PARC Admin 4070 DWG.pdf
PDF 835 KB Posted
- Attached to
- 18 NIPR DROPS Pililaau Army Recreation Center
- Solicitation number
- W912CN-25-Q-A040
About this file
This document is a floor plan detailing Network Infrastructure Protocol (NIPR) network drop requirements for various locations within a facility. The plan specifies 18 total NIPR network drops distributed across nine different areas: back office (2 drops), doorway between administrative areas (2 drops), corner desk (2 drops), middle desk (2 drops), front desk (2 drops), time clock (2 drops), left check-in (2 drops), right check-in (2 drops), and manager's office (2 drops). A critical note emphasizes that these new NIPR drops will coexist with commercial DSL drops but must be physically separated from them, indicating a specific networking infrastructure requirement that maintains network security and segmentation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(1)
(2)
(5)
(4)
(7) (8)
DSL RACK
NIPR RACK
(9)
1. Back office. Requires 2 NIPR
2. Doorway from Admin1 to Admin2.
3. Corner Desk: 2 NIPR
4. Middle Desk: 2 NIPR
5. Front Desk: 2 NIPR
6. Time Clock: 2 NIPR, Remove current time clock drop.
7. Check-In (Left): 2 NIPR.
8. Check-In (Right): 2 NIPR.
9. Manager's Office: 2 NIPR.
Total Drops: 18
(3)
Note: These NIPR drops co-exists with commercial DSL drops As part of this requirement, the new NIPR drops will be separated from the commercial DSL drops.
(6)