Attachment 4 DPW-20263-0J Submittal Register 7-May-2021.XLSX

XLSX spreadsheet 19 KB Posted

Attached to
DPW-20263-0J Repair Roof, B4320
Solicitation number
W912D0-21-B-0001
Issued by

About this file

This solicitation is for a roof repair project at Building 4320 at Fort Wainwright in Alaska. The U.S. Army requires a contractor to replace the existing roof system down to the concrete deck with a fully-adhered EPDM membrane system. The contractor must perform to standards in the contract as well as all local, state, and federal regulations. The period of performance is 100 calendar days from notice to proceed, which will be issued 10 days after contract award. The acquisition value is between $250,000 and $500,000. This is a total small business set-aside solicited under NAICS code 238160 with a size standard of $16.5 million. The Army intends to award a firm-fixed price contract. Electronic bids are due by May 21, 2021 at 10:00 AM Alaska Time, with bid opening conducted virtually.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SUBMITTAL REGISTERPROJECT NUMBERPROJECT TITLECONTRACT NUMBER
DPW-20263-0JRepair/Replace Roof B4320
TO BE COMPLETED BY PROJECT ENGINEERCONTRACTOR SHEDULE DATESCONTRACTOR ACTIONGOVERNMENT ACTIONREMARKS
ACTIVITY NUMBERTRANSMITTAL #ITEM NUMBERSPECIFICATIONPARAGRAPHITEMS OR DESCRIPTION OF ITEMTYPE OF SUBMITTALCLASSIFI-CATIONSREQUIRED SUBMISSION DATE (or prior to DFOW Preparatory)
PRECONSTRUCTIONSHOP DRAWINGSPRODUCT DATASAMPLESDESIGN DATATEST REPORTSCERTIFICATESMANUFACTURER'S INSTRUCTIONSMANUFACTURER'S FIELD REPORTSOPERATION AND MAINTENANCE DATACLOSEOUT SUBMITTALSFOR INFORMATION ONLYGOVERNMENT APPROVALSUBMITAPPROVAL NEEDED BYMATERIAL NEEDED BYCODEDATESUBMITTED TO GOVERNMENTDate Received by GovtCODEDATE of Actiton
17.1.2Access List of Personnel/Subcontractor listXX
17.1.1AT Level 1 TrainingXX
17.1.5iWatch TrainingXX
17.1.6OPSEC TrainingXX
3.1Proof of Insurance & BondingXX
3Preliminary ScheduleXXWith Proposal
3Initial Project ScheduleXX10 Days after NTP
6.3Schedule of ValuesXX10 Days after NTP
18Submittal RegisterXXPrecon & update monthly w/ Govt QA
6.6Job Progress Photos CDX
6.7As-Built Drawings and As built Record of Equipment and MaterialsX
6.7.2; 6.7.3GIS DataX
4.2; 9.3Accident Prevention Plan (APP)XX
3.13Quality Control Plan, DFOWXX
7Site Traffic Control PlanXX
7.7Site Plan to inclusde temp storage/laydown/field office as applicableXX
4.2Environmental Protection PlanXX
14.3Solid Waste Disposal ReportsX
10.3SWPPPX
3.5.4.e; 16DD Form 1354XX
8Contractor Warranty POC'sXXDuring duty and non duty
8Extended WarrantiesXX
6.5.1O&M Data/Manuals, Heat Trace SystemXXX
2.7Roofing PlanXXX
2.7.2EPDM Roofing MembraneXXXXX
2.7.4Vapor BarrierXXXX
2.7.5Roof InsulationX
2.7.6Insulation Cover BoardX
2.8.4 .5, .6Metals - Flashing, Copings, ScuppersXX
2.9Roof DrainsXX
2.9.1.1Hangers for pipingXX
2.9Hubless cast iron drain pipingXX
2.9.3Aluminum Insulation ShieldX
2.9.4Spay Insulation Thru WallX
2.9.4Escuteon PlateX
2.9.5Exterior SpoutX
2.9.6Splash Block Shop DrawingXXX
2.10, 2.10.1Roof Drain Heat TraceXXXX
2.10.2, 2.10.3.4Heat Trace Controller & ComponentsXXXX
2.10.3Electrical RacewayX
2.10.3Circuit BreakersX
2.10.3.3Circuit ProtectionX
2.8.3.3Steel siding, trim, flashing, capXX