B.08.03 Amendment 0001 Reveaux Damage Map.pdf

PDF 2 MB Posted

Attached to
Levee Rehab-Reveaux, Missouri
Solicitation number
W912DQ20B1066
Issued by

About this file

This document outlines a federal contract opportunity for levee repair work in Reveaux, Missouri. The US Army Corps of Engineers, Kansas City District is seeking construction services to repair damages to the Reveaux Levee Unit sustained during the 2019 flood events. The scope of work includes bringing in fill and borrow material, haul road development, debris clearing, erosion and rutting repair, levee surfacing, stone surfacing and armored protection installation, and rehabilitation of drainage structures. Work will also involve establishing turf in compromised areas of the levee's landside, riverside, and crown sections. Offerors are advised to furnish all necessary equipment, labor, materials, and supervision to satisfactorily complete the repairs as specified.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ni em an sB r a nc h

Wolters Ln

Rivaux Creek

Wainwright

Algoa Reformatory

Mo rea u River

Highway 94

Katy

Landward Levee Setback Sta. 33+20 To 43+30

Breach Sta. 201+60

To 203+45

Landward Levee Setback Sta. 211+75 To 221+50

Breach Sta. 234+55 to 236+00

DAMAGE LOCATIONS:

Crown Erosion & Landside Erosion

Sta. 0+00 To 5+00 Sta. 28+00 To 33+20

Sta. 59+00 To 101+00 C

Tr r a o il wn & Embankment Erosion Sta. 43+30 To 48+00

Crown Erosion Sta. 18+25 To 20+25

Sta. 298+28 To 311+06 Sta. 319+94 To 320+10

Crown, Riverside & Landside Slope Erosion Sta. 236+00 To 255+88 Sta. 264+00 To 298+28

Riverside & Landside Slope Erosion Sta. 172+70 To 201+60

Riverside Slope Erosion Sta. 255+88 To 264+00 Landside Slope Erosion Sta. 203+45 To 205+70

Landside Access Ramp Erosion Sta. 28+00

8 Evenly Spaced Stone Hard Points

Private Access Route

Private Access Route

0+00

13+25 - 18" CMP

23+00 - 15" CMP

28+00 - Co Rd

43+25 - R/S Spur

47+50 - 18" CMP

59+00

79+15

92+90 - L/S Rd

109+15 - P Lines

117+15 - L/S Rd

121+30 - R/S Spur

129+75 To 135+20 R/S Stone Protection 153+44 - L/S Rd

(OCCI Dock) 172+70 L/S Rd

205+70

214+30

255+88 - Ext L

292+28 - Ext L

293+50 - 18" CMP

301+40 - 12" CMP

302+40 - L/S Ramp

305+18 - R/S Spur

310+80 - L/S Ramp

311+06 - 48" CMP

319+94 - Co Rd

328+78 - 24" CMP

342+66 - 48" CMP

358+76 End Sta.

358+43 - 18" CMP

139 138

Reveaux Drainage District

Site Map S-1 Amendment 0001 g5edgfnp Cross-Out

File details come from the government source that posted it. Updated .