This solicitation package describes a federal contract opportunity for performance oriented construction activity (POCA) services at Fort Leonard Wood, Missouri. The U.S. Army Corps of Engineers, Kansas City District will award an indefinite delivery/indefinite quantity contract as an 8(a) small business set-aside for design-build and design-bid-build construction services. The contract capacity is $25 million with a minimum guarantee of $1,500. Individual task orders will be awarded for projects up to $2 million. The seed project is renovation of Building 773. Proposals will be evaluated for technical capability and price using best value procedures. Competition is restricted to 8(a) firms with a place of business in SBA Region VII including Iowa, Kansas, Missouri, and Nebraska. Proposals are due in January 2020 and the contract period is three years with an optional two-year extension.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W912DQ20R4000
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
FY20 Performance Oriented Construction Activity (POCA) at Fort Leonard Wood, MO.
The purpose of this Amendment is to update Clause 52.236-27 under Section 00 21 00. See the Continuation Page for more detail.
Proposals are due January 2, 2020 by 2:00 PM CST.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 26
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 05-Dec-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DQ20R4000
X 9B. DATED (SEE ITEM 11)
02-Dec-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
05-Dec-2019
CODE
USACE, KANSAS CITY +
FEDERAL BLDG. CT-M RM 647; 601 E 12TH ST
KANSAS CITY MO 64106-2896
W912DQ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 21 16 - INSTRUCTIONS TO PROPOSERS
The following items are applicable to this modification:
CONTINUATION PAGE
The SOLICITATION is amended as follows:
NOTE: Deleted text is shown with strikethrough. Added text is shown with underline.
1. The purpose of this Amendment is to update Clause 52.236-27 under Section 00 21 00.
A. Section 00 21 16 Instructions to Proposers
i. Page count is change to 35 pages
ii. Technical Approach is added as a factor
iii. Additional requirements added to Price Proposal factor.
iv. See One Step Evaluation Procedures for specific changes.
B. Section 00 21 00: Instructions, Conditions and Notices to Offer
52.236-27 -- Site Visit (Construction) (Feb 1995)
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offeror or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit has been scheduled for--
TBD December 10, 2019 at 1:00 PM CST
(c) Participants will meet at-- TBD USACE Resident Office 15961 Minnesota Ave, Bldg 2204 Fort Leonard Wood, MO 65473
(End of provision)
2. Proposals are due by January 2, 2020 2:00 PM CST.
3. Offeror is required to acknowledge receipt of this amendment. Failure to acknowledge this amendment may cause rejections of the proposal.
4. All other terms and conditions remain unchanged and in full force.
Formatted: Left: 1", Right: 1", Bottom: 1", Header distance from edge: 0.5", Footer distance from edge:
0.5"
The following have been modified:
INSTRUCTIONS TO PROPOSERS
ONE-STEP EVALUATION PROCEDURES
The purpose of this solicitation is to evaluate and award one contract to a responsive and responsible offeror whose proposals represent the “Best Value” to the Government utilizing a One-Step evaluation procedure. The evaluation will be done using the Lowest Price Technically Acceptable (LPTA) source selection procedures with award to the lowest evaluated price of proposals meeting or exceeding the acceptable standards for non-cost factors.
This is 100% set-aside for qualified 8(a) small businesses within SBA Region VII, which includes the states of Nebraska, Iowa, Missouri, and Kansas. The NAICS code is 236220. The Government intends to award one (1) Indefinite Delivery Indefinite Quantity (IDIQ) Performance Oriented Construction Activity (POCA) Contract under this solicitation with a capacity of $25 million. The Performance Oriented Construction Activity (POCA) Contract’s duration will be one three (3) year base period with one two (2) year option option. The minimum guarantee on this contract is $1,500.00. Individual projects under this contract will be awarded by task order. Task orders will be issued in accordance with DFARS 216.505-70, at the Government's discretion. As requirements develop, Requests for Proposals (RFPs) for projects will be issued for each task order. Task orders will include primarily minor construction or Operations and Maintenance (O&M) projects. No task order will exceed $2.0 million and each task order will be negotiated to obtain a fair and reasonable price.
The purpose of this contract is to provide timely responses to the maintenance, repair or rehabilitation needs at the Fort Leonard Wood installation and facilities. Typical efforts include but are not limited to: maintenance, repair, rehabilitation, energy conservation, environmental, logistical, and operation. The contractor will be required to perform all facets of the work such as surveying the problem, recommending a solution, and correction of the problem in a timely manner. The contractor shall maintain the capability to provide quick responses for this work.
Task Orders issued under this contract shall be issued for work assigned to Fort Leonard Wood, MO.
The Government will evaluate the performance capability and price of proposals utilizing a One-Step evaluation procedure. The solicitation will include one (1) requirement as the seed project to be awarded to the base contract awardee. The project selected for the initial task order (seed project) is the Renovation of Building 773 located at Fort Leonard Wood, MO.
The Government will evaluate the proposals in accordance with the criteria described in the solicitation. The solicitation will include a detailed list of Evaluation Factors and will provide instructions for Proposal Submission Requirements and the Basis for Award. Proposals received in response to the solicitation will be evaluated in accordance with procedures outlined in FAR Part 15 for Best Value. The source selection process will be conducted in accordance with FAR Part 15.3 and DFARS Part 215.2, source selection procedures.
The Government intends to award without discussions. Competition for this requirement is restricted to 8(a) firms that have a bona fide place of business within SBA Region VII, which includes the states of Nebraska, Iowa, Missouri, and Kansas. Submission of the SBA letter approving the firm's bona fide place of business within Region VII will be required with the offeror's proposal.
This source selection will be conducted in accordance with procedures described in FAR, DFARS, AFARS, the DOD Source Selection Procedures (1 April 2016), and the Army Source Selection Supplement.
1.0 OVERVIEW
Offerors will submit specific performance capability proposals, to include price, which demonstrate their capability to successfully execute design build and design bid build construction work under the contract resulting from this solicitation. The Government will evaluate the performance capability and price and rates of proposals utilizing a One-Step evaluation procedure. The solicitation will include one requirement as the seed project to be awarded to the base contract awardee. The project selected for the initial task order and or seed project is the Renovation of Building 773 at Fort Leonard Wood, MO.
Offerors must submit a complete proposal including the fourthree (34) technical factors and price proposal to be considered for award.
The Contracting Officer will award one contract to the offeror whose proposal offers the Lowest Price/Technically Acceptable proposal to the Government, considering only the price and non-price factors described in the solicitation document.
Failure to submit a complete proposal may result in the entire proposal being rejected. The proposal should be prepared simply and economically, providing straightforward, concise delineation of capabilities to perform the contract. The proposal should be practical, legible, clear and coherent. Offerors are discouraged from providing information not required by the RFP.
2.0 GENERAL PROPOSAL FORMAT AND SUBMITTAL REQUIREMENTS
All offerors shall be required to submit a proposal with the minimum content as specified herein. Proposals without the minimum content may be rejected. Proposals will be received until the date and time indicated on Standard Form 1442 at the following address:
U.S. Army Corps of Engineers, Kansas City District Federal Building Room 647 ATTN: CECT-NWK-M/Jaclyn Yocum 601 East 12th Street Kansas City, Missouri 64106-2896
A. In order to be considered for award of a contract for the requirements of this solicitation, the offeror must submit a proposal with its offer. Failure to submit a complete proposal may result in the entire offer being rejected. The proposals shall be submitted in Volumes as follows:
Submit the proposal in a tabbed, three-ring binder identified by the Solicitation Number (W912DQ20R4000), project title (FY20 POCA at Fort Leonard Wood), name, address, and telephone number of the Offeror. Arrange tabs as follows:
I. Volume 1, Technical Proposal:
TAB A:
1. Surety Letter, Bid Bond and Joint Venture Teaming Agreement
2. Offeror will submit a cover letter containing: Solicitation number.
3. Names, title, email, signature, telephone and fax numbers of persons authorized to bind the offeror and negotiate on the offeror’s behalf with the Government in connection with this
RFP.
4. A statement specifying agreement with all terms, conditions and provisions included in the
RFP.
5. Acknowledgement of all amendments to the RFP in accordance with the instructions on the Standard Form 30 (amendment form).
6. The completed Section 00 45 00 of the RFP (Representations and Certifications), including the ORCA certification (Offerors System for Award Management extract will suffice) should be placed in a separate envelope labeled “Representation and Certifications” with one copy.
7. Letter from Surety stating offeror is capable of providing a Bid Guarantee and Payment and
Performance Bonds as required in FAR 52.228-1.
8. Proof that Small Business is an 8(a) located within the geographical area serviced by the
U.S. Small Business Administration Region VII, which includes Nebraska, Iowa, Kansas, and Missouri, and other 8(a) construction firms with a bona fide place of business within Region VII, and the assigned NAICS code. Offeror must certify that its approved business plan is on file and serviced by SBA Region VII and is located within Region VII, or has a bona fide place of business in SBA Region VII. If your firm has a bona fide place of business approved by the SBA within Region VII, enclose the SBA letter approving your firm’s bona fide place of business with Region VII.
TAB B: FACTOR 1 Corporate Experience TAB C: FACTOR 2 Performance Confidence TAB D: FACTOR 3 Key Personnel TAB E: FACTOR 4: Technical Approach
II. Volume 2, Price Proposal:
Tab A: The Price Proposal and Binding Labor Rates Schedule and Task Order Breakdown consists of the original signed Standard Form 1442 “Solicitation, Offer, and Award”, providing a price for all line items in the corresponding bid schedule, completion of binding labor rates schedule, and acknowledgment of all amendments to the solicitation. Proposed prices must be entered for all items of the Price Proposal and Binding Labor Rates Schedule.
B. Proposal Characteristics
Submit original and one (1) copies of the proposal. An electronic copy shall also be provided on one CD/DVD in PDF format and be *Optical Character Recognition (OCR) compatible. Each Volume shall contain a table of contents and all pages of each factor shall be sequentially numbered. All text must be legible and easily read.
The page size of the offeror’s proposal shall not exceed 8-1/2 by 11 inches. Diagrams, charts and tables shall conform to the paper size. All text shall be typed single-spaced with a minimum size 10 font. Margins (1-inch) shall be clean and clear. If fold-out charts are unavoidable, and are to be utilized, all sheets shall be reproduced on 11 by 17 inch, and folded to 8-1/2 by 11 inch size. Submit the SF 1442, completed and signed by a person authorized by the offeror. Offerors shall limit proposals to a maximum of 350 pages. A page is defined as text or information on one side of the paper. If it is printed double sided, each face will be counted as a page. TAB A and TAB C - (Performance Confidence) will not be counted towards this page limit.
The Volume of the proposal shall be identified by the Solicitation Number (W912DQ20R4000), project title (FY20 POCA at Fort Leonard Wood, Missouri), name, address, and telephone number of the offeror in bold letters.
*OCR is a common method of digitizing printed texts so that they can be electronically searched, stored more compactly, displayed on-line, and used in machine processes such as machine translation, text-to-speech, key data extraction and text mining.
3.0 INQUIRIES/QUESTIONS
Technical inquiries and questions relating to this solicitation shall be submitted via Bidder Inquiry in ProjNet at (https://www.projnet.org). To submit and review inquiry items, prospective offerors will need to use the Bidder Inquiry Key presented below and follow the instructions listed below the key for access. A prospective offeror who submits a comment /question will receive an acknowledgement of their comment/question via email. Another email to the same address will notify the prospective offeror once the reply is available for viewing.
***Please Note: Offerors shall only submit one question per inquiry. All inquiries containing multiple questions shall be rejected.
The Solicitation Number is: W912DQ20R4000 The Bidder Inquiry Key is: E79M4N-92B9JB The Plan Room Key is: 4BS6IK-GPXTME
Instructions for first-time ProjNet Bid Inquiry Access:
1 From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
2 Identify the Agency. Select agency USACE 3 Enter the Bidder Inquiry Key listed above.
4 Enter the email address you would like to use for communication.
5 Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form.
6 Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.
7 Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.
Instructions for future ProjNet Bidder Inquiry Access:
1 For future access to ProjNet, you will not be provided any type of password. You will utilize your Secret Question and Secret Answer to log in.
2 From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
3 Identify the Agency. Select agency USACE.
4 Key. Enter the Bidder Inquiry Key listed above.
5 Email. Enter the email address you used to register previously in ProjNet.
6 Click Continue. A page will then open asking you to enter the answer to your Secret
Question.
7 Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.
The Bidder Inquiry System will be unavailable for new inquiries ten calendar days before proposal due date in order to ensure adequate time is allotted to form an appropriate response to inquiries and amend the solicitation if necessary.
Offerors are requested to review the specification in its entirety, and review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.
The ProjNet call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago) or by appointment for OCONUS. The telephone number for the Call Center is 1-800-428-HELP. Email to staff@rcesupport.com.
4.0 JOINT VENTURES
Joint Ventures are allowable on competitive 8(a) set-asides; however, proof of SBA approval of the joint venture must be submitted with your proposal. If you are contemplating a joint venture on this project, you must advise your assigned SBA Business Development Specialist (BDS) as soon as possible. It is also recommended that the agreement be submitted as soon as practicable to ensure compliance with established regulations. Any corrections and/or changes needed can be made only when our BDS has adequate time for a thorough review before the proposal due date. NO CORRECTIONS AND/OR CHANGES ARE ALLOWED AFTER TIME OF SUBMISSION OF PROPOSAL. Joint Ventures shall submit the following additional documentation regarding their business entities:
a. A copy of their Joint Venture agreement.
b. A detailed statement outlining the following in terms of percentages, where appropriate:
1 The relationship of the joint venture parties in terms of business ownership, capital contribution, and profit distribution or loss sharing.
2 The management approach of the joint venture in terms of who will conduct, direct, supervise and control the project and have custody and control of the assets of the Joint Venture and perform the duties necessary to complete the work.
3 The structure of the joint venture and decision-making responsibilities of the Joint Venture parties in terms of who will control the manner and method of performance of the work.
4 The bonding responsibilities of the Joint Venture parties.
5 Identification of the key personnel having authority to legally bind the Joint Venture to subcontracts and state who will provide or contract for the labor and materials for the Joint Venture.
6 Identification of party maintaining the Joint Venture bank accounts for the payment of all expenses and the deposits of all receipts, keep the books and records, and pay applicable taxes for the Joint Venture.
7 Identification of party furnishing the facilities, such as office supplies and telephone service.
8 Identification of party having overall control of the Joint Venture.
c. Other sections of the proposal shall identify, where appropriate, whether key personnel are employees of the individual Joint Venture parties and identify the party, or hired as employees of the Joint Venture.
d. If one of the Joint Venture parties possesses experience and/or Performance Confidence as a Federal
Government contractor or as a Corps of Engineers contractor, that experience and/or past experience may be reviewed by the SST for the Joint Venture.
5.0 OBTAINING A D.U.N.S. NUMBER
Data Universal Numbering System (DUNS) Number. The Data Universal Numbering System (DUNS) Number is a unique nine-character identification number provided by the commercial company Dun & Bradstreet (D&B).
Call D&B at 1-866-705-5711 or access their website if you do not have a DUNS number. The site addresses are http://fedbgov.dnb.com/webform OR http://www.dnb.com/us/. The process to request a DUNS number via phone takes about 10 minutes and is free of charge. Internet request are fulfilled within 24 hours. You must have a different nine-digit DUNS number for each physical location or different address in your company as well as each legal division that may be co-located.
6.0 SUBCONTRACTORS/TEAMING PARTNERS
If an offeror wishes to receive credit for the experience or Performance Confidence of a teaming partner/sub-contractor, the offeror must submit a letter of commitment to use the proposed firm on the life of this IDC, signed both by the teaming partner/sub-contractor and the prime construction contractor. The commitment letter must be submitted even if the teaming partner/sub-contractor is in some way affiliated with the offeror (for example, the teaming partner/sub-contractor is a subsidiary of a joint venture partner, or a subsidiary of a firm to which the joint venture partner is also a subsidiary). Include the subcontractor letters of commitment in Volume 1, Tab A.
SAMPLE LETTER OF COMMITMENT
TEAMING PARTNER/SUB-CONTRACTOR
[COMPANY LETTERHEAD]
TO: Contracting Officer, Kansas City District, United States Army Corps of Engineers
SUBJECT: Letter of Commitment for W912DQ20R4000, FY20 Performance Oriented Construction Activity (POCA) Contract Fort Leonard Wood, Missouri
Dear Sir or Madam:
[Insert name of offeror] and [insert name of teaming partner/sub-contractor] hereby make the unequivocal commitment that, in the event that the company receives award of the FY20 8(a) Performance Oriented Construction Activity (POCA) Contract at Fort Leonard Wood t, [insert name of teaming partner/sub-contractor] will perform the following work required by the FY20 8(a) Performance Oriented Construction Activity (POCA) at Fort Leonard Wood [Insert list of tasks to be performed by the teaming partner/sub-contractor]
Sincerely, [Authorized Official] [Legal Name of Offeror] Date:
[Teaming partner/sub-contractor]
[Legal Name of Firm] Date:
7.0 BASIS FOR AWARD
The Government intends to select for award the single responsible offeror whose proposal conforms to the solicitation that proposes a price that is fair and reasonable, and that provides the lowest evaluated price of proposals meeting or exceeding the acceptability standards for non-cost factors. The selection will be based on evaluation of the following evaluation factors: Corporate Experience, Performance Confidence, Key Personnel, Technical Approach and Price.
Each of the fourthree Non-Price factors will receive one of the following ratings: Acceptable or Unacceptable.
Offerors receiving one or more technically “unacceptable” rating will be deemed overall technically “unacceptable” and will not be considered for award. Offerors must receive an “acceptable” rating on both technical factors to be considered for award.
The Government reserves the right to enter into discussions. In the event that discussions are not necessary then we intend to award without discussions, to the responsible offeror whose proposal conforms to the solicitation and is determined to be the lowest price, technically acceptable (LPTA) proposal.
Table 1: Relative Importance of Factors
Location Factor Number
Description Relative Importance
Factor 1
Corporate Experience
Equal in importance to Factor 2, 3 and 4.
Factor 2
Performance Confidence
1 ,3 a nd 4.
Factor 3
Key Personnel
1 , 2 and 4.
Factor 4 Technical Approach Equal in importance to Factor 1 , 2 , a nd 3 .
Factor 5
Price
Equal in importance to all non-price factors when combined.
L o
F a
Descrip tion
Relative Importance
8.0 SOURCE SELECTION PROCESS
All proposals received in response to this solicitation will be evaluated in accordance with informal source selection procedures. The principal objective of this process is to select a responsible offeror who submits the offer that is the Best Value to the Government using the LPTA process. The Government reserves the right to consider and evaluate information regarding Performance Confidence from sources outside the proposal. The process is designed to ensure the impartial, equitable, and comprehensive evaluation of all technically acceptable, responsible proposals received in response to this particular solicitation.
Source Selection Team
The Source Selection Team is established as a separate organization and management chain of command whose only purpose is to accomplish the objective above. The organization consists of a Source Selection Authority (SSA) and a Source Selection Evaluation Board (SSEB). The organization is designed to ensure active ongoing involvement of appropriate contracting, technical, logistics, legal, small business, and other functional staff management expertise.
Source Selection Procedure
The source selection procedures will begin with an initial review of proposals and continue with a technical evaluation conducted by the SSEB. The SSEB shall evaluate the proposals based solely on the evaluation criteria previously identified. The results of the SSEB evaluations will be presented to the SSA for decision of award, and the SSA will determine whether it is appropriate to engage in clarifications or communications.
To be considered acceptable, each offeror shall specifically address each of the evaluation factors. Sufficient detail shall be provided, citing specific data as may be required, such that the proposal may be adequately evaluated. The proposal must show clearly that the offeror has an understanding of the work tasks required and has the capability and responsibility to accomplish the work.
The Government is not responsible for information overlooked during the evaluation which is not located in the appropriate proposal section. To ensure the evaluation credit is appropriately received for proposal material submitted, do not incorporate by reference documents not contained in the proposal. References to sections of the proposal shall be
F a c
Corpora te Experie nce
Equal in importance to Factor 2 and 3.
c t o
Perform ance Confide nce
Equal in importance to Factor 1 and 3.
Key Personn el
Equal in importance to Factor 1 an d 2.
Price
Equal in importance to all non-price factors when combined.
by specific paragraph number (and name, if applicable), page number, and section.
9.0 TECHNICAL FACTORS
The technical considerations listed below are of equal importance to each other. The offeror shall address each of the following factors in sufficient detail to permit a complete and comprehensive evaluation.
10.0 DEFINITIONS
Offeror: Offeror includes, the prime construction contractor, a valid joint venture and any teaming partner/subcontractor with letters of commitment, signed by both parties, committing to the relationship for the duration of this POCA Contract.
11.0 DEBRIEFING OFFEROR
Offerors may request a debriefing in accordance with FAR 15.505 Pre-award Debriefing of offerors, and FAR
15.506 Post-award Debriefing of offerors.
12.0 TECHNICAL FACTORS TO BE EVALUATED
The Government will select the offeror in accordance with the basis of award section above.
VOLUME 1 TECHNICAL FACTORS
TAB B – FACTOR 1 – Corporate Experience
Submission Requirement
The offeror shall submit (3) three similar projects that have been completed (or substantially complete (90%)) by the offeror in the last (6) six years and each with an estimated cost of at least a $1,000,000.00. Similar work consists of design-build construction contracts for building renovations (mechanical, electrical, and architectural systems), and/or new building construction with a construction cost of at least $1,000,000.00 (submission of design contract or design portion of design build contract will not be accepted). If more than three projects are submitted, only the first three projects will be evaluated.
Minimum Evaluation Criteria: For a proposal to be considered relevant and evaluated, it must meet the following minimum criteria:
a) Three (3) Design Build projects;
b) Renovation or new building construction;
c) Offeror was the prime contractor on the projects;
d) Construction contract value of at least $1,000,000 for each project;
e) Completed within the last 6 years as of the proposal submission date or substantially complete at the time of proposal submission. For a project to be considered substantially complete, the offeror must conclude that the project is 90% or more complete and must include a description of the work remaining to be performed on the project.
*MATOC contracts that provide for the issuance of task orders for the performance of construction services will not be considered projects for the purposes of this evaluation. Only individual task orders issued under such contracts will be evaluated as projects.
Use the following format to provide project information:
(a) Project Title:
(b) Location:
(c) Contract Number:
(d) Contract Type (Design/Build, Design/Bid/Build)
(e) Role of offeror (address type of work performed, including design, percentage of work performed by the offeror, as applicable, and any proposed team members that were directly involved in this project, including work performed, roles and responsibilities)
(f) Total Dollar Amount:
(g) Start and Completion Dates: If project is not complete, indicate percentage complete and anticipated completion date
(h) Brief Description of Project: (Address how this project is similar to the types of task orders to be issued under this contract)
(i) Customer Primary Point of Contact (name, relationship to project, agency/firm, phone number, and e-mail address). The Government may contact and interview project references. Reference information will not be revealed to other parties.
TAB C – FACTOR 2 – Performance Confidence
Submission Requirements
For each of the projects submitted under Factor 1, the offeror shall provide a Performance Confidence Questionnaire (Form PPQ-0, included in the solicitation) to a representative of the owner who can provide the owner’s opinion of the offeror’s Performance Confidence for the project. Completed PPQ-0 forms should be submitted with your proposal. A copy of a previously completed PPQ can be submitted if it reflects a substantially complete evaluation of the project. The PPQ-0 does not have to be sent directly from the client. If the offeror is unable to obtain a completed PPQ-0 from a client for a project(s) before proposal closing date, the offeror should complete and submit with the proposal the first page of the PPQ-0, which will provide contract and client information for the respective project(s).
Ensure correct phone numbers and email addresses are provided for the client point of contact. Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government’s point of contact, Jaclyn Yocum, via email at Jaclyn.C.Yocum@usace.army.mil prior to proposal closing date. The offeror is responsible for ensuring that the completed questionnaires are submitted by the closing date. If you have questions regarding the attached questionnaire, or require assistance, please contact the Contract Specialist at (816) 389-2266.
For each of the projects submitted under Factor 1, to ensure the agency has all relevant Performance Confidence information, the offeror also should submit copies of Federal/DoD/Navy/Army performance reviews that are likely already in the agency’s databases or likely within the agency’s arm’s reach, i.e., Contractor’s copy of CCASS or CPARS evaluations. To improve accuracy of database searches, the offeror will also provide the DUNS Number for the prime contractor and all team partner/sub-contractor, (i.e. design firms, key subcontractors, Joint Venture Partners) whose experience is being relied on for Factor 1. If a submitted proposal includes a final CCASS/CPARS evaluation for a Factor 1 Corporate Experience project, it is not necessary to submit a completed PPQ for the same project.
Offerors should organize all Performance Confidence Information based on the Factor 1 Projects, which normally have project titles and are numbered 1-3, so that reviewers can match the owner’s opinion with the corresponding Factor 1 Project. All Performance Confidence Information presented will be identified in the top left hand corner of each page with the Corresponding Project Number and Title from Factor 1. There is no page limit for this factor.
The Government will evaluate the responses from the customers from which Performance Confidence Questionnaires have been received. The Government may contact and interview the owner’s representative on the PPQ-0, and reserves the right to interview other individuals acting for the owner’s representative, if the owner’s representative is not available. While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete Performance Confidence information rests with the offeror.
In addition to the above, the Government may review any other sources of information for evaluating Performance Confidence. Performance Confidence information may be obtained from any other sources available to the Government, to include, but not limited to, the Performance Confidence Information Retrieval System (PPIRS), Construction Contractor Appraisal Support System (CCASS), Contractor Performance Assessment Reporting System (CPARS), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), or other databases; interviews with Program Managers, Contracting Officers, and Fee Determining Officials; and the Defense Contract Management Agency.
At no time during this process, nor during the debriefing, nor after award, will the names of the individuals providing reference information about an offeror’s Performance Confidence be revealed to the offerors or to any other party. If discussions are held, offerors may be afforded the opportunity to respond to adverse comments made by references in accordance with guidelines identified in FAR Part 15.3. In this case, comments will be extracted and provided to the offeror. Copies of the questionnaires will not be furnished to the offeror and will remain confidential.
Evaluation Procedure
PERFORMANCE CONFIDENCE ASSESSMENT
There are three aspects to the Performance Confidence evaluation: recency, relevancy, and quality (including general trends in contractor performance and source of information). In accordance with FAR 15.305(a) (2), the currency and relevance of the information, source of the information, context of the data, and general trends in contractor's performance shall be considered. These will be combined to establish one performance confidence assessment rating for each offeror.
In reviewing each Performance Confidence effort by the offeror, the SST will first evaluate recency. For a project to be considered recent it must be completed (or substantially complete (90%)) by the offeror in the last (6) six years.
The SST will then evaluate how relevant the recent effort is to the work required by this solicitation. The relevancy determination will be based on the Factor 1 Evaluation Criteria above. Each Performance Confidence effort will be assigned one of the levels of relevancy shown in Table 2:
TABLE 2
PERFORMANCE CONFIDENCE RELEVANCY RATINGS
Rating Definition Relevant Performance Confidence efforts meet the requirements outlined in Factor 1 above.
Not Relevant Performance Confidence efforts do not meet the requirements outlined in Factor 1 above.
The third aspect of the Performance Confidence evaluation is to establish the overall quality of the offeror's Performance Confidence (see FAR 15.304(c) (2)). The Performance Confidence evaluation conducted in support of a current source selection does not establish, create, or change the existing record and history of the offeror's Performance Confidence on past contracts; rather, the Performance Confidence evaluation process gathers information from customers on how well the offeror performed those past contracts. The SSEB will review all Performance Confidence information collected and determine the quality of the offeror's performance, general trends, and usefulness of the information and incorporate these into the performance confidence assessment. A separate quality assessment rating is not required. The Performance Confidence assessment rating is based on the offeror's overall record of recency, relevancy, and quality of performance. At the conclusion of the assessment, the offeror shall be assigned one of the ratings in Table 3.
TABLE 3
RATING ADJECTIVAL RATING DESCRIPTION
ACCEPTABLE
BASED ON THE OFFEROR'S PERFORMANCE RECORD, THE GOVERNMENT HAS A
REASONABLE EXPECTATION THAT THE OFFEROR WILL SUCCESSFULLY
PERFORM THE REQUIRED EFFORT.
UNACCEPTABLE
BASED ON THE OFFEROR'S PERFORMANCE RECORD, THE GOVERNMENT DOES
NOT HAVE A REASONABLE EXPECTATION THAT THE OFFEROR WILL BE ABLE
TO SUCCESSFULLY PERFORM THE REQUIRED EFFORT.
UNKNOWN PERFORMANCE RECORD FOR THE OFFEROR IS LIMITED OR UNKNOWN.
*NOTE: If the offeror does not submit Performance Confidence or Performance Confidence information is can’t be retrieved or is so sparse that no meaningful Performance Confidence rating can reasonably be assigned, the offeror shall be determined to have unknown (or “neutral”) Performance Confidence. A neutral rating shall be considered “acceptable.”
TAB D, FACTOR 3 - Key Personnel
Submission Requirements:
The offeror shall provide a resume for each key personnel member to provide information regarding the personnel that will fill the following key positions in the performance of this project:
1 Project Manager 2 Construction Superintendent 3 Design Manager 4 Architect Designer of Record
5 Electrical Engineer Designer of Record
6 Mechanical Engineer Designer of Record
7 Fire Protection Engineer Designer of Record
8 Structural Engineer Designer of Record
Resumes shall indicate the individual’s professional licenses, relevant project experience (as defined in factor 1) in the key role, estimated costs of projects listed as relevant project experience, the beginning and end dates for projects; years of experience in key role, years of experience in role with offeror and if the individual was on any of the projects submitted for factor 1 and in what capacity.
Evaluation Criteria: Key Personnel minimum requirements:
1. Project Manager: At least three (3) years relevant construction management experience as a project manager with the offeror on Factor 1 projects.
2. Construction Superintendent: At least three (3) years’ experience as Superintendent, managing multiple trades and subcontractors with offeror on Factor 1 projects.
3. Design Manager: At least three (3) years design experience, managing multiple design disciplines and subcontractors with offeror.
4. Architect Designer of Record: A professional license as an Architect and at least 3 years of experience in role with offeror.
5. Electrical Engineer Designer of Record: Shall be a licensed professional engineer and at least 3 years of experience in role with offeror.
6. Mechanical Engineer Designer of Record: Shall be a licensed professional engineer and at least 3 years of
7. Fire Protection Engineer Designer of Record: Shall be a licensed professional engineer and at least 3 years of experience in role with offeror.
8. Structural Engineer Designer of Record: Shall be a licensed professional engineer and at least 3 years of
KEY PERSONNEL
RATING ADJECTIVAL RATING DESCRIPTION
ACCEPTABLE
TO BE CONSIDERED TECHNICALLY ACCEPTABLE, AN OFFEROR'S PROPOSAL
MUST BE RATED "ACCEPTABLE" FOR ALL OF THE MINIMUM REQUIREMENTS FOR
THE KEY PERSONNEL.
UNACCEPTABLE
AN UNACCEPTABLE RATING WILL BE ASSIGNED TO AN OFFEROR WHOSE
PROPOSAL DOES NOT SATISFY ONE OR MORE MINIMUM REQUIREMENTS FOR KEY
PERSONNEL.
TAB E, FACTOR 4 – TECHNICAL APPROACH
Submission Requirements:
The offeror shall submit a Technical Approach describing the offeror’s approach to performing work under this task order contract. The Plan shall clearly, but concisely detail the organizational approach to program management and execution, and explain how the firm expects to handle multiple projects at multiple locations under the contract. The plan shall include an organizational chart outlining the entities responsibilities for program execution. The plan shall describe the proposed management structure for the offeror, describing how the design and construction process will be managed and the authorities and delegation of authorities within the offeror’s organization. It shall describe how communications within the organization and with the Corps of Engineers will be conducted. Limit the plan to ten pages or less (using a font size of no smaller than 10 pt.)
Evaluation Criteria:
The Government will evaluate the content of each offeror’s Technical Approach based on the following: The offeror must include an:
1. Organizational chart that graphically represents the offeror’s organization in performance of this contract pertaining to internal personnel and partnering firms/subcontractors and clearly indicates the name of the management team members.
2. Organizational chart that shows clears lines of authority among team members.
3. Organizational chart that demonstrates the roles and responsibilities for Design-build
AND for Design-Bid-Build projects AND any contractual arrangements that have been established (example: Project Manager, AE Design Manager, Construction Superintendent, mechanical, electrical etc...).
a. Please reference Key Personnel factor for minimum experience requirements for key personnel included in the organization chart.
4. A technical approach narrative that clearly addresses how the contractor will manage:
a. Multiple task orders at the same location, at the same time and
b. Multiple task orders at multiple locations at the same time.
5. A technical approach narrative that identifies potential risks AND the planned mitigation for the identified risks in both design-build AND design bid build projects.
6. A technical approach narrative that addresses the planned coordination with the AE firm in relation to all stages of design-build projects: in conjunction with.
a. Include plans for managing multiple task orders, schedules, submittals, changes and other elements that would be necessary to manage all stages of design-build efforts.
VOLUME 2
TAB A FACTOR 45 - PRICE PROPOSAL
A. SUBMISSION REQUIREMENTS
The Price Proposal consists of the:
1. Original signed Standard Form 1442 “Solicitation, Offer, and Award”, providing a price for all line items in the corresponding bid schedule,
2. Completion of binding labor rates schedule,
3. Task order cost breakdown (for seed project) and
4. Acknowledgment of all amendments to the solicitation.
B. EVALUATION CRITERIA
SEED PROJECT PRICE PROPOSAL
Seed project price will not be rated or scored, but will be evaluated for completeness and reasonableness through the use of price analysis. The Price Team (PT) will evaluate the reasonableness of the price proposal using their expert judgment. In the event, during the course of the analysis, the PT has reason to question the reasonableness of a price proposal, the PT may conduct such additional fair and reasonable analysis as it requires in order to complete a thorough price analysis. Because the evaluation of the price proposal will represent a portion of the total evaluation, it is possible that an offeror might not be selected because of an unreasonable price proposal. The price proposal will also be evaluated for completeness; all price information required by the RFP must be submitted. Offerors must complete Task Order Cost Breakdown for the Seed Project.
C. BINDING LABOR RATES
A firm fixed price will be negotiated for each task order partially based on the estimated number of labor hours for each discipline multiplied by the applicable hourly rate in the contract. This IDC will consist of a base period of five years with annual escalation rates.
Negotiations will address hourly labor rates for personnel you deem necessary to perform all the services required for the life of this contract. These disciplines and their rates, as well as direct overhead and general and administrative overhead will be shown on the labor rates schedule forms for you and any teaming partner/sub-contractor you plan to utilize on this IDC. Please ensure you and your team partner/sub-contractors comply with the attached Davis Bacon Wage rates. Required information:
Your proposal should state the raw rates as well as the fully burdened hourly rates for each of the disciplines in the attachment as well as any sub-contractor rates.
Provide a basis for any escalation rates proposed for each year of the contract.
Include other direct cost that would be anticipated for this contract.
Your proposal shall include the following additional data and/or information:
o An analysis of your direct labor, overhead and accounts for the preceding accounting period and computed overhead rates. This should include a listing of the personnel associated with each discipline and their hourly rates (include as an Excel format and PDF format).
o Financial data and the methodology used to calculate the proposed overhead rates for your firm and all sub-contractors. Identify cost not allowed by FAR 31.2.
o The name and address of any Government audit agency that has conducted an audit of your firm within the last year. Include the results of that audit.
o Written evidence of your financial capability to assume responsibility for the proposed contract, either in the form of: (1) recent (within the last three months) financial statements certified by your accountant or auditor, or (2) a letter from your bank indicating sufficiency of cash on hand or extent of credit available to complete the contract, record of liquidation of past indebtedness, etc., and your capacity to accomplish the work in the required time.
o Submission of cost or pricing data if your proposals is over $2,000,000.00 for the seed project as required by FAR 15.403-4(a)(1), 15.403-5(b)(1) and Table 15-2 of 15.408.
o Once negotiations are complete, your firm, and each potential subcontractor, for proposals over $2,000,000.00, will be required to submit a Certificate of Current Cost or Pricing data per FAR 15.406-2.
BINDING LABOR RATES SCHEDULE
DISCIPLINES
RAW
RATES YEAR 1 YR. 2 YR. 3 YR. 4 YR. 5
PROJECT MANAGER $ $ $ $ $ $
CONSTRUCTION
SUPERINTENDENT $ $ $ $ $ $
DESIGN MANAGER $ $ $ $ $ $
ARCHITECT
DESIGNER OF
RECORD $ $ $ $ $ $
ELECTRICAL
ENGINEER
DESIGNER OF
RECORD $ $ $ $ $ $
MECHANICAL
ENGINEER
DESIGNER OF
RECORD $ $ $ $ $ $
FIRE PROTECTION
ENGINEER
DESIGNER OF
RECORD $ $ $ $ $ $
STRUCTURAL
ENGINEER
DESIGNER OF
RECORD $ $ $ $ $ $
INDIRECT COST
INDIRECT RATE (OVERHEAD) %
INDIRECT RATE (G&A) %
FIELD OFFICE OVERHEAD RATE %
ESCALATION RATE %
INDIRECT COST
INDIRECT RATE (OVERHEAD) %
INDIRECT RATE (G&A) %
ESCALATION RATE %
REQUIRED TASK ORDER COST BREAKDOWN
PRIME AND
SUBCONTRACTORS HOURS/QUANTITY LABOR RATE/UNIT RATE TOTAL COST
PROJECT MANAGER $ $
CONSTRUCTION
SUPERINTENDENT $ $
DESIGN MANAGER $ $
ARCHITECT DESIGNER $ $
ELECTRICAL ENGINEER $ $
MECHANICAL ENGINEER $ $
FIRE PROTECTION ENGINEER $ $
STRUCTURAL ENGINEER $ $
CARPENTER $ $
ELELCTRICIAN $ $
PLUMBER $ $
HVAC MECHANIC $ $
STRUCTURAL STEEL
LABORER $ $
CONCRETE LABORER $ $
MASONER $ $
PAINTER $ $
LABORER 1 $ $
LABORER 2 $ $
OPERATOR 1 $ $
OPERATOR 2 $ $
MECHANIC 1 $ $
MECHANIC 2 $ $
EQUIPMENT 1 $ $
EQUIPMENT 2 $ $
EQUIPMENT 3 $ $
EQUIPMENT 4 $ $
MATERIAL 1 $ $
MATERIAL 2 $ $
MATERIAL 3 $ $
MATERIAL 4 $ $
LABORER 1 $ $
LABORER 2 $ $
SAMPLE TRANSMITTAL LETTER
AND
PERFORMANCE CONFIDENCE QUESTIONAIRE
To: ____________________________________ Date: ________________________________
We have listed your firm as a reference for work we have performed for you as listed below. Our firm has submitted a proposal under a project advertised by the U.S. Army Corps of Engineers, Kansas City District. In accordance with Federal Acquisition Regulations (FAR), an evaluation of our firm’s Performance Confidence will be completed by the Corps of Engineers. Your candid response to the attached questionnaire will assist the evaluation team in this process.
We understand that you have a busy schedule and your participation in this evaluation is greatly appreciated. Please complete the enclosed questionnaire as thoroughly as possible. Space is provided for comments. Please respond in time for us to include the questionnaire with our proposal, which is due on ________.
Only one response from each office is required. If at all possible, we suggest that you individually answer this questionnaire and then coordinate your responses with that of , to forge a consensus on one overall response from your organization. Please return completed questionnaires to the following:
If you would prefer to respond directly to USACE, your completed questionnaire may be sent to the following address:
U.S. Army Corps of Engineers, Kansas City District ATTN: CECT-NWK-M/Jaclyn Yocum Federal Building Room 647 601 East 12 Street Kansas City, Missouri 64106-2896
The questionnaires can also be e-mailed to jaclyn.c.yocum@usace.army.mil.
NAVFAC/USACE PAST PERFORMANCE QUESTIONNAIRE (Form PPQ-0)
CON…