Attachment_2_-_CLIN_Structure_Bid_Sheet_v2_(13_MAR_2017).xlsx
XLSX spreadsheet 54 KB Posted
- Attached to
- Cranes and Hoists Services Federal contract opportunity
- Solicitation number
- W912D0-17-R-0005
About this file
Attachment 2 - CLIN Structure Bid Sheet
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Response_to_Industry_Questions.pdf | ||
| Attachment_4_-_Wage_Determination.pdf | ||
| Attachment_3_-_Past_Performance_Questionnaire.pdf | ||
| Attachment_1_-_Performance_Work_Statement_Cranes_and_Hoists_(13_MAR_2017).pdf | ||
| Combined_Synopsis_for_Cranes_and_Hoists_(13_March_2017).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID SUMMARY SHEET
| ONLY FILL OUT THE YELLOW HIGHLIGHTED CELLS THROUGHOUT THIS BID SHEET |
| The quanities in this bid sheet are estimates only. The unit prices will not be changed based on the quantities ordered. |
| DFARS Clause 252.204-7011, Alternative Line Item Structure is included in the solicitation. In addition to filling out the attached bid sheet, the offeror may propose an alternate CLIN Structure. |
| Elevator, Platform and Lift Services Bid Summary Sheet |
| COMBINED SYNOPSIS/SOLICITATION: W912D0-17-R-0005 | |
| Company Name: | |
| Point of Contact (POC): | |
| Tax ID # | |
| CAGE Code: | |
| DUNS Number: | |
| Address: | |
| Phone: | |
| E-mail: | |
| Fax | |
| Bid Summary | |
| BASE YEAR TOTAL: | $ - 0 |
| OPTION YEAR 1 TOTAL: | $ - 0 |
| OPTION YEAR 2 TOTAL: | $ - 0 |
| OPTION YEAR 3 TOTAL: | $ - 0 |
| OPTION YEAR 4 TOTAL: | $ - 0 |
| TOTAL BID AMOUNT: | $ - 0 |
BASE YEAR
| BASE YEAR | |||||
| CLIN # | DESCRIPTION | QTY | UNIT | UNIT PRICE | TOTAL COST |
| 0001 | Cranes and Hoists Services | 12 | MO | $ - 0 | |
| See attached PWS | |||||
| Period of Performance: 12 months (Base Year) | |||||
| QTY | UNIT | UNIT PRICE | TOTAL COST | ||
| 0002 | Over and Above Work | 12 | Job | $ - 0 | |
| Performance under this CLIN will be subject to PGI requirements | |||||
| Period of Performance: 12 months (Base Year) |
| CLIN # | DESCRIPTION | QTY | UNIT | UNIT PRICE | TOTAL COST |
| 0003 | CONTRACT MANPOWER REPORTING | 1 | EA | $ - 0 | |
| The Contractor is required to enter data into the Contractor Manpower Reporting Application (CMRA) system as outlined in local information titled Contractor Manpower Reporting located with the clauses incorporated into the contract. Reporting period will be the period of performance not to exceed 12 months ending 30 September of each Government fiscal year and must be reported by 31 October of each calendar year. Data must be accurate and complete and entered into CMRA during the data gathering period of every year, or part of a year, for which the contract is in force. NOTE: If the reporting of Manpower Equivalents is not separately priced, insert “NSP in the blank shown. | |||||
| BASE YEAR TOTAL COST: | $ - 0 |
OPTION YEAR 1
| CLIN # | DESCRIPTION | QTY | UNIT | UNIT PRICE | TOTAL COST |
| 1001 | Cranes and Hoists Services | 12 | MO | $ - 0 | |
| See attached PWS | |||||
| Period of Performance: 12 months (Base Year) | |||||
| QTY | UNIT | UNIT PRICE | TOTAL COST | ||
| 1002 | Over and Above Work | 12 | Job | $ - 0 | |
| Performance under this CLIN will be subject to PGI requirements | |||||
| Period of Performance: 12 months (Base Year) |
| CLIN # | DESCRIPTION | QTY | UNIT | UNIT PRICE | TOTAL COST |
| 1003 | CONTRACT MANPOWER REPORTING | 1 | EA | $ - 0 | |
| The Contractor is required to enter data into the Contractor Manpower Reporting Application (CMRA) system as outlined in local information titled Contractor Manpower Reporting located with the clauses incorporated into the contract. Reporting period will be the period of performance not to exceed 12 months ending 30 September of each Government fiscal year and must be reported by 31 October of each calendar year. Data must be accurate and complete and entered into CMRA during the data gathering period of every year, or part of a year, for which the contract is in force. NOTE: If the reporting of Manpower Equivalents is not separately priced, insert “NSP in the blank shown. | |||||
| OPTION YEAR TOTAL COST: | $ - 0 |
OPTION YEAR 2
| CLIN # | DESCRIPTION | QTY | UNIT | UNIT PRICE | TOTAL COST |
| 2001 | Cranes and Hoists Services | 12 | MO | $ - 0 | |
| See attached PWS | |||||
| Period of Performance: 12 months (Base Year) | |||||
| QTY | UNIT | UNIT PRICE | TOTAL COST | ||
| 2002 | Over and Above Work | 12 | Job | $ - 0 | |
| Performance under this CLIN will be subject to PGI requirements | |||||
| Period of Performance: 12 months (Base Year) |
| CLIN # | DESCRIPTION | QTY | UNIT | UNIT PRICE | TOTAL COST |
| 2003 | CONTRACT MANPOWER REPORTING | 1 | EA | $ - 0 | |
| The Contractor is required to enter data into the Contractor Manpower Reporting Application (CMRA) system as outlined in local information titled Contractor Manpower Reporting located with the clauses incorporated into the contract. Reporting period will be the period of performance not to exceed 12 months ending 30 September of each Government fiscal year and must be reported by 31 October of each calendar year. Data must be accurate and complete and entered into CMRA during the data gathering period of every year, or part of a year, for which the contract is in force. NOTE: If the reporting of Manpower Equivalents is not separately priced, insert “NSP in the blank shown. | |||||
| OPTION YEAR TOTAL COST: | $ - 0 |
OPTION YEAR 3
| CLIN # | DESCRIPTION | QTY | UNIT | UNIT PRICE | TOTAL COST |
| 3001 | Cranes and Hoists Services | 12 | MO | $ - 0 | |
| See attached PWS | |||||
| Period of Performance: 12 months (Base Year) | |||||
| QTY | UNIT | UNIT PRICE | TOTAL COST | ||
| 3002 | Over and Above Work | 12 | Job | $ - 0 | |
| Performance under this CLIN will be subject to PGI requirements | |||||
| Period of Performance: 12 months (Base Year) |
| CLIN # | DESCRIPTION | QTY | UNIT | UNIT PRICE | TOTAL COST |
| 3003 | CONTRACT MANPOWER REPORTING | 1 | EA | $ - 0 | |
| The Contractor is required to enter data into the Contractor Manpower Reporting Application (CMRA) system as outlined in local information titled Contractor Manpower Reporting located with the clauses incorporated into the contract. Reporting period will be the period of performance not to exceed 12 months ending 30 September of each Government fiscal year and must be reported by 31 October of each calendar year. Data must be accurate and complete and entered into CMRA during the data gathering period of every year, or part of a year, for which the contract is in force. NOTE: If the reporting of Manpower Equivalents is not separately priced, insert “NSP in the blank shown. | |||||
| OPTION YEAR TOTAL COST: | $ - 0 |
OPTION YEAR 4
| CLIN # | DESCRIPTION | QTY | UNIT | UNIT PRICE | TOTAL COST |
| 4001 | Cranes and Hoists Services | 12 | MO | $ - 0 | $ - 0 |
| See attached PWS | |||||
| Period of Performance: 12 months (Base Year) | |||||
| QTY | UNIT | UNIT PRICE | TOTAL COST | ||
| 4002 | Over and Above Work | 12 | Job | $ - 0 | |
| Performance under this CLIN will be subject to PGI requirements | |||||
| Period of Performance: 12 months (Base Year) |
| CLIN # | DESCRIPTION | QTY | UNIT | UNIT PRICE | TOTAL COST |
| 4003 | CONTRACT MANPOWER REPORTING | 1 | EA | $ - 0 | |
| The Contractor is required to enter data into the Contractor Manpower Reporting Application (CMRA) system as outlined in local information titled Contractor Manpower Reporting located with the clauses incorporated into the contract. Reporting period will be the period of performance not to exceed 12 months ending 30 September of each Government fiscal year and must be reported by 31 October of each calendar year. Data must be accurate and complete and entered into CMRA during the data gathering period of every year, or part of a year, for which the contract is in force. NOTE: If the reporting of Manpower Equivalents is not separately priced, insert “NSP in the blank shown. | |||||
| OPTION YEAR TOTAL COST: | $ - 0 |
52.217-8
| CLIN # | DESCRIPTION | QTY | UNIT | UNIT PRICE | TOTAL COST |
| 5001 | Cranes and Hoists Services | 6 | MO | $ - 0 | $ - 0 |
| See attached PWS | |||||
| Period of Performance: 6 months (52.217-8) | |||||
| QTY | UNIT | UNIT PRICE | TOTAL COST | ||
| 5002 | Over and Above Work | 6 | Job | $ - 0 | |
| Performance under this CLIN will be subject to PGI requirements | |||||
| Period of Performance: 6 months (52.217-8) |
| CLIN # | DESCRIPTION | QTY | UNIT | UNIT PRICE | TOTAL COST |
| 5003 | CONTRACT MANPOWER REPORTING | 1 | EA | $ - 0 | |
| The Contractor is required to enter data into the Contractor Manpower Reporting Application (CMRA) system as outlined in local information titled Contractor Manpower Reporting located with the clauses incorporated into the contract. Reporting period will be the period of performance not to exceed 12 months ending 30 September of each Government fiscal year and must be reported by 31 October of each calendar year. Data must be accurate and complete and entered into CMRA during the data gathering period of every year, or part of a year, for which the contract is in force. NOTE: If the reporting of Manpower Equivalents is not separately priced, insert “NSP in the blank shown. | |||||
| OPTION YEAR TOTAL COST: | $ - 0 |
Crane and Hoist Listing Bldg Bldg Description Type
| 1 | 1557 | Hangar 1 | 5 ton bridge | $ |
| 2 | 1610 | DTA Texas Range | 25 ton bridge | $ |
| 3 | 1930 | DTA CRTC | 5 ton bridge | $ |
| 4 | 2077 | Hangar 7 | 1.5 ton monorail | $ |
| 5 | 2077 | Hangar 7 | 5 ton monorail | $ |
| 6 | 2077 | Hangar 7 | 1 ton monorail | $ |
| 7 | 2088 | Aircraft Maintenance Hangar | 5 ton bridge | $ |
| 8 | 2020 | DTA Black Rapids | 3 ton cantilevered | $ |
| 9 | 2132 | Hangar | 2 ton bridge | $ |
| 10 | 2132 | Hangar | 2 ton bridge | $ |
| 11 | 2132 | Hangar | 10 ton bridge | $ |
| 12 | 2132 | Hangar | 10 ton bridge | $ |
| 13 | 2295 | Maintenance Shop | 7-1/2 ton bridge | $ |
| 14 | 2297 | Maintenance Shop | 10 ton bridge | $ |
| 15 | 3007 | Hangar | 2 ton bridge | $ |
| 16 | 3007 | Hangar | 2 ton bridge | $ |
| 17 | 3007 | Hangar | 10 ton bridge | $ |
| 18 | 3007 | Hangar | 10 ton bridge | $ |
| 19 | 3007 | Hangar | 35 ton bridge | $ |
| 20 | 3015 | Engineering Maintenance | 6 ton vehicle lift | $ |
| 21 | 3015 | Engineering Maintenance | 11 ton vehicle lift | $ |
| 22 | 3015 | Engineering Maintenance | 6,000 lbs monorail | $ |
| 23 | 3480 | Maintenance Shop | 15,000 lbs bridge | $ |
| 24 | 3490 | Maintenance Shop | 4,000 lbs bridge | $ |
| 25 | 3490 | Maintenance Shop | 15,000 lbs bridge | $ |
| 26 | 3490 | Maintenance Shop | 30,000 lbs bridge | $ |
| 72 | 3492 | Maintenance Shop | 1 ton monorail | $ |
| 28 | 3492 | Maintenance Shop | 1 ton monorail | $ |
| 29 | 3494 | Maintenance Shop | 1 ton monorail | $ |
| 30 | 3494 | Maintenance Shop | 1 ton monorail | $ |
| 31 | 3496 | Maintenance Shop | 1 ton monorail | $ |
| 32 | 3498 | Maintenance Shop | 6.8 ton monorail | $ |
| 33 | 3498 | Maintenance Shop | 13.6 ton bridge | $ |
| 34 | 3498 | Maintenance Shop | 13.6 ton bridge | $ |
| 35 | 3730 | Auto Skill Center | 2 ton bridge | $ |
| 36 | 3730 | Auto Skill Center | 5 ton vehicle lift | $ |
| 37 | 3730 | Auto Skill Center | 5 ton vehicle lift | $ |
| 38 | 3730 | Auto Skill Center | 5 ton vehicle lift | $ |
| 39 | 3730 | Auto Skill Center | 5 ton vehicle lift | $ |
| 40 | 3730 | Auto Skill Center | 5 ton vehicle lift | $ |
| 41 | 3730 | Auto Skill Center | 5 ton vehicle lift | $ |
| 42 | 3730 | Auto Skill Center | 5 ton vehicle lift | $ |
| 43 | 3730 | Auto Skill Center | 6 ton vehicle lift | $ |
| 44 | 3730 | Auto Skill Center | 6 ton vehicle lift | $ |
| 45 | Seward | Boat Maintenance | 1 ton chain hoist | $ |
| 46 | Seward | Boat Maintenance | 5 ton vehicle lift | $ |
TOTAL PER YEAR $
BASE YEAR OLD
| BASE YEAR | ||||||||
| CLIN # | DESCRIPTION | QTY | UNIT | UNIT PRICE | TOTAL COST | |||
| 0002 | Category I Administrative Buildings | |||||||
| The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. See PWS, Appendix B1 for cleaning standards of Category I buildings . | ||||||||
| Period of Performance: 9 months (Base Year) | ||||||||
| QTY | UNIT | UNIT PRICE | TOTAL COST | |||||
| 0002AA | Category I Administrative Buildings Rest Room Cleans | 2,620,889 | sq. ft | $ - 0 | $ - 0 | 238262.598181818 | 9 | 2144363.38 |
| The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. | ||||||||
| Period of Performance: 11 months (Base Year) | ||||||||
| QTY | UNIT | UNIT PRICE | TOTAL COST | |||||
| 0002AB | Category I Administrative Buildings Hard Floor Cleans | 5,926,029 | sq. ft | $ - 0 | $ - 0 | 538729.909090909 | 9 | 4848569.18 |
| The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. | ||||||||
| Period of Performance: 11 months (Base Year) | ||||||||
| QTY | UNIT | UNIT PRICE | TOTAL COST | |||||
| 0002AC | Category I Administrative Buildings Carpet Floor Cleans | 1,204,420 | sq. ft | $ - 0 | $ - 0 | 109492.752727273 | 9 | 985434.77 |
| The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. | ||||||||
| Period of Performance: 11 months (Base Year) |
| CLIN # | DESCRIPTION | QTY | UNIT | UNIT PRICE | TOTAL COST | |||
| 0003 | Category II Child Development Facilities | |||||||
| The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. See PWS, Appendix B2 for cleaning standards of Category II buildings . | ||||||||
| Period of Performance: 11 months (Base Year). | ||||||||
| QTY | UNIT | UNIT PRICE | TOTAL COST | |||||
| 0003AA | Category II Child Development Facilities Hard Floor Cleans | 11,485,212 | sq. ft | $ - 0 | $ - 0 | 1044110.22 | 9 | 9396991.98 |
| The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. | ||||||||
| Period of Performance: 11 months (Base Year) | ||||||||
| QTY | UNIT | UNIT PRICE | TOTAL COST | |||||
| 0003AB | Category II Child Development Facilities Carpet Floor Cleans | 685,729 | sq. ft | $ - 0 | $ - 0 | 62339.01 | 9 | 561051.09 |
| The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. | ||||||||
| Period of Performance: 11 months (Base Year) |
| CLIN # | DESCRIPTION | QTY | UNIT | UNIT PRICE | TOTAL COST | |||
| 0004 | Category III Physical Fitness Centers | |||||||
| The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. See PWS, Appendix B3 for cleaning standards of Category III buildings . | ||||||||
| Period of Performance: 11 months (Base Year). | ||||||||
| QTY | UNIT | UNIT PRICE | TOTAL COST | |||||
| 0004AA | Category III Physical Fitness Centers Hard Floor Cleans | 3,010,146 | sq. ft | $ - 0 | $ - 0 | 273649.630909091 | 9 | 2462846.68 |
| The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. | ||||||||
| Period of Performance: 11 months (Base Year). | ||||||||
| QTY | UNIT | UNIT PRICE | TOTAL COST | |||||
| 0004AB | Category III Continuous Cleaning Physical Fitness Center Bldg 3709 | 330 | Days | $ - 0 | $ - 0 | 30 | 9 | 270.00 |
| The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. | ||||||||
| Period of Performance: 11 months (Base Year). |
| CLIN # | DESCRIPTION | QTY | UNIT | UNIT PRICE | TOTAL COST | |||
| 0005 | Special /Emergency/Bio-Hazard Cleans | |||||||
| The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. | ||||||||
| Period of Performance: 11 months (Base Year). | ||||||||
| QTY | UNIT | UNIT PRICE | TOTAL COST | |||||
| 0005AA | Special Cleaning | 40,538 | per sq. ft | $ - 0 | $ - 0 | 3685.2727272727 | 9 | 33167.45 |
| The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. Special Cleaning is referenced in the PWS, paragraph 5.5. | ||||||||
| Period of Performance: 11 months (Base Year). |
| QTY | UNIT | UNIT PRICE | TOTAL COST | |||||
| 0005AB | Emergency Cleaning | 22,296 | per sq. ft | $ - 0 | $ - 0 | 2026.9090909091 | 9 | 18242.18 |
| The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. Emergency Cleaning is referenced in the PWS, paragraph 5.4. | ||||||||
| Period of Performance: 11 months (Base Year). | ||||||||
| QTY | UNIT | UNIT PRICE | TOTAL COST | |||||
| 0005AC | Bio-Hazard Cleaning | 10,134 | per sq. ft | $ - 0 | $ - 0 | 921.2727272727 | 9 | 8291.45 |
| The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. Bio-Hazard Cleaning is referenced in the PWS, paragraph 5.6. | ||||||||
| Period of Performance: 11 months (Base Year). |
| CLIN # | DESCRIPTION | QTY | UNIT | UNIT PRICE | TOTAL COST |
| 0006 | CONTRACT MANPOWER REPORTING | 1 | EA | $ - 0 | $ - 0 |
| The Contractor is required to enter data into the Contractor Manpower Reporting Application (CMRA) system as outlined in local information titled Contractor Manpower Reporting located with the clauses incorporated into the contract. Reporting period will be the period of performance not to exceed 12 months ending 30 September of each Government fiscal year and must be reported by 31 October of each calendar year. Data must be accurate and complete and entered into CMRA during the data gathering period of every year, or part of a year, for which the contract is in force. NOTE: If the reporting of Manpower Equivalents is not separately priced, insert “NSP in the blank shown. | |||||
| BASE YEAR TOTAL COST: | $ - 0 |
Sheet1
| BASE YEAR | |||||||||
| CLIN # | DESCRIPTION | QTY | UNIT | UNIT PRICE | TOTAL COST | ||||
| 0002 | Category I Administrative Buildings | ||||||||
| The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. | |||||||||
| Period of Performance: 11 months (Base Year) | |||||||||
| QTY | UNIT | UNIT PRICE | TOTAL COST | ||||||
| 0002AA | Category I Administrative Buildings Rest Room Cleans | 2,620,889 | sq. ft | $ 0.0408 | $ 106,932.25 | *55,026x47.63= 2,620,888.58 SF (11month period) | 55026.0041990342 | 52 | 2,861,352.22 |
| The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. The quantity represents the square footage to be cleaned over an 11 month period. | 0 | 52 | 0.00 | ||||||
| Period of Performance: 11 months (Base Year) | 0 | 52 | 0.00 | ||||||
| QTY | UNIT | UNIT PRICE | TOTAL COST | ERROR:#VALUE! | 52 | ERROR:#VALUE! | |||
| 0002AB | Category I Administrative Buildings Hard Floor Cleans | 6,586,752 | sq. ft | $ 0.0231 | $ 152,153.97 | *94,515x47.63= 4,501,749.45 SF | 138289.986773042 | 52 | 7,191,079.31 |
| The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. The quantity represents the square footage to be cleaned over an 11 month period. | 0 | 52 | 0.00 | ||||||
| Period of Performance: 11 months (Base Year) | 0 | 52 | 0.00 | ||||||
| QTY | UNIT | UNIT PRICE | TOTAL COST | ERROR:#VALUE! | 52 | ERROR:#VALUE! | |||
| 0002AC | Category I Administrative Buildings Carpet Floor Cleans | 1,204,420 | sq. ft | $ 0.0192 | $ 23,124.87 | *19,831x47.63= 944,550.53 SF | 25287.0098677304 | 52 | 1,314,924.51 |
| The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. The quantity represents the square footage to be cleaned over an 11 month period. | $ 282,211.10 | 0 | 52 | 0.00 | |||||
| Period of Performance: 11 months (Base Year) | 0 | 52 | 0.00 | ||||||
| 0 | 52 | 0.00 | |||||||
| CLIN # | DESCRIPTION | QTY | UNIT | UNIT PRICE | TOTAL COST | 52 | 0.00 | ||
| 0003 | Category II Child Development Facilities | 52 | 0.00 | ||||||
| The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. | 52 | ||||||||
| Period of Performance: 11 months (Base Year). | |||||||||
| QTY | UNIT | UNIT PRICE | TOTAL COST | ||||||
| 0003AA | Category II Child Development Facilities Hard Floor Cleans | 11,485,212 | sq. ft | $ 0.0252 | $ 289,427.35 | *390,060x238.15weeks = 9,302,139 SF | TOTAL: 11,485,212.42 SF | ||
| The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. The quantity represents the square footage to be cleaned over an 11 month period. | *7,639x285.78 weeks = 2,183,073 SF | ||||||||
| Period of Performance: 11 months (Base Year) | |||||||||
| QTY | UNIT | UNIT PRICE | TOTAL COST | ||||||
| 0003AB | Category II Child Development Facilities Carpet Floor Cleans | 685,729 | sq. ft | $ 0.0194 | $ 13,303.14 | *1113x238.15 weeks = 265,060.95 SF | TOTAL: 685,729.11 | ||
| The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. The quantity represents the square footage to be cleaned over an 11 month period. | *1472x285.78 weeks = 420,668.16 SF | ||||||||
| Period of Performance: 11 months (Base Year) | $ 302,730.50 |
| CLIN # | DESCRIPTION | QTY | UNIT | UNIT PRICE | TOTAL COST | |||
| 0004 | Category III Physical Fitness Centers | |||||||
| The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. | ||||||||
| Period of Performance: 11 months (Base Year). | ||||||||
| QTY | UNIT | UNIT PRICE | TOTAL COST | |||||
| 0004AA | Category III Physical Fitness Centers Hard Floor Cleans | 3,010,146 | sq. ft | $ 0.0344 | $ 103,549.02 | Bldg 3452(6W) 1,330,305.90 SF | 1W*Hockey 1,323x17.32 = 22,914.36 SF | 1,330,305.90 |
| The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. The quantity represents the square footage to be cleaned over an 11 month period. | Bldg 3709 (7W) 1,416,325.68 SF | 6W*Hockey 1,323x30.31= 240,600.00 SF | 1,416,325.68 | |||||
| Period of Performance: 11 months (Base Year). | 22,914.36 | |||||||
| QTY | UNIT | UNIT PRICE | TOTAL COST | 240,600.00 | ||||
| 0004AB | Category III Continuous Cleaning Physical Fitness Center Bldg 3709 | 11 | monthly | $ 4,322.26 | $ 47,544.86 | Total Hours 1,657.05 | Provide locker room cleaning from 13:00-15:30 daily 1Male/1Female 2-1/2 hours each. | 3,010,145.94 |
| The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. | ||||||||
| Period of Performance: 11 months (Base Year). |
| CLIN # | DESCRIPTION | QTY | UNIT | UNIT PRICE | TOTAL COST |
| 0005 | Special /Emergency/Bio-Hazard Cleans | ||||
| The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. | |||||
| Period of Performance: 11 months (Base Year). | |||||
| QTY | UNIT | UNIT PRICE | TOTAL COST | ||
| 0005AA | Special Cleaning | 40,538 | per sq. ft | $ 0.28 | $ 11,472.25 |
| The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. The quantity of square footage reserved for the Special Cleaning CLIN represents 20% of the total square footage for the contract. | |||||
| Period of Performance: 11 months (Base Year). |
| QTY | UNIT | UNIT PRICE | TOTAL COST | ||
| 0005AB | Emergency Cleaning | 22,296 | per sq. ft | $ 0.38 | $ 8,405.59 |
| The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. The quantity of square footage reserved for the Emergency Cleaning CLIN represents 11% of the total square footage for the contract. | |||||
| Period of Performance: 11 months (Base Year). | |||||
| QTY | UNIT | UNIT PRICE | TOTAL COST | ||
| 0005AC | Bio-Hazard Cleaning | 10,134 | per sq. ft | $ 1.13 | $ 11,471.69 |
| The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. The quantity of square footage reserved for the Special Cleaning CLIN represents 5% of the total square footage for the contract. | |||||
| Period of Performance: 11 months (Base Year). |
| CLIN # | DESCRIPTION | QTY | UNIT | UNIT PRICE | TOTAL COST |
| 0006 | CONTRACT MANPOWER REPORTING | 1 | EA | $ 100.0000 | $ 100.0000 |
| Contractor Manpower Reporting Costs: 1 May 2016 to 30 March 2017. The Contractor Manpower Reporting requirement is associated with the Office of the Assistant Secretary of the Army (Manpower and Reserve Affairs) requirement to obtain better visibility of the Contractor service workforce. | |||||
| The Contractor is required to enter data into the Contractor Manpower Reporting Application (CMRA) system as outlined in local information titled Contractor Manpower Reporting located with the clauses incorporated into the contract. Reporting period will be the period of performance not to exceed 12 months ending 30 September of each Government fiscal year and must be reported by 31 October of each calendar year. Data must be accurate and complete and entered into CMRA during the data gathering period of every year, or part of a year, for which the contract is in force. NOTE: If the reporting of Manpower Equivalents is not separately priced, insert “NSP in the blank shown. | |||||
| BASE YEAR TOTAL COST: | $ 767,485.01 |
File details come from the government source that posted it. Updated .