SEW-20001-0J Seward Military Resort Repairs
Solicitation number
W912D0-21-B-0002
Issued by

About this file

This document provides questions and responses related to a federal solicitation for repairs at the Seward Military Resort in Alaska. The solicitation requires repairs including replacement of decks on lodging units, upgrading an ADA bathroom, repairing or replacing rotten logs on one building, and adding attic insulation to two buildings. A site visit was held on July 28, 2021 and questions were required to be submitted by August 2nd. Responses to contractor questions are provided. The period of performance is 548 days from notice to proceed. The solicitation was issued as a total small business set-aside by the Department of the Army for a firm-fixed-price contract between $500,000 to $1,000,000. Electronic bids were due by August 23, 2021.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question Government response Document reference 1 Can we have a copy of the walk thru sign in sheet? No 2 How many footings are we to replace at the porches? How deep are they? Footings will no longer be replaced. SOW 2.6.7 3 Is there as builts of the existing buildings? If not, how many sq ft are bldgs. 100 and 400? Yes Attachment 9 - As-Builts

How many logs are we to replace? During the walk thru, it was difficult to tell how many were rotten. Can you give us a %? Up to 25% of logs from the bottom log to 4' up will be replaced as identified by COR/Contractor SOW 2.7.1

5 What is the wall structure on the inside of the log building? Unknown. Internal work on the log structure is outside the scope. SOW 2.7.1 6 Is a floor plan available for the bathroom in bldg. 611? Yes Attachment 9 - As-Builts 7 We identified 8-9 logs than need replaced. Is this concurrent with what you have seen? 25% of logs below 4 ft from the bottom log will be replaced as identified by COR SOW 2.7.1 8 Is the stick framed, log sided addition to be sanded and oiled? Stick framed addition to building 93 is outside the scope of log replacement/refinishing SOW 2.7.2

Does the chinking that has been applied need to be totally removed? It appears it was done recently and it is adhered very well. Removing it will be a problematic, time-consuming operation. If it is not loose, would going over it with new chinking be acceptable? Follow manufacturers installation instructions for new chinking. SOW 2.7.3

We have identified approximately 15-20 Sono-tubes that are in need of replacing. Does this number sound about right? Footings will no longer be replaced. SOW 2.6.7

Building 57 (Pilot Rock) has a major life safety issue (on the east side) with the steps that terminate at the door. Is a new 4’X5’ deck and stairs (that meet code) to be included in this bid? Yes SOW 2.6.1

12 Are the structural steel members/fittings on the decks and ADA ramps reusable, if rust has not compromised them? Assume all will need replacement SOW 2.6.8 13 The New ADA curb-less shower, is that a single 48” X 48”? See As-Builts for available dimensions statement of work paragraph 2.7.2. Strip: existing finish on logs Sea bolt Hall. Does this include interior and exterior, or just exterior (only). Exterior only. SOW 2.7.2

15 is it possible to arrange another site visit to view site conditions on a weekend. No more government led site visits are available

TOTAL SQUARE FOOT OF EACH BLDG. ( THE ACTUAL SQ. FT. OF ATTIC SPACE OF EACH BLDG)

Please see as-builts Attachment 9 - As-Builts

17 I would assume that all attic access covers will also need an attached R-38 fiberglass batt to these access covers. Yes SOW 2.6.9.

18 WHAT THE EXISTING R-VALUE IS IN THESE 2 BLDGS ( WHAT TYPE OF INSULATION AND HOW THICK IT IS) Unknown.

NO DETAILS IN SPECS ABOUT ANY "PREP" WORK, that may involve installing baffles in attic/eave areas to maintain eave ventilation so that the added insulation (upgrade) doesnt "block" what existing ventilation there is along the eave areas of these bldgs. And if there actually is any eave ventilation along the outside eave area soffit or bird screen Install cardboard baffles SOW 2.6.9.1

Also a concern about ( if we actually will be able to do this job) the scheduling of gaining access to these units pending Tennants permission to enter their unit to perform our services. If there are any delays resulting in extending our stay in SEWARD, could create a problem, I assume scheduling for us to do our services would be streamlined ahead of time and Tennants would be prepared to have us enter their units in the approx (2) days it should take to perform our services. Barring any"prep" work or unforseen , undetermined, preliminary work.

Coordination with the COR will ensure all units between offseason (Labor Day - Memorial Day) will have no access restrictions. If contractor wishes to preform work during peak season (Memorial Day - Labor Day), advanced coordination will be required and access is not guaranteed.

21 Is there a depth requirement for the 50% deck footings requirement? Footings will no longer be replaced. SOW 2.6.7 22 Is it possible to make additional site visits - i.e. insulation subcontractor to inspect attic accessibility, etc? No more government led site visits are available 23 Are there restrooms available onsite for crew use? Yes - masks required per Covid policies

24 Is there lodging available for worker use? If so, what are the rates?

Contractors can stay subject to availability at the DOD civilian rate as published on www.sewardresort.com.

25 Will the RV area be available for worker use? If so, what are the rates?

RV Park is shutdown for use as of 15 Sept. No water/elec available. Can be used as additional laydown yard area.

26 Is there a heated, lockable storage area for material / tool / supplies storage?

No heated or lockable storage area available. Open laydown yard available under pavilion. Contractor may secure with fencing.

27 Are the Resort parking area and sidewalks cleared of snow in the wintertime? Yes

Are there As-Built DWGs available for the buildings you are referring to? Specifically: We need to know how the log building was constructed. Please see as-builts. No available as-built for original log building

Please confirm that 2.6.2 calls out pressure treated lumber for all framing components to include GLB stringers, posts, joists, decking and the entire handrail assembly. Clarified in SOW SOW 2.6.2

30 Please advise species of wood required for deck components. Salient features that are required are called out in SOW 2.6.2 SOW 2.6.2

Please confirm that 2.6.7 requires the contractor carry an allowance to replace 100 footings.

a. Does this include posts and or beams that support roof structure as well as deck elements. Please note Roof & Deck attachment.

b. Does this include the replacement of building foundation components which also support deck members, i.e.

buckets, hangers and or other hardware. Please note the deck joist hanger picture by way of example. Replacement of this component requires the siding be removed at the least. If the structure the hanger is attached to is water damaged, does it require replacement as well. How about the siding?

c. Is there existing waterproofing that will need to be replaced. If so please advise the specifications.

d. While reviewing deck foundation construction, we note that there is substantial rust on many of the brackets, beam buckets, etc. Are these components to be replaced where they are attached to the building structure as apposed to the deck structure.

e. Please provide specifications for the new hardware, i.e. bolts / washer / nuts, angle and or GLB brackets.

f. Please provide welding procedures for any structural repairs and or replacement.

g. Can concrete piers be cut down below deteriorated areas adjacent to rusted / damaged hardware and reused in place with new hardware and longer posts. Removing and replacing the entire pier will be problematic during the winter months in which this work is to be performed.

Footings no longer to be replaced. See SOW 2.6.7

a. Yes. Support roof structure while deck components are replaced.

B. Yes for the support. The building structure and siding are currently outside the scope.

c. Not included in scope

d. Yes, if they support the deck.

e. SOW 2.6.8

f. No welding identified

g. Yes

a. SOW 2.6.2

b. SOW 2.6.8

d. SOW 2.6.8

e. SOW 2.6.8

g. SOW 2.6.7

Section 2.6.8 calls out blown in insulation.

a. Please confirm that new insulation totaling R-38 is to be added and that this does not include any existing insulation.

b. Are there existing insulation baffles at the eves of these building or do they need to be added? a. Correct.

B. Assume there are no baffles. If baffles are found, remove and replace

a. SOW 2.6.9

b. SOW 2.6.9.1

Please advise if the structure attached to the log cabin will not require stripping and new log oil. This addition is built with log siding, not logs. Attached structure to Seabolt Hall (bldg 93) will not require stripping/log oil. SOW 2.7.2 and 2.7.4

34 Will the Bld 93 soffits be refinished and or require log oil. No SOW 2.7.1 35 What species of wood is to be used for the replacement logs in Bld 93. Sitka Spruce SOW 2.7.1 36 Will any of the log columns on bld 93 be replaced? Yes, the two columns directly in front of the door of Seabolt Hall SOW 2.7.5 37 Are there any existing as built dwgs for these facilities. Yes, see provided as-builts Attachment 9 - As-Builts 38 Will bld 500 require a complete new deck and joists? Yes Attachment 6 - Seward Military Resort Site Map

Please confirm that decks, stairs and landings with no steel handrails, wire mesh and or grip struck treads are to be rebuilt to match existing. Please note the attached examples for the loading dock, Bld 600 and Bld 57 steps.

Replace all decks in kind with exceptions: Replace all wooden stairs with metal safety grate stairs.

Building 57 that has stairs to a door with no deck will be replaced with a deck/stairs that meets applicable codes SOW 2.6.1

Is the decking to be screwed or nailed down? Please advise what type of screw or nail is required, i.e. stainless steel, coated, galvanized, etc. Coated Deck screws SOW 2.6.2

41 Please confirm that wedge anchors can be used for new hardware. What material are the bolts to be? Replace hardware in kind with hot-dipped galvanized hardware SOW 2.6.8

2.6.7. Footings may need to be replaced. 100 Footings allowed for replacement. COR and Contractor shall determine together which footingsshall be replaced based on condition. How can it be determined how many footings will need to be replaced prior to bid if the quantity is determined at post award by the COR and contractor. Footings will no longer be replaced. SOW 2.6.7

Missed out on the site visit for this project as I was on a remote on going project.Is there a chance to visit site this coming week?

No more government led site visits are available was not able to make the site walk on 7/28/2021 is it possible to arrange another site visit to view site conditions on a weekend?

No more government led site visits are available 45 Could you please send us the plans for the Seward Military Resort Repairs project currently out to bid. All solicitation documents are available on betasam.gov 46 I was wondering if the facility is open for contractor visitations, on the exterior of the buildings? No more government led site visits are available

47 I was also wondering if notes / sign in sheet from the site visit will be provided via Amendment?

sign in sheet information is not able to be shared, questions from site visit are incorporated into the Q&A responses and revised documents available by amendment

48 Is the submittal date of 8/23 still expected? Amendment 001 extended due date to 27 August 49 Is there an amendment forthcoming? Question will be resolved when amendment 002 is posted.

50 When is Amendment 002 expected to post? Question will be resolved when amendment 002 is posted.

51 A sign in sheet of all the contractors that attended the site visit. Requested information is not able to be provided.

See bid preparation checklist, item 3: “Representations, Certifications and Other Statements of the Offeror. This form is not included in the bid package, please provide or verify if this is required. See DFARS provision 252.204-7007 Alt A paragraph e of the solicitation

See page 31 of 32, in the solicitation, referencing to include Cage Code and DUNS number with all amendments electronically…

a. Is it expected that we provide electronic confirmation of each amendment to the listed contacts separately from the standard form 1442 on bid day?

b. If we are only acknowledging amendments on SF 1442 on bid day, where should we list Cage Code and Duns Number?

Amendments shall be acknowledged in the submitted bid, which shall be submitted on SF1442, CAGE code and DUNS shall be included in the bid package. The bid package shall be submitted electronically to the listed contacts.

54 Is there any dry storage areas we can use? Like the covered picnic area? The covered pavillion next to building 99 is available for storage Attachment 6 - Seward Military Resort Site Map

SEW-20001-0J Seward Military Resort Repairs (W912D0-21-B-0002) Questions and responses following site visit 28 July 2021

While the decks are off on the northern cabins, do you want the log posts cleaned, & treated? Some have rot showing around their bases. Only the logs that are part of the handicap deck ramp on building 611 are to be cleaned/treated SOW 2.6.6.1

56 Will there be a warm area, to dry out, keep paints, & glues stable, take breaks out of the weather. A small area can be made available, but it would only be accessible during Seward Resort duty hours.

At building 93, I noticed rot at the base of the 4 posts just outside the main door. These and many others need to be addressed for structural. 2 posts outside the main door to be replaced SOW 2.7.5

58 We are reusing a lot of the steel products existing - can we reuse the beam hangers? SOW requires they be replaced in kind. SOW 2.6.8

59 We’re replacing x amount of sona-tubes - can this be done with steel pilings in leu of sona tubes?

Sona-tubes no longer to be replaced. Hardware to be removed and then cut down past any deterioration and adjustable deck pilings/piers to be installed. SOW 2.6.7

Regarding the replacement of the stair treads – is it acceptable to take the best of the salvaged treads, and use them to build the handicapped ramps? Replace handicap ramps in kind. SOW 2.6.6