This Statement of Work (SOW) details the replacement of a UPS Generator Enclosure at the B1292 LMR Tunnel located at Fort Shafter, Hawaii. The contractor is required to send technicians to remove the existing Generac Generator Enclosure (Model #SD0100, 100 KW, SN: 9681684), perform rust remediation, and install a new enclosure. Key responsibilities include reporting site outages, bypassing power to isolate UPS systems, removing and disposing of debris, and conducting rust remediation by removing corrosion and applying protective coatings.

The project involves a momentary site outage during power transition, with the contractor required to re-plug AC power equipment into new UPS AC outlets according to the original configuration. The government will provide base access and necessary escorts. The generator enclosure specifications include dimensions of 144" length, 40" width, and 80" height, with the shipping address set at LMR Tunnel, Patch Place, Building 1292, Fort Shafter, HI 96858. The contractor must also perform quality inspections after completing the work in accordance with industry standards.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work

Contractor will send technicians to the B1292 LMR Tunnel to remove and replace UPS Generator Enclosure and Remediate rust around the generator assembly.

See Salient Characteristics for generator enclosure and pictures for additional information below.

Overview

• Contractor Responsibilities:

• Contractor shall report the site outage and work being performed to B1292 UPS Generator.

• Contractor shall bypass power to isolate the UPSs. There will be a short period of time of no back up power during this remediation.

• Contractor shall remove UPS Generator Enclosure perform rust remediation.

• Contractor shall re-plug the sites AC power equipment into the new UPSs AC outlets per the original configuration. This will cause a momentary site outage during this transition.

• Contractor shall remove and dispose of any debris that was made during the removal and install of the new enclosure.

• Rust remediation shall include service preparation, removal of corrosion, flaking paint to restore surface integrity by applying protective coatings, sealants, or paint systems that meets performance requirements.

• Contractor shall conduct quality inspection(s) after completion of work in accordance with industry standards.

Government responsibilities:

• Provide base access and any necessary escorts to B1292 for Contractor Employees

• Shipping Address for equipment will be determined.

Salient Characteristics Brand Name or Equal to:

Generac Generator Enclosure - Ft Shafter B1292 LMR Master Site Generac Model # SD0100; 100 KW; SN: 9681684 Qty: 1 Dimensions:

L = 144”, W = 40”, H = 80”

Shipping Address: