This document contains a bidder inquiry report and details of a related federal contract opportunity for levee repair work. The bidder inquiry report documents a question received from a bidder regarding specification section 01 30 00, which requires at minimum two qualified individuals to fulfill the roles of superintendent, site safety and health officer, and quality control manager. The government response confirms that the superintendent can also serve as the site safety and health officer or quality control manager, but at a minimum two people are needed for the three roles. Additionally, the superintendent must meet the qualification requirements in specification 01 30 00 and cannot be an equipment operator. The related federal contract opportunity is solicitation number W912DQ20B1065 from the U.S. Army Corps of Engineers, Kansas City District, to perform construction activities for levee repair to the Ray Carroll Levee Unit in Missouri damaged during 2019 flooding events. The work includes earthwork, fill and borrow material hauling, debris clearing, erosion and rutting repair, stone surfacing and armoring installation, drainage structure rehabilitation, and turf establishment on the landside, riverside, and crown sections of compromised levee areas.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

10/5/2020 ProjNet: Logged In User https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont 1/1

UNCLASSIFIED\\FOR OFFICIAL USE ONLY

Bid Inquiry Contractor Report All Inquiries

Project: Ray Carroll Review: Ray Carroll bidder Inquiry (00001) (sorted by CommentID ) Displaying 1 inquiry.

Id Discipline Sheet Detail Spec 8843506 General Section 01 30 00 1.4.2 Superintendent Qualifications Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

In section 01 30 00 Administrative Requirements 1.4.2 Superintendent Qualifications it states "The superintendent may also have duties of the SSHO or the QCM. One person may not hold all three titles."

Please confirm this bid requires two full-time personnel to fill the three roles.

Additionally, Please confirm that the Superintendent can not be an equipment operator.

On: Sep 25 2020.

Government Response. . Per paragraph 1.4.2 The superintendent may serve an additional roll of SSHO or QCM. At a minimum two qualified individuals are needed to full fill the roles of Superintendent, SSHO, and QCM.

Superintendent must meet the requirements of paragraph 1.4 of specification 01 30 00. On: Sep 28 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

Report Complete

UNCLASSIFIED\\FOR OFFICIAL USE ONLY

Patent 11/892,984 ProjNet property of ERDC since 2004.

https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont&RequestTimeout=1000&pagStrRowSort=CommentID https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont&RequestTimeout=1000&pagStrRowSort=Discipline https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont&RequestTimeout=1000&pagStrRowSort=Sheet https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont&RequestTimeout=1000&pagStrRowSort=Detail https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont&RequestTimeout=1000&pagStrRowSort=SpecText http://projnet.com/index.php