This document provides details on a federal contract opportunity for levee repair work. The US Army Corps of Engineers, Kansas City District is soliciting firms to perform construction activities on the Ray Carroll Levee Unit in Missouri to repair damages from 2019 flooding events. Work will include earthwork, bringing in fill and borrow material, constructing haul roads, clearing debris, repairing erosion and rutting, resurfacing and repairing the levee crown and slopes, installing stone armoring and drainage structures, and establishing turf. Firms are required to provide all necessary equipment, labor, supervision, quality control, supplies and materials to satisfactorily complete the repairs. The solicitation number is W912DQ20B1065 and responses are due by the date specified in the solicitation. The agency listed is the Department of the Army Corps of Engineers, Kansas City District.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ray-Carroll Levee District of Ray County, MO - Item No. 71 ATT: B-1 Site Map
Levee Station Established From July 2010 Top-Of-Levee Profile Survey
Map Created July 2020
0 0.2 0.40.1 Miles
Repair Fortifying "Flattening" the Compromised Landside Levee Slope Station 229+00 to Station 231+00
BORROW SITE:
Hatched Area indicates borrow material to be taken evenly over designated area leaving standing timber in place. Any and all additional borrow deemed necessary will be excavated from designated area here staying at least 30-feet landward of High Bank Line before excavation of material. Will need to ramp over levee embankment.
(Approx. 4.5 AC)
Access Route from Graveled Road
GENERAL NOTES:
Contractor will access site via
County Road from East then along landside toe of levee embankment.
"Indicated by the Blue Line on Map"
Contractor will leave entire site of construction in a manner that still has positive drainage "No Ponding Areas"
REPAIR DESCRIPTIONS:
Staging Area Will Be Within The
Limits of 200' Of The Construction Site
Ha ul
Ro ute
Ray-Carroll Levee District of Ray County, MO ATT: B-2 Site Map
Levee Station Established From July 2010 Top-Of-Levee Profile Survey
Map Created July 2020
0 0.15 0.30.075 Miles
The Hatched area indicates borrow material in the manner of a temporary riverward ring levee. This designated borrow is only to be utilized once the cross-hatched borrow area has been exhausted or once enough material has been obtained that there is adequate material placed into the scour that completion of the repair can be ensured.
Approximately 4.1 AC
In-Place Repair Along Pre-Existing Alignment
Station 451+80 To
Station 457+30 (Repair Includes L/S Area Fill)
BORROW AREA:
The Cross-Hatched area indicates borrow in the manner of sand deposits left from the breached area. Sand materials will be incorporated in the core (center) of the levee construction and placed into the scour area.
Excavation will be done in a manner over the entire area maintaining positive drainage away from the newly constructed levee down to original plow zone.
Approximately 25.0 AC
Access Route from Graveled Road
GENERAL NOTES:
Contractor will access site via
County Road from West then along landside toe of levee embankment.
"Indicated by the Blue Line on Map"
Contractor will leave entire site of construction in a manner that still has positive drainage "No Ponding Areas"
REPAIR DESCRIPTIONS:
Staging Area Will Be Within The
Limits of 200' Of The Construction Site
ATT: B-3 Site Map
Levee Station Established From July 2010 Top-Of-Levee Profile Survey
Map Created July 2020
Landside Slope Failure Station 542+50 to 544+00
60" Drainage Structure Failure Station 543+40
0 0.4 0.80.2 Miles
Breach Station 451+80
To Station 457+30
Access Route from Graveled Road
GENERAL NOTES:
Contractor will access site via County Road from North.
"Indicated by the Blue Line on Map" Contractor will leave entire site of construction in a manner that still has positive drainage
"No Ponding Areas"
REPAIR DESCRIPTIONS:
Staging Area Will Be Within The
Limits of 200' Of The Construction Site
The Hatched area indicates borrow material to be obtained evenly over the entire flagged area maintaining proper drainage and slope.
Borrow site to be left in a manner that has
NO PONDING AREAS
Approx. 3.3 AC
Haul Route Along the Riverward Limits of Levee Embankment
ATT: B-4 Site Map
Levee Station Established From July 2010 Top-Of-Levee Profile Survey
Map Created July 2020
0 0.1 0.20.05 Miles
Riverward Alignment Repair Station 0+00 = Station 688+25
Station 16+25 = Station 718+85
Alternate Borrow Site The 2 Cross-Hatched areas indicate borrow materials within the pre-existing levee embankment and can be obtained after initial borrow area has been exhausted.
Borrow will be obtained down to natural
(adjacent) ground levels.
Approximately 2.7 & 5.0 AC
Access Route from Graveled Road
GENERAL NOTES:
Contractor will access site via
County Road from West then along landside toe of levee embankment.
"Indicated by the Blue Line on Map"
Contractor will leave entire site of construction in a manner that still has positive drainage "No Ponding Areas"
REPAIR DESCRIPTIONS:
Staging Area Will Be Within The
Limits of 200' Of The Construction Site
The Hatched area indicates borrow material in the manner of a temporary riverward levee.
Borrow is to be obtained over the entire designated area in a manner that ALL of the riverward levee alignment is exhausted for the repairs in the Riverward Alignment Repair Station 688+25 to Station 718+85 or the
Compromised Landside Levee Embankment Slope Station 718+85 to Station 752+50.
Approximately 5.5 AC
ATT: B-5 Site Map
Levee Station Established From July 2010 Top-Of-Levee Profile Survey
0 0.2 0.40.1 Miles
Riverward Alignment Repair Station 0+00 = Station 688+25
Station 16+25 = Station 718+85
Alternate Borrow Site The 2 Cross-Hatched areas indicate borrow materials within the pre-existing levee embankment and can be obtained after initial borrow area has been exhausted.
Borrow will be obtained down to natural
(adjacent) ground levels.
Approximately 2.7 & 5.0 AC
Access Route from Graveled Road
GENERAL NOTES:
Contractor will access site via
County Road from West then along landside toe of levee embankment.
"Indicated by the Blue Line on Map"
Contractor will leave entire site of construction in a manner that still has positive drainage "No Ponding Areas"
REPAIR DESCRIPTIONS:
Staging Area Will Be Within The
Limits of 200' Of The Construction Site
The Hatched area indicates borrow material in the manner of a temporary riverward levee.
Borrow is to be obtained over the entire designated area in a manner that ALL of the riverward levee alignment is exhausted for the repairs in the Riverward Alignment Repair Station 688+25 to Station 718+85 or the
Compromised Landside Levee Embankment Slope Station 718+85 to Station 752+50.
Approximately 5.5 AC
Repair Fortifying "Flattening" the Landside Levee Embankment Slope
& Riverside Slope Erosion Station 718+85 to Station 752+50
Amendment 0001 g5edgfnp Polygon
ATT: B-6 Site Map
Levee Station Established From July 2010 Top-Of-Levee Profile Survey
Map Created July 2020
0 0.75 1.50.375 Miles
Breach Station 1025+40
To Station 1031+40
In-Place Repairs for Landside Slope
Embankment Erosion Station 752+50 to 860+80
Station 885+00 to 1021+90
GENERAL NOTES:
Contractor will access site along the landside toe of levee embankment.
Contractor will leave entire site of construction in a manner that still has positive drainage
"No Ponding Areas"
REPAIR DESCRIPTIONS:
Staging Area Will Be Within The
Limits of 200' Of The Construction Site
2 BORROW AREAS:
The Hatched area indicates borrow material to be obtained for Landside Slope Embankment
Erosioin Stations 752+50 to 860+80 & Stations 885+00 to 1021+90.
Location of Borrow to be utillized in relation to proximity of construction.
Excavation will be done in a manner within the FLAGGED area.
Borrow will be obtained without damage to standing timber and staying outside the dripline of the standing timber
Approximately 20 & 90 AC.
Haul Routes will generally be along the Landside Toe Line throughout the designated repairs.
C/L Levee
Landside
Existing Levee Slope
Drawing Not To Scale
Intact Levee Embankment
1' Vertical on 8' Horizontal Slope
Fortify (Flatten) Lower Landside Toe Slope
Natural Ground
Drawing Not To Scale
2'
Compromised Lower Levee Toe Slope (Concentrated Seepage Zone)
Typical Repair Section Compromised Landside Toe Slope
Station 229+00 to Station 231+00
Ray-Carroll Levee District of Ray County, MO - Item No. 71 ATT: C-1 Drawing
RiversideLandside
Drawing Not To Scale
Water SurfaceNatural Ground Natural Ground
1' V. on 50' H.
1' V . on
3.0 ' H.
1' V. on 3.0' H.
10' Crown
22'
11'
1' V. on 3' H.
In-Place Repair Of Levee Breach w/ Associated Scour
Station 451+80 to Station 457+30
Ray-Carroll Levee District of Ray County, MO - Item No. 71 ATT: C-2 Drawing
5' 5'
RiversideLandside
Excavate Failed Levee Embankment Slope On 1'V on 2' H Slope
Existing Grade Lines
Existing Riverside Levee Slope (No Damage)
Re-Construct Levee Embankment Compacting Around
All Existing Infrastructure
Construct Landside Slope Embankment
1' V. on 3' H.
C/L
Drawing Not To Scale
General Note:
Landside Slope Construction
Will Be Complicated By Existing Pump Station
Infrastructure.
Station 542+50 to 544+00
Quarry-Run-Stone Placement
Ray-Carroll Levee District of Ray County, MO - Item No. 71 ATT: C-3 Drawing
REPAIR SECTION - LANDSIDE SLOPE FAILURE
Station 542+50 to Station 544+00
C/L Pre-Existing Levee C/L Riverward Levee Alignment
Maximum Riverward Alignment 250'
Landside Riverside
New Landward Levee Setback Repair
(10' Crown 1 on 3 Slopes)
Existing Grade LineDrawing Not To Scale
Water Surface Existing Grade Line
Repair Riverward Alignment for Breach w/ Foundation Scouring
Station 0+00 = Station 688+25 Station 16+45 = Station 718+85
Ray-Carroll Levee District of Ray County, MO - Item No. 71 ATT: C-4 Drawing
Landside
Existing Levee Slope
Drawing Not To Scale
Intact Levee Embankment 1' Vertical on 4' Horizontal Slope
Fortify (Flatten) Levee Embankment Slope
Natural Ground
Drawing Not To Scale
Compromised Levee Embankment Slope (Concentrated Seepage Zone)
Repair Section Compromised Levee Embankment Slope
Station 718+85 to Station 752+50
Ray-Carroll Levee District of Ray County, MO - Item No. 71 ATT: C-5 Drawing
| ATT B-1 Site Map |
| ATT B-2 Site Map |
| ATT B-3 Site Map |
| ATT B-4 Site Map |
| ATT B-5 Site Map |
| ATT B-6 Site Map |
| ATT C-1 Drawing |
| ATT C-2 Drawing |
| ATT C-3 Drawing |
| ATT C-4 Drawing |
| ATT C-5 Drawing |
File details come from the government source that posted it. Updated .