FY20 POCA Amendment 0005.pd.pdf

PDF 648 KB Posted

Attached to
FY20 Performance Oriented Construction Activity (POCA) at Fort Leonard Wood, MO
Solicitation number
W912DQ20R4000
Issued by

About this file

This document provides details for a federal solicitation for Performance Oriented Construction Activity (POCA) services at Fort Leonard Wood, Missouri. The U.S. Army Corps of Engineers, Kansas City District intends to award an Indefinite Delivery/Indefinite Quantity contract as an 8(a) small business set-aside with a value of $25 million. The solicitation will be issued for design-build and design-bid-build construction services including sustainability, renovation, and modernization projects not exceeding $2 million each. The seed project involves renovating Building 773 at Fort Leonard Wood for exterior and interior repairs. Proposals are due within 30 days of solicitation issuance and will be evaluated based on technical capability and price using one-phase procedures. The minimum contract guarantee is $1,500. Task orders will be awarded at the government's discretion in accordance with DFARS 216.505-70. Competition is restricted to 8(a) firms with a bona fide place of business in SBA Region VII including Iowa, Kansas, Missouri, and Nebraska.

View the file

Other files

File Type Posted
Amendment 0004.pd.pdf PDF
Amendment 0003.pd.pdf PDF
FY20 POCA Amendment 0002.pdf PDF
FY20 POCA Amendment 0001.pdf PDF
Pre-Bid Site Visit Sign In 10 Dec 2019.pdf PDF
FY20 POCA Amendment 0001.pdf PDF
B.08.02 Solicitation W912DQ20R4000.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

See Continuation Page

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 14-Jan-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DQ20R4000

X 9B. DATED (SEE ITEM 11)

02-Dec-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO.

5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

14-Jan-2020

CODE

USACE, KANSAS CITY +

FEDERAL BUILDING CT-M, RM 647 601 EAST 12TH S

KANSAS CITY MO 64106-2896

W912DQ 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DQ20R4000

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

The following items are applicable to this modification:

CONTINUATION PAGE

The SOLICITATION is amended as follows:

1. PURPOSE: The purpose of this Amendment is to: Revise the Supplemental Bid Schedule for the Seed Project.

2. CHANGE: See attached revised supplemental bid schedule.

3. TIME: Proposal due date remains the same.

4. ACKNOWLEDGMENT: Offeror is required to acknowledge receipt of this amendment. Failure to acknowledge this amendment may cause rejections of the proposal.

5. OTHER TERMS AND CONDITIONS: All other terms and conditions remain unchanged and in full force.

SUPPLEMENTAL BID SCHEDULE

SUPPLEMENTAL BID SCHEDULE

The contractor shall complete the following Supplemental Bid Schedule in addition to the Bid Schedule. This Supplemental Bid Schedule is not contractually binding. The Government will use this Supplemental Bid Schedule to assist in the evaluation of prices. The individual supplemental bid items should add up to the prices for the bid schedule. In the event that the CLIN subtotal in the supplemental bid schedule does not match the CLIN total in the bid schedule, the bid schedule shall control and will be the price evaluated by the Government.

SUBCONTRACTOR QUOTES

CLIN 0001 Subcontractor 1 Subcontractor 2 Subcontractor

Design - Renovate Bldg. 773 Est. Qty. Unit Unit Price Subtotal* Subtotal Subtotal Subtotal Design $ $ $ $ $

FF&E $ $ $ $ $

CLIN 0001 SUBTOTAL $

CLIN 0002

Construct - Renovate Bldg. 773 Est. Qty. Unit Unit Price Subtotal*

Substructure $ $ $ $ $ Superstructure $ $ $ $ $ Exterior Closure $ $ $ $ $ Interior Construction $ $ $ $ $ Interior Finishes $ $ $ $ $ Plumbing $ $ $ $ $

HVAC $ $ $ $ $

Fire Protection Systems $ $ $ $ $ Electric Power and Lighting $ $ $ $ $ Electrical Systems $ $ $ $ $ Selective Building Demolition $ $ $ $ $

CLIN 0002 SUBTOTAL $

Percent Unit Amount Subtotal Field Office Overhead (FOOH) % $ $ Home office Overhead (HOOH) % $ $ Profit % $ $ Bond % $ $

TOTAL MARK-

UPS

CLIN 0003 _________________$

CONTRACTOR MANPOWER REPORTING CLIN 0003 SUBTOTAL $

Amendment 0005.pd
Revised Supplemental Bid Schedule

File details come from the government source that posted it. Updated .