Attachment 2 - CLIN Structure Bid Sheet

View the file

Other files for this federal contract opportunity

Other files attached to Cranes and Hoists Services, newest first.
File Type Posted
Response_to_Industry_Questions.pdf PDF
Attachment_4_-_Wage_Determination.pdf PDF
Attachment_3_-_Past_Performance_Questionnaire.pdf PDF
Attachment_1_-_Performance_Work_Statement_Cranes_and_Hoists_(13_MAR_2017).pdf PDF
Combined_Synopsis_for_Cranes_and_Hoists_(13_March_2017).pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID SUMMARY SHEET

ONLY FILL OUT THE YELLOW HIGHLIGHTED CELLS THROUGHOUT THIS BID SHEET
The quanities in this bid sheet are estimates only. The unit prices will not be changed based on the quantities ordered.
DFARS Clause 252.204-7011, Alternative Line Item Structure is included in the solicitation. In addition to filling out the attached bid sheet, the offeror may propose an alternate CLIN Structure.
Elevator, Platform and Lift Services Bid Summary Sheet
COMBINED SYNOPSIS/SOLICITATION: W912D0-17-R-0005
Company Name:
Point of Contact (POC):
Tax ID #
CAGE Code:
DUNS Number:
Address:
Phone:
E-mail:
Fax
Bid Summary
BASE YEAR TOTAL:$ - 0
OPTION YEAR 1 TOTAL:$ - 0
OPTION YEAR 2 TOTAL:$ - 0
OPTION YEAR 3 TOTAL:$ - 0
OPTION YEAR 4 TOTAL:$ - 0
TOTAL BID AMOUNT:$ - 0

BASE YEAR

BASE YEAR
CLIN #DESCRIPTIONQTYUNITUNIT PRICETOTAL COST
0001Cranes and Hoists Services12MO$ - 0
See attached PWS
Period of Performance: 12 months (Base Year)
QTYUNITUNIT PRICETOTAL COST
0002Over and Above Work12Job$ - 0
Performance under this CLIN will be subject to PGI requirements
Period of Performance: 12 months (Base Year)
CLIN #DESCRIPTIONQTYUNITUNIT PRICETOTAL COST
0003CONTRACT MANPOWER REPORTING1EA$ - 0
The Contractor is required to enter data into the Contractor Manpower Reporting Application (CMRA) system as outlined in local information titled Contractor Manpower Reporting located with the clauses incorporated into the contract. Reporting period will be the period of performance not to exceed 12 months ending 30 September of each Government fiscal year and must be reported by 31 October of each calendar year. Data must be accurate and complete and entered into CMRA during the data gathering period of every year, or part of a year, for which the contract is in force. NOTE: If the reporting of Manpower Equivalents is not separately priced, insert “NSP in the blank shown.
BASE YEAR TOTAL COST:$ - 0

OPTION YEAR 1

CLIN #DESCRIPTIONQTYUNITUNIT PRICETOTAL COST
1001Cranes and Hoists Services12MO$ - 0
See attached PWS
Period of Performance: 12 months (Base Year)
QTYUNITUNIT PRICETOTAL COST
1002Over and Above Work12Job$ - 0
Performance under this CLIN will be subject to PGI requirements
Period of Performance: 12 months (Base Year)
CLIN #DESCRIPTIONQTYUNITUNIT PRICETOTAL COST
1003CONTRACT MANPOWER REPORTING1EA$ - 0
The Contractor is required to enter data into the Contractor Manpower Reporting Application (CMRA) system as outlined in local information titled Contractor Manpower Reporting located with the clauses incorporated into the contract. Reporting period will be the period of performance not to exceed 12 months ending 30 September of each Government fiscal year and must be reported by 31 October of each calendar year. Data must be accurate and complete and entered into CMRA during the data gathering period of every year, or part of a year, for which the contract is in force. NOTE: If the reporting of Manpower Equivalents is not separately priced, insert “NSP in the blank shown.
OPTION YEAR TOTAL COST:$ - 0

OPTION YEAR 2

CLIN #DESCRIPTIONQTYUNITUNIT PRICETOTAL COST
2001Cranes and Hoists Services12MO$ - 0
See attached PWS
Period of Performance: 12 months (Base Year)
QTYUNITUNIT PRICETOTAL COST
2002Over and Above Work12Job$ - 0
Performance under this CLIN will be subject to PGI requirements
Period of Performance: 12 months (Base Year)
CLIN #DESCRIPTIONQTYUNITUNIT PRICETOTAL COST
2003CONTRACT MANPOWER REPORTING1EA$ - 0
The Contractor is required to enter data into the Contractor Manpower Reporting Application (CMRA) system as outlined in local information titled Contractor Manpower Reporting located with the clauses incorporated into the contract. Reporting period will be the period of performance not to exceed 12 months ending 30 September of each Government fiscal year and must be reported by 31 October of each calendar year. Data must be accurate and complete and entered into CMRA during the data gathering period of every year, or part of a year, for which the contract is in force. NOTE: If the reporting of Manpower Equivalents is not separately priced, insert “NSP in the blank shown.
OPTION YEAR TOTAL COST:$ - 0

OPTION YEAR 3

CLIN #DESCRIPTIONQTYUNITUNIT PRICETOTAL COST
3001Cranes and Hoists Services12MO$ - 0
See attached PWS
Period of Performance: 12 months (Base Year)
QTYUNITUNIT PRICETOTAL COST
3002Over and Above Work12Job$ - 0
Performance under this CLIN will be subject to PGI requirements
Period of Performance: 12 months (Base Year)
CLIN #DESCRIPTIONQTYUNITUNIT PRICETOTAL COST
3003CONTRACT MANPOWER REPORTING1EA$ - 0
The Contractor is required to enter data into the Contractor Manpower Reporting Application (CMRA) system as outlined in local information titled Contractor Manpower Reporting located with the clauses incorporated into the contract. Reporting period will be the period of performance not to exceed 12 months ending 30 September of each Government fiscal year and must be reported by 31 October of each calendar year. Data must be accurate and complete and entered into CMRA during the data gathering period of every year, or part of a year, for which the contract is in force. NOTE: If the reporting of Manpower Equivalents is not separately priced, insert “NSP in the blank shown.
OPTION YEAR TOTAL COST:$ - 0

OPTION YEAR 4

CLIN #DESCRIPTIONQTYUNITUNIT PRICETOTAL COST
4001Cranes and Hoists Services12MO$ - 0$ - 0
See attached PWS
Period of Performance: 12 months (Base Year)
QTYUNITUNIT PRICETOTAL COST
4002Over and Above Work12Job$ - 0
Performance under this CLIN will be subject to PGI requirements
Period of Performance: 12 months (Base Year)
CLIN #DESCRIPTIONQTYUNITUNIT PRICETOTAL COST
4003CONTRACT MANPOWER REPORTING1EA$ - 0
The Contractor is required to enter data into the Contractor Manpower Reporting Application (CMRA) system as outlined in local information titled Contractor Manpower Reporting located with the clauses incorporated into the contract. Reporting period will be the period of performance not to exceed 12 months ending 30 September of each Government fiscal year and must be reported by 31 October of each calendar year. Data must be accurate and complete and entered into CMRA during the data gathering period of every year, or part of a year, for which the contract is in force. NOTE: If the reporting of Manpower Equivalents is not separately priced, insert “NSP in the blank shown.
OPTION YEAR TOTAL COST:$ - 0

52.217-8

CLIN #DESCRIPTIONQTYUNITUNIT PRICETOTAL COST
5001Cranes and Hoists Services6MO$ - 0$ - 0
See attached PWS
Period of Performance: 6 months (52.217-8)
QTYUNITUNIT PRICETOTAL COST
5002Over and Above Work6Job$ - 0
Performance under this CLIN will be subject to PGI requirements
Period of Performance: 6 months (52.217-8)
CLIN #DESCRIPTIONQTYUNITUNIT PRICETOTAL COST
5003CONTRACT MANPOWER REPORTING1EA$ - 0
The Contractor is required to enter data into the Contractor Manpower Reporting Application (CMRA) system as outlined in local information titled Contractor Manpower Reporting located with the clauses incorporated into the contract. Reporting period will be the period of performance not to exceed 12 months ending 30 September of each Government fiscal year and must be reported by 31 October of each calendar year. Data must be accurate and complete and entered into CMRA during the data gathering period of every year, or part of a year, for which the contract is in force. NOTE: If the reporting of Manpower Equivalents is not separately priced, insert “NSP in the blank shown.
OPTION YEAR TOTAL COST:$ - 0

Crane and Hoist Listing Bldg Bldg Description Type

11557Hangar 15 ton bridge$
21610DTA Texas Range25 ton bridge$
31930DTA CRTC5 ton bridge$
42077Hangar 71.5 ton monorail$
52077Hangar 75 ton monorail$
62077Hangar 71 ton monorail$
72088Aircraft Maintenance Hangar5 ton bridge$
82020DTA Black Rapids3 ton cantilevered$
92132Hangar2 ton bridge$
102132Hangar2 ton bridge$
112132Hangar10 ton bridge$
122132Hangar10 ton bridge$
132295Maintenance Shop7-1/2 ton bridge$
142297Maintenance Shop10 ton bridge$
153007Hangar2 ton bridge$
163007Hangar2 ton bridge$
173007Hangar10 ton bridge$
183007Hangar10 ton bridge$
193007Hangar35 ton bridge$
203015Engineering Maintenance6 ton vehicle lift$
213015Engineering Maintenance11 ton vehicle lift$
223015Engineering Maintenance6,000 lbs monorail$
233480Maintenance Shop15,000 lbs bridge$
243490Maintenance Shop4,000 lbs bridge$
253490Maintenance Shop15,000 lbs bridge$
263490Maintenance Shop30,000 lbs bridge$
723492Maintenance Shop1 ton monorail$
283492Maintenance Shop1 ton monorail$
293494Maintenance Shop1 ton monorail$
303494Maintenance Shop1 ton monorail$
313496Maintenance Shop1 ton monorail$
323498Maintenance Shop6.8 ton monorail$
333498Maintenance Shop13.6 ton bridge$
343498Maintenance Shop13.6 ton bridge$
353730Auto Skill Center2 ton bridge$
363730Auto Skill Center5 ton vehicle lift$
373730Auto Skill Center5 ton vehicle lift$
383730Auto Skill Center5 ton vehicle lift$
393730Auto Skill Center5 ton vehicle lift$
403730Auto Skill Center5 ton vehicle lift$
413730Auto Skill Center5 ton vehicle lift$
423730Auto Skill Center5 ton vehicle lift$
433730Auto Skill Center6 ton vehicle lift$
443730Auto Skill Center6 ton vehicle lift$
45SewardBoat Maintenance1 ton chain hoist$
46SewardBoat Maintenance5 ton vehicle lift$

TOTAL PER YEAR $

BASE YEAR OLD

BASE YEAR
CLIN #DESCRIPTIONQTYUNITUNIT PRICETOTAL COST
0002Category I Administrative Buildings
The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. See PWS, Appendix B1 for cleaning standards of Category I buildings .
Period of Performance: 9 months (Base Year)
QTYUNITUNIT PRICETOTAL COST
0002AACategory I Administrative Buildings Rest Room Cleans2,620,889sq. ft$ - 0$ - 0238262.59818181892144363.38
The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated.
Period of Performance: 11 months (Base Year)
QTYUNITUNIT PRICETOTAL COST
0002ABCategory I Administrative Buildings Hard Floor Cleans5,926,029sq. ft$ - 0$ - 0538729.90909090994848569.18
The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated.
Period of Performance: 11 months (Base Year)
QTYUNITUNIT PRICETOTAL COST
0002ACCategory I Administrative Buildings Carpet Floor Cleans1,204,420sq. ft$ - 0$ - 0109492.7527272739985434.77
The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated.
Period of Performance: 11 months (Base Year)
CLIN #DESCRIPTIONQTYUNITUNIT PRICETOTAL COST
0003Category II Child Development Facilities
The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. See PWS, Appendix B2 for cleaning standards of Category II buildings .
Period of Performance: 11 months (Base Year).
QTYUNITUNIT PRICETOTAL COST
0003AACategory II Child Development Facilities Hard Floor Cleans11,485,212sq. ft$ - 0$ - 01044110.2299396991.98
The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated.
Period of Performance: 11 months (Base Year)
QTYUNITUNIT PRICETOTAL COST
0003ABCategory II Child Development Facilities Carpet Floor Cleans685,729sq. ft$ - 0$ - 062339.019561051.09
The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated.
Period of Performance: 11 months (Base Year)
CLIN #DESCRIPTIONQTYUNITUNIT PRICETOTAL COST
0004Category III Physical Fitness Centers
The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. See PWS, Appendix B3 for cleaning standards of Category III buildings .
Period of Performance: 11 months (Base Year).
QTYUNITUNIT PRICETOTAL COST
0004AACategory III Physical Fitness Centers Hard Floor Cleans3,010,146sq. ft$ - 0$ - 0273649.63090909192462846.68
The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated.
Period of Performance: 11 months (Base Year).
QTYUNITUNIT PRICETOTAL COST
0004ABCategory III Continuous Cleaning Physical Fitness Center Bldg 3709330Days$ - 0$ - 0309270.00
The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated.
Period of Performance: 11 months (Base Year).
CLIN #DESCRIPTIONQTYUNITUNIT PRICETOTAL COST
0005Special /Emergency/Bio-Hazard Cleans
The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated.
Period of Performance: 11 months (Base Year).
QTYUNITUNIT PRICETOTAL COST
0005AASpecial Cleaning40,538per sq. ft$ - 0$ - 03685.2727272727933167.45
The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. Special Cleaning is referenced in the PWS, paragraph 5.5.
Period of Performance: 11 months (Base Year).
QTYUNITUNIT PRICETOTAL COST
0005ABEmergency Cleaning22,296per sq. ft$ - 0$ - 02026.9090909091918242.18
The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. Emergency Cleaning is referenced in the PWS, paragraph 5.4.
Period of Performance: 11 months (Base Year).
QTYUNITUNIT PRICETOTAL COST
0005ACBio-Hazard Cleaning10,134per sq. ft$ - 0$ - 0921.272727272798291.45
The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. Bio-Hazard Cleaning is referenced in the PWS, paragraph 5.6.
Period of Performance: 11 months (Base Year).
CLIN #DESCRIPTIONQTYUNITUNIT PRICETOTAL COST
0006CONTRACT MANPOWER REPORTING1EA$ - 0$ - 0
The Contractor is required to enter data into the Contractor Manpower Reporting Application (CMRA) system as outlined in local information titled Contractor Manpower Reporting located with the clauses incorporated into the contract. Reporting period will be the period of performance not to exceed 12 months ending 30 September of each Government fiscal year and must be reported by 31 October of each calendar year. Data must be accurate and complete and entered into CMRA during the data gathering period of every year, or part of a year, for which the contract is in force. NOTE: If the reporting of Manpower Equivalents is not separately priced, insert “NSP in the blank shown.
BASE YEAR TOTAL COST:$ - 0

Sheet1

BASE YEAR
CLIN #DESCRIPTIONQTYUNITUNIT PRICETOTAL COST
0002Category I Administrative Buildings
The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated.
Period of Performance: 11 months (Base Year)
QTYUNITUNIT PRICETOTAL COST
0002AACategory I Administrative Buildings Rest Room Cleans2,620,889sq. ft$ 0.0408$ 106,932.25*55,026x47.63= 2,620,888.58 SF (11month period)55026.0041990342522,861,352.22
The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. The quantity represents the square footage to be cleaned over an 11 month period.0520.00
Period of Performance: 11 months (Base Year)0520.00
QTYUNITUNIT PRICETOTAL COSTERROR:#VALUE!52ERROR:#VALUE!
0002ABCategory I Administrative Buildings Hard Floor Cleans6,586,752sq. ft$ 0.0231$ 152,153.97*94,515x47.63= 4,501,749.45 SF138289.986773042527,191,079.31
The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. The quantity represents the square footage to be cleaned over an 11 month period.0520.00
Period of Performance: 11 months (Base Year)0520.00
QTYUNITUNIT PRICETOTAL COSTERROR:#VALUE!52ERROR:#VALUE!
0002ACCategory I Administrative Buildings Carpet Floor Cleans1,204,420sq. ft$ 0.0192$ 23,124.87*19,831x47.63= 944,550.53 SF25287.0098677304521,314,924.51
The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. The quantity represents the square footage to be cleaned over an 11 month period.$ 282,211.100520.00
Period of Performance: 11 months (Base Year)0520.00
0520.00
CLIN #DESCRIPTIONQTYUNITUNIT PRICETOTAL COST520.00
0003Category II Child Development Facilities520.00
The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated.52
Period of Performance: 11 months (Base Year).
QTYUNITUNIT PRICETOTAL COST
0003AACategory II Child Development Facilities Hard Floor Cleans11,485,212sq. ft$ 0.0252$ 289,427.35*390,060x238.15weeks = 9,302,139 SFTOTAL: 11,485,212.42 SF
The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. The quantity represents the square footage to be cleaned over an 11 month period.*7,639x285.78 weeks = 2,183,073 SF
Period of Performance: 11 months (Base Year)
QTYUNITUNIT PRICETOTAL COST
0003ABCategory II Child Development Facilities Carpet Floor Cleans685,729sq. ft$ 0.0194$ 13,303.14*1113x238.15 weeks = 265,060.95 SFTOTAL: 685,729.11
The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. The quantity represents the square footage to be cleaned over an 11 month period.*1472x285.78 weeks = 420,668.16 SF
Period of Performance: 11 months (Base Year)$ 302,730.50
CLIN #DESCRIPTIONQTYUNITUNIT PRICETOTAL COST
0004Category III Physical Fitness Centers
The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated.
Period of Performance: 11 months (Base Year).
QTYUNITUNIT PRICETOTAL COST
0004AACategory III Physical Fitness Centers Hard Floor Cleans3,010,146sq. ft$ 0.0344$ 103,549.02Bldg 3452(6W) 1,330,305.90 SF1W*Hockey 1,323x17.32 = 22,914.36 SF1,330,305.90
The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. The quantity represents the square footage to be cleaned over an 11 month period.Bldg 3709 (7W) 1,416,325.68 SF6W*Hockey 1,323x30.31= 240,600.00 SF1,416,325.68
Period of Performance: 11 months (Base Year).22,914.36
QTYUNITUNIT PRICETOTAL COST240,600.00
0004ABCategory III Continuous Cleaning Physical Fitness Center Bldg 370911monthly$ 4,322.26$ 47,544.86Total Hours 1,657.05Provide locker room cleaning from 13:00-15:30 daily 1Male/1Female 2-1/2 hours each.3,010,145.94
The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated.
Period of Performance: 11 months (Base Year).
CLIN #DESCRIPTIONQTYUNITUNIT PRICETOTAL COST
0005Special /Emergency/Bio-Hazard Cleans
The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated.
Period of Performance: 11 months (Base Year).
QTYUNITUNIT PRICETOTAL COST
0005AASpecial Cleaning40,538per sq. ft$ 0.28$ 11,472.25
The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. The quantity of square footage reserved for the Special Cleaning CLIN represents 20% of the total square footage for the contract.
Period of Performance: 11 months (Base Year).
QTYUNITUNIT PRICETOTAL COST
0005ABEmergency Cleaning22,296per sq. ft$ 0.38$ 8,405.59
The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. The quantity of square footage reserved for the Emergency Cleaning CLIN represents 11% of the total square footage for the contract.
Period of Performance: 11 months (Base Year).
QTYUNITUNIT PRICETOTAL COST
0005ACBio-Hazard Cleaning10,134per sq. ft$ 1.13$ 11,471.69
The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. The quantity of square footage reserved for the Special Cleaning CLIN represents 5% of the total square footage for the contract.
Period of Performance: 11 months (Base Year).
CLIN #DESCRIPTIONQTYUNITUNIT PRICETOTAL COST
0006CONTRACT MANPOWER REPORTING1EA$ 100.0000$ 100.0000
Contractor Manpower Reporting Costs: 1 May 2016 to 30 March 2017. The Contractor Manpower Reporting requirement is associated with the Office of the Assistant Secretary of the Army (Manpower and Reserve Affairs) requirement to obtain better visibility of the Contractor service workforce.
The Contractor is required to enter data into the Contractor Manpower Reporting Application (CMRA) system as outlined in local information titled Contractor Manpower Reporting located with the clauses incorporated into the contract. Reporting period will be the period of performance not to exceed 12 months ending 30 September of each Government fiscal year and must be reported by 31 October of each calendar year. Data must be accurate and complete and entered into CMRA during the data gathering period of every year, or part of a year, for which the contract is in force. NOTE: If the reporting of Manpower Equivalents is not separately priced, insert “NSP in the blank shown.
BASE YEAR TOTAL COST:$ 767,485.01