Bldgs_203_205_207_Amdt_0004_Attachments.pdf

PDF 3 MB Posted

Attached to
Whole Building Renovations of Building 203, Building 205 and Building 207 at Fort Riley, Kansas
Solicitation number
W912DQ-17-R-4014
Issued by

About this file

Attachments to Amendment-0004

View the file

Other files

File Type Posted
W912DQ-17-R-4014Amendment-0004-20170901.pdf PDF
W912DQ-17-R-4014Amendment-0003_20170829.pdf PDF
Attachments-Amendment-0003.pdf PDF
W912DQ-17-R-4014Amendment-0002_20170825.pdf PDF
Amdt_0002_Attachments.pdf PDF
Amendment-0001.pdf PDF
Amendment-0001Attachment.pdf PDF
InstructionsToOfferors.docx DOCX document
InstructionsToOfferors.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 57 PAGES

FORT RILEY BLDGS 203, 205 AND 207

01 32 01.00 10 SD-01 Preconstruction Submittals

1.3 G ROProject Scheduler Qualifications

3.4.1 G ROPreliminary Project Schedule

3.4.2 G ROInitial Project Schedule

3.6.2 G ROPeriodic Schedule Update

01 33 00 SD-01 Preconstruction Submittals

1.11 G ROSubmittal Register

01 33 16.00 10 SD-01 Preconstruction Submittals

1.5.1 G DODesign Quality Control Plan

1.5.2.2Initial Design Conference 1.5.2.3Preconstruction Conference

3.5.1 G RODCM Procedures

3.8.4 G DOSubmittal Register

SD-05 Design Data

1.7.1 G DODesign and Code Checklists

2.4 G DOSustainable Design

3.2.1 G DOInterim Design Submittals

3.6.4.1.1 G DOInterior And Exterior Building

Finishes Scheme

3.6.4.2.3 G ROFurniture, Fixtures & Equipment

3.7.3Conference Documentation

3.8 G DOFinal Design Submittals

3.9 G DODesign Complete Documents

SD-11 Closeout Submittals

3.8.6 G RODD Form 1354

01 33 29 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

Amendment 0004

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 57 PAGES

01 33 29 1.5.3.1 G DOPreliminary Sustainability Notebook

1.5.3.1Preliminary High Performance and Sustainable Building Checklist

SD-07 Certificates 1.4.4Third Party Certification (TPC)

SD-11 Closeout Submittals

1.5.3.1 G DOFinal Sustainability Notebook

1.5.3.1 G DOFinal High Performance and

Sustainable Building Checklist

1.5.3.1 G DOAmended Final Sustainability

Notebook

3.2.1 G ROThird Party Certification Plaque

and Certificates 01 35 26 SD-01 Preconstruction Submittals

1.7 G ROAccident Prevention Plan (APP)

SD-06 Test Reports

1.4Monthly Exposure Reports 1.12Notifications and Reports

1.12.2 G ROAccident Reports

1.12.3LHE Inspection Reports

SD-07 Certificates

1.7.2.2 G ROStandard Lift Plan

1.7.2.3 G ROCritical Lift Plan

1.8Activity Hazard Analysis (AHA) 1.9.1Confined Space Entry Permit

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 57 PAGES

01 35 26 1.9.1Hot Work Permit 01 45 00.00 10 SD-01 Preconstruction Submittals

3.2 G ROContractor Quality Control (CQC)

Plan

3.2.2 G DOAdditional Requirements for

Design Quality Control (DQC) Plan

SD-05 Design Data 3.2.2Discipline-Specific Checklists 3.9.1Design Quality Control

01 45 35 SD-01 Preconstruction Submittals 3.1.2Written Practices 3.1.2NDT Procedures and Equipment

Calibration Records SD-06 Test Reports

3.1.2Daily Reports 3.1.1Biweekly Reports

SD-07 Certificates 2.1Fabrication Plant 2.1Steel Joist Institute Membership 2.1Certificate of Compliance

1.5 G ROSpecial Inspector

3.1.2Qualification Records

SD-11 Closeout Submittals

3.1.2 G ROComprehensive Final Report

01 50 00 SD-01 Preconstruction Submittals

1.3 G ROConstruction Site Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 57 PAGES

01 51 00.00 23 SD-01 Preconstruction Submittals G ROExisting Conditions

01 57 19 SD-01 Preconstruction Submittals 1.6.1Preconstruction Survey 1.6.2Regulatory Notifications 1.7Environmental Protection Plan

1.7.9.1 G RODirt and Dust Control Plan

1.6.5Employee Training Records

1.6.4 G ROEnvironmental Manager

Qualifications SD-06 Test Reports

3.2.1.3Inspection Reports

3.7.2.1 G ROSolid Waste Management Report

SD-07 Certificates 1.6.5Employee Training Records 1.6.5Erosion and Sediment Control

Inspector SD-11 Closeout Submittals

3.2.1.4 G ROStormwater Pollution Prevention

Plan Compliance Notebook

3.2.1.5 G ROStormwater Notice of Termination

3.7.1Waste Determination

Documentation 1.6.5Assembled Employee Training

Records 1.11Solid Waste Management Permit

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 57 PAGES

01 57 19 3.7.2.1Solid Waste Management Report 1.6.2Regulatory Notifications 3.7.2.1Sales Documentation

01 74 19 SD-01 Preconstruction Submittals

1.6 G ROWaste Management Plan

SD-11 Closeout Submittals 1.7Records

01 78 00 SD-03 Product Data 1.7.1Warranty Management Plan 1.7.5Warranty Tags 1.5Spare Parts Data

SD-08 Manufacturer’s Instructions 1.7.1Instructions

SD-10 Operation and Maintenance Data

3.7 G ROOperation and Maintenance

Manuals

SD-11 Closeout Submittals

3.1 G ROAs-Built Drawings

3.3 G RORecord Drawings

3.6As-Built Record of Equipment and Materials 3.4Final Approved Shop Drawings 3.5Construction Contract

Specifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 57 PAGES

01 78 00 2.3 G ROCertification of EPA Designated Items

3.9 G ROInterim DD FORM 1354

3.9 G ROChecklist for DD FORM 1354

01 78 23 SD-10 Operation and Maintenance Data

1.3 G ROO&M Database

3.1.1 G ROTraining Plan

SD-11 Closeout Submittals

3.1.3 G ROTraining Video Recording

3.1.5 G ROValidation of Training Completion

01 91 00.15 SD-01 Preconstruction Submittals

1.6 G CXCommissioning Firm

1.6.1 G CXLead Commissioning Specialist

1.6.2 G CXTechnical Commissioning

Specialists

1.6 G CXCommissioning Firm's Contract

SD-06 Test Reports

3.1.4 G CXDesign Review Report

3.1.3.1 G CXInterim Construction Phase

Commissioning Plan

3.1.3.2 G CXFinal Construction Phase

Commissioning Plan

3.1.3.1.2 G CXTemplate Building Envelope

Inspection Checklists

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 57 PAGES

01 91 00.15 3.1.6.2 G CXBuilding Envelope Inspection Checklists

3.1.6.3 G CXPre-Functional Checklists

1.8 G CXIssues Log

3.2 G CXCommissioning Report

3.3.1 G CXPost-Construction Trend Log

Report SD-07 Certificates

1.9 G CXCertificate of Readiness

SD-10 Operation and Maintenance Data

3.1.7 G CXTraining Plan

3.1.7 G ROTraining Attendance Rosters

3.1.8 G CXSystems Manual

3.1.9 G DOMaintenance and Service Life

Plans 02 41 00 SD-01 Preconstruction Submittals

1.2.1 G RODemolition Plan

1.9Existing Conditions

1.3 G DOShoring Plan

SD-07 Certificates

1.6 G RONotification

SD-11 Closeout Submittals 3.2.4Receipts

02 42 51 SD-01 Preconstruction Submittals

1.4.2 G ROProposed Dust-Control Measures

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 57 PAGES

02 42 51 1.4.2 G ROProposed Packing and Transportation Measures

1.4.4 G ROSchedule of Carpet Reclamation

Activities

1.4.3 G ROCarpet Reclamation Agency

Records

02 42 91 SD-03 Product Data

1.1 G ROWork Plan

02 83 13.00 20 SD-01 Preconstruction Submittals

1.5.2.3 G DOOccupational and Environmental

Assessment Data Report

1.5.2.2 G DOLead Compliance Plan

1.5.1.1 G ROCompetent Person

1.5.1.2 G ROTraining Certification

1.5.2.8 G DOlead waste management plan

3.5.2.1 G ROWritten evidence

1.5.2.4 G ROMedical Examinations

SD-06 Test Reports

1.5.2.3 G DOsampling results

1.5.2.3 G DOOccupational and Environmental

Assessment Data Report SD-07 Certificates

1.5.1.3 G ROTesting laboratory

3.1.1.1 G ROOccupant Notification

3.5.1.1 G ROClearance Certification

SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 57 PAGES

02 83 13.00 20 3.5.2.1 G DOhazardous waste manifest

3.5.2.1 G DOturn-in documents or weight

tickets 03 30 53 SD-02 Shop Drawings

1.4 G DOInstallation Drawings

SD-03 Product Data

2.2.3.1Air-Entraining Admixture 2.2.3.2Accelerating Admixture 2.2.3.3Water-Reducing or Retarding

Admixture 2.2.11Curing Materials 2.2.6Expansion Joint Filler Strips, Premolded 2.2.7Joint Sealants - Field Molded

Sealants 2.4.1Waterstops 3.2Conveying and Placing Concrete 2.2.8Formwork

2.3 G DOMix Design Data

2.3Ready-Mix Concrete 2.4.2Curing Compound

SD-06 Test Reports 2.2.2Aggregates

2.1.3 G DOConcrete Mixture Proportions

3.3.3.2Measurement of Floor

Tolerances

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 57 PAGES

03 30 53 3.8.3 G DOCompressive Strength Testing

3.8.3 G DOSlump

3.8.3Air Content 2.2.4Water

SD-07 Certificates 2.2.1Cementitious Materials 2.2.2Aggregates 2.3Delivery Tickets

SD-08 Manufacturer’s Instructions 2.4.2Curing Compound

04 20 00 SD-02 Shop Drawings

3.4.1.1 G DODetail Drawings

SD-03 Product Data

1.5.1 G ROHot Weather Procedures

1.5.2 G ROCold Weather Procedures

2.4.1.1 G DOCementitious Materials

SD-04 Samples

1.3.1.1 G ROMock-Up Panel

2.2.2.1 G ROConcrete Masonry Units (CMU)

2.4.1.3 G ROAdmixtures for Masonry Mortar

2.6.2 G ROBar Positioners

SD-05 Design Data

2.1.2 G DOMasonry Compressive Strength

2.2.2.2Fire-Rated Concrete Masonry

Units

3.2.4 G DOBracing Calculations

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 57 PAGES

04 20 00 SD-06 Test Reports 2.2.2.2Fire-Rated Concrete Masonry

Units

1.3.3 G DOGPR Testing of Masonry Jambs

3.6.1.2Field Testing of Grout

SD-07 Certificates 1.3.2Special Masonry Inspector

Qualifications 2.2.2.1Concrete Masonry Units (CMU) 2.2.2.3Concrete Brick 2.4.1.1Cementitious Materials 2.4.1.3Admixtures for Masonry Mortar 2.4.2.2Admixtures for Grout 2.6.2Bar Positioners

SD-08 Manufacturer’s Instructions 2.4.1.3Admixtures for Masonry Mortar 2.4.2.2Admixtures for Grout

SD-10 Operation and Maintenance Data

3.8Take-Back Program SD-11 Closeout Submittals

2.2.2.1.1Recycled Content 05 12 00 SD-02 Shop Drawings

1.3.2 G DOFabrication Drawings

SD-03 Product Data

2.5.2Shop Primer

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 57 PAGES

05 12 00 2.4.1Welding Electrodes and Rods 2.3.2.3Direct Tension Indicator Washers 2.4.2Non-Shrink Grout 2.3.3Tension Control Bolts

SD-06 Test Reports 2.3Bolts, Nuts, and Washers 3.6.1.2Weld Inspection Reports 3.6.2.1Direct Tension Indicator Washer

Inspection Reports 3.6.3.1Bolt Testing Reports

SD-07 Certificates 2.2Steel 2.3Bolts, Nuts, and Washers 1.3.3.1Welding Procedures and

Qualifications 2.4.1Welding Electrodes and Rods

05 21 00 SD-01 Preconstruction Submittals 1.3.2Welder Qualification

SD-02 Shop Drawings

1.3.1 G DOSteel Joist Framing

SD-06 Test Reports 3.3Erection Inspection 3.3Welding Inspections

SD-07 Certificates 1.3.2Certification of Compliance

SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 57 PAGES

05 21 00 2.3Recycled Content of Steel Products

05 30 00 SD-02 Shop Drawings

1.3.5 G ROFabrication Drawings

SD-03 Product Data 2.2Accessories 2.1Deck Units 2.2.4Mechanical Fasteners 2.1.4Touch-Up Paint 1.3.3Welding Equipment 1.3.3Welding Rods and Accessories

SD-04 Samples 2.1.1Metal Roof Deck Units

SD-05 Design Data

2.1 G RODeck Units

SD-07 Certificates 1.3.2Powder-Actuated Tool Operator 1.3.3Welder Qualifications 1.3.3Welding Procedures 1.3.4.1Fire Safety 1.3.4.2Wind Storm Resistance 1.3.1Manufacturer's Certificate 2.2.2Stud Manufacture's Certification 2.2.2Stud Manufacture's Test Reports

05 50 13 SD-02 Shop Drawings

2.4 G DOAngles and Plates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 57 PAGES

06 10 00 SD-02 Shop Drawings

2.3.2 G DOEngineered Lumber

1.8.2 G DOModifications of Structural

Members SD-03 Product Data

1.7Fire-retardant Treatment 1.4.4Structural-use and OSB Panels 2.4Oriented Strand Board

SD-05 Design Data

1.8.2 G DOModifications of Structural

Members SD-07 Certificates

1.9.1Certificates of Grade 1.9.2Indoor Air Quality

SD-10 Operation and Maintenance Data

3.5Take-back Program SD-11 Closeout Submittals

2.3.2VOC Content for Structural Engineered Lumber

06 20 00 SD-02 Shop Drawings

1.3 G DODetail Drawings Indicating All

Wood Assemblies SD-03 Product Data

2.2 G DOWood Products

1.4 G DOTreated Wood Products

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 57 PAGES

06 20 00 2.3 G DOFascias and Trim

2.7 G DOHardware and Accessories

SD-04 Samples

1.5 G DOSamples

SD-07 Certificates

1.7.1.1 G ROCertificates of Grade

1.7.1.2 G ROCertified Sustainably Harvested

Wood

1.7.1.3 G ROIndoor Air Quality

SD-11 Closeout Submittals 2.2.3Certified Sustainably Harvested

Wood for Trim and Frames 2.8.1.2Indoor Air Quality for Non-aerosol

Adhesives 2.8.1.2Indoor Air Quality for Aerosol

Adhesives 07 05 23 SD-01 Preconstruction Submittals

1.4 G CxWork Plan

SD-03 Product Data

2.2 G CxThermal Imaging Camera

SD-05 Design Data

3.2 G CxEnvelope Surface Area

Calculations

SD-07 Certificates 1.6.2.1Pressure Test Agency 1.6.2.2Thermographer Qualifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 57 PAGES

07 05 23 1.6.3Test Instruments 1.6.3Date Of Last Calibration

SD-06 Test Reports

3.5 G CxPressure Test Procedures

3.5.7 G CxAir Leakage Test Report

3.6.5 G CxDiagnostic Test Report

07 21 13 SD-03 Product Data

1.3 G ROManufacturer's Standard Details

2.2 G ROBlock or Board Insulation

2.3 G ROVapor Retarder

2.4 G ROPressure Sensitive Tape

1.4 G ROProtection Board or Coatings

2.6 G ROAccessories

SD-07 Certificates

2.2 G ROBlock or Board Insulation

2.3 G ROVapor Retarder

2.5 G ROProtection Board or Coating

1.8 G ROSpecial Warranties

1.8 G ROSpecial Warranties

1.5 G ROULE Greenguard

SD-08 Manufacturer’s Instructions 2.2Block or Board Insulation 2.6.1Adhesive

SD-11 Closeout Submittals

1.5 G ROULE Greenguard

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 57 PAGES

07 21 13 2.1.1 G ROVolatile Organic Compound (VOC) Content

2.1.2 G RORecycled Content

07 21 16 SD-03 Product Data

2.2Blanket Insulation 2.4Vapor Retarder 2.5Pressure Sensitive Tape 2.6Accessories

SD-08 Manufacturer’s Instructions 3.3.1Insulation

SD-11 Closeout Submittals

2.1.1 G RORecycled Content for Insulation

Materials

2.1.2 G ROReduce Volatile Organic

Compounds (VOC) 07 27 10.00 10 SD-04 Samples

3.1.2 G CxMock-up

SD-06 Test Reports

1.8 G CxDesign Review Report

3.1.3 G CxTesting and Inspection

SD-07 Certificates

1.7 G CxAir Barrier Inspector

07 84 00 SD-02 Shop Drawings

2.1 G ROFirestopping System

SD-03 Product Data

2.2 G ROFirestopping Materials

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 57 PAGES

07 84 00 SD-06 Test Reports

3.3 G ROInspection

SD-07 Certificates 2.2Firestopping Materials

1.5.1 G ROInstaller Qualifications

07 92 00 SD-03 Product Data 2.1Sealants 2.2Primers 2.3Bond breakers 2.4Backstops

SD-07 Certificates 3.3.6Sealant

08 11 13 SD-02 Shop Drawings

2.1 G RODoors

2.1 G RODoors

2.3 G ROFrames

2.3 G ROFrames

2.2Accessories

SD-03 Product Data

2.1 G RODoors

2.3 G ROFrames

2.2Accessories

08 14 00 SD-02 Shop Drawings

2.2 G DODoors

SD-03 Product Data

2.2 G DODoors

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 57 PAGES

08 14 00 2.3Accessories 2.4.7Water-resistant Sealer 1.5Warranty

SD-04 Samples 2.2Doors

2.4.6.2 G DODoor Finish Colors

SD-06 Test Reports 2.5Cycle-Slam 2.5Hinge Loading Resistance

SD-07 Certificates 1.3.1Certificates of Grade

1.3.2 G ROIndoor Air Quality

SD-11 Closeout Submittals

2.2.1 G ROCertified Sustainably Harvested

Stile and Rail Wood Doors

2.2.2 G ROCertified Sustainably Harvested

Flush Wood Doors

2.2.2.1 G RORecycled Content for Door Cores

1.5Warranty

08 39 54 SD-02 Shop Drawings

3.1 G DOInstallation

SD-03 Product Data

1.2 G DODoor Description

1.2.1 G DODesign Requirements

3.3Manufacturer's Field Service

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 57 PAGES

08 39 54 3.2Tests 2.6Tests, Inspections, and

Verifications

2.6.1 G DOPrototype Static Test

2.6.2 G DOPrototype Blast Test

SD-07 Certificates 2.1Materials 2.4.3Thermal Insulation

SD-10 Operation and Maintenance Data

1.2 G DODoor Description

08 51 13 SD-02 Shop Drawings

2.2 G DOWindows

1.10Fabrication Drawings

SD-03 Product Data

2.2 G DOWindows

2.3.6.1 G DOHardware

2.3.2 G ROFasteners

1.11 G ROWindow Performance

2.5 G DOMullions

2.3.6 G ROAccessories

2.3.3Adhesives

SD-04 Samples 1.4.4.1Finish Sample 1.4.4.2Window Sample

SD-05 Design Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 57 PAGES

08 51 13 2.2 G DOStructural Calculations for Deflection

1.4.5.3 G DODesign Analysis

1.4.5.3 G DOComputational Design Analysis

for Minimum Antiterrorism Performance Standards

SD-06 Test Reports 1.4.6Resistance to Forced Entry

1.11.2.3 G DOStandard Airblast Test

1.4.6.1 G DOAir Blast Test Report

1.4.6.2Tested Minimum Antiterrorism

Performance Window Comparison Report

SD-07 Certificates

1.4.2 G DOCertificate of Engineer

Qualifications

1.12 G DOCertificate of Manufacturer's

Qualifications

1.4.3 G DOCertificate of Air-Blast Testing

Laboratory Qualifications SD-10 Operation and Maintenance Data

2.2 G ROWindows

1.7Plastic Identification

SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 57 PAGES

08 51 13 2.1.1Recycled Content of Aluminum Windows

08 52 70 SD-02 Shop Drawings

1.5 G ROShop Drawings

SD-03 Product Data 2.4Hardware 3.2.10Weatherstripping 1.5Qualifications

SD-04 Samples 2.4Hardware 3.2.10Moldings 3.2.10Weatherstripping

SD-11 Closeout Submittals 1.3LEED Documentation

08 71 00 SD-02 Shop Drawings

1.3 G ROManufacturer's Detail Drawings

1.3 G ROVerification of Existing Conditions

1.5 G ROHardware Schedule

2.3.10 G ROKeying System

SD-03 Product Data

2.3 G ROHardware Items

SD-08 Manufacturer’s Instructions 3.1Installation

SD-10 Operation and Maintenance Data

1.5 G ROHardware Schedule

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 57 PAGES

08 71 00 SD-11 Closeout Submittals 1.6.1Key Bitting

08 81 00 SD-02 Shop Drawings 3.2.3Installation 3.2.4Installation

SD-04 Samples 2.3.3Tape 2.3.1.1Sealant

SD-05 Design Data

2.2.5.1 G DOComputational Design Analysis

Approach 2.2.5.1Dynamic Analysis Approach

Report

2.2.5.3 G DOStatic Analysis Approach Report

SD-06 Test Reports

2.2.5.2 G DOAir-Blast Testing Report

SD-08 Manufacturer’s Instructions 2.3Setting and Sealing Materials 3.2Glass Setting

08 91 00 SD-02 Shop Drawings 1.4Wall louvers 1.5Wall louvers

SD-03 Product Data 2.2Metal Wall Louvers

SD-04 Samples

1.4 G ROWall louvers

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 57 PAGES

08 91 00 1.5 G ROWall louvers 09 01 90.50 SD-03 Product Data

1.2 G ROWork Plan

1.2Materials 1.4.4Qualifications

SD-07 Certificates 1.2Work Plan

09 22 00 SD-02 Shop Drawings

2.1 G DOMetal support systems

09 29 00 SD-03 Product Data 2.1.7Cementitious backer units 2.1.4Glass Mat Water-Resistant

Gypsum Tile Backing Board 2.1.3Water-Resistant Gypsum

Backing Board 2.1.5Glass Mat Covered or Reinforced

Gypsum Sheathing 2.1.5.1Glass Mat Covered or Reinforced

Gypsum Sheathing Sealant 2.1.6Impact Resistant Gypsum Board 2.1.8Joint Treatment Materials 2.1.11Accessories 1.3Certification

SD-07 Certificates

2.1 G ROAsbestos Free Materials

SD-08 Manufacturer’s Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 57 PAGES

09 29 00 2.1Material Safety Data Sheets SD-10 Operation and Maintenance Data

2.1Manufacturer maintenance instructions

3.8Waste Management SD-11 Closeout Submittals

1.6.1Local/Regional Materials 2.1.1Gypsum Board

09 30 10 SD-02 Shop Drawings

3.2 G DODetail Drawings

SD-03 Product Data

2.1 G DOTile

2.3 G DOMortar, Grout, and Adhesive

SD-04 Samples

2.1 G DOTile

2.1 G DOAccessories

2.1.4 G DOAccessories

2.1 G DOTransition Strips

2.4 G DOTransition Strips

2.3 G DOGrout

SD-07 Certificates 2.1Tile 2.3Mortar, Grout, and Adhesive

SD-08 Manufacturer’s Instructions 3.8Maintenance Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 57 PAGES

09 30 10 SD-10 Operation and Maintenance Data

3.2 G ROInstallation

SD-11 Closeout Submittals

1.2LEED Documentation 2.3Adhesives

09 51 00 SD-02 Shop Drawings 1.2Approved Detail Drawings

SD-03 Product Data

2.2 G ROSuspension System

SD-04 Samples 2.1Acoustical Units 2.1.1Acoustic Ceiling Tiles

SD-07 Certificates 2.1Acoustical Units 2.1.1Acoustic Ceiling Tiles

09 65 00 SD-02 Shop Drawings

2.10 G DOResilient Flooring and

Accessories SD-03 Product Data

2.10 G DOResilient Flooring and

Accessories

2.6Adhesives

2.1 G DOWALL BASE

2.2 G DOLUXURY VINYL TILE

2.5 G DOFloor Transition

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 57 PAGES

09 65 00 2.3 G DOLinoleum Tile

2.4 G DOVinyl Composition Tile

SD-04 Samples

2.10 G DOResilient Flooring and

Accessories

2.1 G DOWALL BASE

2.2 G DOLUXURY VINYL TILE

2.5 G DOFloor Transition

2.3 G DOLinoleum Tile

2.4 G DOVinyl Composition Tile

SD-06 Test Reports

3.3 G ROMoisture, Alkalinity and Bond

Tests SD-08 Manufacturer’s Instructions

3.2 G ROSurface Preparation

3.1 G ROInstallation

SD-10 Operation and Maintenance Data

2.10 G ROResilient Flooring and

Accessories

SD-11 Closeout Submittals 1.3LEED Documentation

09 68 00 SD-02 Shop Drawings

3.4 G DOInstallation Drawings

2.5 G DOMoldings

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 57 PAGES

09 68 00 2.2 G DOCarpet

2.5 G DOMoldings

2.2.3 G DOEntrance Floor Mat (Efm-1)

SD-04 Samples

2.2 G DOCarpet

2.5 G DOMoldings

SD-06 Test Reports

3.2 G ROMoisture and Alkalinity Tests

SD-08 Manufacturer’s Instructions 3.1Surface Preparation 3.4Installation

SD-10 Operation and Maintenance Data

2.2 G ROCarpet

3.5 G ROCleaning and Protection

SD-11 Closeout Submittals 2.1.1Recycled Content for Carpeting 2.2.1Recycled Content for Carpeting 2.2.1Indoor Air Quality for Carpet 2.4Indoor Air Quality for Aerosol

Adhesives 2.4Indoor Air Quality for

Non-Aerosol Adhesives 2.4Indoor Air Quality for Concrete

Primer 1.6Warranty

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 57 PAGES

09 90 00 SD-03 Product Data

2.1 G ROCoating

2.1Manufacturer's Technical Data

Sheets SD-04 Samples

1.9 G DOColor

SD-07 Certificates

1.3Applicator's qualifications

1.4.1.2 G ROQualification Testing

SD-08 Manufacturer’s Instructions 3.2.1Application instructions 3.5.2Mixing 1.7.2Manufacturer's Material Safety

Data Sheets SD-10 Operation and Maintenance Data

2.1 G ROCoatings:

09 97 30 SD-03 Product Data

1.2 G ROWork Plan

1.2Materials 1.4.4Qualifications

SD-07 Certificates 1.2Work Plan

10 21 13 SD-02 Shop Drawings 2.1Fabrication Drawings

3.2 G DOInstallation Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 57 PAGES

10 21 13 SD-03 Product Data 2.1Cleaning and Maintenance

Instructions 2.9Colors And Finishes 2.2.1Sound-Deadening Cores 2.2.2Anchoring Devices and

Fasteners 2.2.4Hardware and Fittings 2.2.3Brackets 2.2.5Door Hardware 2.7Pilaster Shoes

SD-04 Samples

2.9 G DOColors and Finishes

2.2.4Hardware and Fittings 2.2.2Anchoring Devices and

Fasteners SD-07 Certificates

1.6Warranty SD-11 Closeout Submittals

2.3.1Toilet Enclosures 2.3.2Urinal Screens 2.7Pilaster Shoes

10 26 00 SD-02 Shop Drawings

2.2 G DOCorner Guards

SD-03 Product Data

2.2 G DOCorner Guards

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 57 PAGES

10 26 00 SD-04 Samples

2.4 G DOFinish

SD-06 Test Reports 2.2Corner Guards

SD-07 Certificates 2.2Corner Guards

10 28 13 SD-03 Product Data

2.1.2 G DOFinishes

2.2 G DOAccessory Items

SD-04 Samples

2.1.2 G DOFinishes

2.2Accessory Items

SD-07 Certificates 2.2Accessory Items

10 44 16 SD-02 Shop Drawings

1.3.1 G ROAccessories

Part 2 G ROCabinets

1.3.1 G ROWall Brackets

SD-03 Product Data

1.3.1 G ROAccessories

Part 2 G ROCabinets

1.3.1 G ROWall Brackets

3.2.1 G ROReplacement Parts List

SD-04 Samples

1.3.1 G ROCabinet

1.3.1 G ROWall Brackets

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 57 PAGES

10 44 16 1.3.1 G ROAccessories 12 24 13 SD-02 Shop Drawings

3.3 G DOInstallation

SD-03 Product Data

2.1 G DOWindow Shades

SD-04 Samples

2.1 G DOWindow Shades

SD-06 Test Reports

2.1Window Shades SD-08 Manufacturer’s Instructions

2.1Window Shades SD-10 Operation and Maintenance Data

2.1Window Shades 12 48 13 SD-02 Shop Drawings

3.2 G DOInstallation Drawings

3.2 G DODetail Drawings

SD-03 Product Data

2.1 G DOEntrance Floor Mats and Frames

2.2 G ROAdhesives and Concrete Primers

SD-04 Samples

2.1 G DOEntrance Floor Mats and Frames

SD-08 Manufacturer’s Instructions

3.2 G ROManufacturer's Instructions

SD-10 Operation and Maintenance Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 57 PAGES

12 48 13 3.2 G ROProtection, Maintenance, and Repair Information

SD-11 Closeout Submittals

1.2.1 G ROLEED (TM) Documentation

14 24 23 SD-02 Shop Drawings

2.1 G DOElevator

1.2.1 G DOElevator Components

1.2.2 G DOElevator Components

1.2.1 G DOMachine and Elevator Controller

1.3.4 G DOWiring Diagrams

SD-03 Product Data

2.1 G ROElevator

1.2.1 G ROElevator Components

1.2.2 G ROElevator Components

1.2.2 G ROData Sheets

2.5.2 G ROElevator Microprocessor

Controller SD-05 Design Data

1.2.3.3Emergency Power Systems 1.2.3.2Heat Loads 1.2.3.1Reaction Loads

SD-07 Certificates

1.3.2 G ROPrice Lists

1.4Warranty 1.3.1.1Endorsement Letter 1.2.4Welders' Qualifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 57 PAGES

14 24 23 2.5.2.3 G ROElevator Controller Certification SD-10 Operation and Maintenance Data

2.1 G ROElevator

1.2.5 G ROMaintenance Control Program

(MCP)

2.5.2.2 G ROSoftware and Documentation

14 93 00.00 23 SD-02 Shop Drawings

2.1 G DOVertical Platform Chair Lift

1.2.1 G DOVertical Platform Chair Lift

Components

1.2.2 G DOVertical Platform Chair Lift

Components

1.3.4 G DOWiring Diagrams

SD-03 Product Data

2.1 G ROVertical Platform Chair Lift

1.2.1 G ROVertical Platform Chair Lift

Components

1.2.2 G ROVertical Platform Chair Lift

Components

1.2.2 G ROData Sheets

SD-05 Design Data 1.2.3.1Emergency Power Systems

SD-07 Certificates

1.3.2 G ROPrice Lists

1.4Warranty

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 57 PAGES

14 93 00.00 23 1.3.1.1Endorsement Letter 1.2.4Welders' Qualifications

SD-10 Operation and Maintenance Data

2.1 G ROVertical Platform Chair Lift

1.2.5 G ROMaintenance Control Program

(MCP)

21 13 13.00 10 SD-02 Shop Drawings

1.4.3 G DOShop Drawings

3.8As-Built Drawings

SD-03 Product Data 1.4.1Fire Protection Related

Submittals

2.3 G DOMaterials and Equipment

1.6Spare Parts

3.7 G DOPreliminary Tests

3.8 G DOFinal Acceptance Test

3.9 G DOOnsite Training

1.4.1 G DOFire Protection Specialist

1.4.2 G DOSprinkler System Installer

SD-05 Design Data

1.4.3 G ROSway Bracing

1.2.1.3 G DOHydraulic Calculations

SD-06 Test Reports 3.7Preliminary Test Report 3.8Final Acceptance Test Report

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 57 PAGES

21 13 13.00 10 SD-07 Certificates 3.3Inspection by Fire Protection

Specialist SD-10 Operation and Maintenance Data

3.9 G DOOperating and Maintenance

Manuals

21 13 17.00 10 SD-02 Shop Drawings

1.4.3 G DOShop Drawings

3.8As-Built Drawings

SD-03 Product Data 1.4.1List of Submittals

2.1 G DOMaterials and Equipment

1.6Spare Parts

1.4.1 G DOFire Protection Specialist

1.4.2 G DOInstaller Qualifications

3.9 G DOOnsite Training

SD-05 Design Data 3.4.1Sway Bracing

1.2.1.2 G DOHydraulic Calculations

SD-06 Test Reports 3.7Preliminary Tests 3.8Final Acceptance Test

SD-07 Certificates 3.3Inspection by Fire Protection

Specialist

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 57 PAGES

21 13 17.00 10 SD-10 Operation and Maintenance Data

3.9 G DOOperating and Maintenance

Instructions

22 00 00 SD-02 Shop Drawings

3.8.1 G ROPlumbing System

SD-03 Product Data 2.5Fixtures

2.5.2 G ROFlush Valve Urinals

2.5.3 G ROFlush Tank Water Closets

2.5.4Wall Hung Lavatories 1.5.1Welding

3.3 G ROVibration-Absorbing Features

3.8.1 G ROPlumbing System

SD-06 Test Reports

3.8 G ROTests, Flushing and Disinfection

SD-07 Certificates 1.3Materials and Equipment 2.2.1Bolts

SD-10 Operation and Maintenance Data

3.8.1 G ROPlumbing System

SD-11 Closeout Submittals

2.1.1Water-Efficient Products 23 00 00 SD-02 Shop Drawings

1.4.5 G DODetail Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 57 PAGES

23 00 00 SD-03 Product Data 2.10.1.1Metallic Flexible Duct 2.10.1.2Insulated Nonmetallic Flexible

Duct Runouts 2.10.1.2Duct Connectors

2.10.2 G RODuct Access Doors

2.10.4 G ROManual Balancing Dampers

2.10.8.1 G DODiffusers

2.10.8.2 G RORegisters and Grilles

2.10.9Air Vents, Penthouses, and

Goosenecks

2.11.1.1 G DOCentrifugal Fans

2.11.1.2 G DOIn-Line Centrifugal Fans

2.12 G DO Air Handling Units

2.13.1 G DORoom Fan-Coil Units

2.14 G DOEnergy Recovery Devices

1.4.6Test Procedures 1.2.1.2Diagrams

SD-06 Test Reports

3.12 G CXPerformance Tests

3.10 G CXDamper Acceptance Test

SD-07 Certificates 1.4.7Certification 1.4.3Ozone Depleting Substances

SD-08 Manufacturer’s Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 57 PAGES

23 00 00 3.3Manufacturer's Installation Instructions

3.14.2Operation and Maintenance Training

SD-10 Operation and Maintenance Data

3.14.1 G CXOperation and Maintenance

Manuals

2.10.3 G ROFire Dampers

2.10.4 G ROManual Balancing Dampers

2.11.1.1 G DOCentrifugal Fans

2.11.1.2 G DOIn-Line Centrifugal Fans

2.11.1.3 G DOCeiling Exhaust Fans

2.12 G DOAir Handling Units

2.13.1 G DORoom Fan-Coil Units

2.14 G DOEnergy Recovery Devices

SD-11 Closeout Submittals 2.1.1Energy Efficient Equipment 2.1.2Reduce Volatile Organic

Compounds (VOC) 3.1Indoor Air Quality During

Construction 2.1.3Ozone Depleting Substances for

Refrigerants 23 05 93 SD-01 Preconstruction Submittals

1.3.2 G DORecords of Existing Conditions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 57 PAGES

23 05 93 1.5.3.1 G ROTAB Firm

1.2 G ROTAB Team Assistants

1.2 G ROTAB Team Engineer

1.5.3.2 G ROTAB Specialist

1.2 G ROTAB Team Field Leader

SD-02 Shop Drawings

1.3.2 G DOTAB Schematic Drawings and

Report Forms SD-03 Product Data

1.3 G DOEquipment and Performance

Data

1.5.3.4 G DOTAB Related HVAC Submittals

1.5.2 G DOTAB Procedures

1.5.2 G ROCalibration

1.3.2 G ROSystems Readiness Check

1.5.4 G DOTAB Execution

1.5.4.3 G DOTAB Verification

SD-06 Test Reports

3.3.5 G CXCompleted Pre-Final DALT

Report

3.3.8 G CXCertified Final DALT Report

1.7.1.1 G CXTAB Design Review Report

1.5.5.2 G CXTAB Report for Season 1

1.5.5.2 G CXTAB Report for Season 2

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 41 OF 57 PAGES

23 05 93 1.5.1 G ROIndependent TAB Agency and Personnel Qualifications

1.7.1 G RODALT and TAB Submittal and

Work Schedule

1.7.1.3 G CXTAB Pre-Field Engineering

Report

1.5.3.1 G ROTAB Firm

1.3.2 G DODesign Review Report

1.7.1.2 G ROPre-field DALT Preliminary

Notification

1.7.1 G ROAdvanced Notice for Season 1

TAB Field Work

1.7.1 G CXPrerequisite HVAC Work Check

Out List For Season 1

1.7.1 G CXAdvanced Notice for Season 2

TAB Field Work

1.7.1 G CXPrerequisite HVAC Work Check

Out List For Season 2 23 07 00 SD-02 Shop Drawings

3.2.2.4 G ROMICA Plates

2.4Pipe Insulation Systems 3.2Pipe Insulation Systems 3.3Duct Insulation Systems 3.4Equipment Insulation Systems

SD-03 Product Data

2.4 G ROPipe Insulation Systems

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 42 OF 57 PAGES

23 07 00 3.2 G ROPipe Insulation Systems

3.3 G RODuct Insulation Systems

3.4 G ROEquipment Insulation Systems

SD-04 Samples

2.3.1.3 G ROThermal Insulation

3.1.1 G RODisplay Samples

SD-08 Manufacturer’s Instructions

2.4 G ROPipe Insulation Systems

3.2 G ROPipe Insulation Systems

3.3 G RODuct Insulation Systems

3.4 G ROEquipment Insulation Systems

SD-11 Closeout Submittals 2.1.1Reduce Volatile Organic

Compounds (VOC) 2.1.2Recycled Content

23 09 00 SD-02 Shop Drawings

3.3 G DODDC Contractor Design Drawings

3.3 G DODraft As-Built Drawings

3.3 G DOFinal As-Built Drawings

SD-03 Product Data

2.7.1 G ROPhotocell

1.8.7 G ROCertificate of Networthiness

Documentation

1.8.1 G ROProgramming Software

1.8.2 G ROController Application Programs

2.2 G ROManufacturer's Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTO…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .