B08.03 Amendment 0001 W912DQ20B1066.pdf

PDF 399 KB Posted

Attached to
Levee Rehab-Reveaux, Missouri
Solicitation number
W912DQ20B1066
Issued by

About this file

This document provides specifications for a federal construction contract opportunity with the U.S. Army Corps of Engineers Kansas City District. The opportunity involves levee repair work on the Reveaux Levee Unit in Missouri to address damages from 2019 flooding. The scope of work includes earthwork, bringing in fill and borrow material from a predetermined site, haul road development, debris clearing, erosion and rutting repairs, levee surfacing with various stone, installing stone armored protection and drainage structures, and establishing turf. The specifications outline borrow locations and materials for the landward levee setback repair from stations 33+20 to 43+30, including impervious borrow from an excavated drainage ditch and the supplemental impervious borrow area. The contractor must exhaust random borrow sources in the specified order before moving to subsequent sources.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to provide updated specif ications to section 34 41 00. Updated site maps are provided. Delteted text is show n in red strikethrough and added text is show n in green underline.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 6

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 23-Jun-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DQ20B1066

X 9B. DATED (SEE ITEM 11)

10-Jun-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

23-Jun-2020

CODE

USACE, KANSAS CITY +

FEDERAL BLDG, CT-C

601 E 12TH ST RM 647

KANSAS CITY MO 64106-2896

W912DQ 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DQ20B1066

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT CHANGES

The SOLICITATION is amended as follows:

NOTE: Deleted text is shown with strikethrough. Added text is shown with underline.

1. SPECIFICATIONS:

a. Section 35 41 00 Paragraph No 3.11.2 Landside Ramp Erosion Station 28+00 and Crown and Landside Slope Erosion Station 28+00 to 33+20

The contractor shall repair/restore the levee embankment to same cross section as undamaged sections of existing levee within repair reach per COR direction (approx. 12' crown with 1' vertical on 3' horizontal slopes). Landside access ramp shall be restored to a 1' vertical on 10' horizontal slope, with width of ramp matching the county roadway width. (385 260 CY Fill, 75 CY Excavation, 75 TN Gravel Surfacing, & 0.18 AC Seeding/Mulching)

Borrow for repairs shall be obtained from the impervious borrow locations described for landward levee setback repair at station 33+20 to 43+30, repairs at station 0+00 to 5+00 and 18+25 to 20+25, see Site Maps B-1, B-2 and B-2a.

At landside access ramp repair station 28+00 the contractor shall first remove all gravel surfacing from levee crown crest and landside approach ramp and stockpile nearby. Upon completion of necessary fill placement for repairs, the contractor shall place and spread stockpiled gravel surfacing in an even lift thickness fashion over repaired surface, then place 75 tons of additional "like" gravel surfacing utilized by the Callaway County Road Department in an even lift thickness fashion over the placed/spread salvaged gravel surfacing. Upon completion of all gravel surfacing, the surface area to be traffic compacted with 2 passes of hauling equipment and surface smoothed graded per COR direction.

b. Section 35 41 00 Paragraph No 3.11.3 Landward Levee Setback Station 33+20 to 43+30

Repair consists of constructing an approximate 935-linear-feet long new landward levee setback to a 12-feet crown crest width, 1-foot vertical on 3-feet horizontal slopes, with a 1-foot on 100-feet landside area fill and a 1-foot on 30-feet wide riverside berm, both where necessary (see Drawing C-1). The government shall provide initial centerline staking of the new landward levee setback alignment. The Contractor will be responsible for maintaining and/or replacing centerline staking if damaged. The design grade for levee setback commences at elevation 100.0, sloping upward (ascending) to elevation 101.5 at setback station 5+75, maintaining this elevation grade (E. 101.5) to levee setback station 7+60, then sloping downward (descending) to elevation 100.0 at levee setback ending station 9+35. A smooth radius curve is to be provided at levee setback P.I. (approx.

sta. 4+67) per COR direction. Repair elevations shall be based from hub elevation 100.0 near levee station 32+00. NOTE: Overbuild requirement is not necessary at this repair location, however, grade elevations cannot be exceeded by greater than two tenths of a foot (0.20’). See

Site Map B-2 and Drawings C-1 and C-2. (25,350 CY Fill & 2.03 AC Seeding/Mulching -includes riverside berm)

Random Borrow A: Random borrow for landward levee setback generally consists of sand deposition materials (ranging 6" to 48" in depth), located landward of landward levee setback, generally positioned and as is shown on Site Map B-2. Random borrow deposition materials shall not be removed below former agricultural lands and contoured to drain to slough generally positioned within centermost location of designated borrow area. Contractor to consult COR concerning available depth of random materials and applicable drainage patterns. Random borrow at this location is to be utilized first and completely exhausted, per COR direction, prior to commencement of borrow operations at Random Borrow B location. See Site Map B- 2 and Drawings C-1 and C-2 for levee random fill zone.

Random Borrow B: The contractor shall not commence with borrow operations at this location until such notice is given by COR. Random borrow generally consists of sand deposition materials (ranging 6" to 60" in depth), located landward and south of landward levee setback, generally positioned and as is shown on Site Map B-2. Random borrow deposition materials shall not be removed below the surrounding agricultural lands and removed in such fashion as to not result in depression areas which will hold standing water. Contractor to consult COR concerning available depth of random materials and applicable drainage patterns. See Site Map B-2 and Drawings C-1 and C-2 for levee random fill zone.

Impervious borrow is material resulting from the excavation of a drainage ditch positioned north and alongside County Road 4038, commencing from near existing levee station 27+50 to junction of County Roads 4038 and 4035. Ditch excavation shall commence 5-feet from the north shoulder of County Road 4038, commencing on a 1' vertical on 3' horizontal slope to required ditch depth, maintaining this ditch depth for a width of 10' then commencing on a 1' vertical on 6' horizontal slope. The excavated ditch bottom shall slope (drain) to drainage pipe located within County road 4038. The contractor shall consult with COR on location, depths and drainage patterns of ditch excavation. See Site Map B-2 and Drawings C-1 and C-2 for impervious fill zone.

Available impervious borrow can also be obtained by removing the outer 2-feet of remaining existing levee segments riverward the landward levee setback (approx. sta. 33+20 to 34+80 & 38+50 to 43+30). The "center-most core" of levee segments to be utilized in random fill zone of landward levee setback. Levee segments removed down to existing natural ground surface grade at levee toe lines. In addition, any remaining foreshore area 30 feet riverward of landward levee setback riverside levee toe lines and devoid of timber less-than 3-inches diameter breast height (< 3" DBH), can be utilized within impervious fill zone. All materials to be removed so as to drain away from landward levee setback toe lines, sloping to scour area. See Site Map B-2 and Drawings C-1 and C-2 for impervious fill zone.

Upon exhaustion of all impervious material available at ditch excavation, existing riverward levee segments and associated riverward borrow, the contractor shall obtain borrow from the supplemental impervious borrow area. Supplemental borrow is a small berm which is positioned north alongside County Road 4035 and is as shown on Site Map B-2a. The contractor shall commence borrow operations at the westernmost end and proceed east by removing material in even 6-inch cut fashion throughout entire designated reach, with succeeding 6-inch cuts being made after initial 6-inch cut has been conducted, resulting in a widened flat crown crest. This sequence of borrowing operations to continue until sufficient material has been obtained to complete required necessary impervious fill zone and/or a 3-feet layer of material has been obtained/removed. Maximum depth of borrow removal is 3-feet. See Site Map B-2a and Drawing C-1 and C-2 for impervious fill zone.

Contractor shall consult with COR on exact location of property line between the Forck and Beck properties. No random borrow shall be obtained/removed from the Forck property.

Random borrow generally consists of sand deposition materials (ranging 6” to 60” in depth), located entirely on the Beck property which is landward and south of landward levee setback and is within cross-hatched area generally positioned as is shown on Site Map B-2 (approx. 12.7 total AC). Random borrow deposition materials shall not be removed below the surrounding agricultural lands and removed in such fashion as to not result in depression areas which will hold/retain standing water. Contractor shall consult COR concerning available depth of random materials and applicable drainage patterns. Should additional random borrow become necessary to complete random fill zone as shown on Drawings C-1 and C-2 the contractor shall degrade and remove the Sponsor constructed temporary flood protection berm located on the Beck property only. Temporary flood protection berm to be removed down to surrounding natural ground contours found at respective toe lines. The contractor shall completely exhaust all available random borrow from within cross-hatched area, per COR direction, prior to usage of temporary flood protection berm borrow. See Site Map B-2 and Drawings C-1 and C-2 for random fill zones.

Impervious borrow for riverside levee and levee berm slopes, along with berm crown crest, shall be obtained and utilized from the three cross-hatched areas positioned riverward the landward levee setback located on the Forck property. The contractor shall excavate and remove the two existing levee segments outside limits of the new landward levee setback design lines down to natural ground found at the existing levee riverside toe line from approximate stations 33+20 to 34+80 and 38+50 to 43+30 and commence placement of this material onto the riverside berm slope, proceeding up slope until this borrow material is exhausted. Upon exhaustion of existing levee segments borrow degrading, remaining impervious borrow is any remaining foreshore area 30-feet riverward of landward levee setback riverside levee toe line and devoid of timber less-than 3-inches diameter breast height (<3” DBH) and is within cross-hatched areas shown on Site Map B-2 (1.2 & 0.2 AC sites). Borrow from designated areas shall be utilized to maximum depth possible, with drainage away from landward levee setback riverside toe line and into scour feature.

Impervious borrow for remainder of landward levee setback shall be obtained from material resulting from the excavation of two separate drainage ditches positioned north and alongside County Road 4038. Westernmost drainage ditch commences from near existing levee station 27+50 to intersection of a field service road and easternmost drainage ditch commences from intersection of same field service road to near junction of County roads 4038 and 4035 (see Site Map B-2). Ditch excavations shall commence 5-feet from the north shoulder of County road 4038, commencing on a 1’ vertical on 3’ horizontal slope to required ditch depth, maintaining this ditch depth for a width of 10-feet then commencing on a 1’ vertical on 6’ horizontal slope to “day-light-out” with the natural ground surface. The excavated ditch bottoms shall slope (drain) to yet to be determined designated drainage pipe locations within County Road 4038. Drainage pipes within County Road 4038 to be installed by others. The contractor shall consult with COR on location, depths and drainage patterns of ditch excavations. Upon completion/exhaustion of excavated material from drainage ditch excavations additional impervious borrow shall be obtained from the supplemental impervious borrow area shown on Site Map B-2a. Supplemental borrow is a small berm which is positioned north alongside County Road 4035 and is positioned within cross-hatched area generally as shown on Site Map B-2a. The contractor shall commence borrow operations at the westernmost end and proceed east by removing material in even 6-inch cut fashion throughout entire designated reach, with succeeding 6-inch cuts being made after initial 6-inch cut has been conducted, resulting in a widened flat crown crest. This sequence of borrowing operations to continue until sufficient material has been obtained to complete necessary impervious fill zones and/or a 3-feet layer of material has been obtained/removed. Maximum depth of supplemental borrow removal is 3-feet. See Site Maps B-2, B-2a and Drawings C-1 and C-2 for impervious fill zones.

c. Section 35 41 00 Paragraph No 3.11.7 Breach Station 201+60 to 203+45

During prosecution of work the contractor shall maintain the capability to provide flood control protection within a minimum of 24 hours’ notice at a level of protection that is currently being afforded by the Sponsor constructed temporary flood protection berm.

The contractor shall repair breach to a 12-feet crown crest width, 1-foot vertical on 3-feet horizontal slopes, with a 1-foot vertical on 50-feet horizontal landside scour fill (see Drawing C- 3). Repair elevations shall be based from hub elevation 100.0, located near levee station 205+00.

The height of levee embankment shall be increased by 5% tapering to no increase in height at the toe of the embankment. The 5% height requirement cannot be exceeded by greater than two tenths of a foot (0.20'). (4,690 CY Fill & 0.27 AC Seeding/Mulching)

Random borrow for landward levee setback breach repair generally consists of sand deposition materials (ranging 6" to 48" in depth), located landward of breach area generally positioned and as is shown on Site Map B-5. The contractor shall commence material removal at the greater deposition depths within designated area first, then continue in uniform fashion over entire area as deposition depths become equal in depth. Random borrow deposition materials shall not be removed below the surrounding agricultural lands found at perimeter limits and contoured to drain to slough located north of designated random borrow area. COR to identify/flag perimeter limits of random borrow area. See Drawing C-3 for levee random fill zone.

Impervious borrow consists of a small berm which is positioned south of County Road 4038 and is generally positioned and as is shown on Site Map B-5. The contractor shall commence borrow operations at the westernmost end and proceed east by removing material in even 6-inch cut fashion throughout entire designated reach, with succeeding 6-inch cuts being made after initial 6-inch cut has been conducted, resulting in a widened flat crown crest. Succeeding 6-inch cuts shall continue until sufficient borrow has been obtained to complete identified repair locations.

Contractor to utilize designated private access and travel haul routes for transport of material to breach repair location.

Random borrow for breach repair is all material located within Sponsor constructed temporary flood protection berm, to be removed down to present field contour found at the landside toe line of flood protection berm, as directed by COR. Additional random borrow is sand deposition materials (approx. 6” to 12” in depth), located landward of breach area and is located within cross-hatched area generally positioned and as is shown on Site Map B-5 (approx. 0.1 AC site).

Random borrow deposition materials shall not be removed below the surrounding agricultural lands found at perimeter limits. COR to identify/flag perimeter limits of random borrow area.

Should additional borrow be necessary to complete random fill zone it shall be obtained and removed at impervious borrow location and as described. See Site Map B-5 and Drawing C-3 for random fill zone.

Impervious borrow consists of a small berm which is positioned south of County Road 4038, and is generally positioned and as is shown on Site Map B-5. The contractor shall commence borrow operations at the westernmost end and proceed east by removing material in even 6-inch cut fashion throughout entire designated reach, with succeeding 6-inch cuts being made after initial 6-inch cut has been conducted, resulting in a widened flat crown crest. Succeeding 6-inch cuts shall continue until sufficient borrow has been obtained to complete identified repair locations.

Contractor to utilize designated private access and travel haul routes for transport of material to breach repair location. See Site Map B-5 and Drawing C-3 for impervious fill zone.

d. Section 35 41 00 Paragraph No 3.11.10 Breach Station 234+55 to 236+00

During prosecution of work the contractor shall maintain the capability to provide flood control protection within a minimum of 24 hours’ notice at a level of protection that is currently being afforded by the Sponsor constructed temporary flood protection berm.

The contractor shall repair breach to match the undamaged end sections of existing levee found at either end of repair reach (approx. 12' crown with 1' vertical on 3' horizontal slopes) and per random and impervious fill zones detailed in Drawing C-2. Repair elevations shall be based from hub elevation 100.0, located near levee station 205+00. The height of levee embankment shall be increased by 5% tapering to no increase in height at the toe of the embankment. The 5% height requirement cannot be exceeded by greater than two tenths of a foot (0.20'). (1,150 CY Fill & 0.21 AC Seeding/Mulching)

Sponsor constructed temporary flood protection berm shall remain in-tact and in-place during breach repair operations. The portion of temporary flood protection berm fill which is within the landside slope breach repair “template” is considered as impervious fill and shall remain in-place.

Remaining temporary flood protection berm fill “outside” the landside slope breach repair “template” shall remain and will be removed by Sponsor.

Borrow material for repairs shall be obtained from designated random and impervious borrow areas as described for landward levee setback repair area (sta. 211+75 to 221+50). Contractor to transport material via designated borrow haul route as shown on Site Map B-6. The contractor to access existing levee crown at approximate station 232+35 to deliver fill material to breach repair.

Absolutely no landside clearing of timber is to be conducted in the transport of borrow material.

Contractor to restore levee embankment utilized for borrow transport (sta. 232+35 to 234+55), to pre hauling conditions.

Should additional impervious borrow material be necessary to complete breach repair, it shall be obtained from Borrow Area 1 as shown on Site Map B-7 and per removal operations as described for repairs at station 236+00 to 264+00. Contractor may utilize a direct transport haul route from borrow area to breach repair area. The contractor shall notify COR prior to Borrow Area 1 usage and shall not utilize this area until COR approval acceptance has been granted.

2. DRAWINGS:

a. 01 11 00 Attachment 1: Reveaux Damage Map

Removed Access Ramp Erosion at Station 28+00 from list of damage areas.

b. 35 41 00 Attachment 1: Reveaux Levee Site Maps

Revised borrow areas on Site Map B-2, B-2a, and B-5. Added reference to sponsor constructed protection berms on Site Maps B-2, B-5, and B-6. Added reference to overbuild not required on levee repair Station 33+20 to 43+30 on Drawing C-2.

3. Offerors are required to acknowledge receipt of this amendment on the Bidding Form in the space provided. Failure to acknowledge all amendments may cause rejection of the proposal.

4. All other terms and conditions remain unchanged and in full force.

(End of Changes)

(End of Summary of Changes)