Att_A_-_Photo_Log.pdf

PDF 6 MB Posted

Attached to
Truman Power Plant Lead Based Paint Remediation
Solicitation number
W912DQ18B1002
Issued by

About this file

Attachment A Photos

View the file

Other files

File Type Posted
Bid_Opening_Sheet.pdf PDF
Amendment_0004.pdf PDF
amendment0003.pdf PDF
A.07.24_Amendment_0002_LBP.pdf PDF
HST_LBP_SOW_-_Att_B_Revised_for_Amendment__2_-_Paint_Spec_Sheet.pdf PDF
Site_Visit_sign_in_roster_and_functional_areas_list.pdf PDF
Amendment_1Revised_Table1.pdf PDF
Amen.pdf PDF
Site_Visit_PPE_info.pdf PDF
Table_1.pdf PDF
Att_B_-_Paint_Spec_Sheet.pdf PDF
SolicitationforLBP.pdf PDF
Att_C_-_APEX_Survey_-_For_Release.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

10/18/2017

Truman Power PlantLead Based Paint Clean-UpScope of Work – Photo Log October 2017

Truman Power Plant Diagram

TPP_01_Elev 708 Men Bathroom_092217

TPP_02_Service Elevator Floor

TPP_03_Elev 708_Kitchen Ceiling

TPP_03b_Elev 708_Kitchen Ceiling

TPP_04_Elev 708_Control Room Carpet Floor

TPP_4b_Elev 708_Control Room

TPP_05_Elev 708_Hallway Outside Vent Equip Room

TPP_05b_Elev 708 Hallway outside Ventilation Equipment Room

TPP_06_Elev 708_Spillway Staircase

TPP_06b_Elev 780plus_Spillway Stairwell

TPP_06c_Elev 780plus_Spillway Stairwell

TPP_06d_Elev 780plus_Spillway Stairwell

TPP_06e_Elev 780plus_Spillway Stairwell

TPP_06f_Elev 780plus_Spillway Stairwell

TPP_07_Elev xxx_Stairwell Wall

TPP_07b_Elev xxx_Stairwell Ceiling

TPP_07c_Elev xxx_Stairwell underside

TPP_07d_Elev xxx Stairwell

TPP_07e_Elev xxx Stairwell

TPP_07f_Elev xxx Stairwell

TPP_08_Elev 682_Service Gallery South Wall

TPP_08b_Elev 682_CO2 Fire Supression System

TPP_08c_Elev 682_Service Gallery

TPP_08d_Elev 682_Service Gallery

TPP_08e_Elev 682_Service Gallery

TPP_08f_Elev 682_Service Gallery

TPP_08g_Elev 682_Service Gallery_CO2 Cylinder Rack

TPP_08h_Elev 682_Service Gallery_CO2 Cylinder Rack

TPP_09_Elev 658_North Wall of Oil Transfer Hall

TPP_09b_Elev 658_North Wall of Oil Transfer Hall

TPP_09c_Elev 658_North Wall of Oil Transfer Hall

TPP_09d_Elev 658_North Wall of Oil Transfer Hall

TPP_09e_Elev 658_North Wall of Oil Transfer Hall - End Cap Wall

TPP_10_Elev 658_Service Gallery South Wall

TPP_10b_Elev 658_Service Gallery South Wall

TPP_10c_Elev 658_Service Gallery South Wall

TPP_11_Elev 658_Service Gallery_East Wall

TPP_11b_Elev 658_Service Gallery_East Wall

TPP_11c_Elev 658_Service Gallery_East Wall

TPP_11d_Elev 658_Service Gallery_East Wall

TPP_11e_Elev 658_Mech Gallery - Walls that overhang Main Shaft Pits

TPP_11f_Elev 658_Mech Gallery - Walls that overhang Main Shaft Pits

TPP_12_Elev 658_Tool Room_West Wall

TPP_13_Elev 658_Mech Maintenance Room_ NW Corner

TPP_13b_Elev 658_Mech Maintenance Room_ NW Corner_092217

TPP_14_Elev 658 Lower Stairwell

TPP_14b_Elev 658 Lower Stairwell_092217

TPP_14c_Elev 658 Lower Stairwell_092217

TPP_14d_Elev 658 Lower Stairwell

TPP_15_Elev 730 Generator Gallery Corebl Wall

TPP_15b_Generator Gallery_Looking across from Elev 682 to South Wall

TPP_15c_Generator Gallery_Looking up from 682 Elev to South Wall Corbel

TPP_15d_Elev 730 Generator Gallery Corbel Wall

TPP_15d_Generator Gallery South Wall

TPP_15e_Generator Gallery South Wall

TPP_15f_Generator Gallery South Wall

TPP_16_Elev 708 Pump Turbine Corbel ledge

TPP_16b_Elev 708 Pump Turbine Corbel ledge

TPP_17_Elev 658 Pump Turbine Gallery floor

TPP_17b_Elev 658 Pump Turbine Gallery floor

TPP_17c_Elev 658 Pump Turbine Gallery floor

TPP_17d_Elev 658 Pump Turbine Gallery floor

TPP_17e_Elev 658 Pump Turbine Gallery floor

TPP_17f_Elev 658 Pump Turbine Gallery floor

TPP_17g_Elev 658 Pump Turbine Gallery floor

TPP_17h_Elev 658 Pump Turbine Gallery floor

TPP_18_Elev 658 Mechanical Shop floor

TPP_18b_Elev 658 Mechanical Shop floor

TPP_18c_Elev 658 Mechanical Shop floor

TPP_18d_Elev 658 Mechanical Shop floor

TPP_18e_Elev 658 Mechanical Shop floor

TPP_18f_Elev 658 Mechanical Shop floor

TPP_18g_Elev 658 Mechanical Shop floor

TPP_19_Elev 644 walkway floors

TPP_19b_Elev 644 walkway floors

TPP_19c_Elev 644 walkway floors

TPP_19d_Elev 644 walkway floors

TPP_20_Elev 605 Pump Turbine Gallery lower Level floors

TPP_20b_Elev 605 Pump Turbine Gallery lower Level floors

TPP_20c_Elev 605 Pump Turbine Gallery lower Level floors

TPP_20d_Elev 605 Pump Turbine Gallery lower Level floors

TPP_20e_Elev 605 Pump Turbine Gallery lower Level floors

TPP_21_Elev 658 Generator Drive Shaft Pits

TPP_21b_Elev 658 Generator Drive Shaft Pits

TPP_21c_Elev 658 Generator Drive Shaft Pits

TPP_21d_Elev 658 Generator Drive Shaft Pits

TPP_21e_Elev 658 Generator Drive Shaft Pits

TPP_22_Elev 682_North Wall Pump Turbine Gallery

TPP_22c_Elev 682_North Wall Pump Turbine Gallery

TPP-22a_Elev 682_Closeup of South Wall_092217

TPP-22b_Elev 658_South Wall_092217

TPP_22d_Elev 682_North Wall Pump Turbine Gallery

TPP_22e_Elev 682_South and East Wall Pump Turbine Gallery

TPP_22f_Elev 682_East Wall Pump Turbine Gallery

TPP_22g_Elev 682_South Wall Pump Turbine Gallery

TPP_22h_Elev 682_South Wall Pump Turbine Gallery

TPP_22i_Elev 682_North Wall Pump Turbine Gallery

TPP_23_Elev 658 Mechanical Gallery floors

TPP_23b_Elev 658 Mechanical Gallery floors

TPP_23c_Elev 658 Mechanical Gallery floors

TPP_23d_Elev 658 Mechanical Gallery floors

TPP_23e_Elev 658 Mechanical Gallery floors

TPP_23f_Elev 658 Mechanical Gallery floors

TPP_24_Elev 658 Air Handler Units 2 3 4

TPP_24b_Elev 658 Air Handler Unit 1

File details come from the government source that posted it. Updated .