AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
a) Revise Section B, paragraph 6.1
b) Revise Section B, Caution Page
c) Revise Section J, Attachment 2 - Bid Schedule
d) Revise Section J, Attachment 2 - Add Davis Bacon Wage Rates
e) Revise Section L, paragraph 5.4
1. CONTRACT ID CODE PAGE OF PAGES
U 1 102
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 11-May-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DQ-16-R-3001
X 9B. DATED (SEE ITEM 11)
20-Apr-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
11-May-2016
CODE
USACE, KANSAS CITY +
FEDERAL BLDG CT-H 601 E 12TH ST RM 647
KANSAS CITY MO 64106-2896
W912DQ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DQ-16-R-3001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION B - SUPPLIES OR SERVICES AND PRICES
The following have been modified:
CAUTION PAGE
CAUTION!
BEFORE SIGNING AND MAILING THIS PROPOSAL, please take note of the following:
1. ACCOUNTING SYSTEM ADEQUACY: Offerors must have an adequate accounting system to receive a cost-reimbursable task order. All offerors shall provide a recent adequacy determination from either (1) a Federal Government Cognizant Audit Agency or (2) any commercially recognized auditing or accounting firm stating that the offeror's accounting system is adequate. The determination should include a completed Standard Form 1408 "Preaward Survey of Prospective Contractor Accounting System" signed in Blocks 3 and 4. To be considered recent, the determination should be no older than four years prior to the due date of proposals. The offeror must also confirm that the accounting system has not changed since the issuance of the determination. An offeror that does not have a recent accounting system adequacy determination should include with its proposal a completed "Preaward Survey of Prospective Contractor Accounting System Checklist"; a copy of the checklist is included in Section J, Attachment 7. The Contracting Officer will use this completed checklist to request a DCAA preaward survey of the offeror's accounting system.
2. EVMS: Offerors shall submit a comprehensive plan for compliance with the guidelines in ANSI/EIA-748.
If offerors have a recent compliance determination from either (1) a Federal Government Cognizant Audit Agency or (2) any commercially recognized auditing or accounting firm stating that the offeror's EVMS is compliant, the compliance determination may be submitted in lieu of the comprehensive plan outlined in Section L, paragraph 5.4. To be considered recent, the determination should be no older than four years prior to the due date of proposals.
3. AMENDMENTS: Have you acknowledged receipt of ALL Amendments? If in doubt as to number of amendments issued, please contact our office.
4. HAND-DELIVERED PROPOSALS: If proposals are hand-delivered, you must be aware of enhanced security requirements in effect in the Federal Building and allow for extra time to clear security. You must have a valid picture ID in order to enter the building. No additional time will be allowed due to security requirements.
5. Time for acceptance by the Government of Proposals: See Section L, paragraph 2.6
SECTION B
1. Contract Definition
This Indefinite Delivery / Indefinite Quantity (ID/IQ) Multiple Award Task Order Contract (MATOC) is a part of the U.S. Army Corps of Engineers, Multiple Environmental Government Acquisition (MEGA) Strategy.
This will be an Indefinite Delivery / Indefinite Quantity (ID/IQ), Multiple Award Task Order Contract (MATOC) for Pre-placed Remedial Action Contracts (PRACs) under NAICS Code 562910, in support of existing and future USACE customers of the Districts within the Northwestern Division of the Army Corps of Engineers (USACE) and the Environmental Protection Agency (EPA) Region 2. Firm fixed price and cost reimbursement Task Orders may be written against the ID/IQ contracts.
All Task Orders to be awarded under this MATOC will be competed in accordance with (IAW) FAR 16.505(b)(1), Fair Opportunity, unless one of the exceptions to fair opportunity at FAR 16.505(b)(2)(i) applies. Task Order selection will be tailored to specific project requirements and awarded IAW pre-established evaluation criteria.
The Government’s target is to award five (5) contracts under this solicitation; however, if the Contracting Officer determines during the source selection process that fewer or more than five (5) contracts should be awarded, based upon the selection criteria, the Source Selection Authority has the discretion of adjusting that number, or awarding none at all.
Please ensure this NAICS code 562910 is incorporated in your current Contract Registration at the System for Award Management (SAM) https://www.sam.gov/portal/public/SAM/ Failure to have this NAICS code current in SAM may result in not being considered for the award.
***NOTE***
When contacting the SAM Help Desk with issues relating to registering for a CAGE Code, please DO NOT ask for CAGE Code help, instead ask for help with SAM Registration which will end in a better result and assistance with the SAM Help desk.
For SAM Customer Service, contact:
Federal Service Desk URL: www.fsd.gov Hours: 8am - 8pm (Eastern Time) US Calls: 866-606-8220 International Calls: 334-206-7828
DSN: 866-606-8220
2. Eligibility
The contract will be awarded only to qualified offerors who are eligible.
3. Total Amount of Contract
The total amount of shared capacity among all Contractors awarded contracts under this solicitation shall not exceed $92.5 million. There is no limit of the number of Task Orders that may be executed against this contract. The cumulative total of all Task Orders issued under the MATOC shall not exceed the total contract capacity amount of $92.5 million.
4. Guaranteed Contract Amount
The minimum guarantee for the IDIQ is $2500. Task Order 0001 will be issued under each contract awarded as a result of this solicitation. The Task Order will satisfy the minimum guarantee of the contract terms and conditions.
Task Order 0001 will have a period of performance for 5 years. If additional Task Orders are awarded under the contract, Task Order 0001 will be de-obligated and closed at no additional cost or liability to either party.
5. Performance Period
Contracts will have a basic ordering period of three (3) years plus one two-year option period or until the $92.5 million contract limit is reached, whichever comes first. This Solicitation also includes FAR 52.217-8, which if necessary, allows the Government to extend the term of the Contract an additional six (6) months. The total length of the contract ordering period, including the exercise of all option periods, will not exceed five years and six months from date of contract award.
6. Pricing
6.1 Firm-fixed price (FFP) Task Orders.
FFP Task Orders will be for services performed at prices expressly provided for therein and based on the rates proposed by the offeror, but in no case shall they exceed the rates proposed in the tables below. Profit will be reflected in individual Task Orders issued. The hourly rates proposed for each firm-fixed price Task Order shall not exceed the hourly rates for labor disciplines proposed by the offeror in the “Hourly Labor Rates, Firm Fixed Price” table shown below, and the offeror’s proposed markups for the other direct costs in the tables below. All hourly rates shall include Overhead, General/Administrative, Labor Burden Fringes, and any other markups that are included in the offeror’s fully burdened rate. All hourly rates shall be exclusive of profit. If a discipline is not listed in the Hourly Labor Rates table and is required for a specific Task Order, that labor rate will be determined before award of that Task Order.
The offeror shall submit its proposed rates for all disciplines and years listed in Table 1 below. The rates proposed will be legally binding and will be the maximum rates that the offeror will use for all firm-fixed price Task Orders.
Lower rates may be offered at the Task Order level, if deemed appropriate by the offeror. Offerors shall provide one rate per labor discipline, including those provided by subcontractors. The offeror may not have all personnel on staff. Therefore, if those personnel are subcontracted, their rates shall be provided in the tables as well. The rates provided per labor discipline shall be fully burdened rates, exclusive of profit.
The offeror shall only provide the Overhead and G&A rates for the prime, even if the labor disciplines will be performed by the prime or a subcontractor, depending on the Task Order. The subcontractor would be subject to honoring the labor rates stated for the subject labor discipline.
NOTE: If during the Contract Period of Performance, the Contractor’s original subcontracted personnel are no longer available to the Prime, the Prime shall find a subcontractor that has at a minimum, the same qualifications as the previous subcontracted personnel. The Prime shall be responsible for negotiating with their subcontractor, the labor rates for those personnel that have been provided in this Solicitation. Those rates provided in Section B, Table 1 are the maximum that will be paid by the Government for any replacement personnel.
In Table 2 (Rates/Markups) below, offerors shall show the breakout of all rates and markups that are incorporated into the fully burdened rates proposed by the offeror in Table 1.
Maximum rates shall be governed by the date of the Task Order requirement. Task Orders will use the prices for the 12-month period effective on the date the Task Order is issued. Modifications to Task Orders will reflect the rates of the "current 12-month" bid schedule. For example, if the rate schedule changes over on 1 November of each year, and a Task Order is issued on 1 Sep 2018 for 12 months work, the maximum rates will be the rates that were effective on 1 Nov 2017. Under the same assumptions, if a modification to this Task Order is required in December 2018, labor rates effective on 1 Nov 2018 will apply.
Table 1
Maximum Hourly Labor Rates, Firm Fixed Price Task Orders
DISCIPLINE
PRIME
OR SUB
BASE
HRLY
RATE
Year 1
FULLY
LOADED
HRLY
RATE
Base
Period Year 1
FULLY
LOADED
HRLY
RATE
Base
Period Year 2
FULLY
LOADED
HRLY
RATE
Base
Period Year 3
FULLY
LOADED
HRLY
RATE
Option
Period 1/ Year 4
FULLY
LOADED
HRLY
RATE
Option
Period 1/ Year 5
FULLY
LOADED
HRLY RATE
6 MONTH
OPTION
PERIOD IF
NECESSARY
(52.217-8) Program Manager
Project Manager On-Site Contractor Quality Control Supv (CQCS)
Site Safety and Health Officer
(SSHO)
Geologist Chemist
Process Engineer
Field Technician
Clerical
Offerors are to submit their labor rates for each of the ordering periods.
Assume base year 1 labor rates cover period December 1, 2017 2016 through November 30, 2017.
For each labor discipline, please annotate whether the discipline provided is Prime or Subcontractor. If both Prime and Subcontractor will perform the work, indicate “Both” in column 2 and enter a single maximum rate.
Offerors are to provide an example of how mark-ups are applied to the labor rates Offerors are to provide only one table with one rate per discipline. Table 1 must be completely filled out.
If an Offeror is utilizing a subcontractor for a discipline, you must include subcontractor’s base rate in Table 1 and their mark-up breakdown in Table 2.
Joint Ventures must submit a single maximum rate in Table 1 for the JV.
If the cost for a discipline indicated above is included in an Offeror’s overhead rates as part of the Offeror’s standard accounting system, the Offeror shall enter an hourly rate of $1 and include an explanation below the table regarding how that discipline’s costs are accounted for under the Offeror’s standard accounting practices.
If the offeror has a different job title than the above-listed disciplines, the offeror shall add that job title to the job title in Table 1 above that most closely represents the offeror’s job title. Example: if the offeror has an Administrative Assistant, they shall add “/Administrative Assistant” after “Clerical” in the table above.
Table 2
Rates / Markups for FFP Task Orders
Base
Contract Year 1
Year 2
Year 3
Option
Period 1/ Year 4
Option Period
1/Year 5
6 Month Option
Period – If Necessary (52.217-8)
Total Labor Home Office
Overhead Rate*
Field Office Overhead Rate*
G&A Rate* _________% Fully Loaded
Hourly Labor Rate Annual Escalation
*Must be substantiated by DCAA at a later time
NOTES:
1. Overhead and G&A rates should be shown separately.
2. The rates/markups provided in Table 2 are a breakout of the rates/markups incorporated into the fully burdened rates proposed by the offeror in Table 1.
3. For any mark-up that is not considered as Overhead or G&A in accordance with your company’s standard accounting practice, please adjust the table to include all applicable markups. It the table is adjusted, the Offeror shall provide documentation that the mark-up is part of your company’s standard accounting practices (examples: computer usage fees, Facilities Capital Cost of Money).
6.2 Cost reimbursable type Task Orders
Cost reimbursable type Task Orders will be for allowable incurred costs for best effort on the part of the Contractor.
For cost reimbursement type Task Orders, the Contractor shall use DCAA/DCMA approved forward pricing rates, third party audited rates, or actual rates for individuals performing work if the offeror does not have DCAA/DCMA approved forward pricing rates or third party audited rates.
The Contractor shall have an accounting system that is in compliance with Generally Accepted Accounting Principles (GAAP) and the Cost Accounting Standards (CAS), if applicable. In accordance with FAR 16.301-3, the Contractor’s accounting system must be determined adequate for tracking costs for cost reimbursable work.
Therefore, in order to be awarded a cost reimbursable Task Order under this contract the offeror must have an accounting system that is adequate for tracking costs under cost reimbursable contracts. See Section L, paragraph
4.4 for further details.
6.3 Profit/Fee on Firm Fixed Price and Cost Reimbursable Task Orders
Offerors shall propose a maximum profit rate (for firm fixed price work) and a maximum fixed fee rate (for cost reimbursable work) in Table 3. The proposed maximum profit rate will be legally binding and will be the maximum profit rate the offeror will be allowed to propose for all firm fixed price work and cost reimbursable work performed under this contract. The proposed maximum fixed fee rate or maximum profit rate will be legally binding and will be the maximum fixed fee rate or profit rate the offeror will be allowed to propose for all work performed under this contract. Lower rates may be proposed on subsequent Task Orders/Modifications. Profit and fee will be negotiated on an individual Task Order and modification basis.
Table 3 Maximum Profit and Fee Rates
Maximum Fixed Fee Rate (Cost Reimbursable
Work) Maximum Profit Rate (Firm Fixed Price Work)
Note: Offerors must propose a single rate in Table 3. Do not propose separate maximum rates for subcontractors or Joint Venture partners. Do not submit different maximum rates for self-performed work and subcontracted work. The purpose of this table is to set a maximum profit/fee rate. On subsequent Task Orders and Modifications issued off this MATOC, Offerors may propose separate rates for Joint Ventures and subcontracted work at their own discretion; as long as they do not exceed the maximum rates identified in Table 3 above.
7. Department of Labor Wage Rates
For the purposes of the sample project, Department of Labor Wage Determination 2005-2349, Rev 18, dated December 29, 2015 is attached in Section J of this Solicitation. For individual Task Orders written against the contract, the appropriate Department of Labor Wage Determination will be provided.
8. Travel
The Contractor shall perform all travel and attend all meetings necessary for completion of the work required by the Task Orders. Per Diem (lodging and MI & E expenses) shall be paid at the current Government rates in accordance with the Federal Travel Regulation (FTR) per person per calendar day spent in travel status. No per diem will be paid for travel less than the number of hours per day stated in the current FTR. Per Diem rate information may be obtained at http:www.defensetravel.dod.mil/. Actual cost of transportation by public conveyance (plane, limited to coach class) shall be paid. Air travel shall (if possible) be planned in advance in order to acquire the best prices available. Privately owned vehicles shall be paid at the current Government mileage rate in accordance with the FTR. No fee or profit will be paid on travel.
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been modified:
SECTION J
Attachment No. Description 1 Past Performance Questionnaire with Information 2 Sample Project Scope of Work & Bid Schedule (Cost Plus Fixed Fee) 3 Instructions for Completion of ENG 93 - Payment Estimate 4 Request to Sub Contract 5 Request for Authority to Proceed 6 Work Variation Notification 7 Pre-Award Survey of Prospective Contractor Accounting System Checklist 8 Chemistry Supplement to the Scope of Services for the Multiple Environmental
Government Acquisition (MEGA) 9 Geology Supplement to the Scope of Services for the Multiple Environmental
Government Acquisition (MEGA) 10 NWK Supplement for Contractor Quality Control Plans for Remedial Actions
SECTION J, ATTACHMENT 1
PAST PERFORMANCE QUESTIONNAIRE
INFORMATION
This Attachment 1 contains the following:
- Sample Cover Letter
- Instructions to the Reference for Completing the Past Performance Questionnaire
- Past Performance Questionnaire
NOTE TO OFFERORS/RESPONDENTS: Please ensure all Past Performance information submitted includes solicitation number W912DQ-16-R-3001 and the prime offeror’s name.
RESPONDENTS MAY USE ADDITIONAL PAGES TO COMPLETE PAST PERFORMANCE
QUESTIONNAIRE, IF NECESSARY.
PAST PERFORMANCE QUESTIONNAIRE
SAMPLE COVER LETTER
SAMPLE OF COVER LETTER TO BE SENT BY THE OFFORER TO ITS REFERENCES
Date
Name and Address of Reference
Dear __________________________:
We have listed your firm as a reference for work we have performed for you as listed below. Our firm has submitted a proposal for a project advertised by the U.S. Army Corps of Engineers (USACE), Kansas City District.
In accordance with Federal Acquisition Regulations (FAR), an evaluation of our firm’s past performance will be completed by the USACE. Your candid response to the attached questionnaire will assist the evaluation team in this process.
Your firm has been listed as a reference for the work we performed for you on the following project:
(INSERT Project name and contract number)
We understand that you have a busy schedule and your participation in this evaluation is greatly appreciated. Please complete the enclosed questionnaire as thoroughly as possible. Furthermore, a questionnaire has also been sent to ___________________ of your organization. Only one response from each company is required. If at all possible, we suggest that you individually answer this questionnaire and then coordinate your responses with that of _________________, to forge a consensus on one overall response from your organization. It is preferred that you return your questionnaire to our office; however you may also send your completed questionnaire directly to USACE at the following address:
U.S. Army Engineer District, Kansas City ATTN: CECT-NWK-Mr. Josh Hill
Federal Building Room 647 601 East 12th Street
Kansas City, Missouri 640106-2896
The questionnaires can also be e-mailed to william.j.hill@usace.army.mil. We request your questionnaire be provided by the proposal deadline, which is May 20, 2016
If you have questions regarding the attached questionnaire, or require assistance, please contact Mr. Josh Hill, USACE Contract Specialist, at (816) 389-3827.
Sincerely, (Offeror’s signature)
Attachments:
1. Instructions to the Reference for completing the Past Performance Questionnaire
2. Past Performance Questionnaire
THE PAST PERFORMANCE QUESTIONNAIRE
NAVFAC/USACE PAST PERFORMANCE QUESTIONNAIRE (Form PPQ-0)
CONTRACT INFORMATION (Contractor to complete Blocks 1-4)
1. Contractor Information Firm Name: CAGE Code:
Address: DUNs Number:
Phone Number:
Email Address:
Point of Contact: Contact Phone Number:
2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain) Percent of project work performed:
If subcontractor, who was the prime (Name/Phone #):
3. Contract Information Contract Number:
Delivery/Task Order Number (if applicable):
Contract Type: Firm Fixed Price Cost Reimbursement Other (Please specify):
Contract Title:
Contract Location:
Award Date (mm/dd/yy):
Contract Completion Date (mm/dd/yy):
Actual Completion Date (mm/dd/yy):
Explain Differences:
Original Contract Price (Award Amount):
Final Contract Price (to include all modifications, if applicable):
Explain Differences:
4. Project Description:
Complexity of Work High Med Routine How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, or other)
CLIENT INFORMATION (Client to complete Blocks 5-8)
5. Client Information Name:
Title:
Phone Number:
Email Address:
6. Describe the client’s role in the project:
7. Date Questionnaire was completed (mm/dd/yy):
8. Client’s Signature:
NOTE: CLIENTS ARE HIGHLY ENCOURAGED TO SUBMIT QUESTIONNAIRES DIRECTLY TO
THE OFFEROR. HOWEVER, QUESTIONNAIRES MAY BE SUBMITTED DIRECTLY TO USACE.
THE GOVERNMENT RESERVES THE RIGHT TO VERIFY ANY AND ALL INFORMATION ON THIS
FORM.
ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT YOUR EVALUATION OF THE
CONTRACTOR’S PERFORMANCE
RATING DEFINITION NOTE
(E) Exceptional Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the Contractor was highly effective.
An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.
(VG) Very Good Performance meets contractual requirements and exceeds some to the Government’s/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the Contractor were effective.
A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.
(S) Satisfactory Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the Contractor appear or were satisfactory.
A Satisfactory rating is appropriate when there were only minor problems, or major problems that the Contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that Contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.
(M) Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the Contractor has not yet identified corrective actions. The Contractor's proposed actions appear only marginally effective or were not fully implemented.
A Marginal is appropriate when a significant event occurred that the Contractor had trouble overcoming which impacted the Government/Owner.
(U) Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the Contractor's corrective actions appear or were ineffective.
An Unsatisfactory rating is appropriate when multiple significant events occurred that the Contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.
(N) Not Applicable No information or did not apply to your contract Rating will be neither positive nor negative.
Contractor Information (Firm Name): ________________________________________________
Client Information (Name): ________________________________________________________
TO BE COMPLETED BY CLIENT
PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS
YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE.
1. QUALITY:
a) Quality of technical data/report preparation efforts E VG S M U N
b) Ability to meet quality standards specified for technical performance E VG S M U N
c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance
E VG S M U N
d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)
E VG S M U N
2. SCHEDULE/TIMELINESS OF PERFORMANCE:
a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)
E VG S M U N
b) Rate the Contractor’s use of available resources to accomplish tasks identified in the contract
E VG S M U N
3. CUSTOMER SATISFACTION:
a) To what extent were the end users satisfied with the project? E VG S M U N
b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes;
responsiveness to administrative reports, businesslike and communication)
E VG S M U N
c) To what extent was the Contractor cooperative, businesslike, and concerned with the interests of the customer?
E VG S M U N
d) Overall customer satisfaction E VG S M U N
4. MANAGEMENT/ PERSONNEL/LABOR
a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force?
E VG S M U N
b) Ability to hire, apply, and retain a qualified workforce to this effort E VG S M U N
c) Government Property Control E VG S M U N
d) Knowledge/expertise demonstrated by Contractor personnel E VG S M U N
e) Utilization of Small Business concerns E VG S M U N
f) Ability to simultaneously manage multiple projects with multiple disciplines E VG S M U N
g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes
E VG S M U N
h) Effectiveness of overall management (including ability to effectively lead, manage and control the program)
E VG S M U N
5. COST/FINANCIAL MANAGEMENT
a) Ability to meet the terms and conditions within the contractually agreed price(s)?
E VG S M U N
Contractor Information (Firm Name): ________________________________________________
Client Information (Name): ________________________________________________________
b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client
E VG S M U N
c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)
E VG S M U N
d) Is the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section.
Yes No
e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.
Yes No
f) Have there been any indications that the Contractor has had any financial problems? If yes, please explain below.
Yes No
6. SAFETY/SECURITY
a) To what extent was the Contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues? (Includes:
following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies)
E VG S M U N
b) Contractor complied with all security requirements for the project and personnel security requirements.
E VG S M U N
7. GENERAL
a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues).
E VG S M U N
b) Compliance with contractual terms/provisions (explain if specific issues) E VG S M U N
c) Would you hire or work with this firm again? (If no, please explain below) Yes No
d) In summary, provide an overall rating for the work performed by this Contractor.
E VG S M U N
Please provide responses to the questions above (if applicable) and/or additional remarks. Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary):
PART III – Return Information It is preferred that your questionnaire be returned to the offeror. However, you may also send your completed questionnaire directly to the U.S. Army Corps of Engineers at the following address:
U.S. Army Corps of Engineers, Kansas City District
Attn: William Hill 635 Federal Building 601 East 12th Street
Kansas City, Missouri 64106-2824
The questionnaires can also be emailed to william.j.hill@usace.army.mil.
SECTION J, ATTACHMENT 2
PRAC SAMPLE PROJECT SCOPE OF WORK – COST PLUS FIXED FEE
AND
BID SCHEDULE
1. INTRODUCTION:
1.1 General – This sample project is intended to enable the government to evaluate an offeror’s cost proposal to perform the work and to also gage an offeror’s understanding of the work. The cost proposal associated with this sample project will be analyzed for cost realism leading to a probable cost determination for this cost-plus-fixed-fee project.
1.2 Contract Type. Assume a Cost-Plus-Fixed-Fee Task Order to perform the activities described in this Sample Scope of Work.
2. LOCATION
The Superfund Site (Site) is located in a light industrial area in South Plainfield, New Jersey.
3. SITE HISTORY
From 1936 to 1962, a facility manufacturing electronic parts and components including capacitors operated at the site. During site operations, the company released/buried material contaminated with PCBs, which resulted in contamination of site soils. The only contaminant above action levels at the site is PCBs. The remedy associated with this sample project is excavation and offsite disposal. Due to the large area impacted by this contaminated fill material, the site was divided into a number of areas to better manage the remediation. Each of the areas is being remediated in a designated phase. This project covers one phase of the work.
4. SITE CONDITIONS
4.1 Physical Setting and Climate: The area of the site included in this phase of remediation consists of a park located adjacent to a light industrial area of the city. The park consists of a level and open grass area. Access to a major interstate highway is approximately 7 miles from the site.
4.2 Soil Conditions: Soil to be excavated consists of a variety of materials, from silty sand, to sand. The unit weight of the soil is 1.6 tons/bank cubic yard. The total amount of soil to be excavated is 125,190 bank cubic yards.
The amount of soil requiring offsite disposal is 71,110 bank cubic yards. The soil that does not require offsite disposal will be used onsite as backfill.
The top one foot of the contaminated interval requiring disposal is above the TSCA threshold of 50mg/kg for PCB contamination in soil and EPA has approved this material to be disposed of at a Subtitle C facility. The underlying five feet of the contaminated interval requiring offsite disposal can be disposed of at a Subtitle D facility.
The pre-design investigation (PDI) indicates that 54,080 bank cubic yards can be used onsite as backfill. This volume includes clean overburden and soils excavated in order to bench the excavation to ensure excavation stability and excavated soil that is segregated and does not exhibit VOCs, SVOCs, TAL Metals, Pesticides and PCBs above regulatory limits and will be reused as backfill. The remainder of backfill will be imported from offsite.
4.3 Groundwater: Groundwater in the area targeted for excavation is encountered at approximately 12 feet below the ground surface.
5. SITE CHARACTERIZATION
Site characterization indicates the limits of contaminated soil are bounded by a rectangular area of approximate dimensions as follows: 400 feet by 800 feet. Contaminated soil above action levels occurs within this area in the 4 to 10-foot depth interval with the top 4 feet of overburden and benching soils around the perimeter being below cleanup criteria.
6. REMEDIAL ACTION SCOPE OF WORK
The general scope of work includes excavation of contaminated soil; sampling and analysis of soil to ensure remedial action objectives have been attained; transportation and offsite disposal of all excavated waste; restoration of the park to pre-excavation conditions; and preparing as built drawings and a Remedial Action Report; and other activities necessary for complete and proper remediation of the site. The Project duration is from November 1, 2016 to Oct 30, 2017.
Waste Handling/Disposal: All waste material will be segregated on site, sampled, and transported off-site for disposal at a disposal facility permitted to accept the waste.
A brief narrative of the Sample Project Approach (2 to 5 pages) that documents means and methods being proposed for completion of the work is to be submitted with the cost proposal. The Sample Project Approach shall document the offeror’s’ assumptions including equipment to be used and production rates assumed. The proposal (bid) schedule shall be completed in its entirety. Also, detailed backup shall be included for each proposal line item. The backup shall include labor, equipment, materials, subcontract information (including subcontractor quotes), and any other information as necessary for the government to understand the basis of the Contractor’s proposal.
Below is a compilation of assumptions and technical requirements for the offeror to consider in development of their cost proposal. Costs have been provided for several subcontract type items the offeror should use in developing their estimate. The reason these costs are provided is to reduce the number of quotes offerors need to obtain for a project that is hypothetical and to limit the number of variables in the cost realism evaluation.
Development of Pre-Work Submittals – assumed cost: $75,000 (fully burdened)
Confirmatory sampling required at base of excavation with one sample from each 30’ x 30’ area at the base of the excavation and one sample per 100-ft along the sidewalls of the excavation across the depth interval of 4 to 10 ft.
bgs. Confirmatory samples shall be analyzed at an offsite laboratory by EPA for PCBs only.
Assume 1-1/2 to 1 slope for benching of excavation.
Assume no laboratory costs – all laboratory analysis including sampling of borrow material, will be performed by an EPA laboratory at no cost to the project.
The topsoil overlying the excavation area shall be scraped off, stockpiled, and re-used as topsoil during backfill operations. Additional backfill shall be obtained from an off-site borrow source. The top 6-inches of topsoil will be reused during site restoration. The quantity of this topsoil that shall be placed and rolled by the contractor prior to seeding is 6,610 bcy.
All backfill and topsoil shall be tested for VOCs, SVOCs, TAL Metals, Pesticides and PCBs at a rate of one sample per 2000 BCY or fraction thereof, prior to being delivered to the site. Except for topsoil, backfill shall be placed in 12-inch loose lifts and compacted to 90% standard proctor (ASTM D 698) density with + 3 percent of optimum moisture content. In-place density shall be verified using either ASTM D 1556 or ASTM D 2922. In place density shall be measured at a frequency of 1 sample per lift. Delivered price does not include analysis to certify clean or placement, compaction, and compaction testing.
Site Restoration shall consist of hydro seeding the excavated area with a turf-type tall fescue at a rate of 250 lbs/acre. Starter fertilizer shall be at 24-25-4 applied at a rate of 150 lbs/acre.
A closeout report consisting of a Post Remedial Action Report (PRAR) and a Construction Closeout Report (CCOR) shall be developed at the completion of the project. Assume the cost to develop these reports is a total of $75,000 (fully burdened).
Assume all required permits have been obtained.
Assume no cost for storm water management
Assume 1 sample per 500 tons for soil that is to be disposed at an offsite disposal facility
All analytical work will be performed by an EPA lab at no cost to the project. Assume no cost for the analytical requirements of this sample project. Sampling costs shall be included in the offeror’s proposal.
Estimated Costs for certain items:
Pre-Work Submittals - $75,000 (fully burdened, exclusive of fee) Backfill delivered - $15/ton (subcontractor quote) Closeout Report - $75, 000 (fully burdened, exclusive of fee) Transportation and Disposal of waste to Subtitle D Landfill - $120/ton (subcontractor quote) Transportation and Disposal of waste to Subtitle C Landfill - $380/ton (subcontractor quote)
Site Management:
The following site management personnel are required onsite full time for the entire duration of the project: Site Superintendent, CQC supervisor, and Site Health and Safety Officer. A Project Manager is required for 25% of the project duration.
7. MEASUREMENT AND PAYMENT
Measurement and Payment shall be made as described under each Bid Item description.
7.1 BID ITEM NO. 1 – PRE-CONSTRUCTION SUBMITTALS
Assumed cost included in Bid Schedule
7.2 BID ITEM NO. 2 – GENERAL CONDITIONS
This bid item includes costs associated establishment and maintenance of a temporary facility to support remediation; costs for project-dedicated site management staff; costs associated with regulatory compliance; costs for pre-construction and construction period planning, and project schedule development and updates; costs associated with periodic submittals, reporting, and administration; costs associated with contractor quality control;
the cost of environmental protection and spill control; costs for project photographs, weather monitoring, and weekly inspection during shutdown periods. Work includes all of the items required by the scope of work and base contract that is not explicitly covered under other bid items. Examples of this are the Contractor’s cost for insurance, fees, and other similar expenses directly related to the work. Payment will be made when work has been conducted and submitted with each progress payment.
7.3 BID ITEM NO. 3 – MOBILIZATION AND DEMOBILIZATION
Work shall include labor, materials, and equipment necessary to transport to the site all personnel and equipment;
establish work areas and boundaries; and initial setup, including temporary facilities. Payment shall be made on a lump sum basis - fifty percent (50%) after completion of mobilization to the site and fifty percent (50%) after demobilization has been completed and the work has been accepted by the Contracting Officer.
7.4 BID ITEM NO. 4 – SOIL EXCAVATION, SAMPLING, AND STOCKPILING (INCLUDES STRIPPED
TOPSOIL)
Work shall include all labor, materials, and equipment associated with excavation and stockpiling of soils; loading soil for transportation to an offsite disposal facility of both TSCA and non-TSCA PCB-contaminated soil;
stockpiling of non-contaminated excavated material for re-use as backfill; and segregating excavated soil that is below action levels for re-use as backfill.
7.5 BID ITEM NO.5 – LOAD OUT, TRANSPORTATION, AND DISPOSAL OF TSCA MATERIAL
(SUBTITLE C FACILITY)
Work shall include all labor, materials, and equipment associated with load out, transportation, and disposal of all TSCA material at an off-site facility approved to accept this waste stream. Use Transportation and Disposal (T&D) unit cost provided by the Government. Payment will be made based upon disposal tickets.
7.6 BID ITEM NO.6 – LOAD OUT, TRANSPORTATION, AND DISPOSAL OF NON-TSCA MATERIAL
(SUBTITLE D FACILITY)
Work shall include all labor, materials, and equipment associated with load out, transportation, and disposal of all non-TSCA material at an off-site facility approved to accept this waste stream. Use Transportation and Disposal (T&D) unit cost provided by the Government. Payment will be made based upon disposal tickets.
7.7 BID ITEM NO.7 - SAMPLE COLLECTION
Work shall include all labor, materials, and equipment associated with sampling of the excavation bottom and side slopes to ensure remediation goals are achieved; sampling of contaminated excavated material to meet disposal facility requirements; and sampling of excavated material for onsite re-use.
7.8 BID ITEM NO. 8 –BACKFILL, PLACE, AND COMPACT (IMPORTED SOIL)
Work shall include all labor, materials, and equipment associated with purchasing backfill from an off-site source, sampling imported backfill for analysis to verify it is clean, placing and compacting all imported backfill to within 6-inches of the existing grade. Payment will be by the in-place compacted cubic yard. Measurement for payment for Bid Item No. 8 will be calculated from surveys taken after completion of excavation and after completion of backfill.
Cost of clean backfill delivered to the site is provided in project description.
7.9. BID ITEM NO. 9 – BACKFILL, PLACE, AND COMPACT (REUSED SOIL)
Work shall include all labor, materials, and equipment associated with placing and compacting all reusable backfill in the excavation. Payment will be by the in-place compacted cubic yard.
7.10 BID ITEM NO. 10 - SEEDING
Work shall include all labor, materials, and equipment associated with restoring the disturbed area with seed, fertilizer, and straw mulch at the rates provided in the Scope of Work. Payment shall be at the contract unit rate per acre seeded.
7.10 BID ITEM NO. 11 – CLOSEOUT REPORT
Assumed cost included in Bid Schedule
7.11 BID ITEM NO. 12 – FIXED FEE
Proposed fixed fee for the project. Offeror shall use the proposed maximum fixed fee rate in accordance with the maximum rate proposed in Section B, Table 3.
PROPOSAL (BID) SCHEDULE: Sample Project
Unit Total
Item Description Unit Quantity Cost Cost
1 Pre-Construction Submittals (Work Plans) LS N/A $75,000.00 $75,000.00
2 General Conditions month
3 Mobilization & Demobilization LS N/A
Soil Excavation, Sampling and Stockpiling (includes stripped topsoil)
BCY 125,190
Load Out, Transportation & Disposal of TSCA Material (Subtitle C facility)
Tons 18,960
Load Out, Transportation & Disposal of non-TSCA Material (Subtitle D facility)
Tons 94,820
7 Sample Collection LS 1
8 Imported Backfill, Place, and Compact BCY 71,110
9 Re-Use Backfill, Place, and Compact7 BCY 54,080
10 Seeding Acre 11 -
11 Closeout Report LS N/A $75,000.00 $75,000.00
12 Fixed Fee LS N/A
Total Project Cost
Note 1: The Offeror shall utilize the fully burdened labor rates proposed in Table 1 of Section B to develop the unit costs. Enter your unit rates and costs for each bid item and the total project cost.
Note 2: For those quantities not provided, enter estimated quantities for execution of that element of the scope of work.
Note 3: Cost backup including labor, equipment, materials, subcontracts and incidental expenses, and any assumptions are to be provided in the cost proposal. This basis of proposal information shall support the costs proposed for each line item in the schedule above and if vendor quotes or subcontractor bids were obtained, copies of the vendor quotes and subcontractor bids should be provided as part of the backup. Backup information should include detail by line item. Subcontractor quotes should also include a breakout of labor hours, labor costs, equipment costs, & material costs.
Note 4: The offeror shall utilize the maximum fee rate proposed in Table 3 of Section B.
Note 5: Amounts in line items 1 and 11 are fully burdened price.
Note 6: For line items 8 and 9, the compacted unit weight of material is assumed to be equal to the in-place unit weight prior to excavation (bank cubic yards).
Note 7: Includes 6,610 bcy of topsoil.
Note 8: The offeror shall utilize the attached wage determinations for all appropriate personnel proposed to execute the work.
Note 9: The offeror shall not charge fee on travel, per this base contract.
**Note: The Service Contract Act Wage Determinations apply to all work performed under this project, except for the following work: 1) Excavation of contaminated soil; and
2) Restoration activities .**
WD 05-2349 (Rev.-18) was first posted on www.wdol.gov on 01/05/2016
REGISTER OF WAGE DETERMINATIONS UNDER | U.S. DEPARTMENT OF LABOR
THE SERVICE CONTRACT ACT | EMPLOYMENT STANDARDS ADMINISTRATION
By direction of the Secretary of Labor | WAGE AND HOUR DIVISION
| WASHINGTON D.C. 20210
| Wage Determination No.: 2005-2349 Daniel W. Simms Division of | Revision No.: 18 Director Wage Determinations| Date Of Revision: 12/29/2015 Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.15 for calendar year 2016 applies to all contracts subject to the Service Contract Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.15 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
State: New Jersey
Area: New Jersey Counties of Hunterdon, Middlesex, Somerset, Warren **Fringe Benefits Required Follow the Occupational Listing**
OCCUPATION CODE - TITLE FOOTNOTE RATE
01000 - Administrative Support And Clerical Occupations 01011 - Accounting Clerk I 15.11 01012 - Accounting Clerk II 19.61 01013 - Accounting Clerk III 21.89 01020 - Administrative Assistant 30.93 01040 - Court Reporter 21.64 01051 - Data Entry Operator I 14.71 01052 - Data Entry Operator II 16.05 01060 - Dispatcher, Motor Vehicle 25.79 01070 - Document Preparation Clerk 15.56 01090 - Duplicating Machine Operator 15.56 01111 - General Clerk I 14.82 01112 - General Clerk II 17.49 01113 - General Clerk III 18.82 01120 - Housing Referral Assistant 26.92 01141 - Messenger Courier 12.34 01191 - Order Clerk I 17.35 01192 - Order Clerk II 21.37 01261 - Personnel Assistant (Employment) I 18.96 01262 - Personnel Assistant (Employment) II 21.22
01263 - Personnel Assistant (Employment) III 23.66 01270 - Production…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .