Statement of Work 1292 Rust Remediation and Replace UPS Generator Enclosure.pdf
PDF 2 MB Posted
- Attached to
- Short Suspense Notice - Rust Remediation and Replacement of UPS Generator Enclosure Amendment 2
- Solicitation number
- W912CN-25-Q-A049
About this file
This Statement of Work (SOW) details the replacement of a UPS Generator Enclosure at the B1292 LMR Tunnel located at Fort Shafter, Hawaii. The contractor is required to send technicians to remove the existing Generac Generator Enclosure (Model #SD0100, 100 KW), perform rust remediation, and install a new enclosure. Key contractor responsibilities include reporting site outages, bypassing power to isolate UPS systems, removing the existing enclosure, performing rust remediation, reinstalling AC power equipment, and disposing of all debris. The generator enclosure dimensions are 144" long, 40" wide, and 80" high.
The government's responsibilities are limited to providing base access and escorts for contractor employees. The work will involve a momentary site outage during power transition, and the contractor must carefully manage the power bypass to minimize disruption. The shipping address for the new equipment is the LMR Tunnel, Patch Place, Building 1292, Fort Shafter, HI 96858. The SOW includes multiple images documenting significant rust damage to the existing generator enclosure, which appears to be the primary motivation for the replacement project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
Contractor will send technicians to the B1292 LMR Tunnel to remove and replace UPS Generator Enclosure and Remediate rust around the generator assembly.
See Salient Characteristics for generator enclosure and pictures for additional information below.
Overview
• Contractor Responsibilities:
• Contractor shall report the site outage and work being performed to B1292 UPS Generator.
• Contractor shall bypass power to isolate the UPSs. There will be a short period of time of no back up power during this remediation.
• Contractor shall remove UPS Generator Enclosure perform rust remediation.
• Contractor shall re-plug the sites AC power equipment into the new UPSs AC outlets per the original configuration. This will cause a momentary site outage during this transition.
• Contractor shall remove and dispose of any debris that was made during the removal and Install of the new enclosure and rust remediation.
Government responsibilities:
• Provide base access and any necessary escorts to B1292 for Contractor Employees
• Shipping Address for equipment will be determined.
Salient Characteristics Brand Name or Equal to:
Generac Generator Enclosure - Ft Shafter B1292 LMR Master Site Generac Model # SD0100; 100 KW; SN: 9681684 Qty: 1 Dimensions:
L = 144”, W = 40”, H = 80”
Shipping Address:
LMR Tunnel Patch Place, Bldg. 1292, Fort Shafter, HI 96858