W912DQ19R1030_Combined_Synopsis_and_Solicitation_-_Amendment_-_MAPS.pdf

PDF 14 MB Posted

Attached to
Vegetative Management and Pest Management Services in Support of the Harry S. Truman Lake Project, Warsaw, Missouri
Solicitation number
W912DQ19R1030
Issued by

About this file

W912DQ19R1030 Combined Synopsis and Solicitation - Amendment - MAPS

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community

Dam Structure and Dam Features Vegetation Management ±

Manage Vegetation behind the guardrail Near the Entrance to the Visitor Center.

Truman Dam

Maintenance Complex

Rim Dike #1

Rim Dike #2

Rim Dike #3

Powerhouse, Lab Yard, and Switch Yard Areas

Downstream Levees Downstream Levees

Dam Guard Rails (4.0 ac.)

Rip Rap Areas (67.3 ac.)

Dam Structure and Dam Features

- All Upstream and Downstream Rip Rap,

- Left and Right Abutment Contacts,

- Entire 1 on 4 Downstream Slope.

Guard Rails (BLUE)

- Includes a 3 foot wide band under the and along dam roadway guardrails.

- Includes Access Road and Service Road A

- Includes Guard Rail Near the Entrance of the Visitor Center.

- Includes Crane Rails along the top of the dam and crane rails in front of the draft tube deck Accelerograph Boxes

- 2 ft around Each.

Rim Dikes 1 ,2, & 3

- Includes Roadways and Rip Rap Areas Left and Right Bank Downstream Levees

- Include Roadways and Rip Rap Areas.

Dam Spillway, Outlet Channel, and Entire Enclosure Rip Rap Areas.

- Rip Rap Areas.

Power House, Switchyard, and Transformer Yards

- Includes all Gravel Surfaced Areas, including a a band of 10 ft wide around outside of Swithcyard Security Fence and the 2 Transformer Yards by the Power House Entrance.

Emergency Rip Rap Stockpiles

- Include all Rip Rap

Transformer Yard

Emergency Rip Rap Stockpile

Emergency Rip Rap Stockpile

Sterett Creek Vegetation Management ±

Rip Rap Areas (11.5 ac.)

Sterett Creek Dike includes the entire roadway shoulder to shoulder; downstream rip rap slope protection, abutment, and shoreline riprap.

Dam Structure and Dam Features Vegetation Management ±

Sterett Creek Dike

Truman Dam

Maintenance Complex

Rim Dike #1

Rim Dike #2

Rim Dike #3

Powerhouse, Lab Yard, and Switch Yard Areas

Downstream Levees

Downstream Levees

Dam Guard Rails (4.0 ac.)

Rip Rap Areas (78.8 ac.)

Emergency Rip Rap Stockpile

Emergency Rip Rap Stockpile

Yellow Areas = Paved Surface

Yellow = Paved Surface Red = Unpaved Surface

Red= Unpaved Surface

Combined Veg Mgmt Dam SC and feature Maps
Veg Management Dam
Veg Management SC
Veg Management
Combined Veg Mgmt Parking Maps
Berry Bend
Bledsoe Ferry East
Bucksaw
Cooper Creek
Crowe's Crossing
Fairfield
Long Shoal
Power House
Sac River
Shawnee Bend
Sparrowfoot
Thibuat Point
Windsor Crossing

File details come from the government source that posted it.