W912DQ-17-R-4014Amendment-0004-20170901.pdf

PDF 154 KB Posted

Attached to
Whole Building Renovations of Building 203, Building 205 and Building 207 at Fort Riley, Kansas
Solicitation number
W912DQ-17-R-4014
Issued by

About this file

Amendment-0004 to update Drawings and Specs

View the file

Other files

File Type Posted
Bldgs_203_205_207_Amdt_0004_Attachments.pdf PDF
W912DQ-17-R-4014Amendment-0003_20170829.pdf PDF
Attachments-Amendment-0003.pdf PDF
W912DQ-17-R-4014Amendment-0002_20170825.pdf PDF
Amdt_0002_Attachments.pdf PDF
Amendment-0001.pdf PDF
Amendment-0001Attachment.pdf PDF
InstructionsToOfferors.docx DOCX document
InstructionsToOfferors.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Renovation of Historic Building 205, w ith optionsfor Design-Build Renovation of Historic Building 203 and Renovation of Historic Building 207 at Fort Riley, Kansas

The purpose of this amendment is to add Draw ing and Specification changes. See SF30, Block 14 Continuation Page.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 01-Sep-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DQ-17-R-4014

X 9B. DATED (SEE ITEM 11)

09-Aug-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

01-Sep-2017

CODE

USACE, KANSAS CITY +

FEDERAL BUILDING CT-M, RM 647 601 EAST 12TH S

KANSAS CITY MO 64106-2896

W912DQ 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DQ-17-R-4014

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT-0004

The Solicitation is amended as follows:

Deleted text is shown with a strikethrough. Added text is shown with underline.

1. SPECIFICATION CHANGES:

a. Section 01 30 00 “Administrative Requirements”. DELETE paragraph 1.33.3 “Asbestos-Containing

Materials” in its entirety.

1.33.3 Asbestos-Containing Materials

Bidders are advised that friable and/or non-friable asbestos-containing materials have been identified in areas where contract work is to be performed. Bidder's attention is directed to Section

02 82 13.00 10 "ASBESTOS ABATEMENT".

b. DELETE the submittal register in its entirety and replace with the revised submittal register that accompanies this amendment.

c. Section 01 91 00.15 “Total Building Commissioning”, DELETE Paragraph 3.1.2 “Design Phase Commissioning Plan” in its entirety.

3.1.2 Design Phase Commissioning Plan

A commissioning plan developed during design phase is provided as Appendix C for information only.

The design phase commissioning plan does not form a part of this contract and is provided for commissioning review purposes only.

d. Section 01 91 00.15 “Total Building Commissioning”, Paragraph 3.1.4 “Design Review” is changed to read as follows:

3.1.4 Design Review

The Lead Commissioning Specialist and Technical Commissioning Specialists must review the construction contract plans and specifications, the Owner's Project Requirements, and the Basis of Design. The Owner's Project Requirements are attached as Appendix A. The Basis of Design is attached as Appendix B. The Owner's Project Requirements and Basis of Design documents are not contract documents and are provided for commissioning review purposes only after award.

a. Advise the Contracting Officer's Representative of any discrepancies between the Basis of Design and Owner's Project Requirements, deficiencies of the design to comply with the Owner's Project Requirements or Basis of Design, and deficiencies that would prevent the building systems and features from operating or performing effectively and from being adequately maintainable.

b. The Commissioning Specialists must provide a Design Review Report individually listing each deficiency and the corresponding proposed corrective action necessary for proper system operation or performance. Submit one hard copy and an electronic copy of the report to the Contracting Officer's Representative no later than 14 days after approval of the Commissioning Specialists.

c. The Lead Commissioning Specialist must participate in a meeting to discuss any items contained in the report no later than 14 calendar days after submission of the report.

e. Section 01 91 00.15 “Total Building Commissioning”. Paragraph 3.3.2 “Post-Construction Site Visit”, First sentence is changed to read as follows:

The Commissioning Specialists must visit the building site a minimum of six times to inspect building system equipment and review building operation with the building operating/maintenance staff.

f. Section 01 91 00.15 “Total Building Commissioning” Attachments. DELETE Appendix A, B and C in their entirety.

2. NARRATIVE DRAWING CHANGES:

a. Building 205, ADD the following two new sheet notes to Drawing Sheet “CS100 Site Plan”.

3. The contractor shall provide exterior concrete pavement (including design and coordination) to support mechanical equipment VRF-1, VRF-2, DOAU and CRU-1 that is directly adjacent to Building 205 - refer to MH110. The pavement shall be capable of supporting all electrical and mechanical lines routed between the equipment and the building. The new concrete pavement for the new mechanical units will cause the existing concrete sidewalk directly to the south of the building to be relocated to the south. The contractor shall provide the relocated concrete sidewalk (including layout, design and coordination) keeping adequate clearance to the equipment directly to the south of the existing sidewalk. The contractor shall ensure adequate drainage is provided for all concrete pavement and sidewalks, submit the concrete pavement and sidewalk design / shop drawings to the COR for review and approval, indicate specific locations for concrete placement, steel reinforcement, accessories, contraction / control joints, concrete thicknesses, plan dimensions, dimensions / locations of mechanical units, and site elevations on the installation drawings.

4. The contractor shall provide exterior concrete pavement (including design and coordination) to support mechanical equipment OVRF-1, OVRF-2, and ODOAU that is directly adjacent to Building 207 - refer to MH110. The pavement shall be capable of supporting all electrical and mechanical lines routed between the equipment and the building. The location of OVRF-1 as currently shown on MH110 will need to relocated, as it currently interferes with an existing piece of equipment that will remain - see V-100. The contractor shall ensure adequate drainage is provided for all concrete pavement, shall submit the concrete pavement design / shop drawings to the COR for review / approval and indicate specific locations for concrete placement, steel reinforcement, accessories, contraction / control joints, concrete thicknesses, plan dimensions, dimensions / locations of mechanical units, and site elevations on the installation drawings. Provide an exterior concrete pad for unit CRU-1 per Detail

A5/SE510.

b. Building 207: Drawing Sheet FX110, “Building 207 First Floor Fire Suppression Plan” Sheet Keynote

4 is changed to read as follows:

4. PROVIDE ACCESS HATCH TO FIRE SPRINKLER VALVES. ACCESS HATCH TO BE

36" X 36" MINIMUM. REFER TO ARCHITECTURAL DETAILS FOR MORE

INFORMATIONNOT USED

3. DRAWINGS CHANGES:

a. Delete the following Drawing Sheets from Building 205 and replace with the revised Drawings sheets that accompanies this amendment.

CS100 Site Plan CU100 Utility Plan

b. Delete the following Drawing Sheets from Building 207 and replace with the revised Drawings sheets that accompanies this amendment.

AE500 Partition Types F-010 Building 207 Life Safety Plan

4. All other terms and conditions remain unchanged and in full force.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .