Attachment 9 Solicitation AttachmentsACWS Configuration(W912D027QA003).pdf
PDF 495 KB Posted
- Attached to
- Repair and Maintenance of 10 Sprung Structures (8 WINMATs & 2 CRTFs) - Fort Wainwright, AK
- Solicitation number
- W912D027QA003
About this file
This is a Request for Quotations (RFQ) under FAR Part 12 and FAR Subpart 13.5 for labor, equipment, and materials to perform baseline and over-and-above repairs to ten tensioned-membrane structures (eight WINMATs and two CRTFs) at Fort Wainwright, Alaska. The 413th Regional Contracting Office – Alaska (RCO-AK) is the issuing agency. Quotations must be submitted electronically via email to Richard F. Smith (richard.f.smith3.civ@army.mil) and Jeff Morgan (jeffrey.a.morgan69.civ@army.mil) by Monday, 07 December 2026 at 12:00 PM Alaska Standard Time, with prices held firm for a minimum of 90 calendar days. The contract will be awarded to the lowest-priced, technically acceptable offeror under an LPTA evaluation methodology.
Quotations must be organized into three volumes: Volume I (Technical Capability, 15 pages maximum) demonstrating Sprung Structures OEM certification or preferred contractor status, a detailed technical execution plan for membrane thermal welding and insulation repairs under sub-arctic conditions, and a feasible schedule with completion no later than 31 January 2027; Volume II (Past Performance, 6 pages maximum) providing one to three relevant projects within the past three years; and Volume III (Price Schedule & Certifications, no page limit) containing a lump-sum firm-fixed-price for CLIN 0001 (baseline repairs across all ten structures), fully burdened hourly labor rates for CLIN 0002 (over-and-above discovered work) across four labor categories with 380 plug hours evaluated at an NTE materials ceiling of $125,690, completed SF 1449, and representations and certifications. All proposed labor rates must comply with SCA Wage Determination No. 2015-5683, Revision 29. The Independent Government Cost Estimate is $754,140.00, against which prices will be evaluated for fairness and reasonableness.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION W912D027QA003
FORT WAINWRIGHT SPRUNG STRUCTURE
REPAIRS (8 WINMATs & 2 CRTFs)
ATTACHMENT 9: QUOTE
SUBMISSION INSTRUCTIONS
(TAILORED ADDENDUM TO FAR 52.212-1, INSTRUCTIONS
TO OFFERORS—COMMERCIAL PRODUCTS AND
COMMERCIAL SERVICES)
Solicitation Number: W912D027QA003
Procurement Title: Labor, Equipment, and Materials for Baseline and Over-and-
Above Repairs to Fort Wainwright Sprung Structures (8 WINMATs & 2 CRTFs)
Issuing Agency: 413th Regional Contracting Office – Alaska (RCO-AK), Fort
Wainwright, AK
Procurement Method: Request for Quotations (RFQ) under FAR Part 12 and FAR
Subpart 13.5
1.0 GENERAL QUOTE INSTRUCTIONS
(a) Submission Media & Formatting:
Quotations shall be submitted electronically via email to the Contract Specialist and
Contracting Officer identified below. No physical, telephonic, facsimile, or oral quotes will be accepted.
• Submission Email Recipients:
• Primary Contract Specialist: Richard F. Smith, richard.f.smith3.civ@army.mil
• Contracting Officer: Jeff Morgan, jeffrey.a.morgan69.civ@army.mil
• Subject Line Convention: Quote Submission - W912D027QA003 -
[Vendor Name]
• File Format: Files must be submitted in searchable Adobe Portable Document
Format (.pdf) or Microsoft Office compatible formats (.docx, .xlsx). Executable files (.exe, .zip) will be rejected by DoD email security firewalls.
(b) Submission Deadline:
All quotations must be received in full by the Government no later than:
Monday, 07 December 2026 at 12:00 PM (Noon) Alaska Standard Time
(AKST).
Offerors are responsible for submitting quotes sufficiently in advance to account for transmission time across DoD server filters. Quotations received after the exact time specified may not be evaluated, at the sole discretion of the Contracting Officer.
(c) Acceptance Period:
Offerors agree to hold prices and rates set forth in their quotation firm for a minimum of ninety (90) calendar days from the quote receipt deadline.
2.0 QUOTATION ORGANIZATION AND STRUCTURE
The quotation must be organized into three (3) separate, distinct volumes as outlined below. Each volume must be clearly titled and self-contained:
Volume Title Page Limit Content Summary
Volume I Technical Capability
15 Pages • Subfactor 1A:
Sprung OEM Preferred Contractor Verification
• Subfactor 1B:
Technical Execution Plan & MHE Access Strategy
• Subfactor 1C:
Schedule
Feasibility & Milestones (Completion NLT 31 Jan 2027)
Volume II Past Performance
6 Pages • Minimum of one (1), maximum of three (3) recent and relevant past performance project descriptions (within last 3 years).
Volume III Price Schedule & Certifications
No Limit • Completed and signed SF 1449 (Blocks 17a, 30a– c)
• Section B Pricing
(CLIN 0001 FFP)
• CLIN 0002 Over-and-Above (O&A) Hourly Labor Rate Schedule
• Completed Reps and Certs (FAR 52.212-3 / 52.204- 24)
Note: Title pages, tables of contents, compliance matrices, and OEM letters/certifications do not count toward the page limitations of Volumes I and II.
3.0 VOLUME I: TECHNICAL CAPABILITY (FACTOR 1)
Offerors must provide detailed narratives demonstrating the technical ability, equipment, qualifications, and operational methodologies required to fulfill all terms of the Performance Work Statement (Attachment 6). To achieve an
"Acceptable" (Pass) rating under Factor 1, the volume must satisfy the following three subfactors:
Subfactor 1A: Sprung OEM Preferred Contractor / Certified Installer
Qualification
The offeror must provide verifiable proof of authorization directly linked to Sprung
Structures, Inc., to maintain structural warranty continuity across all ten (10) heavy tensioned-membrane facilities:
1. Copy of official documentation from Sprung Structures, Inc., validating current status as a Sprung Structures "Preferred Contractor"; OR
2. Factory-authorized installer certification issued by Sprung Structures, Inc., validating qualified installer status on large-span (60′ × 100′ and 110′ × 255′) tensioned-fabric architectural structures; OR
3. A formal, bilateral commitment letter from Sprung Structures, Inc., or an authorized Sprung partner, certifying that a designated, factory-certified Sprung
Technical Representative will be present on-site throughout execution to supervise all membrane thermal extrusion welding, structural hardware tensioning, and architectural envelope repairs.
Subfactor 1B: Technical Execution Plan & MHE Access Strategy
The offeror must submit an operational plan detailing how baseline structural repairs will be executed in accordance with OEM standards and safety mandates:
4. Membrane Thermal Welding: Specific methods for hot-air extrusion or radio-frequency thermal welding of fabric tears, puncture repairs, skirt resealing, and vestibule fabric repairs under sub-arctic conditions (including temporary heated enclosures if ambient temperature drops below manufacturer bonding thresholds).
5. Insulation & Poly Vapor Barrier: Methodology for rehanging, splicing, and securing dislodged R-30 fiberglass insulation blankets and continuous poly vapor barrier films along high-bay arches, end-walls, and ceilings.
6. Doors & Architectural Access: Approach to overhauling rolling overhead service door hood covers, track realignment, cable/roller lubrication, vestibule personnel door hinge weldment repairs, and arctic weatherstripping.
7. Aerial Lift Equipment (MHE): Detailed list of contractor-furnished rough-terrain aerial access equipment (e.g., 60-ft articulating/telescoping boom lifts, wide-deck scissor lifts) capable of safely reaching maximum ridge apex heights up to 45 feet, including OSHA fall-protection safety controls.
8. System Exclusions Affirmation: Explicit written affirmation confirming that the offeror's scope excludes maintenance, servicing, or repair of fuel-fired furnaces, hydronic boilers, ducting networks, fire suppression loops, and fire alarm systems.
Subfactor 1C: Schedule Feasibility & Milestones
The offeror must provide an operational milestone schedule demonstrating physical completion and Government acceptance no later than 31 January 2027:
9. Phased timeline showing mobilization, site setup, high-bay access staging, and progressive remediation across the ten (10) structures.
10. Written commitment to submit all post-award deliverables (Staffing Plan, Sprung OEM Verification, Equipment Manifest) within ten (10) working days of contract award.
4.0 VOLUME II: PAST PERFORMANCE (FACTOR 2)
Offerors must submit descriptions for a minimum of one (1) and a maximum of three (3) contracts completed or performed within the past three (3) years from the issuance date of this solicitation.
• Relevance: Projects should demonstrate experience in tensioned-membrane fabric structure installation, repair, re-covering, or envelope maintenance, ideally in cold-weather, remote, or sub-arctic operating environments.
• Required Reference Details:
• Client / Agency Name, Contract Number, and Project Title.
• Contracting Officer or Program Manager Contact (Name, Phone, Email).
• Period of Performance and Total Dollar Value.
• Specific scope performed, detailing relevance to tensioned-fabric repairs, rigging, and aerial access operations.
Note: In accordance with FAR 13.106-2(b)(3), the Contracting Officer reserves the right to evaluate past performance using Government databases (CPARS, SPRS) and agency contracting knowledge.
5.0 VOLUME III: PRICE SCHEDULE & CERTIFICATIONS
(FACTOR 3)
5.1 Price Submission Format:
Offerors must submit complete, firm-fixed-price quotations covering:
11. CLIN 0001 (Baseline Sprung Repairs - FFP): Lump-sum firm-fixed-price to perform all baseline inspections, membrane welding, insulation restoration, hardware tensioning, door overhaul, and electrical/grounding repairs for all ten
(10) facilities as identified in Attachments 2 through 6.
12. CLIN 0002 (Over-and-Above Discovered Repairs - FFP Work Orders): Fully burdened fixed hourly labor rates for discovered work ordered under DFARS
252.217-7028. Offerors must complete the following table:
Labor Category
(CLIN 0002)
Government Evaluation Plug Hours
Proposed Fully Burdened Fixed Hourly Rate
Extended Evaluated Amount
Sprung Certified Lead Installer
100 hrs $_____________ $_____________
Membrane Technician / Welder
150 hrs $_____________ $_____________
Mechanical / Rigging Technician
80 hrs $_____________ $_____________
General Laborer / Helper
50 hrs $_____________ $_____________
Total Evaluated Labor Pool
380 hrs — $_____________ (Sum of above)
Funded Parts / Materials NTE Ceiling
Plug Value Do Not Alter $125,690.00
TOTAL
EVALUATED
PRICE (TEP)
— — $_____________ (CLIN
0001 + Labor Pool
+ NTE)
Wage Determination Compliance: All proposed hourly wage rates must equal or exceed the minimum prevailing wages and fringe benefits specified in Attachment 8
(SCA Wage Determination No. 2015-5683, Revision 29).
5.2 Administrative & Regulatory Documents:
Volume III must include:
• Signed Standard Form 1449 (Blocks 17a, 30a, 30b, 30c).
• Completed representation in FAR 52.204-24 and/or FAR 52.204-26 regarding covered telecommunications.
• Active CAGE Code and Unique Entity Identifier (UEI) registered in SAM.gov under NAICS 332311.
ATTACHMENT 7: EVALUATION
FACTORS FOR AWARD
(TAILORED ADDENDUM TO FAR 52.212-2)
1.0 BASIS FOR CONTRACT AWARD
The Government will award a single, Firm-Fixed-Price (FFP) contract resulting from this solicitation to the responsible offeror whose quote conforms to the solicitation instructions (Attachment 9), achieves an "Acceptable" rating across all technical evaluation factors, and offers the Lowest Evaluated Price (Lowest Price
Technically Acceptable – LPTA).
2.0 EVALUATION FACTORS & RATING METHODOLOGY
Quotations will be evaluated against three (3) primary factors:
• Factor 1: Technical Capability (Pass / Fail)
• Factor 2: Past Performance (Acceptable / Unacceptable / Neutral)
• Factor 3: Evaluated Price (Fairness, Reasonableness, and Realism Analysis)
Evaluation Sequence:
• Step 1: All conforming quotations received by the deadline will be ranked by
Total Evaluated Price (TEP) from lowest to highest.
• Step 2: The lowest-priced quotation will be evaluated under Factor 1 (Technical
Capability). If evaluated as "Acceptable" (Pass), evaluation proceeds to Factor 2.
• Step 3: If the lowest-priced quotation is evaluated as "Acceptable" or "Neutral" under Factor 2, and the price is determined fair, reasonable, and realistic, award will be made without evaluating higher-priced quotes.
• Step 4: If the lowest-priced quotation is found "Unacceptable" under Factor 1 or
Factor 2, it will be eliminated, and the next lowest-priced quote will be evaluated following the same sequence.
3.0 FACTOR 1: TECHNICAL CAPABILITY (PASS / FAIL)
To achieve an Acceptable (Pass) rating, the quotation must satisfy all three (3) subfactors:
• Subfactor 1A: Sprung OEM Preferred Contractor / Certified Installer
Qualification: Verified proof of Sprung Structures Preferred Contractor status, factory-certified installer status, or an executed commitment letter from Sprung
Structures guaranteeing an on-site factory technical representative.
• Subfactor 1B: Technical Execution Plan & MHE Access Strategy: Sound, compliant methodology for sub-arctic membrane thermal extrusion welding, R-
30 insulation re-securing, overhead door servicing, and staging of heavy rough-terrain aerial lifts up to 45 ft apex heights, accompanied by written affirmation of system exclusions (HVAC, boilers, fire alarms).
• Subfactor 1C: Schedule Feasibility & Milestones: Realistic operational schedule ensuring completion of on-site repairs and Government acceptance no later than 31 January 2027.
4.0 FACTOR 2: PAST PERFORMANCE (ACCEPTABLE /
UNACCEPTABLE / NEUTRAL)
• Acceptable: Reasonable expectation that the offeror will successfully perform the required effort based on relevant experience within the past 3 years.
• Unacceptable: No reasonable expectation of successful performance based on adverse past performance.
• Neutral: Offeror lacks a record of recent and relevant past performance.
Evaluated as Acceptable per FAR 15.305(a)(2)(iv).
5.0 FACTOR 3: EVALUATED PRICE
The Total Evaluated Price (TEP) will be calculated as follows: \text{Total Evaluated
Price (TEP)} = \text{CLIN 0001 FFP} + \text{CLIN 0002 Evaluated Labor (380 Plug
Hours)} + \text{CLIN 0002 Funded Materials NTE ($125,690.00)} Prices will be evaluated for fairness, reasonableness, and realism against the Independent
Government Cost Estimate (IGCE) of $754,140.00.
SOLICITATION SECTION J: LIST OF
ATTACHMENTS
The following nine (9) documents are attached and incorporated into Solicitation
W912D027QA003:
Attachment No. Document Title / Description
Source File / Reference
Attachment 0001 FWA Sprung Shelter Locations (Site Map & Facility Layouts)
Attachment 1 - FWA Sprung Shelter Locations.pdf
Attachment 0002 Itemized List of WINMAT and CRTF Structure Faults
Attachment 2 - List of WINAMT, CRTF Faults.pdf
Attachment 0003 CRTF 01 Detailed Inspection Photos and Fault Log
Attachment 3 - CRTF01 Faults.pdf
Attachment 0004 WINMAT RWS 07 Detailed Inspection Photos & Fault Log
Attachment 4 -
WINMAT RWS07
Faults.pdf
Attachment 0005 WINMAT 01–04, 08–10, and CRTF 02 Photo Log
Attachment 5 -
WINMAT
1,2,3,4,8,9,10 CRTF02 Faults.pdf
Attachment 0006 Performance Work Statement (PWS) – Fort Wainwright Repairs
PWS Fort_Wainwright Sprung Structures Repairs Oct 2026.pdf
Attachment 0007 Evaluation Factors for Award (Tailored Addendum to FAR 52.212-2)
Full text set forth in Attachment 7 above
Attachment 0008 SCA Wage Determination No. 2015-5683 (Revision No. 29)
SCA Wage Determination No.
2015-5683 Rev No. 29 (27Aug2026).pdf
Attachment 0009 Quote Submission Instructions (Tailored Addendum to FAR 52.212-1)
Full text set forth in Attachment 9 above
ACWS SECTION L & M CROSS-
REFERENCE INSTRUCTIONS
To implement Option 2 cleanly inside the Army Contract Writing System (ACWS):
1. Section L (Page 67) – FAR 52.212-1 Instruction Pointer:
In ACWS under Section L, in the text/addendum field for FAR 52.212-1, replace the existing placeholder text with the following exact language:
"Offerors shall prepare and submit quotations in accordance with Attachment 9 (Quote Submission Instructions - Tailored
Addendum to FAR 52.212-1) incorporated in Section J of this solicitation. Quotations will be evaluated strictly in accordance with the criteria set forth in Attachment 7 (Evaluation Factors for Award - Tailored Addendum to FAR 52.212-2). All proposed labor rates must comply with the prevailing minimum wage rates and fringe benefits set forth in Attachment 8 (SCA Wage
Determination No. 2015-5683, Revision 29)."
2. Section M (Page 73) – FAR 52.212-2 Evaluation Pointer:
In ACWS under Section M, in the text/addendum field for FAR 52.212-2(a), enter:
"The Government will evaluate quotations in accordance with the Lowest Price Technically Acceptable (LPTA) evaluation criteria set forth in Attachment 7 (Evaluation Factors for
Award - Tailored Addendum to FAR 52.212-2) incorporated in
Section J of this solicitation."
3. SF 1449 Header Block 27a:
Ensure Block 27a on Standard Form 1449 has the checkbox marked:
[X] ARE for "ADDENDA ARE ATTACHED".
| SOLICITATION W912D027QA003 |
| FORT WAINWRIGHT SPRUNG STRUCTURE REPAIRS (8 WINMATs & 2 CRTFs) |
| ATTACHMENT 9: QUOTE SUBMISSION INSTRUCTIONS |
| (TAILORED ADDENDUM TO FAR 52.212-1, INSTRUCTIONS TO OFFERORS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES) |
| 1.0 GENERAL QUOTE INSTRUCTIONS |
| 2.0 QUOTATION ORGANIZATION AND STRUCTURE |
| 3.0 VOLUME I: TECHNICAL CAPABILITY (FACTOR 1) |
| Subfactor 1A: Sprung OEM Preferred Contractor / Certified Installer Qualification |
| Subfactor 1B: Technical Execution Plan & MHE Access Strategy |
| Subfactor 1C: Schedule Feasibility & Milestones |
| 4.0 VOLUME II: PAST PERFORMANCE (FACTOR 2) |
| 5.0 VOLUME III: PRICE SCHEDULE & CERTIFICATIONS (FACTOR 3) |
| 5.1 Price Submission Format: |
| 5.2 Administrative & Regulatory Documents: |
| ATTACHMENT 7: EVALUATION FACTORS FOR AWARD |
| (TAILORED ADDENDUM TO FAR 52.212-2) |
| 1.0 BASIS FOR CONTRACT AWARD |
| 2.0 EVALUATION FACTORS & RATING METHODOLOGY |
| Evaluation Sequence: |
| 3.0 FACTOR 1: TECHNICAL CAPABILITY (PASS / FAIL) |
| 4.0 FACTOR 2: PAST PERFORMANCE (ACCEPTABLE / UNACCEPTABLE / NEUTRAL) |
| 5.0 FACTOR 3: EVALUATED PRICE |
| SOLICITATION SECTION J: LIST OF ATTACHMENTS |
| ACWS SECTION L & M CROSS-REFERENCE INSTRUCTIONS |
| 1. Section L (Page 67) – FAR 52.212-1 Instruction Pointer: |
| 2. Section M (Page 73) – FAR 52.212-2 Evaluation Pointer: |
| 3. SF 1449 Header Block 27a: |
60 ′ × 100 ′
110 ′ × 255 ′
File details come from the government source that posted it. Updated .