AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

a) Revise Section J, paragraphs 6 and 7 (proposal bid schedule).

b) Revise Section M, paragraph 5.1

1. CONTRACT ID CODE PAGE OF PAGES

U 1 89

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 07-May-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DQ-16-R-3001

X 9B. DATED (SEE ITEM 11)

20-Apr-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

07-May-2016

CODE

USACE, KANSAS CITY +

FEDERAL BLDG CT-H 601 E 12TH ST RM 647

KANSAS CITY MO 64106-2896

W912DQ 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DQ-16-R-3001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

SECTION J

Attachment No. Description 1 Past Performance Questionnaire with Information 2 Sample Project Scope of Work & Bid Schedule (Cost Plus Fixed Fee) 3 Instructions for Completion of ENG 93 - Payment Estimate 4 Request to Sub Contract 5 Request for Authority to Proceed 6 Work Variation Notification 7 Pre-Award Survey of Prospective Contractor Accounting System Checklist 8 Chemistry Supplement to the Scope of Services for the Multiple Environmental

Government Acquisition (MEGA) 9 Geology Supplement to the Scope of Services for the Multiple Environmental

Government Acquisition (MEGA) 10 NWK Supplement for Contractor Quality Control Plans for Remedial Actions

SECTION J, ATTACHMENT 1

PAST PERFORMANCE QUESTIONNAIRE

INFORMATION

This Attachment 1 contains the following:

- Sample Cover Letter

- Instructions to the Reference for Completing the Past Performance Questionnaire

- Past Performance Questionnaire

NOTE TO OFFERORS/RESPONDENTS: Please ensure all Past Performance information submitted includes solicitation number W912DQ-16-R-3001 and the prime offeror’s name.

RESPONDENTS MAY USE ADDITIONAL PAGES TO COMPLETE PAST PERFORMANCE

QUESTIONNAIRE, IF NECESSARY.

PAST PERFORMANCE QUESTIONNAIRE

SAMPLE COVER LETTER

SAMPLE OF COVER LETTER TO BE SENT BY THE OFFORER TO ITS REFERENCES

Date

Name and Address of Reference

Dear __________________________:

We have listed your firm as a reference for work we have performed for you as listed below. Our firm has submitted a proposal for a project advertised by the U.S. Army Corps of Engineers (USACE), Kansas City District.

In accordance with Federal Acquisition Regulations (FAR), an evaluation of our firm’s past performance will be completed by the USACE. Your candid response to the attached questionnaire will assist the evaluation team in this process.

Your firm has been listed as a reference for the work we performed for you on the following project:

(INSERT Project name and contract number)

We understand that you have a busy schedule and your participation in this evaluation is greatly appreciated. Please complete the enclosed questionnaire as thoroughly as possible. Furthermore, a questionnaire has also been sent to ___________________ of your organization. Only one response from each company is required. If at all possible, we suggest that you individually answer this questionnaire and then coordinate your responses with that of _________________, to forge a consensus on one overall response from your organization. It is preferred that you return your questionnaire to our office; however you may also send your completed questionnaire directly to USACE at the following address:

U.S. Army Engineer District, Kansas City ATTN: CECT-NWK-Mr. Josh Hill

Federal Building Room 647 601 East 12th Street

Kansas City, Missouri 640106-2896

The questionnaires can also be e-mailed to william.j.hill@usace.army.mil. We request your questionnaire be provided by the proposal deadline, which is May 20, 2016

If you have questions regarding the attached questionnaire, or require assistance, please contact Mr. Josh Hill, USACE Contract Specialist, at (816) 389-3827.

Sincerely, (Offeror’s signature)

Attachments:

1. Instructions to the Reference for completing the Past Performance Questionnaire

2. Past Performance Questionnaire

THE PAST PERFORMANCE QUESTIONNAIRE

NAVFAC/USACE PAST PERFORMANCE QUESTIONNAIRE (Form PPQ-0)

CONTRACT INFORMATION (Contractor to complete Blocks 1-4)

1. Contractor Information Firm Name: CAGE Code:

Address: DUNs Number:

Phone Number:

Email Address:

Point of Contact: Contact Phone Number:

2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain) Percent of project work performed:

If subcontractor, who was the prime (Name/Phone #):

3. Contract Information Contract Number:

Delivery/Task Order Number (if applicable):

Contract Type: Firm Fixed Price Cost Reimbursement Other (Please specify):

Contract Title:

Contract Location:

Award Date (mm/dd/yy):

Contract Completion Date (mm/dd/yy):

Actual Completion Date (mm/dd/yy):

Explain Differences:

Original Contract Price (Award Amount):

Final Contract Price (to include all modifications, if applicable):

Explain Differences:

4. Project Description:

Complexity of Work High Med Routine How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, or other)

CLIENT INFORMATION (Client to complete Blocks 5-8)

5. Client Information Name:

Title:

Phone Number:

Email Address:

6. Describe the client’s role in the project:

7. Date Questionnaire was completed (mm/dd/yy):

8. Client’s Signature:

NOTE: CLIENTS ARE HIGHLY ENCOURAGED TO SUBMIT QUESTIONNAIRES DIRECTLY TO

THE OFFEROR. HOWEVER, QUESTIONNAIRES MAY BE SUBMITTED DIRECTLY TO USACE.

THE GOVERNMENT RESERVES THE RIGHT TO VERIFY ANY AND ALL INFORMATION ON THIS

FORM.

ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT YOUR EVALUATION OF THE

CONTRACTOR’S PERFORMANCE

RATING DEFINITION NOTE

(E) Exceptional Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the Contractor was highly effective.

An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.

(VG) Very Good Performance meets contractual requirements and exceeds some to the Government’s/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the Contractor were effective.

A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.

(S) Satisfactory Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the Contractor appear or were satisfactory.

A Satisfactory rating is appropriate when there were only minor problems, or major problems that the Contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that Contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.

(M) Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the Contractor has not yet identified corrective actions. The Contractor's proposed actions appear only marginally effective or were not fully implemented.

A Marginal is appropriate when a significant event occurred that the Contractor had trouble overcoming which impacted the Government/Owner.

(U) Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the Contractor's corrective actions appear or were ineffective.

An Unsatisfactory rating is appropriate when multiple significant events occurred that the Contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.

(N) Not Applicable No information or did not apply to your contract Rating will be neither positive nor negative.

Contractor Information (Firm Name): ________________________________________________

Client Information (Name): ________________________________________________________

TO BE COMPLETED BY CLIENT

PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS

YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE.

1. QUALITY:

a) Quality of technical data/report preparation efforts E VG S M U N

b) Ability to meet quality standards specified for technical performance E VG S M U N

c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance

E VG S M U N

d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)

E VG S M U N

2. SCHEDULE/TIMELINESS OF PERFORMANCE:

a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)

E VG S M U N

b) Rate the Contractor’s use of available resources to accomplish tasks identified in the contract

E VG S M U N

3. CUSTOMER SATISFACTION:

a) To what extent were the end users satisfied with the project? E VG S M U N

b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes;

responsiveness to administrative reports, businesslike and communication)

E VG S M U N

c) To what extent was the Contractor cooperative, businesslike, and concerned with the interests of the customer?

E VG S M U N

d) Overall customer satisfaction E VG S M U N

4. MANAGEMENT/ PERSONNEL/LABOR

a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force?

E VG S M U N

b) Ability to hire, apply, and retain a qualified workforce to this effort E VG S M U N

c) Government Property Control E VG S M U N

d) Knowledge/expertise demonstrated by Contractor personnel E VG S M U N

e) Utilization of Small Business concerns E VG S M U N

f) Ability to simultaneously manage multiple projects with multiple disciplines E VG S M U N

g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes

E VG S M U N

h) Effectiveness of overall management (including ability to effectively lead, manage and control the program)

E VG S M U N

5. COST/FINANCIAL MANAGEMENT

a) Ability to meet the terms and conditions within the contractually agreed price(s)?

E VG S M U N

Contractor Information (Firm Name): ________________________________________________

Client Information (Name): ________________________________________________________

b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client

E VG S M U N

c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)

E VG S M U N

d) Is the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section.

Yes No

e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.

Yes No

f) Have there been any indications that the Contractor has had any financial problems? If yes, please explain below.

Yes No

6. SAFETY/SECURITY

a) To what extent was the Contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues? (Includes:

following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies)

E VG S M U N

b) Contractor complied with all security requirements for the project and personnel security requirements.

E VG S M U N

7. GENERAL

a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues).

E VG S M U N

b) Compliance with contractual terms/provisions (explain if specific issues) E VG S M U N

c) Would you hire or work with this firm again? (If no, please explain below) Yes No

d) In summary, provide an overall rating for the work performed by this Contractor.

E VG S M U N

Please provide responses to the questions above (if applicable) and/or additional remarks. Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary):

PART III – Return Information It is preferred that your questionnaire be returned to the offeror. However, you may also send your completed questionnaire directly to the U.S. Army Corps of Engineers at the following address:

U.S. Army Corps of Engineers, Kansas City District

Attn: William Hill 635 Federal Building 601 East 12th Street

Kansas City, Missouri 64106-2824

The questionnaires can also be emailed to william.j.hill@usace.army.mil.

SECTION J, ATTACHMENT 2

PRAC SAMPLE PROJECT SCOPE OF WORK – COST PLUS FIXED FEE

AND

BID SCHEDULE

1. INTRODUCTION:

1.1 General – This sample project is intended to enable the government to evaluate an offeror’s cost proposal to perform the work and to also gage an offeror’s understanding of the work. The cost proposal associated with this sample project will be analyzed for cost realism leading to a probable cost determination for this cost-plus-fixed-fee project.

1.2 Contract Type. Assume a Cost-Plus-Fixed-Fee Task Order to perform the activities described in this Sample Scope of Work.

2. LOCATION

The Superfund Site (Site) is located in a light industrial area in South Plainfield, New Jersey.

3. SITE HISTORY

From 1936 to 1962, a facility manufacturing electronic parts and components including capacitors operated at the site. During site operations, the company released/buried material contaminated with PCBs, which resulted in contamination of site soils. The only contaminant above action levels at the site is PCBs. The remedy associated with this sample project is excavation and offsite disposal. Due to the large area impacted by this contaminated fill material, the site was divided into a number of areas to better manage the remediation. Each of the areas is being remediated in a designated phase. This project covers one phase of the work.

4. SITE CONDITIONS

4.1 Physical Setting and Climate: The area of the site included in this phase of remediation consists of a park located adjacent to a light industrial area of the city. The park consists of a level and open grass area. Access to a major interstate highway is approximately 7 miles from the site.

4.2 Soil Conditions: Soil to be excavated consists of a variety of materials, from silty sand, to sand. The unit weight of the soil is 1.6 tons/bank cubic yard. The total amount of soil to be excavated is 125,190 bank cubic yards.

The amount of soil requiring offsite disposal is 71,110 bank cubic yards. The soil that does not require offsite disposal will be used onsite as backfill.

The top one foot of the contaminated interval requiring disposal is above the TSCA threshold of 50mg/kg for PCB contamination in soil and EPA has approved this material to be disposed of at a Subtitle C facility. The underlying five feet of the contaminated interval requiring offsite disposal can be disposed of at a Subtitle D facility.

The pre-design investigation (PDI) indicates that 54,080 bank cubic yards can be used onsite as backfill. This volume includes clean overburden and soils excavated in order to bench the excavation to ensure excavation stability and excavated soil that is segregated and does not exhibit VOCs, SVOCs, TAL Metals, Pesticides and PCBs above regulatory limits and will be reused as backfill. The remainder of backfill will be imported from offsite.

4.3 Groundwater: Groundwater in the area targeted for excavation is encountered at approximately 12 feet below the ground surface.

5. SITE CHARACTERIZATION

Site characterization indicates the limits of contaminated soil are bounded by a rectangular area of approximate dimensions as follows: 400 feet by 800 feet. Contaminated soil above action levels occurs within this area in the 4 to 10-foot depth interval with the top 4 feet of overburden and benching soils around the perimeter being below cleanup criteria.

6. REMEDIAL ACTION SCOPE OF WORK

The general scope of work includes excavation of contaminated soil; sampling and analysis of soil to ensure remedial action objectives have been attained; transportation and offsite disposal of all excavated waste; restoration of the park to pre-excavation conditions; and preparing as built drawings and a Remedial Action Report; and other activities necessary for complete and proper remediation of the site. The Project duration is from November 1, 2016 to Oct 30, 2017.

Waste Handling/Disposal: All waste material will be segregated on site, sampled, and transported off-site for disposal at a disposal facility permitted to accept the waste.

A brief narrative of the Sample Project Approach (2 to 5 pages) that documents means and methods being proposed for completion of the work is to be submitted with the cost proposal. The Sample Project Approach shall document the offeror’s’ assumptions including equipment to be used and production rates assumed. The proposal (bid) schedule shall be completed in its entirety. Also, detailed backup shall be included for each proposal line item. The backup shall include labor, equipment, materials, subcontract information (including subcontractor quotes), and any other information as necessary for the government to understand the basis of the Contractor’s proposal.

Below is a compilation of assumptions and technical requirements for the offeror to consider in development of their cost proposal. Costs have been provided for several subcontract type items the offeror should use in developing their estimate. The reason these costs are provided is to reduce the number of quotes offerors need to obtain for a project that is hypothetical and to limit the number of variables in the cost realism evaluation.

Development of Pre-Work Submittals – assumed cost: $75,000 (fully burdened)

Confirmatory sampling required at base of excavation with one sample from each 30’ x 30’ area at the base of the excavation and one sample per 100-ft along the sidewalls of the excavation across the depth interval of 4 to 10 ft.

bgs. Confirmatory samples shall be analyzed at an offsite laboratory by EPA for PCBs only.

Assume 1-1/2 to 1 slope for benching of excavation.

Assume no laboratory costs – all laboratory analysis including sampling of borrow material, will be performed by an EPA laboratory at no cost to the project.

The topsoil overlying the excavation area shall be scraped off, stockpiled, and re-used as topsoil during backfill operations. Additional backfill shall be obtained from an off-site borrow source. The top 6-inches of topsoil will be reused during site restoration. The quantity of this topsoil that shall be placed and rolled by the contractor prior to seeding is 6,610 bcy.

All backfill and topsoil shall be tested for VOCs, SVOCs, TAL Metals, Pesticides and PCBs at a rate of one sample per 2000 BCY or fraction thereof, prior to being delivered to the site. Except for topsoil, backfill shall be placed in 12-inch loose lifts and compacted to 90% standard proctor (ASTM D 698) density with + 3 percent of optimum moisture content. In-place density shall be verified using either ASTM D 1556 or ASTM D 2922. In place density shall be measured at a frequency of 1 sample per lift. Delivered price does not include analysis to certify clean or placement, compaction, and compaction testing.

Site Restoration shall consist of hydro seeding the excavated area with a turf-type tall fescue at a rate of 250 lbs/acre. Starter fertilizer shall be at 24-25-4 applied at a rate of 150 lbs/acre.

A closeout report consisting of a Post Remedial Action Report (PRAR) and a Construction Closeout Report (CCOR) shall be developed at the completion of the project. Assume the cost to develop these reports is a total of $75,000 (fully burdened).

Assume all required permits have been obtained.

Assume no cost for storm water management

Assume 1 sample per 500 tons for soil that is to be disposed at an offsite disposal facility

All analytical work will be performed by and EPA lab at no cost to the project. Assume no cost for the analytical requirements of this sample project. Sampling costs shall be included in the offeror’s proposal.

Estimated Costs for certain items:

Pre-Work Submittals - $75,000 (fully burdened, exclusive of fee) Backfill delivered - $15/ton (subcontractor quote) Closeout Report - $75, 000 (fully burdened, exclusive of fee) Transportation and Disposal of waste to Subtitle D Landfill - $120/ton (subcontractor quote) Transportation and Disposal of waste to Subtitle C Landfill - $380/ton (subcontractor quote)

Site Management:

The following site management personnel are required onsite full time for the entire duration of the project: Site Superintendent, CQC supervisor, and Site Health and Safety Officer. A Project Manager is required for 25% of the project duration.

7. MEASUREMENT AND PAYMENT

Measurement and Payment shall be made as described under each Bid Item description.

7.1 BID ITEM NO. 1 – PRE-CONSTRUCTION SUBMITTALS

Assumed cost included in Bid Schedule

7.2 BID ITEM NO. 2 – GENERAL CONDITIONS

This bid item includes costs associated establishment and maintenance of a temporary facility to support remediation; costs for project-dedicated site management staff; costs associated with regulatory compliance; costs for pre-construction and construction period planning, and project schedule development and updates; costs associated with periodic submittals, reporting, and administration; costs associated with contractor quality control;

the cost of environmental protection and spill control; costs for project photographs, weather monitoring, and weekly inspection during shutdown periods. Work includes all of the items required by the scope of work and base contract that is not explicitly covered under other bid items. Examples of this are the Contractor’s cost for insurance, fees, and other similar expenses directly related to the work. Payment will be made when work has been conducted and submitted with each progress payment.

7.3 BID ITEM NO. 3 – MOBILIZATION AND DEMOBILIZATION

Work shall include labor, materials, and equipment necessary to transport to the site all personnel and equipment;

establish work areas and boundaries; and initial setup, including temporary facilities. Payment shall be made on a lump sum basis - fifty percent (50%) after completion of mobilization to the site and fifty percent (50%) after demobilization has been completed and the work has been accepted by the Contracting Officer.

7.4 BID ITEM NO. 4 – SOIL EXCAVATION, SAMPLING, AND STOCKPILING (INCLUDES STRIPPED

TOPSOIL)

Work shall include all labor, materials, and equipment associated with excavation and stockpiling of soils; loading soil for transportation to an offsite disposal facility of both TSCA and non-TSCA PCB-contaminated soil;

stockpiling of non-contaminated excavated material for re-use as backfill; and segregating excavated soil that is below action levels for re-use as backfill.

7.5 BID ITEM NO.5 – LOAD OUT, TRANSPORTATION, AND DISPOSAL OF TSCA MATERIAL

(SUBTITLE C FACILITY)

Work shall include all labor, materials, and equipment associated with load out, transportation, and disposal of all TSCA material at an off-site facility approved to accept this waste stream. Use Transportation and Disposal (T&D) unit cost provided by the Government. Payment will be made based upon disposal tickets.

7.6 BID ITEM NO.6 – LOAD OUT, TRANSPORTATION, AND DISPOSAL OF NON-TSCA MATERIAL

(SUBTITLE D FACILITY)

Work shall include all labor, materials, and equipment associated with load out, transportation, and disposal of all non-TSCA material at an off-site facility approved to accept this waste stream. Use Transportation and Disposal (T&D) unit cost provided by the Government. Payment will be made based upon disposal tickets.

7.7 BID ITEM NO.7 - SAMPLE COLLECTION

Work shall include all labor, materials, and equipment associated with sampling of the excavation bottom and side slopes to ensure remediation goals are achieved; sampling of contaminated excavated material to meet disposal facility requirements; and sampling of excavated material for onsite re-use.

7.8 BID ITEM NO. 8 –BACKFILL, PLACE, AND COMPACT (IMPORTED SOIL)

Work shall include all labor, materials, and equipment associated with purchasing backfill from an off-site source, sampling imported backfill for analysis to verify it is clean, placing and compacting all imported backfill to within 6-inches of the existing grade. Payment will be by the in-place compacted cubic yard. Measurement for payment for Bid Item No. 8 will be calculated from surveys taken after completion of excavation and after completion of backfill.

Cost of clean backfill delivered to the site is provided in project description.

7.9. BID ITEM NO. 9 – BACKFILL, PLACE, AND COMPACT (REUSED SOIL)

Work shall include all labor, materials, and equipment associated with placing and compacting all reusable backfill in the excavation. Payment will be by the in-place compacted cubic yard.

7.10 BID ITEM NO. 10 - SEEDING

Work shall include all labor, materials, and equipment associated with restoring the disturbed area with seed, fertilizer, and straw mulch at the rates provided in the Scope of Work. Payment shall be at the contract unit rate per acre seeded.

7.10 BID ITEM NO. 11 – CLOSEOUT REPORT

Assumed cost included in Bid Schedule

7.11 BID ITEM NO. 12 – FIXED FEE

Proposed fixed fee for the project. Offeror shall use the proposed maximum fixed fee rate in accordance with the maximum rate proposed in Section B, Table 3.

PROPOSAL (BID) SCHEDULE: Sample Project

Unit Total

Item Description Unit Quantity Cost Cost

1 Pre-Construction Submittals (Work Plans) LS N/A $75,000.00 $75,000.00

2 General Conditions month

3 Mobilization & Demobilization LS N/A

Soil Excavation, Sampling and Stockpiling (includes stripped topsoil)

BCY 125,190

Load Out, Transportation & Disposal of TSCA Material (Subtitle C facility)

Tons 18,960

Load Out, Transportation & Disposal of non-TSCA Material (Subtitle D facility)

Tons 94,820

7 Sample Analysis LS N/A

8 Imported Backfill, Place, and Compact BCY 71,110

9 Re-Use Backfill, Place, and Compact7 BCY 54,080

10 Seeding Acre 11 -

11 Closeout Report LS N/A $75,000.00 $75,000.00

12 Fixed Fee LS N/A

Total Project Cost

Note 1: The Offeror shall utilize the fully burdened labor rates proposed in Table 1 of Section B to develop the unit costs. Enter your unit rates and costs for each bid item and the total project cost.

Note 2: For those quantities not provided, enter estimated quantities for execution of that element of the scope of work.

Note 3: Cost backup including labor, equipment, materials, subcontracts and incidental expenses, and any assumptions are to be provided in the cost proposal. This basis of proposal information shall support the costs proposed for each line item in the schedule above and if vendor quotes or subcontractor bids were obtained, copies of the vendor quotes and subcontractor bids should be provided as part of the backup. Backup information should include detail by line item. Subcontractor quotes should also include a breakout of labor hours, labor costs, equipment costs, & material costs.

Note 4: The offeror shall utilize the maximum fee rate proposed in Table 3 of Section B.

Note 5: Amounts in line items 1 and 11 are fully burdened price.

Note 6: For line items 8 and 9, the compacted unit weight of material is assumed to be equal to the in-place unit weight prior to excavation (bank cubic yards).

Note 7: Includes 6,610 bcy of topsoil.

Note 8: The offeror shall utilize the attached wage determinations for all appropriate personnel proposed to execute the work.

Note 9: The offeror shall not charge fee on travel, per this base contract.

WD 05-2349 (Rev.-18) was first posted on www.wdol.gov on 01/05/2016

REGISTER OF WAGE DETERMINATIONS UNDER | U.S. DEPARTMENT OF LABOR

THE SERVICE CONTRACT ACT | EMPLOYMENT STANDARDS ADMINISTRATION

By direction of the Secretary of Labor | WAGE AND HOUR DIVISION

| WASHINGTON D.C. 20210

| Wage Determination No.: 2005-2349 Daniel W. Simms Division of | Revision No.: 18 Director Wage Determinations| Date Of Revision: 12/29/2015 Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.15 for calendar year 2016 applies to all contracts subject to the Service Contract Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.15 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

State: New Jersey

Area: New Jersey Counties of Hunterdon, Middlesex, Somerset, Warren **Fringe Benefits Required Follow the Occupational Listing**

OCCUPATION CODE - TITLE FOOTNOTE RATE

01000 - Administrative Support And Clerical Occupations 01011 - Accounting Clerk I 15.11 01012 - Accounting Clerk II 19.61 01013 - Accounting Clerk III 21.89 01020 - Administrative Assistant 30.93 01040 - Court Reporter 21.64 01051 - Data Entry Operator I 14.71 01052 - Data Entry Operator II 16.05 01060 - Dispatcher, Motor Vehicle 25.79 01070 - Document Preparation Clerk 15.56 01090 - Duplicating Machine Operator 15.56 01111 - General Clerk I 14.82 01112 - General Clerk II 17.49 01113 - General Clerk III 18.82 01120 - Housing Referral Assistant 26.92 01141 - Messenger Courier 12.34 01191 - Order Clerk I 17.35 01192 - Order Clerk II 21.37 01261 - Personnel Assistant (Employment) I 18.96 01262 - Personnel Assistant (Employment) II 21.22 01263 - Personnel Assistant (Employment) III 23.66 01270 - Production Control Clerk 23.51 01280 - Receptionist 15.67 01290 - Rental Clerk 18.04

01300 - Scheduler, Maintenance 21.57 01311 - Secretary I 21.57 01312 - Secretary II 24.82 01313 - Secretary III 26.92 01320 - Service Order Dispatcher 18.55 01410 - Supply Technician 30.93 01420 - Survey Worker 21.64 01531 - Travel Clerk I 14.64 01532 - Travel Clerk II 15.88 01533 - Travel Clerk III 17.17 01611 - Word Processor I 17.62 01612 - Word Processor II 19.79 01613 - Word Processor III 22.13 05000 - Automotive Service Occupations 05005 - Automobile Body Repairer, Fiberglass 29.36 05010 - Automotive Electrician 28.50 05040 - Automotive Glass Installer 27.31 05070 - Automotive Worker 27.31 05110 - Mobile Equipment Servicer 24.42 05130 - Motor Equipment Metal Mechanic 29.68 05160 - Motor Equipment Metal Worker 27.31 05190 - Motor Vehicle Mechanic 29.68 05220 - Motor Vehicle Mechanic Helper 23.15 05250 - Motor Vehicle Upholstery Worker 26.12 05280 - Motor Vehicle Wrecker 27.31 05310 - Painter, Automotive 28.50 05340 - Radiator Repair Specialist 27.31 05370 - Tire Repairer 17.20 05400 - Transmission Repair Specialist 29.68 07000 - Food Preparation And Service Occupations 07010 - Baker 18.00 07041 - Cook I 15.06 07042 - Cook II 16.80 07070 - Dishwasher 9.34 07130 - Food Service Worker 12.02 07210 - Meat Cutter 19.20 07260 - Waiter/Waitress 12.67 09000 - Furniture Maintenance And Repair Occupations 09010 - Electrostatic Spray Painter 21.17 09040 - Furniture Handler 16.74 09080 - Furniture Refinisher 21.17 09090 - Furniture Refinisher Helper 17.77 09110 - Furniture Repairer, Minor 19.47 09130 - Upholsterer 21.17 11000 - General Services And Support Occupations 11030 - Cleaner, Vehicles 12.94 11060 - Elevator Operator 12.94 11090 - Gardener 19.34 11122 - Housekeeping Aide 15.14 11150 - Janitor 15.70 11210 - Laborer, Grounds Maintenance 15.89 11240 - Maid or Houseman 13.34 11260 - Pruner 14.75 11270 - Tractor Operator 18.12 11330 - Trail Maintenance Worker 15.89 11360 - Window Cleaner 16.95

12000 - Health Occupations 12010 - Ambulance Driver 22.50 12011 - Breath Alcohol Technician 22.61 12012 - Certified Occupational Therapist Assistant 24.12 12015 - Certified Physical Therapist Assistant 22.28 12020 - Dental Assistant 16.83 12025 - Dental Hygienist 35.31 12030 - EKG Technician 28.65 12035 - Electroneurodiagnostic Technologist 28.65 12040 - Emergency Medical Technician 22.50 12071 - Licensed Practical Nurse I 21.76 12072 - Licensed Practical Nurse II 24.34 12073 - Licensed Practical Nurse III 24.48 12100 - Medical Assistant 16.66 12130 - Medical Laboratory Technician 20.63 12160 - Medical Record Clerk 18.00 12190 - Medical Record Technician 20.55 12195 - Medical Transcriptionist 18.33 12210 - Nuclear Medicine Technologist 36.93 12221 - Nursing Assistant I 12.37 12222 - Nursing Assistant II 13.91 12223 - Nursing Assistant III 15.82 12224 - Nursing Assistant IV 16.79 12235 - Optical Dispenser 24.64 12236 - Optical Technician 16.64 12250 - Pharmacy Technician 14.58 12280 - Phlebotomist 16.79 12305 - Radiologic Technologist 28.08 12311 - Registered Nurse I 32.76 12312 - Registered Nurse II 38.41 12313 - Registered Nurse II, Specialist 38.41 12314 - Registered Nurse III 49.39 12315 - Registered Nurse III, Anesthetist 49.39 12316 - Registered Nurse IV 59.22 12317 - Scheduler (Drug and Alcohol Testing) 26.17 13000 - Information And Arts Occupations 13011 - Exhibits Specialist I 27.03 13012 - Exhibits Specialist II 33.19 13013 - Exhibits Specialist III 35.62 13041 - Illustrator I 25.89 13042 - Illustrator II 32.08 13043 - Illustrator III 35.62 13047 - Librarian 36.42 13050 - Library Aide/Clerk 15.79 13054 - Library Information Technology Systems 32.65 Administrator 13058 - Library Technician 24.10 13061 - Media Specialist I 20.90 13062 - Media Specialist II 21.56 13063 - Media Specialist III 23.95 13071 - Photographer I 21.29 13072 - Photographer II 24.10 13073 - Photographer III 29.53 13074 - Photographer IV 36.11 13075 - Photographer V 43.69 13110 - Video Teleconference Technician 24.33

14000 - Information Technology Occupations 14041 - Computer Operator I 19.00 14042 - Computer Operator II 21.26 14043 - Computer Operator III 23.71 14044 - Computer Operator IV 26.35 14045 - Computer Operator V 29.17 14071 - Computer Programmer I (see 1) 27.56 14072 - Computer Programmer II (see 1) 14073 - Computer Programmer III (see 1) 14074 - Computer Programmer IV (see 1) 14101 - Computer Systems Analyst I (see 1) 14102 - Computer Systems Analyst II (see 1) 14103 - Computer Systems Analyst III (see 1) 14150 - Peripheral Equipment Operator 19.00 14160 - Personal Computer Support Technician 26.35 15000 - Instructional Occupations 15010 - Aircrew Training Devices Instructor (Non-Rated) 39.54 15020 - Aircrew Training Devices Instructor (Rated) 43.75 15030 - Air Crew Training Devices Instructor (Pilot) 52.46 15050 - Computer Based Training Specialist / Instructor 39.54 15060 - Educational Technologist 33.25 15070 - Flight Instructor (Pilot) 52.46 15080 - Graphic Artist 33.72 15090 - Technical Instructor 31.19 15095 - Technical Instructor/Course Developer 38.04 15110 - Test Proctor 25.11 15120 - Tutor 25.11 16000 - Laundry, Dry-Cleaning, Pressing And Related Occupations 16010 - Assembler 10.75 16030 - Counter Attendant 10.75 16040 - Dry Cleaner 13.97 16070 - Finisher, Flatwork, Machine 10.75 16090 - Presser, Hand 10.75 16110 - Presser, Machine, Drycleaning 10.75 16130 - Presser, Machine, Shirts 10.75 16160 - Presser, Machine, Wearing Apparel, Laundry 10.75 16190 - Sewing Machine Operator 14.96 16220 - Tailor 15.93 16250 - Washer, Machine 12.02 19000 - Machine Tool Operation And Repair Occupations 19010 - Machine-Tool Operator (Tool Room) 20.82 19040 - Tool And Die Maker 24.21 21000 - Materials Handling And Packing Occupations 21020 - Forklift Operator 16.96 21030 - Material Coordinator 23.51 21040 - Material Expediter 23.51 21050 - Material Handling Laborer 14.24 21071 - Order Filler 13.99 21080 - Production Line Worker (Food Processing) 16.96 21110 - Shipping Packer 15.28 21130 - Shipping/Receiving Clerk 15.28 21140 - Store Worker I 15.06 21150 - Stock Clerk 18.88 21210 - Tools And Parts Attendant 16.96 21410 - Warehouse Specialist 16.96 23000 - Mechanics And Maintenance And Repair Occupations

23010 - Aerospace Structural Welder 29.79 23021 - Aircraft Mechanic I 27.11 23022 - Aircraft Mechanic II 29.58 23023 - Aircraft Mechanic III 30.66 23040 - Aircraft Mechanic Helper 21.15 23050 - Aircraft, Painter 26.03 23060 - Aircraft Servicer 23.86 23080 - Aircraft Worker 24.93 23110 - Appliance Mechanic 23.29 23120 - Bicycle Repairer 17.14 23125 - Cable Splicer 36.53 23130 - Carpenter, Maintenance 29.89 23140 - Carpet Layer 27.98 23160 - Electrician, Maintenance 36.84 23181 - Electronics Technician Maintenance I 24.37 23182 - Electronics Technician Maintenance II 25.26 23183 - Electronics Technician Maintenance III 25.32 23260 - Fabric Worker 28.00 23290 - Fire Alarm System Mechanic 22.02 23310 - Fire Extinguisher Repairer 22.51 23311 - Fuel Distribution System Mechanic 29.05 23312 - Fuel Distribution System Operator 26.70 23370 - General Maintenance Worker 24.67 23380 - Ground Support Equipment Mechanic 27.11 23381 - Ground Support Equipment Servicer 23.86 23382 - Ground Support Equipment Worker 24.93 23391 - Gunsmith I 22.51 23392 - Gunsmith II 25.12 23393 - Gunsmith III 27.25 23410 - Heating, Ventilation And Air-Conditioning 26.97 Mechanic 23411 - Heating, Ventilation And Air Contditioning 28.93 Mechanic (Research Facility) 23430 - Heavy Equipment Mechanic 26.10 23440 - Heavy Equipment Operator 34.30 23460 - Instrument Mechanic 30.86 23465 - Laboratory/Shelter Mechanic 26.21 23470 - Laborer 14.74 23510 - Locksmith 20.70 23530 - Machinery Maintenance Mechanic 23.95 23550 - Machinist, Maintenance 19.98 23580 - Maintenance Trades Helper 15.09 23591 - Metrology Technician I 30.34 23592 - Metrology Technician II 31.53 23593 - Metrology Technician III 32.67 23640 - Millwright 31.22 23710 - Office Appliance Repairer 22.16 23760 - Painter, Maintenance 26.69 23790 - Pipefitter, Maintenance 33.20 23810 - Plumber, Maintenance 32.93 23820 - Pneudraulic Systems Mechanic 27.25 23850 - Rigger 24.36 23870 - Scale Mechanic 25.12 23890 - Sheet-Metal Worker, Maintenance 29.46 23910 - Small Engine Mechanic 19.34 23931 - Telecommunications Mechanic I 30.91

23932 - Telecommunications Mechanic II 32.20 23950 - Telephone Lineman 32.90 23960 - Welder, Combination, Maintenance 23.01 23965 - Well Driller 25.57 23970 - Woodcraft Worker 27.25 23980 - Woodworker 21.46 24000 - Personal Needs Occupations 24570 - Child Care Attendant 13.38 24580 - Child Care Center Clerk 16.51 24610 - Chore Aide 11.53 24620 - Family Readiness And Support Services 15.08 Coordinator 24630 - Homemaker 19.66 25000 - Plant And System Operations Occupations 25010 - Boiler Tender 29.03 25040 - Sewage Plant Operator 25.19 25070 - Stationary Engineer 29.03 25190 - Ventilation Equipment Tender 23.71 25210 - Water Treatment Plant Operator 26.43 27000 - Protective Service Occupations 27004 - Alarm Monitor 19.12 27007 - Baggage Inspector 17.98 27008 - Corrections Officer 30.97 27010 - Court Security Officer 30.66 27030 - Detection Dog Handler 19.18 27040 - Detention Officer 30.97 27070 - Firefighter 31.42 27101 - Guard I 17.98 27102 - Guard II 19.18 27131 - Police Officer I 32.37 27132 - Police Officer II 35.94 28000 - Recreation Occupations 28041 - Carnival Equipment Operator 13.28 28042 - Carnival Equipment Repairer 13.84 28043 - Carnival Equpment Worker 10.96 28210 - Gate Attendant/Gate Tender 16.49 28310 - Lifeguard 13.00 28350 - Park Attendant (Aide) 18.46 28510 - Recreation Aide/Health Facility Attendant 13.48 28515 - Recreation Specialist 22.22 28630 - Sports Official 14.69 28690 - Swimming Pool Operator 12.77 29000 - Stevedoring/Longshoremen Occupational Services 29010 - Blocker And Bracer 27.64 29020 - Hatch Tender 27.64 29030 - Line Handler 27.64 29041 - Stevedore I 26.22 29042 - Stevedore II 30.32 30000 - Technical Occupations 30010 - Air Traffic Control Specialist, Center (HFO) (see 2) 40.33 30011 - Air Traffic Control Specialist, Station (HFO) (see 2) 27.82 30012 - Air Traffic Control Specialist, Terminal (HFO) (see 2) 30.63 30021 - Archeological Technician I 19.73 30022 - Archeological Technician II 22.02 30023 - Archeological Technician III 27.27 30030 - Cartographic Technician 27.27

30040 - Civil Engineering Technician 25.21 30061 - Drafter/CAD Operator I 19.69 30062 - Drafter/CAD Operator II 22.02 30063 - Drafter/CAD Operator III 24.55 30064 - Drafter/CAD Operator IV 30.20 30081 - Engineering Technician I 19.16 30082 - Engineering Technician II 22.24 30083 - Engineering Technician III 25.28 30084 - Engineering Technician IV 31.22 30085 - Engineering Technician V 38.08 30086 - Engineering Technician VI 46.20 30090 - Environmental Technician 20.55 30210 - Laboratory Technician 21.37 30240 - Mathematical Technician 26.78 30361 - Paralegal/Legal Assistant I 23.36 30362 - Paralegal/Legal Assistant II 28.94 30363 - Paralegal/Legal Assistant III 35.39 30364 - Paralegal/Legal Assistant IV 42.84 30390 - Photo-Optics Technician 27.27 30461 - Technical Writer I 26.41 30462 - Technical Writer II 32.29 30463 - Technical Writer III 39.17 30491 - Unexploded Ordnance (UXO) Technician I 25.63 30492 - Unexploded Ordnance (UXO) Technician II 31.02 30493 - Unexploded Ordnance (UXO) Technician III 37.18 30494 - Unexploded (UXO) Safety Escort 25.63 30495 - Unexploded (UXO) Sweep Personnel 25.63 30620 - Weather Observer, Combined Upper Air Or (see 2) 24.55 Surface Programs 30621 - Weather Observer, Senior (see 2) 27.27 31000 - Transportation/Mobile Equipment Operation Occupations 31020 - Bus Aide 16.40 31030 - Bus Driver 19.89 31043 - Driver Courier 16.75 31260 - Parking and Lot Attendant 10.05 31290 - Shuttle Bus Driver 17.80 31310 - Taxi Driver 13.23 31361 - Truckdriver, Light 17.80 31362 - Truckdriver, Medium 18.87 31363 - Truckdriver, Heavy 24.52 31364 - Truckdriver, Tractor-Trailer 24.52 99000 - Miscellaneous Occupations 99030 - Cashier 10.53 99050 - Desk Clerk 13.34 99095 - Embalmer 27.84 99251 - Laboratory Animal Caretaker I 12.33 99252 - Laboratory Animal Caretaker II 13.11 99310 - Mortician 34.44 99410 - Pest Controller 17.74 99510 - Photofinishing Worker 16.23 99710 - Recycling Laborer 19.78 99711 - Recycling Specialist 22.62 99730 - Refuse Collector 18.36 99810 - Sales Clerk 14.70 99820 - School Crossing Guard 14.27 99830 - Survey Party Chief 25.53

99831 - Surveying Aide 15.48 99832 - Surveying Technician 20.42 99840 - Vending Machine Attendant 13.66 99841 - Vending Machine Repairer 17.44 99842 - Vending Machine Repairer Helper 14.72

ALL OCCUPATIONS LISTED ABOVE RECEIVE THE FOLLOWING BENEFITS:

HEALTH & WELFARE: $4.27 per hour or $170.80 per week or $740.13 per month

VACATION: 2 weeks paid vacation after 1 year of service with a contractor or successor; 3 weeks after 5 years, and 4 weeks after 15 years. Length of service includes the whole span of continuous service with the present contractor or successor, wherever employed, and with the predecessor contractors in the performance of similar work at the same Federal facility. (Reg. 29 CFR 4.173)

HOLIDAYS: A minimum of eleven paid holidays per year: New Year's Day, Martin Luther King Jr's Birthday, Washington's Birthday, Good Friday, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans' Day, Thanksgiving Day, and Christmas Day. A contractor may substitute for any of the named holidays another day off with pay in accordance with a plan communicated to the employees involved.)

(See 29 CFR 4.174)

THE OCCUPATIONS WHICH HAVE NUMBERED FOOTNOTES IN PARENTHESES RECEIVE THE FOLLOWING:

1) COMPUTER EMPLOYEES: Under the SCA at section 8(b), this wage determination does not apply to any employee who individually qualifies as a bona fide executive, administrative, or professional employee as defined in 29 C.F.R. Part 541. Because most Computer System Analysts and Computer Programmers who are compensated at a rate not less than $27.63 (or on a salary or fee basis at a rate not less than $455 per week) an hour would likely qualify as exempt computer professionals, (29 C.F.R. 541.

400) wage rates may not be listed on this wage determination for all occupations within those job families. In addition, because this wage determination may not list a wage rate for some or all occupations within those job families if the survey data indicates that the prevailing wage rate for the occupation equals or exceeds $27.63 per hour conformances may be necessary for certain nonexempt employees. For example, if an individual employee is nonexempt but nevertheless performs duties within the scope of one of the Computer Systems Analyst or Computer Programmer occupations for which this wage determination does not specify an SCA wage rate, then the wage rate for that employee must be conformed in accordance with the conformance procedures described in the conformance note included on this wage determination.

Additionally, because job titles vary widely and change quickly in the computer industry, job titles are not determinative of the application of the computer professional exemption. Therefore, the exemption applies only to computer employees who satisfy the compensation requirements and whose primary duty consists of:

(1) The application of systems analysis techniques and procedures, including consulting with users, to determine hardware, software or system functional specifications;

(2) The design, development, documentation, analysis, creation, testing or modification of computer systems or programs, including prototypes, based on and related to user or system design specifications;

(3) The design, documentation, testing, creation or modification of computer programs related to machine operating systems; or

(4) A combination of the aforementioned duties, the performance of which requires the same level of skills. (29 C.F.R. 541.400).

2) AIR TRAFFIC CONTROLLERS AND WEATHER OBSERVERS - NIGHT PAY & SUNDAY PAY: If you work at night as part of a regular tour of duty, you will earn a night differential and receive an additional 10% of basic…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .