, and SP. Cohesive materials include materials classified as GC, SC, ML, CL, and CH. Materials classified as SM will be identified as cohesionless only when the fines are nonplastic. Perform testing, required for classifying materials, in accordance with ASTM D4318, ASTM C136, ASTM D422, and ASTM D1140.

1.2.4 Degree of Compaction

Degree of compaction required, except as noted in the second sentence, is expressed as a percentage of the maximum density obtained by the test procedure presented in ASTM D1557 abbreviated as a percent of laboratory maximum density. Since ASTM D1557 applies only to soils that have 30 percent or less by weight of their particles retained on the 3/4 inch sieve, express the degree of compaction for material having more than 30 percent by weight of their particles retained on the 3/4 inch sieve as a percentage of the maximum density in accordance with AASHTO T 180 and corrected with AASHTO T 224. To maintain the same percentage of coarse material, use the "remove and replace" procedure as described in NOTE 8 of Paragraph 7.2 in AASHTO T 180.

31 00 00 - 4

1.2.5 Topsoil

Material suitable for topsoil obtained from excavations is defined as:

Natural, friable soil representative of productive, well-drained soils in the area, free of subsoil, stumps, rocks larger than one inch diameter, brush, weeds, toxic substances, and other material detrimental to plant growth. Amend topsoil pH range to obtain a pH of 5.5 to 7.

1.2.6 Hard/Unyielding Materials

Hard/Unyielding materials comprise weathered rock, dense consolidated deposits, or conglomerate materials which are not included in the definition of "rock" with stones greater than 3 inches in any dimension or as defined by the pipe manufacturer, whichever is smaller. These materials usually require the use of heavy excavation equipment, ripper teeth, or jack hammers for removal.

1.2.7 Unstable Material

Unstable materials are too wet to properly support the utility pipe, conduit, or appurtenant structure.

1.2.8 Expansive Soils

Expansive soils are defined as soils that have a plasticity index equal to or greater than 25 and a liquid limit greater than 50 when tested in accordance with ASTM D4318.

1.3 SYSTEM DESCRIPTION

1.3.1 Classification of Excavation

No consideration will be given to the nature of the materials, and all excavation will be designated as unclassified excavation.

1.3.2 Blasting

Blasting will not be permitted.

1.4 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-03 Product Data

Utilization of Excavated Materials Opening of any Excavation or Borrow Pit

SD-06 Test Reports

Testing

Borrow Site Testing

Within 24 hours of conclusion of physical tests, submit 2 copies

31 00 00 - 5 of test results, including calibration curves and results of calibration tests. Results of testing at the borrow site.

SD-07 Certificates

Testing, G, RO

Qualifications of the Corps validated commercial testing laboratory or the Contractor's validated testing facilities.

PART 2 PRODUCTS

2.1 REQUIREMENTS FOR OFFSITE SOILS

Test offsite soils brought in for use as backfill for Total Petroleum Hydrocarbons (TPH), Benzene, Toluene, Ethyl Benzene, and Xylene (BTEX) and full Toxicity Characteristic Leaching Procedure (TCLP) including ignitability, corrosivity and reactivity. Backfill shall contain a maximum of 100 parts per million (ppm) of total petroleum hydrocarbons (TPH) and a maximum of 10 ppm of the sum of Benzene, Toluene, Ethyl Benzene, and Xylene (BTEX) and shall pass the TCPL test. Determine TPH concentrations by using EPA 600/4-79/020 Method 418.1. Determine BTEX concentrations by using EPA SW-846.3-3 Method 5030/8020. Perform TCLP in accordance with EPA SW-846.3-3 Method 1311. Provide Borrow Site Testing for TPH, BTEX and TCLP from a composite sample of material from the borrow site, with at least one test from each borrow site. Do not bring material onsite until tests have been approved by the Contracting Officer.

PART 3 EXECUTION

3.1 STRIPPING OF TOPSOIL

Where indicated or directed, strip topsoil to a minimum depth of 4 inches.

Spread topsoil on areas already graded and prepared for topsoil, or transport and deposit in stockpiles convenient to areas that are to receive application of topsoil later, or at locations indicated or specified. Keep topsoil separate from other excavated materials, brush, litter, objectionable weeds, roots, stones larger than 2 inches in diameter, and other materials that would interfere with planting and maintenance operations. Remove from the site any surplus of topsoil from excavations and gradings.

3.2 GENERAL EXCAVATION

Perform excavation of every type of material encountered within the limits of the project to the lines, grades, and elevations indicated and as specified. Perform the grading in accordance with the typical sections shown and the tolerances specified in paragraph FINISHING. Transport satisfactory excavated materials and place in fill or embankment within the limits of the work. Excavate unsatisfactory materials encountered within the limits of the work below grade and replace with satisfactory materials as directed. Include such excavated material and the satisfactory material ordered as replacement in excavation. Dispose surplus satisfactory excavated material not required for fill or embankment in areas approved for surplus material storage or designated waste areas. Dispose unsatisfactory excavated material in designated waste or spoil areas.

During construction, perform excavation and fill in a manner and sequence that will provide proper drainage at all times. Excavate material required for fill or embankment in excess of that produced by excavation within the

31 00 00 - 6 grading limits from the borrow areas indicated or from other approved areas selected by the Contractor as specified.

3.2.1 Ditches, Gutters, and Channel Changes

Finish excavation of ditches, gutters, and channel changes by cutting accurately to the cross sections, grades, and elevations shown on the drawings. Do not excavate ditches and gutters below grades shown.

Backfill the excessive open ditch or gutter excavation with satisfactory, thoroughly compacted, material or with suitable stone or cobble to grades shown. Dispose excavated material as shown or as directed, except in no case allow material be deposited a maximum 4 feet from edge of a ditch.

Maintain excavations free from detrimental quantities of leaves, brush, sticks, trash, and other debris until final acceptance of the work.

3.2.2 Drainage

Provide for the collection and disposal of surface and subsurface water encountered during construction. Completely drain construction site during periods of construction to keep soil materials sufficiently dry. Construct storm drainage features (ponds/basins) at the earliest stages of site development, and throughout construction grade the construction area to provide positive surface water runoff away from the construction activity and provide temporary ditches, swales, and other drainage features and equipment as required to maintain dry soils. When unsuitable working platforms for equipment operation and unsuitable soil support for subsequent construction features develop, remove unsuitable material and provide new soil material as specified herein. It is the responsibility of the Contractor to assess the soil and ground water conditions presented by the plans and specifications and to employ necessary measures to permit construction to proceed.

3.2.3 Underground Utilities

The Contractor is responsible for movement of construction machinery and equipment over pipes and utilities during construction. Excavation made with power-driven equipment is not permitted within 3 feet of known Government-owned utility or subsurface construction. For work immediately adjacent to or for excavations exposing a utility or other buried obstruction, excavate by hand. Start hand excavation on each side of the indicated obstruction and continue until the obstruction is uncovered or until clearance for the new grade is assured. Support uncovered lines or other existing work affected by the contract excavation until approval for backfill is granted by the Contracting Officer. Report damage to utility lines or subsurface construction immediately to the Contracting Officer.

3.3 SELECTION OF BORROW MATERIAL

Select borrow material to meet the requirements and conditions of the particular fill or embankment for which it is to be used. Obtain borrow material from from approved private sources if offsite borrow is required.

Unless otherwise provided in the contract, the Contractor is responsible for obtaining the right to procure material, pay royalties and other charges involved, and bear the expense of developing the sources, including rights-of-way for hauling from the owners. Borrow material from approved sources on Government-controlled land may be obtained without payment of royalties. Unless specifically provided, do not obtain borrow within the limits of the project site without prior written approval. Consider necessary clearing, grubbing, and satisfactory drainage of borrow pits and

31 00 00 - 7 the disposal of debris thereon related operations to the borrow excavation.

3.4 OPENING AND DRAINAGE OF EXCAVATION AND BORROW PITS

Notify the Contracting Officer sufficiently in advance of the opening of any excavation or borrow pit or borrow areas to permit elevations and measurements of the undisturbed ground surface to be taken. Except as otherwise permitted, excavate borrow pits and other excavation areas providing adequate drainage. Transport overburden and other spoil material to designated spoil areas or otherwise dispose of as directed. Provide neatly trimmed and drained borrow pits after the excavation is completed.

Ensure that excavation of any area, operation of borrow pits, or dumping of spoil material results in minimum detrimental effects on natural environmental conditions.

3.5 FINAL GRADE OF SURFACES TO SUPPORT CONCRETE

Do not excavate to final grade until just before concrete is to be placed.

Place concrete within 24 hours of excavation to final grade. Only use excavation methods that will leave the foundation rock in a solid and unshattered condition. Roughen the level surfaces, and cut the sloped surfaces, as indicated, into rough steps or benches to provide a satisfactory bond. Protect shales from slaking. Keep all surfaces to support concrete protected from precipitation and runoff.

3.6 GROUND SURFACE PREPARATION

3.6.1 General Requirements

Remove and replace unsatisfactory material with satisfactory materials in surfaces to receive fill or in excavated areas. Scarify the surface to a depth of 6 inches before the fill is started. Plow, step, bench, or break up sloped surfaces steeper than 1 vertical to 4 horizontal so that the fill material will bond with the existing material. When subgrades are less than the specified density, break up the ground surface to a minimum depth of 6 inches, pulverizing, and compacting to the specified density. When the subgrade is part fill and part excavation or natural ground, scarify the excavated or natural ground portion to a depth of 12 inches and compact it as specified for the adjacent fill.

3.6.2 Frozen Material

Do not place material on surfaces that are muddy, frozen, or contain frost.

Do not place material that contains Frost or Frozen materials.

3.7 UTILIZATION OF EXCAVATED MATERIALS

Dispose unsatisfactory materials removed from excavations into designated waste disposal or spoil areas. Use satisfactory material removed from excavations, insofar as practicable, in the construction of fills, embankments, subgrades, shoulders, bedding (as backfill), and for similar purposes. Submit procedure and location for disposal of unused satisfactory material. Submit proposed source of borrow material. Do not waste any satisfactory excavated material without specific written authorization. Dispose of satisfactory material, authorized to be wasted, in designated areas approved for surplus material storage or designated waste areas as directed. Clear and grub newly designated waste areas on Government-controlled land before disposal of waste material thereon. Do not dispose excavated material to obstruct the flow of any stream, endanger

31 00 00 - 8 a partly finished structure, impair the efficiency or appearance of any structure, or be detrimental to the completed work in any way.

3.8 SPECIAL REQUIREMENTS

Special requirements for both excavation and backfill relating to the specific utilities are as follows:

3.8.1 Gas Distribution

Excavate trenches to a depth that will provide a minimum 18 inches of cover in rock excavation and a minimum 24 inch of cover in other excavation.

3.8.2 Water Lines

Excavate trenches to a depth that provides a minimum cover of 3 feet from the existing ground surface, or from the indicated finished grade, whichever is lower, to the top of the pipe.

3.8.3 Heat Distribution System

Free initial backfill material of stones larger than 1/4 inch in any dimension.

3.8.4 Electrical Distribution System

Provide a minimum cover of 24 inches from the finished grade to direct burial cable and conduit or duct line, unless otherwise indicated.

3.8.5 Sewage Absorption Trenches or Pits

3.9 SUBGRADE PREPARATION

3.9.1 Construction

Shape subgrade to line, grade, and cross section, and compact as specified. Include plowing, disking, and any moistening or aerating required to obtain specified compaction for this operation. Remove soft or otherwise unsatisfactory material and replace with satisfactory excavated material or other approved material as directed. Excavate rock encountered in the cut section to a depth of 6 inches below finished grade for the subgrade. Bring up low areas resulting from removal of unsatisfactory material or excavation of rock to required grade with satisfactory materials, and shape the entire subgrade to line, grade, and cross section and compact as specified. After rolling, the surface of the subgrade for roadways shall not show deviations greater than 1/2 inch when tested with a 12-foot straightedge applied both parallel and at right angles to the centerline of the area. Do not vary the elevation of the finish subgrade more than 0.05 foot from the established grade and cross section.

3.9.2 Compaction

Finish compaction by sheepsfoot rollers, pneumatic-tired rollers, steel-wheeled rollers, vibratory compactors, or other approved equipment.

Except for paved areas, compact each layer of the embankment to at least 90 percent of laboratory maximum density for cohesionless soils. Achieve an in-place moisture content between plus or minus 2 percent of the optimum water content for non-expansive cohesive soils. cohesionless soils shall have a water content suitable to achieving the required dry density.

31 00 00 - 9

3.9.2.1 Subgrade for Pavements

Compact subgrade for pavements to at least 95 percent laboratory maximum density for the depth below the surface of the pavement shown. Achieve a water content at compaction of +2 percent to -2 percent of the optimum water content. When more than one soil classification is present in the subgrade, thoroughly blend, reshape, and compact the top 12 inch of subgrade. Expansive soils shall be compacted to 90 to 93 percent of ASTM D1557 laboratory maximum density and +3 percent to +7 percent of optimum moisture content.

3.10 FINISHING

Finish the surface of excavations, embankments, and subgrades to a smooth and compact surface in accordance with the lines, grades, and cross sections or elevations shown. Provide the degree of finish for graded areas within 0.1 foot of the grades and elevations indicated except that the degree of finish for subgrades specified in paragraph SUBGRADE PREPARATION. Finish gutters and ditches in a manner that will result in effective drainage. Finish the surface of areas to be turfed from settlement or washing to a smoothness suitable for the application of turfing materials. Repair graded, topsoiled, or backfilled areas prior to acceptance of the work, and re-established grades to the required elevations and slopes.

3.11 TESTING

Perform testing by a Corps validated commercial testing laboratory.

3.11.1 Fill and Backfill Material Gradation

One test per 5000 cubic yards stockpiled or in-place source material.

Determine gradation of fill and backfill material in accordance with

ASTM D422.

3.11.2 In-Place Densities

3.11.2.1 Method

Determine field in-place density in accordance with ASTM D1556, ASTM D2167, or ASTM D6938. When ASTM D6938 is used, check the calibration curves and adjust using only the sand cone method as described in ASTM D1556.

ASTM D6938 results in a wet unit weight of soil in determining the moisture content of the soil when using this method. Check the calibration curves furnished with the moisture gauges along with density calibration checks as described in ASTM D6938; check the calibration of both the density and moisture gauges at the beginning of a job on each different type of material encountered and at intervals as directed by the Contracting Officer.

3.11.2.2 Confirmation

When test results indicate that compaction is not as specified, remove the material, replace and recompact to meet specification requirements.

Perform tests on recompacted areas to determine conformance with specification requirements. Appoint a registered professional civil engineer to certify inspections and test results. These certifications shall state that the tests and observations were performed by or under the

31 00 00 - 10 direct supervision of the engineer and that the results are representative of the materials or conditions being certified by the tests. The following number of tests, if performed at the appropriate time, will be the minimum acceptable for each type operation.

3.11.2.3 Testing Frequency

a. One test per 1000 square yards, or fraction thereof, of each lift of fill or backfill areas compacted by other than hand-operated machines.

b. One test per 100 square yards, or fraction thereof, of each lift of fill or backfill areas compacted by hand-operated machines.

c. One test per 50 linear feet, or fraction thereof, of each lift of embankment or backfill for roads.

3.11.3 Check Tests on In-Place Densities

If ASTM D6938 is used, check in-place densities by ASTM D1556 as follows:

a. One check test per lift for every 10 field in-place density tests, or fraction thereof, of each lift of fill or backfill compacted by other than hand-operated machines.

b. One check test per lift for every 4 field in-place density tests, of fill or backfill areas compacted by hand-operated machines.

c. One check test per lift for every 4 field in-place density tests, or fraction thereof, of embankment or backfill for roads.

3.11.4 Moisture Contents

In the stockpile, excavation, or borrow areas, perform a minimum of two tests per day per type of material or source of material being placed during stable weather conditions. During unstable weather, perform tests as dictated by local conditions and approved by the Contracting Officer.

3.11.5 Optimum Moisture and Laboratory Maximum Density

Perform tests for each type material or source of material including borrow material to determine the optimum moisture and laboratory maximum density values. One representative test per 2000 cubic yards of fill and backfill, or when any change in material occurs which may affect the optimum moisture content or laboratory maximum density.

3.11.6 Tolerance Tests for Subgrades

Perform continuous checks on the degree of finish specified in paragraph SUBGRADE PREPARATION during construction of the subgrades.

3.11.7 Displacement of Pipes

After other required tests have been performed and the trench backfill has been compacted to the finished grade surface, inspect the pipe to determine whether significant displacement has occurred. Conduct this inspection in the presence of the Contracting Officer. Inspect pipe sizes larger than 36 inches, while inspecting smaller diameter pipe by shining a light or laser between manholes or manhole locations, or by the use of television cameras passed through the pipe. If, in the judgment of the Contracting Officer, 31 00 00 - 11 the interior of the pipe shows poor alignment or any other defects that would cause improper functioning of the system, replace or repair the defects as directed at no additional cost to the Government.

3.12 DISPOSITION OF SURPLUS MATERIAL

Remove surplus material or other soil material not required or suitable for filling or backfilling, and brush, refuse, stumps, roots, and timber from Government property to an approved location.

31 00 00 - 12

SECTION TABLE OF CONTENTS

DIVISION 31 - EARTHWORK

SECTION 31 11 00

CLEARING AND GRUBBING

PART 1 GENERAL

1.1 SUBMITTALS

1.2 DELIVERY, STORAGE, AND HANDLING

PART 2 PRODUCTS

2.1 TREE WOUND PAINT

2.2 HERBICIDE

PART 3 EXECUTION

3.1 PROTECTION

3.1.1 Roads and Walks

3.1.2 Trees, Shrubs, and Existing Facilities

3.1.3 Utility Lines

3.2 CLEARING

3.3 TREE REMOVAL

3.4 PRUNING

3.5 GRUBBING

3.6 DISPOSAL OF MATERIALS

3.6.1 Saleable Timber

3.6.2 Nonsaleable Materials

31 11 00 - 1

SECTION 31 11 00

CLEARING AND GRUBBING

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-03 Product Data

Nonsaleable Materials;

SD-04 Samples

Tree wound paint Herbicide

1.2 DELIVERY, STORAGE, AND HANDLING

Deliver materials to store at the site, and handle in a manner which will maintain the materials in their original manufactured or fabricated condition until ready for use.

PART 2 PRODUCTS

2.1 TREE WOUND PAINT

Submit samples in cans with manufacturer's label of bituminous based paint of standard manufacture specially formulated for tree wounds.

2.2 HERBICIDE

Comply with Federal Insecticide, Fungicide, and Rodenticide Act (Title 7 U.S.C. Section 136) for requirements on Contractor's licensing, certification and record keeping. Contact the command Pest Control Coordinator prior to starting work. Submit samples in cans with manufacturer's label.

PART 3 EXECUTION

3.1 PROTECTION

3.1.1 Roads and Walks

Keep roads and walks free of dirt and debris at all times.

3.1.2 Trees, Shrubs, and Existing Facilities

Protect trees and vegetation to be left standing from damage incident to

31 11 00 - 2 clearing, grubbing, and construction operations by the erection of barriers or by such other means as the circumstances require.

3.1.3 Utility Lines

Protect existing utility lines that are indicated to remain from damage.

Notify the Contracting Officer immediately of damage to or an encounter with an unknown existing utility line. The Contractor is responsible for the repairs of damage to existing utility lines that are indicated or made known to the Contractor prior to start of clearing and grubbing operations. When utility lines which are to be removed are encountered within the area of operations, notify the Contracting Officer in ample time to minimize interruption of the service.

3.2 CLEARING

Clearing shall consist of the felling, trimming, and cutting of trees into sections and the satisfactory disposal of the trees and other vegetation designated for removal, including downed timber, snags, brush, and rubbish occurring within the areas to be cleared. Clearing shall also include the removal and disposal of structures that obtrude, encroach upon, or otherwise obstruct the work. Trees, stumps, roots, brush, and other vegetation in areas to be cleared shall be cut off flush with or below the original ground surface, except such trees and vegetation as may be indicated or directed to be left standing. Trees designated to be left standing within the cleared areas shall be trimmed of dead branches 1-1/2 inches or more in diameter and shall be trimmed of all branches the heights indicated or directed. Limbs and branches to be trimmed shall be neatly cut close to the bole of the tree or main branches. Cuts more than 1-1/2 inches in diameter shall be painted with an approved tree-wound paint.

3.3 TREE REMOVAL

Where indicated or directed, trees and stumps that are designated as trees shall be removed from areas outside those areas designated for clearing and grubbing. This work shall include the felling of such trees and the removal of their stumps and roots as specified in paragraph GRUBBING.

Trees shall be disposed of as specified in paragraph DISPOSAL OF MATERIALS.

3.4 PRUNING

Prune trees designated to be left standing within the cleared areas of dead branches 1-1/2 inches or more in diameter; and trim branches to heights and in a manner as indicated. Neatly cut limbs and branches to be trimmed close to the bole of the tree or main branches. Paint cuts more than 1-1/4 inches in diameter with an approved tree wound paint.

3.5 GRUBBING

Grubbing consists of the removal and disposal of stumps, roots larger than 3 inches in diameter, and matted roots from the designated grubbing areas.

Remove material to be grubbed, together with logs and other organic or metallic debris not suitable for foundation purposes, to a depth of not less than 18 inches below the original surface level of the ground in areas indicated to be grubbed and in areas indicated as construction areas under this contract, such as areas for buildings, and areas to be paved. Fill depressions made by grubbing with suitable material and compact to make the surface conform with the original adjacent surface of the ground.

31 11 00 - 3

3.6 DISPOSAL OF MATERIALS

3.6.1 Saleable Timber

All timber on the project site noted for clearing and grubbing shall become the property of the Contractor, and shall be removed from the project site and disposed of off stations.

3.6.2 Nonsaleable Materials

Written permission to dispose of such products on private property shall be filed with the Contracting Officer. Logs, stumps, roots, brush, rotten wood, and other refuse from the clearing and grubbing operations, shall be disposed of in the designated waste disposal area outside the limits of Government-controlled land at the Contractor's responsibility, except when otherwise directed in writing. Such directive will state the conditions covering the disposal of such products and will also state the areas in which they may be placed.

31 11 00 - 4

SECTION TABLE OF CONTENTS

DIVISION 31 - EARTHWORK

SECTION 31 32 11

SOIL SURFACE EROSION CONTROL

PART 1 GENERAL

1.1 SUMMARY

1.2 MEASUREMENT AND PAYMENT

1.2.1 Standard and Geosynthetic Binder

1.2.2 Mulch and Compost

1.2.3 Hydraulic Mulch

1.2.4 Geotextile Fabric

1.2.5 Erosion Control Blankets

1.2.6 Synthetic Grid/Sheet Systems

1.2.7 Cellular Concrete Block Systems

1.3 REFERENCES

1.4 SUBMITTALS

1.5 QUALITY ASSURANCE

1.5.1 Installer's Qualification

1.5.2 Substitutions

1.5.3 SUSTAINABLE DESIGN REQUIREMENTS

1.6 DELIVERY, STORAGE, AND HANDLING

1.7 WARRANTY

PART 2 PRODUCTS

2.1 WATER

PART 3 EXECUTION

3.1 WEATHER CONDITIONS

3.1.1 Finished Grade

3.1.2 Placement of Erosion Control Blankets

3.1.3 Synthetic Grid

3.1.4 Concrete Cellular Block

3.2 SITE PREPARATION

3.2.1 Soil Test

3.2.2 Layout

3.2.3 Protecting Existing Vegetation

3.2.4 Obstructions Below Ground

3.3 INSTALLATION

3.3.1 Synthetic Binders

3.3.2 Mulch Installation

3.3.3 Mulch Control Netting

3.3.4 Mechanical Anchor

3.3.5 Asphalt Adhesive Tackifier

3.3.6 Non-Asphaltic Tackifier

3.3.7 Asphalt Adhesive Coated Mulch

3.3.8 Wood Cellulose Fiber, Paper Fiber, and Recycled Paper

3.3.9 Erosion Control Blankets

31 32 11 - 1

3.3.10 Synthetic Sheet System

3.3.10.1 Sheet System Revegetation

3.3.10.2 Sheet System Grids

3.3.10.3 Grid System Grids

3.3.11 Grids

3.3.11.1 Grid System Revegetation

3.3.11.2 Synthetic Grids

3.4 CLEAN-UP

3.5 WATERING SEED

3.6 MAINTENANCE RECORD

3.6.1 Maintenance

3.6.2 Maintenance Instructions

3.6.3 Patching and Replacement

3.7 SATISFACTORY STAND OF GRASS PLANTS

31 32 11 - 2

SECTION 31 32 11

SOIL SURFACE EROSION CONTROL

PART 1 GENERAL

1.1 SUMMARY

The work consists of furnishing and installing soil surface erosion control materials, including fine grading, blanketing, stapling, mulching and miscellaneous related work, within project limits and in areas outside the project limits where the soil surface is disturbed from work under this contract at the designated locations. This work includes all necessary materials, labor, supervision and equipment for installation of a complete system. Submit a listing of equipment to be used for the application of erosion control materials. Coordinate this section with the requirements of Section 31 00 00 EARTHWORK and Section 32 92 23 SODDING. Complete backfilling the openings in synthetic grid systems and articulating cellular concrete block systems a maximum 7 days after placement to protect the material from ultraviolet radiation.

1.2 MEASUREMENT AND PAYMENT

1.2.1 Standard and Geosynthetic Binder

Measure the standard and geosynthetic binder by the square yard of surface area covered. No measurement for payment will be made for fine grading, trenching or other miscellaneous materials necessary for placement of the binder.

1.2.2 Mulch and Compost

Measure mulch and compost by the square yard of surface area covered. No measurement for payment will be made for binder, dye or other miscellaneous materials or equipment necessary for placement of the mulch or compost.

1.2.3 Hydraulic Mulch

Measure hydraulic mulch by the square yard of surface area covered.

Measurement for payment will include binder, dye or both. No measurement for payment will be made for other miscellaneous materials or equipment necessary for placement of the…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .