About this file

Conformed Copy of W912CN-19-B-0001-0003.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W912CN19B0001

0011221174

PROJECT TITLE: This is a f irm f ixed price requirements-type construction contract to furnish all labor, materials, equipment, management, supervision, tools, transportation and other incidental items to perform Open-End roofing repairs/installation and related w ork located at various Army installations (to include, but not limited to Schofield Barracks, Fort Shafter, Wheeler Army Air Field, Helemano Military Reservation, Aliamanu Military Reservation, Tripler Army Medical Center), Island of Oahu, Haw aii.

FEWR: RH000528J

NAICS: 238160

MAGNITUDE OF CONSTRUCTION: More than $10,000,000.

X

ANNA LEE 808.656.1064

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

26-Oct-2018

(RFP)

(IFB)

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______30 calendar days and complete it w ithin ________ calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________28 Nov 2018 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

EXPEDITIONARY CONTRACTING COMMAND

413THCONTRACTING SUPPORT BRIGADE

BLDG T122 536 PALM CIRCLE DR 2ND FLOOR H

FORT SHAFTER HI 96858-5025

W912CN

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

10:00 AM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

8084386544 / 8084386563FAX:TEL: 8084386535 TEL: FAX:

W912CN19B0001 497

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

SECTION 07 14 00 Page 3

Section SF 30 - Block 14 Continuation Page (SF 30)

QUESTIONS AND RESPONSES

QUESTION GOVERNMENT RESPONSE

Bid Bond - Does the bid bond need to be based on the whole contract total (base+2 years value) or just the base year value?

Bid Bond is based off your Grand Total in Attachment 1 of the solicitation.

Payment/Performance Bonds - Will the awarded contractor need to provide payment and performance blanket bonds for the whole value of the contract (base+2 years value) or just the base year value and then new bonds issued each year when the options are exercised?

See 52.228-15(a). “Original contract price means the award price of the contract; or, for requirements contracts, the price payable for the estimated total quantity; or, for indefinite-quantity contracts, the price payable for the specified minimum quantity. Original contract price does not include the price of any options, except those options exercised at the time of contract award.”

Section 07 41 13, Non-Structural Metal Roofing, Section 1.6.2 Finish Warranty. Please confirm that the 7-year warranty is a manufacturer’s warranty.

Also the surety is requesting that the 2 year limitation surety language be added to this section. “The Surety’s liability shall be limited to the first 2 years.”

Paragraph 1.6.2 falls under Paragraph 1.6, which states, "Provide metal roof system material and workmanship warranties meeting specified requirements. Revision or amendment to manufacturer's standard warranty shall be made as required to comply with the specified requirements."

The following statement is added to Section 07 41 13, Paragraph 1.6.2, "The Surety's liability shall be limited to the first 2 years of the warranty period. The Contractor shall be responsible for the balance of the warranty period as stated above." This verbiage is also added to Section 07 61 15.00 20, Paragraph 1.8.

CLIN #0058, #1058, & #2058, Contractor Manhour Reporting. The CLIN quantities in the pricing section have a quantity of 1 each. In Section 07 14 00 that details the CLIN descriptions the quantity is listed at 15 each. Please advise which is correct.

The correct quantity is 1 each. Bid Item Number X058 in Section 01026 (in Section 07 14 00) is revised from 15 each to 1 each.

If the CLIN quantity for the Contractor Manhour Reporting is 1, will a separate task order be issued to the awarded contractor for completion of all eCMRA reports for the Fiscal Year or will each issued task order include the CLIN for Contractor Manhour Reporting.

A separate task order can be issued or it can be incorporated into a project task order for the Contractor Manpower Report (CMR) CLIN X058. Regardless, the CLIN can only be invoiced against and paid out once for each fiscal year.

In previous roofing IDIQ contracts CLINs were included for stairway scaffolding, gradall, and snorkel.

Would the government please consider adding these CLINs back into the contract. It is very difficult to include equipment costs into the existing CLIN pricing

The Government will not be adding CLINs for these equipment into the contract. These equipment are standard for roofing projects and will considered incidentals.

SECTION 07 14 00 Page 4 when the nature of the future task orders is unknown.

Some task orders will require this equipment and others will not.

CLIN 0046, 1046, and 2046 in the pricing schedule the unit is blank. In section 07 14 00 the unit is noted as Weeks. Please confirm that the pricing should be based on rental/operator cost for a week. The price different between days and weeks on this piece of equipment can be significant.

Pricing should be based on rental/operator for a week.

WEEK is added as the unit for CLINs X046.

QUESTIONS AND RESPONSES #2

QUESTION GOVERNMENT RESPONSE

Line item 0028 - What size chem curbs are required? Can go from 4” to unlimited size with straight and corner accessories.

Up to 7.5" round curb.

Line item 0041, 0043 – EPS & Polyiso is difficult to price out per square foot. Would be easier to price out using cubic feet.

Different heights for different lengths, pitch requirements and starting heights.

Unit is board feet which is also a unit of volume.

Line item 0032 – Building code looks to require installation of solid sheathing when replacing a tile roof. Should we include cost to resheath?

Do not resheath the entire roof. CLIN 25 can be used if needed for damaged portions.

Line item 0033 – Depending on condition of the existing tiles, installation of clear coat would cause broken tiles. Depending on profile of the tile, method of securing, and age it adds to factoring in how much will require replacement. This one could turn into a disaster. No way we can guess if existing tiles are already brittle, Already leaking? We can go in and clean tiles and get nailed for leaks and breakage due to our men accessing the roof. How do you suggest we approach this

CLIN?

This CLIN will only be applied to newly installed tiles. Each task order should have the same quantities of CLIN 32 and 33.

SECTION 07 14 00 Page 5

Line item 0037 (/0038) – Gravel roofs – Often times there are multiple layers on these types of roofs. Are we pricing out a single layer?

CLIN includes 3-6 layers. Removal of a typical roofing system.

Line item 0044 – What is the required DFT?

Or gallons per square? We found the gallons per square and mils for the Silicone coating but not the Acrylic coating

The DFT varies for different substrates.

Complete manufacturer’s instructions are available online. Foundation Coat Application Rate: 1.00-1.50 gal per 100 ft2 (4.08 - 6.11 L/10 m2) per coat. Finish Coat Application Rate: 0.75-1.50 gal per 100 ft2 (3.05 - 6.11 L/10 m2) per coat.

We are wondering how to determine the building location of each CLIN.

In regards to the basic contract, the CLINs do not have specific building location. The location will be identified with the individual task orders. The Government has provided estimated quantities, which are based on anticipated need for various Army installations.

QUESTIONS AND RESPONSES #3

QUESTION GOVERNMENT RESPONSE

Spec Section 07 81 00

SPRAY APPLIED FIREPROOFING ---

Questions:

1. What is the fire rating required for the roof?

2. What type of roof to be applied with fireproofing? is it (concrete, fluted metal deck, etc…)?

3. What type of existing insulation is on the deck, if any?

4. What are the sizes of structural members under the roof (any as built draws would work) to be applied with?

The Government has determined that CLINs X055 and X056 are no longer required.

CLINs X055 and X056 are deleted.

Subsequently, Section 01026 is updated and Section 07 81 00 is deleted.

SECTION 07 14 00 Page 6

5. What is the height of roof (elevations) to be considered?

I am requesting a bid extension of 2 weeks from the RFB of Monday, 11/26/18. Please let me know if an extension is granted. Thank you in advance for your consideration

The IFB extension deadline is extended to 28 November 2018, 10:00 am, Hawaii Standard Time (HST).

Section 2.1 Materials ( Asphalt Shingles)

Looks like they are requesting two different type of shingles but have only one line item.

Shingles no less than 210 pounds per square and also not less than 290 pounds per square in the next line.

The CLIN should be architectural shingles weighing not less than 290 pounds per 100 square feet. Section 07 31 13 is updated.

CLIN 0039 Wanted to clarify if this is for a torch on material or is peel and stick allowed

Peel and stick is allowed.

SECTION 07 14 00 Page 7

Section 00 10 00 - Solicitation

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 100,000 Square

Foot

REPAIR OR ALTERATION OF OFFICE BLDG

FFP

: CLIN 0001; REPLACE CERAMIC COATED MINERAL SURFACED SELF-

SEALING FIBERGLASS COMPOSITION STRIP SHINGLES, composed of a fiberglass mat base with ceramic-coated mineral granules tightly embedded in carefully refined, water-resistant asphalt. Two pieces of the shingle are firmly laminated together in a special tough asphaltic cement. Includes Removal & Disposal of existing Strip Shingles, Roofing Felt Underlayment, Metal Drip Edge and Installation of new, Felt Underlayment & Metal Drip Edge.

FOB: Destination

PURCHASE REQUEST NUMBER: 0011221174

PSC CD: Z2AA

NET AMT

0002 100,000 Square

: CLIN 0002; ROOFING PANELS Removal and Disposal, Includes Preformed & Corrugated Aluminum Roofing Panels, Preformed, Corrugated, Ribbed & Standing Seam Galvanized, Zinc & Colored Sheet Metal; and Preformed, Corrugated & Ribbed Fiberglass Panels.

FOB: Destination

SECTION 07 14 00 Page 8

0003 8,000 Square

: CLIN 0003; TRANSITE ROOFING PANELS, Removal and Disposal. Includes Asbestos Abatement Air Monitoring, Temporary Fence Barricades, Personnel, Waste and Decontamination Unit.

FOB: Destination

0004 8,000 Square

: CLIN 0004; ALUMINUM ROOFING PANELS, Installation of Preformed or Corrugated Panels.

FOB: Destination

SECTION 07 14 00 Page 9

0005 100,000 Square

: CLIN 0005; STEEL SHEET METAL ROOFING PANELS, Installation of Preformed, Standing Seam, Zinc Coated & Factory Painted.

FOB: Destination

0006 30,000 Square

: CLIN 0006; SHEET METAL FLASHING, Removal and Disposal. Includes Aluminum, Galvanized Steel, Copper, and Aluminum Fascia.

FOB: Destination

SECTION 07 14 00 Page 10

0007 5,000 Square

: CLIN 0007; SHEET METAL FLASHING, Installation of Aluminum Flashing.

FOB: Destination

0008 1,000 Square

: CLIN 0008; SHEET METAL FLASHING, Installation of Aluminum Fascia.

FOB: Destination

SECTION 07 14 00 Page 11

0009 25,000 Square

: CLIN 0009; SHEET METAL FLASHING, Installation of Galvanized Steel Flashing.

FOB: Destination

0010 10,000 Square

: CLIN 0010; SHEET METAL FLASHING, Installation of Copper Flashing.

FOB: Destination

SECTION 07 14 00 Page 12

0011 20 Each

REPAIR OR ALTERATION OF OFFICE BLDG

FFP

: CLIN 0011; VENT THRU ROOF FLASHING, Installation, Includes Removal and Disposal. Aluminum Vent Flashing.

FOB: Destination

0012 20 Each

REPAIR OR ALTERATION OF OFFICE BLDG

FFP

: CLIN 0012; VENT THRU ROOF FLASHING, INSTALLATION, INCLUDES

REMOVAL AND DISPOSAL. Galvanized Vent Flashing.

FOB: Destination

SECTION 07 14 00 Page 13

0013 300 Each

REPAIR OR ALTERATION OF OFFICE BLDG

FFP

: CLIN 0013; VENT THRU ROOF FLASHING, INSTALLATION, INCLUDES

REMOVAL AND DISPOSAL. Lead Vent Flashing.

FOB: Destination

0014 15,000 Linear

: CLIN 0014; SHEET METAL GUTTERS & DOWNSPOUTS, Removal and Disposal of existing Gutter and Downspouts.

FOB: Destination

SECTION 07 14 00 Page 14

0015 7,000 Linear

: CLIN 0015; SHEET METAL GUTTERS & DOWNSPOUTS, Installation of Aluminum Gutters and Downspouts, 5".

FOB: Destination

0016 3,000 Linear

: CLIN 0016; SHEET METAL GUTTERS & DOWNSPOUTS, Installation of Aluminum Gutters and Downspouts, 7".

FOB: Destination

SECTION 07 14 00 Page 15

0017 2,000 Linear

: CLIN 0017; SHEET METAL GUTTERS & DOWNSPOUTS, Installation of Galvanized Steel Gutters and Downspouts.

FOB: Destination

0018 4,000 Linear

: CLIN 0018; SHEET METAL GUTTERS & DOWNSPOUTS, Installation of Copper Gutters and Downspouts, k-style.

FOB: Destination

SECTION 07 14 00 Page 16

0019 2,000 Linear

: CLIN 0019; SHEET METAL GUTTERS & DOWNSPOUTS, Installation of Copper Gutters and Downspouts. Half round style.

FOB: Destination

0020 250 Each

REPAIR OR ALTERATION OF OFFICE BLDG

FFP

: CLIN 0020; SPLASH BLOCKS, Installation of Concrete Splash Blocks.

FOB: Destination

SECTION 07 14 00 Page 17

0021 10 Each

REPAIR OR ALTERATION OF OFFICE BLDG

FFP

: CLIN 0021; ROOF VENT PIPE EXTENSION, Installation of Roof Vent Pipe Extension.

FOB: Destination

0022 10 Each

REPAIR OR ALTERATION OF OFFICE BLDG

FFP

: CLIN 0022; SCUPPER DRAINS, Re-install existing Scupper drains.

FOB: Destination

SECTION 07 14 00 Page 18

0023 10 Each

REPAIR OR ALTERATION OF OFFICE BLDG

FFP

: CLIN 0023; SCUPPER DRAINS, Install new Scupper drains.

FOB: Destination

0024 50,000 Board Feet

REPAIR OR ALTERATION OF OFFICE BLDG

FFP

: CLIN 0024; STRUCTRUAL LUMBER, Replacement of existing Deteriorated or Termite Damaged Lumber. Includes Removal & Disposal of existing Deteriorated or Termite damaged Structural Lumber, and Incidental Painting of new Exposed Woodwork at Eaves, or as required. (1-Primer and 2-finish coats to match adjacent existing surfaces).

FOB: Destination

SECTION 07 14 00 Page 19

0025 10,000 Board Feet

REPAIR OR ALTERATION OF OFFICE BLDG

FFP

: CLIN 0025; ROOF SHEATHING, Replacement of existing Deteriorated Termite Damaged Sheathing Includes Removal & Disposal of e xisting Deteriorated or Termite damaged Sheathing and Incidental Painting of new Exposed Woodwork at Eaves, or as required. (1-Primer and 2-finish coats to match adjacent existing surfaces).

FOB: Destination

0026 5,000 Linear

: CLIN 0026; METAL ROOF PURLINS, Replacement of existing Rusted or Damaged Purlins. Includes Removal & Disposal of existing Rusted or Damaged Metal Purlins, and Incidental Painting of new Purlins as required. (1-Primer and 2-finish coats to match adjacent existing surfaces).

FOB: Destination

SECTION 07 14 00 Page 20

0027 10 Each

REPAIR OR ALTERATION OF OFFICE BLDG

FFP

: CLIN 0027; PITCH PANS, Replacement of existing Pitch Pans, Includes Removal and disposal.

FOB: Destination

0028 100 Each

REPAIR OR ALTERATION OF OFFICE BLDG

FFP

: CLIN 0028; CHEMCURB PITCH POCKET, Installation of CHEMCURB Pitch Pocket or approved equal. To include Removal, installation disposal and all required materials and equipment to complete work.

FOB: Destination

SECTION 07 14 00 Page 21

0029 25 Each

REPAIR OR ALTERATION OF OFFICE BLDG

FFP

: CLIN 0029; ROOF DRAINS, Removal and Re-installation of existing Roof Drains, Includes cleaning, testing, and installing Modified Bitumen Sheet Flashing.

FOB: Destination

0030 25 Each

REPAIR OR ALTERATION OF OFFICE BLDG

FFP

: CLIN 0030; ROOF VENTILATORS, Removal and Re-installation of existing Electrical Power Aluminum Roof Ventilators.

FOB: Destination

SECTION 07 14 00 Page 22

0031 100 Each

REPAIR OR ALTERATION OF OFFICE BLDG

FFP

: CLIN 0031; ROOF VENTILATORS, Removal and Re-installation of existing Electrical Power Galvanized Roof Ventilators.

FOB: Destination

0032 15,000 Square

: CLIN 0032; REPLACE CLAY TILE ROOFING, Includes Removal & Disposal of existing Clay Tile Roofing, Roofing Felt Underlayment, and Installation of new Clay Tile Roofing, Felt Underlayment, and Flashing as required.

FOB: Destination

SECTION 07 14 00 Page 23

0033 15,000 Square

: CLIN 0033; CLAY TILE ROOF SEALER Installation of Low moisture absorption Clear drying penetrating water repellent barrier, Clay Tile Roof Sealer.

To include Surface preparation and Installation of Roof Coating, clean-up and all required materials and equipment to complete work.

FOB: Destination

0034 300 Each

REPAIR OR ALTERATION OF OFFICE BLDG

FFP

: CLIN 0034; ASBESTOS ABATEMENT, Bulk Sampling, Field.

FOB: Destination

SECTION 07 14 00 Page 24

0035 8,000 Square

: CLIN 0035; ASBESTOS ABATEMENT, Remove Asbestos Contaminated Metal Flashing, Base Flashing, and Mastic as required.

FOB: Destination

0036 8,000 Square

: CLIN 0036; ASBESTOS ABATEMENT, Total Demolition and Disposal of existing Built-Up Roofing System clear down to existing Roof Deck as required.

FOB: Destination

SECTION 07 14 00 Page 25

0037 80,000 Square

: CLIN 0037; 90 LB. MINERAL SURFACE on Built-up Roofing, Removal and disposal. Remove existing roofing down to existing substrate.

FOB: Destination

0038 15,000 Square

: CLIN 0038; Gravel on Built-up Roofing, Removal and disposal. Remove existing gravel roofing down to existing substrate.

FOB: Destination

SECTION 07 14 00 Page 26

0039 80,000 Square

: CLIN 0039; Built-up Roofing Installation of 2-Ply, Includes 90LB. SBS Mineral Surfaced Roll-Roofing Cap Sheet on SBS fiberglass Base Sheet.

FOB: Destination

0040 1,000 Square

: CLIN 0040; Walkway Surface, Installation, Mineral Asphalt Plank.

FOB: Destination

SECTION 07 14 00 Page 27

0041 300,000 Board Feet

REPAIR OR ALTERATION OF OFFICE BLDG

FFP

: CLIN 0041; ROOFING INSULATION (without Fire Proofing Insulation), Removal & Disposal. Includes Tapered or Flat Insulation Boards.

FOB: Destination

0042 300,000 Board Feet

REPAIR OR ALTERATION OF OFFICE BLDG

FFP

: CLIN 0042; ROOFING INSULATION, Installation. Complete Installation to include 1/2" thick Fiberglass Reinforced Gypsum Roof Boards and adhesive.

FOB: Destination

SECTION 07 14 00 Page 28

0043 50,000 Board Feet

REPAIR OR ALTERATION OF OFFICE BLDG

FFP

: CLIN 0043; ROOFING INSULATION, Installation. Tapered. Complete Installation to include 1/2" thick Fiberglass Reinforced Gypsum Roof Boards and adhesive.

FOB: Destination

0044 5,000 Square

: CLIN 0044; ROOF COATING, Installation of Hydro-Stop Elastomeric Roofing with 1/16" reinforcing or approved equal.

FOB: Destination

SECTION 07 14 00 Page 29

0045 200,000 Square

: CLIN 0045; ROOF COATING, Installation of Silicone Roof coating.

FOB: Destination

0046 40 Week

REPAIR OR ALTERATION OF OFFICE BLDG

FFP

: CLIN 0046; Equipment Rental of 25 ton Crane with Operator.

FOB: Destination

SECTION 07 14 00 Page 30

0047 5 Each

REPAIR OR ALTERATION OF OFFICE BLDG

FFP

: CLIN 0047; Equipment Hauling, round trip to include delivery to jobsite location and return to Rental Company.

FOB: Destination

0048 30 Each

REPAIR OR ALTERATION OF OFFICE BLDG

FFP

: CLIN 0048; REMOVE AND REINSTALL SOLAR PANELS.

FOB: Destination

SECTION 07 14 00 Page 31

0049 25 Linear

: CLIN 0049; Install RIDGE VENTS, Installation of Ridge Vents, for Composition Shingle Roofing. Includes creating new opening & installing preformed material, cap sheet and all incidental items required.

FOB: Destination

0050 30 Each

REPAIR OR ALTERATION OF OFFICE BLDG

FFP

: CLIN 0050; SAMPLE ANALYSIS, Collection and Laboratory analysis to determine if paint contains Lead. To include all incidental items required.

FOB: Destination

SECTION 07 14 00 Page 32

0051 15 Each

REPAIR OR ALTERATION OF OFFICE BLDG

FFP

: CLIN 0051; SAMPLE ANALYSIS, Collection and Laboratory analysis (TCLP) to determine if paint/demolition debris contains Lead Based Paint and resulting debris can be classified as hazardous waste To include all incidental items required.

FOB: Destination

0052 20,000 Square

: CLIN 0052; LEAD BASED PAINT ABATEMENT, Removal/Disposal of lead containing (hazardous) materials to include all incidental items r equired.

FOB: Destination

SECTION 07 14 00 Page 33

0053 50 Each

REPAIR OR ALTERATION OF OFFICE BLDG

FFP

: CLIN 0053; Install RIDGE VENTS, Installation of Ridge Vents for metal roofing (10" to 36"W X10'-0"L), Includes creating new opening & installing preformed material, flashing, and all incidental items required to provide a complete useable product.

FOB: Destination

0054 5,000 Linear

: CLIN 0054; Install Cant Strips, Installation of Cant Strips. To include all incidental items required. To include Removal, instal lation, disposal and all required materials and equipment to complete work.

FOB: Destination

SECTION 07 14 00 Page 34

0055 Square

CLIN DELETED

CLIN NOT NEEDED.

FOB: Destination

0056 Square

CLIN DELETED

CLIN NOT NEEDED.

FOB: Destination

SECTION 07 14 00 Page 35

0057 30,000 Square

: CLIN 0057; Plastic Sheeting, install plastic sheeting to protect furniture, equipment, supplies, etc. from dust. Includes clean-up and removal.

FOB: Destination

0058 1 Each

REPAIR OR ALTERATION OF OFFICE BLDG

FFP

: CLIN 0058; Contractor Manpower reporting (CMR).

FOB: Destination

SECTION 07 14 00 Page 36

1001 100,000 Square

OPTION REPAIR OR ALTERATION OF OFFICE BLDG

: CLIN 1001; REPLACE CERAMIC COATED MINERAL SURFACED SELF-

SEALING FIBERGLASS COMPOSITION STRIP SHINGLES, composed of a fiberglass mat base with ceramic-coated mineral granules tightly embedded in carefully refined, water-resistant asphalt. Two pieces of the shingle are firmly laminated together in a special tough asphaltic cement. Includes Removal & Disposal of existing Strip Shingles, Roofing Felt Underlayment, Metal Drip Edge and Installation of new, Felt Underlayment & Metal Drip Edge.

FOB: Destination

1002 100,000 Square

: CLIN 1002; ROOFING PANELS Removal and Disposal, Includes Preformed & Corrugated Aluminum Roofing Panels, Preformed, Corrugated, Ribbed & Standing Seam Galvanized, Zinc & Colored Sheet Metal; and Preformed, Corrugated & Ribbed Fiberglass Panels.

FOB: Destination

SECTION 07 14 00 Page 37

1003 8,000 Square

: CLIN 1003; TRANSITE ROOFING PANELS, Removal and Disposal. Includes Asbestos Abatement Air Monitoring, Temporary Fence Barricades, Personnel, Waste and Decontamination Unit.

FOB: Destination

1004 8,000 Square

: CLIN 1004; ALUMINUM ROOFING PANELS, Installation of Preformed or Corrugated Panels.

FOB: Destination

SECTION 07 14 00 Page 38

1005 100,000 Square

: CLIN 1005; STEEL SHEET METAL ROOFING PANELS, Installation of Preformed, Standing Seam, Zinc Coated & Factory Painted.

FOB: Destination

1006 30,000 Square

: CLIN 1006; SHEET METAL FLASHING, Removal and Disposal. Includes Aluminum, Galvanized Steel, Copper, and Aluminum Fascia.

FOB: Destination

SECTION 07 14 00 Page 39

1007 5,000 Square

: CLIN 1007; SHEET METAL FLASHING, Installation of Aluminum Flashing.

FOB: Destination

1008 1,000 Square

: CLIN 1008; SHEET METAL FLASHING, Installation of Aluminum Fascia.

FOB: Destination

SECTION 07 14 00 Page 40

1009 25,000 Square

: CLIN 1009; SHEET METAL FLASHING, Installation of Galvanized Steel Flashing.

FOB: Destination

1010 10,000 Square

: CLIN 1010; SHEET METAL FLASHING, Installation of Copper Flashing.

FOB: Destination

SECTION 07 14 00 Page 41

1011 20 Each

OPTION REPAIR OR ALTERATION OF OFFICE BLDG

FFP

: CLIN 1011; VENT THRU ROOF FLASHING, Installation, Includes Removal and Disposal. Aluminum Vent Flashing.

FOB: Destination

1012 20 Each

OPTION REPAIR OR ALTERATION OF OFFICE BLDG

FFP

: CLIN 1012; VENT THRU ROOF FLASHING, INSTALLATION, INCLUDES

REMOVAL AND DISPOSAL. Galvanized Vent Flashing FOB: Destination

SECTION 07 14 00 Page 42

1013 300 Each

OPTION REPAIR OR ALTERATION OF OFFICE BLDG

FFP

: CLIN 1013; VENT THRU ROOF FLASHING, INSTALLATION, INCLUDES

REMOVAL AND DISPOSAL. Lead Vent Flashing FOB: Destination

1014 15,000 Linear

: CLIN 1014; SHEET METAL GUTTERS & DOWNSPOUTS, Removal and Disposal of existing Gutter and Downspouts FOB: Destination

SECTION 07 14 00 Page 43

1015 7,000 Linear

: CLIN 1015; SHEET METAL GUTTERS & DOWNSPOUTS, Installation of Aluminum Gutters and Downspouts, 5".

FOB: Destination

1016 3,000 Linear

: CLIN 1016; SHEET METAL GUTTERS & DOWNSPOUTS, Installation of Aluminum Gutters and Downspouts, 7".

FOB: Destination

SECTION 07 14 00 Page 44

1017 2,000 Linear

: CLIN 1017; SHEET METAL GUTTERS & DOWNSPOUTS, Installation of Galvanized Steel Gutters and Downspouts.

FOB: Destination

1018 4,000 Linear

: CLIN 1018; SHEET METAL GUTTERS & DOWNSPOUTS, Installation of Copper Gutters and Downspouts, k-style.

FOB: Destination

SECTION 07 14 00 Page 45

1019 2,000 Linear

: CLIN 1019; SHEET METAL GUTTERS & DOWNSPOUTS, Installation of Copper Gutters and Downspouts. Half round style.

FOB: Destination

1020 250 Each

OPTION REPAIR OR ALTERATION OF OFFICE BLDG

FFP

: CLIN 1020; SPLASH BLOCKS, Installation of Concrete Splash Blocks.

FOB: Destination

SECTION 07 14 00 Page 46

1021 10 Each

OPTION REPAIR OR ALTERATION OF OFFICE BLDG

FFP

: CLIN 1021; ROOF VENT PIPE EXTENSION, Installation of Roof Vent Pipe Extension.

FOB: Destination

1022 10 Each

OPTION REPAIR OR ALTERATION OF OFFICE BLDG

FFP

: CLIN 1022; SCUPPER DRAINS, Re-install existing Scupper drains.

FOB: Destination

SECTION 07 14 00 Page 47

1023 10 Each

OPTION REPAIR OR ALTERATION OF OFFICE BLDG

FFP

: CLIN 1023; SCUPPER DRAINS, Install new Scupper drains.

FOB: Destination

1024 50,000 Board Feet

OPTION REPAIR OR ALTERATION OF OFFICE BLDG

FFP

: CLIN 1024; STRUCTRUAL LUMBER, Replacement of existing Deteriorated or Termite Damaged Lumber. Includes Removal & Disposal of existing Deteriorated or Termite damaged Structural Lumber, and Incidental Painting of new Exposed Woodwork at Eaves, or as required. (1-Primer and 2-finish coats to match adjacent existing surfaces).

FOB: Destination

SECTION 07 14 00 Page 48

1025 10,000 Board Feet

OPTION REPAIR OR ALTERATION OF OFFICE BLDG

FFP

: CLIN 1025; ROOF SHEATHING, Replacement of existing Deteriorated Termite Damaged Sheathing Includes Removal & Disposal of e xisting Deteriorated or Termite damaged Sheathing and Incidental Painting of new Exposed Woodwork at Eaves, or as required. (1-Primer and 2-finish coats to match adjacent existing surfaces).

FOB: Destination

1026 5,000 Linear

: CLIN 1026; METAL ROOF PURLINS, Replacement of existing Rusted or Damaged Purlins. Includes Removal & Disposal of existing Rusted or Damaged Metal Purlins, and Incidental Painting of new Purlins as required. (1-Primer and 2-finish coats to match adjacent existing surfaces).

FOB: Destination

SECTION 07 14 00 Page 49

1027 10 Each

OPTION REPAIR OR ALTERATION OF OFFICE BLDG

FFP

: CLIN 1027; PITCH PANS, Replacement of existing Pitch Pans, Includes Removal and disposal.

FOB: Destination

1028 100 Each

OPTION REPAIR OR ALTERATION OF OFFICE BLDG

FFP

: CLIN 1028; CHEMCURB PITCH POCKET, Installation of CHEMCURB Pitch Pocket or approved equal. To include Removal, installation disposal and all required materials and equipment to complete work.

FOB: Destination

SECTION 07 14 00 Page 50

1029 25 Each

OPTION REPAIR OR ALTERATION OF OFFICE BLDG

FFP

: CLIN 1029; ROOF DRAINS, Removal and Re-installation of existing Roof Drains, Includes cleaning, testing, and installing Modified Bitumen Sheet Flashing.

FOB: Destination

1030 25 Each

OPTION REPAIR OR ALTERATION OF OFFICE BLDG

FFP

: CLIN 1030; ROOF VENTILATORS, Removal and Re-installation of existing Electrical Power Aluminum Roof Ventilators.

FOB: Destination

SECTION 07 14 00 Page 51

1031 100 Each

OPTION REPAIR OR ALTERATION OF OFFICE BLDG

FFP

: CLIN 1031; ROOF VENTILATORS, Removal and Re-installation of existing Electrical Power Galvanized Roof Ventilators.

FOB: Destination

1032 15,000 Square

: CLIN 1032; REPLACE CLAY TILE ROOFING, Includes Removal & Disposal of existing Clay Tile Roofing, Roofing Felt Underlayment, and Installation of new Clay Tile Roofing, Felt Underlayment, and Flashing as required.

FOB: Destination

SECTION 07 14 00 Page 52

1033 15,000 Square

: CLIN 1033; CLAY TILE ROOF SEALER Installation of Low moisture absorption Clear drying penetrating water repellent barrier, Clay Tile Roof Sealer.

To include Surface preparation and Installation of Roof Coating, clean-up and all required materials and equipment to complete work.

FOB: Destination

1034 300 Each

OPTION REPAIR OR ALTERATION OF OFFICE BLDG

FFP

: CLIN 1034; ASBESTOS ABATEMENT, Bulk Sampling, Field.

FOB: Destination

SECTION 07 14 00 Page 53

1035 8,000 Square

: CLIN 1035; ASBESTOS ABATEMENT, Remove Asbestos Contaminated Metal Flashing, Base Flashing, and Mastic as required.

FOB: Destination

1036 8,000 Square

: CLIN 1036; ASBESTOS ABATEMENT, Total Demolition and Disposal of existing Built-Up Roofing System clear down to existing Roof Deck as required.

FOB: Destination

SECTION 07 14 00 Page 54

1037 80,000 Square

: CLIN 1037; 90 LB. MINERAL SURFACE on Built-up Roofing, Removal and disposal. Remove existing roofing down to existing substrate.

FOB: Destination

1038 15,000 Square

: CLIN 1038; Gravel on Built-up Roofing, Removal and disposal. Remove existing gravel roofing down to existing substrate.

FOB: Destination

SECTION 07 14 00 Page 55

1039 80,000 Square

: CLIN 1039; Built-up Roofing Installation of 2-Ply, Includes 90LB. SBS Mineral Surfaced Roll-Roofing Cap Sheet on SBS fiberglass Base Sheet.

FOB: Destination

1040 1,000 Square

: CLIN 1040; Walkway Surface, Installation, Mineral Asphalt Plank.

FOB: Destination

SECTION 07 14 00 Page 56

1041 300,000 Board Feet

OPTION REPAIR OR ALTERATION OF OFFICE BLDG

FFP

: CLIN 1041; ROOFING INSULATION (without Fire Proofing Insulation), Removal & Disposal. Includes Tapered or Flat Insulation Boards.

FOB: Destination

1042 300,000 Board Feet

OPTION REPAIR OR ALTERATION OF OFFICE BLDG

FFP

: CLIN 1042; ROOFING INSULATION, Installation. Complete Installation to include 1/2" thick Fiberglass Reinforced Gypsum Roof Boards and adhesive.

FOB: Destination

SECTION 07 14 00 Page 57

1043 50,000 Board Feet

OPTION REPAIR OR ALTERATION OF OFFICE BLDG

FFP

: CLIN 1043; ROOFING INSULATION, Installation. Tapered. Complete Installation to include 1/2" thick Fiberglass Reinforced Gypsum Roof Boards and adhesive.

FOB: Destination

1044 5,000 Square

: CLIN 1044; ROOF COATING, Installation of Hydro-Stop Elastomeric Roofing with 1/16" reinforcing or approved equal.

FOB: Destination

SECTION 07 14 00 Page 58

1045 200,000 Square

: CLIN 1045; ROOF COATING, Installation of Silicone Roof coating.

FOB: Destination

1046 40 Week

OPTION REPAIR OR ALTERATION OF OFFICE BLDG

FFP

: CLIN 1046; Equipment Rental of 25 ton Crane with Operator.

FOB: Destination

SECTION 07 14 00 Page 59

1047 5 Each

OPTION REPAIR OR ALTERATION OF OFFICE BLDG

FFP

: CLIN 1047; Equipment Hauling, round trip to include delivery to jobsite location and return to Rental Company.

FOB: Destination

1048 30 Each

OPTION REPAIR OR ALTERATION OF OFFICE BLDG

FFP

: CLIN 1048; REMOVE AND REINSTALL SOLAR PANELS.

FOB: Destination

SECTION 07 14 00 Page 60

1049 25 Linear

: CLIN 1049; Install RIDGE VENTS, Installation of Ridge Vents, for Composition Shingle Roofing. Includes creating new opening & installing preformed material, cap sheet and all incidental items required.

FOB: Destination

1050 30 Each

OPTION REPAIR OR ALTERATION OF OFFICE BLDG

FFP

: CLIN 1050; SAMPLE ANALYSIS, Collection and Laboratory analysis to determine if paint contains Lead. To include all incidental items required.

FOB: Destination

SECTION 07 14 00 Page 61

1051 15 Each

OPTION REPAIR OR ALTERATION OF OFFICE BLDG

FFP

: CLIN 1051; SAMPLE ANALYSIS, Collection and Laboratory analysis (TCLP) to determine if paint/demolition debris contains Lead Based Paint and resulting debris can be classified as hazardous waste To include all incidental items required.

FOB: Destination

1052 20,000 Square

: CLIN 1052; LEAD BASED PAINT ABATEMENT, Removal/Disposal of lead containing (hazardous) materials to include all incidental items r equired.

FOB: Destination

SECTION 07 14 00 Page 62

1053 50 Each

OPTION REPAIR OR ALTERATION OF OFFICE BLDG

FFP

: CLIN 1053; Install RIDGE VENTS, Installation of Ridge Vents for metal roofing (10" to 36"W X10'-0"L), Includes creating new opening & installing preformed material, flashing, and all incidental items required to provide a complete useable product.

FOB: Destination

1054 5,000 Linear

: CLIN 1054; Install Cant Strips, Installation of Cant Strips. To include all incidental items required. To include Removal, instal lation, disposal and all required materials and equipment to complete work.

FOB: Destination

SECTION 07 14 00 Page 63

1055 Square

OPTION CLIN DELETED

CLIN NOT NEEDED.

FOB: Destination

1056 Square

CLIN NOT NEEDED.

FOB: Destination

SECTION 07 14 00 Page 64

1057 30,000 Square

: CLIN 1057; Plastic Sheeting, install plastic sheeting to protect furniture, equipment, supplies, etc. from dust. Includes clean-up and removal.

FOB: Destination

1058 1 Each

OPTION REPAIR OR ALTERATION OF OFFICE BLDG

FFP

: CLIN 1058; Contractor Manpower reporting (CMR).

FOB: Destination

SECTION 07 14 00 Page 65

2001 100,000 Square

: CLIN 2001; REPLACE CERAMIC COATED MINERAL SURFACED SELF-

SEALING FIBERGLASS COMPOSITION STRIP SHINGLES, composed of a fiberglass mat base with ceramic-coated mineral granules tightly embedded in carefully refined, water-resistant asphalt. Two pieces of the shingle are firmly laminated together in a special tough asphaltic cement. Includes Removal & Disposal of existing Strip Shingles, Roofing Felt Underlayment, Metal Drip Edge and Installation of new, Felt Underlayment & Metal Drip Edge.

FOB: Destination

2002 100,000 Square

: CLIN 2002; ROOFING PANELS Removal and Disposal, Includes Preformed & Corrugated Aluminum Roofing Panels, Preformed, Corrugated, Ribbed & Standing Seam Galvanized, Zinc & Colored Sheet Metal; and Preformed, Corrugated & Ribbed Fiberglass Panels.

FOB: Destination

SECTION 07 14 00 Page 66

2003 8,000 Square

: CLIN 2003; TRANSITE ROOFING PANELS, Removal and Disposal. Includes Asbestos Abatement Air Monitoring, Temporary Fence Barricades, Personnel, Waste and Decontamination Unit.

FOB: Destination

2004 8,000 Square

: CLIN 2004; ALUMINUM ROOFING PANELS, Installation of Preformed or Corrugated Panels.

FOB: Destination

SECTION 07 14 00 Page 67

2005 100,000 Square

: CLIN 2005; STEEL SHEET METAL ROOFING PANELS, Installation of Preformed, Standing Seam, Zinc Coated & Factory Painted.

FOB: Destination

2006 30,000 Square

: CLIN 2006; SHEET METAL FLASHING, Removal and Disposal. Includes Aluminum, Galvanized Steel, Copper, and Aluminum Fascia.

FOB: Destination

SECTION 07 14 00 Page 68

2007 5,000 Square

: CLIN 2007; SHEET METAL FLASHING, Installation of Aluminum Flashing.

FOB: Destination

2008 1,000 Square

: CLIN 2008; SHEET METAL FLASHING, Installation of Aluminum Fascia.

FOB: Destination

SECTION 07 14 00 Page 69

2009 25,000 Square

: CLIN 2009; SHEET METAL FLASHING, Installation of Galvanized Steel Flashing.

FOB: Destination

2010 10,000 Square

: CLIN 2010; SHEET METAL FLASHING, Installation of Copper Flashing.

FOB: Destination

SECTION 07 14 00 Page 70

2011 20 Each

OPTION REPAIR OR ALTERATION OF OFFICE BLDG

FFP

: CLIN 2011; VENT THRU ROOF FLASHING, Installation, Includes Removal and Disposal. Aluminum Vent Flashing.

FOB: Destination

2012 20 Each

OPTION REPAIR OR ALTERATION OF OFFICE BLDG

FFP

: CLIN 2012; VENT THRU ROOF FLASHING, INSTALLATION, INCLUDES

REMOVAL AND DISPOSAL. Galvanized Vent Flashing.

FOB: Destination

SECTION 07 14 00 Page 71

2013 300 Each

OPTION REPAIR OR ALTERATION OF OFFICE BLDG

FFP

: CLIN 2013; VENT THRU ROOF FLASHING, INSTALLATION, INCLUDES

REMOVAL AND DISPOSAL. Lead Vent Flashing.

FOB: Destination

2014 15,000 Linear

: CLIN 2014; SHEET METAL GUTTERS & DOWNSPOUTS, Removal and Disposal of existing Gutter and Downspouts.

FOB: Destination

SECTION 07 14 00 Page 72

2015 7,000 Linear

: CLIN 2015; SHEET METAL GUTTERS & DOWNSPOUTS, Installation of Aluminum Gutters and Downspouts, 5".

FOB: Destination

2016 3,000 Linear

: CLIN 2016; SHEET METAL GUTTERS & DOWNSPOUTS, Installation of Aluminum Gutters and Downspouts, 7".

FOB: Destination

SECTION 07 14 00 Page 73

2017 2,000 Linear

: CLIN 2017; SHEET METAL GUTTERS & DOWNSPOUTS, Installation of Galvanized Steel Gutters and Downspouts.

FOB: Destination

2018 4,000 Linear

: CLIN 2018; SHEET METAL GUTTERS & DOWNSPOUTS, Installation of Copper Gutters and Downspouts, k-style.

FOB: Destination

SECTION 07 14 00 Page 74

2019 2,000 Linear

: CLIN 2019; SHEET METAL GUTTERS & DOWNSPOUTS, Installation of Copper Gutters and Downspouts. Half round style.

FOB: Destination

2020 250 Each

OPTION REPAIR OR ALTERATION OF OFFICE BLDG

FFP

: CLIN 2020; SPLASH BLOCKS, Installation of Concrete Splash Blocks.

FOB: Destination

SECTION 07 14 00 Page 75

2021 10 Each

OPTION REPAIR OR ALTERATION OF OFFICE BLDG

FFP

: CLIN 2021; ROOF VENT PIPE EXTENSION, Installation of Roof Vent Pipe Extension.

FOB: Destination

2022 10 Each

OPTION REPAIR OR ALTERATION OF OFFICE BLDG

FFP

: CLIN 2022; SCUPPER DRAINS, Re-install existing Scupper drains.

FOB: Destination

SECTION 07 14 00 Page 76

2023 10 Each

OPTION REPAIR OR ALTERATION OF OFFICE BLDG

FFP

: CLIN 2023; SCUPPER DRAINS, Install new Scupper drains.

FOB: Destination

2024 50,000 Board Feet

OPTION REPAIR OR ALTERATION OF OFFICE BLDG

FFP

: CLIN 2024; STRUCTRUAL LUMBER, Replacement of existing Deteriorated or Termite Damaged Lumber. Includes Removal & Disposal of existing Deteriorated or Termite damaged Structural Lumber, and Incidental Painting of new Exposed Woodwork at Eaves, or as required. (1-Primer and 2-finish coats to match adjacent existing surfaces).

FOB: Destination

SECTION 07 14 00 Page 77

2025 10,000 Board Feet

OPTION REPAIR OR ALTERATION OF OFFICE BLDG

FFP

: CLIN 2025; ROOF SHEATHING, Replacement of existing Deteriorated Termite Damaged Sheathing Includes Removal & Disposal of e xisting Deteriorated or Termite damaged Sheathing and Incidental Painting of new Exposed Woodwork at Eaves, or as required. (1-Primer and 2-finish coats to match adjacent existing surfaces).

FOB: Destination

2026 5,000 Linear

: CLIN 2026; METAL ROOF PURLINS, Replacement of existing Rusted or Damaged Purlins. Includes Removal & Disposal of existing Rusted or Damaged Metal Purlins, and Incidental Painting of new Purlins as required. (1-Primer and 2-finish coats to match adjacent existing surfaces).

FOB: Destination

SECTION 07 14 00 Page 78

2027 10 Each

OPTION REPAIR OR ALTERATION OF OFFICE BLDG

FFP

: CLIN 2027; PITCH PANS, Replacement of existing Pitch Pans, Includes Removal and disposal.

FOB: Destination

2028 100 Each

OPTION REPAIR OR ALTERATION OF OFFICE BLDG

FFP

: CLIN 2028; CHEMCURB PITCH POCKET, Installation of CHEMCURB Pitch Pocket or approved equal. To include Removal, installation disposal and all required materials and equipment to complete work.

FOB: Destination

SECTION 07 14 00 Page 79

2029 25 Each

OPTION REPAIR OR ALTERATION OF OFFICE BLDG

FFP

: CLIN 2029; ROOF DRAINS, Removal and Re-installation of existing Roof Drains, Includes cleaning, testing, and installing Modified Bitumen Sheet Flashing.

FOB: Destination

2030 25 Each

OPTION REPAIR OR ALTERATION OF OFFICE BLDG

FFP

: CLIN 2030; ROOF VENTILATORS, Removal and Re-installation of existing Electrical Power Aluminum Roof Ventilators.

FOB: Destination

SECTION 07 14 00 Page 80

2031 100 Each

OPTION REPAIR OR ALTERATION OF OFFICE BLDG

FFP

: CLIN 2031; ROOF VENTILATORS, Removal and Re-installation of existing Electrical Power Galvanized Roof Ventilators.

FOB: Destination

2032 15,000 Square

: CLIN 2032; REPLACE CLAY TILE ROOFING, Includes Removal & Disposal of existing Clay Tile Roofing, Roofing Felt Underlayment, and Installation of new Clay Tile Roofing, Felt Underlayment, and Flashing as required.

FOB: Destination

SECTION 07 14 00 Page 81

2033 15,000 Square

: CLIN 2033; CLAY TILE ROOF SEALER Installation of Low moisture absorption Clear drying penetrating water repellent barrier, Clay Tile Roof Sealer.

To include Surface preparation and Installation of Roof Coating, clean-up and all required materials and equipment to complete work.

FOB: Destination

2034 300 Each

OPTION REPAIR OR ALTERATION OF OFFICE BLDG

FFP

: CLIN 2034; ASBESTOS ABATEMENT, Bulk Sampling, Field.

FOB: Destination

SECTION 07 14 00 Page 82

2035 8,000 Square

: CLIN 2035; ASBESTOS ABATEMENT, Remove Asbestos Contaminated Metal Flashing, Base Flashing, and Mastic as required.

FOB: Destination

2036 8,000 Square

: CLIN 2036; ASBESTOS ABATEMENT, Total Demolition and Disposal of existing Built-Up Roofing System clear down to existing Roof Deck as required.

FOB: Destination

SECTION 07 14 00 Page 83

2037 80,000 Square

: CLIN 2037; 90 LB. MINERAL SURFACE on Built-up Roofing, Removal and disposal. Remove existing roofing down to existing substrate.

FOB: Destination

2038 15,000 Square

: CLIN 2038; Gravel on Built-up Roofing, Removal and disposal. Remove existing gravel roofing down to existing substrate.

FOB: Destination

SECTION 07 14 00 Page 84

2039 80,000 Square

: CLIN 2039; Built-up Roofing Installation of 2-Ply, Includes 90LB. SBS Mineral Surfaced Roll-Roofing Cap Sheet on SBS fiberglass Base Sheet.

FOB: Destination

2040 1,000 Square

: CLIN 2040; Walkway Surface, Installation, Mineral Asphalt Plank.

FOB: Destination

SECTION 07 14 00 Page 85

2041 300,000 Board Feet

OPTION REPAIR OR ALTERATION OF OFFICE BLDG

FFP

: CLIN 2041; ROOFING INSULATION (without Fire Proofing Insulation), Removal & Disposal. Includes Tapered or Flat Insulation Boards.

FOB: Destination

2042 300,000 Board Feet

OPTION REPAIR OR ALTERATION OF OFFICE BLDG

FFP

: CLIN 2042; ROOFING INSULATION, Installation. Complete Installation to include 1/2" thick Fiberglass Reinforced Gypsum Roof Boards and adhesive.

FOB: Destination

SECTION 07 14 00 Page 86

2043 50,000 Board Feet

OPTION REPAIR OR ALTERATION OF OFFICE BLDG

FFP

: CLIN 2043; ROOFING INSULATION, Installation. Tapered. Complete Installation to include 1/2" thick Fiberglass Reinforced Gypsum Roof Boards and adhesive.

FOB: Destination

2044 5,000 Square

: CLIN 2044; ROOF COATING, Installation of Hydro-Stop Elastomeric Roofing with 1/16" reinforcing or approved equal.

FOB: Destination

SECTION 07 14 00 Page 87

2045 200,000 Square

: CLIN 2045; ROOF COATING, Installation of Silicone Roof coating.

FOB: Destination

2046 40 Week

OPTION REPAIR OR ALTERATION OF OFFICE BLDG

FFP

: CLIN 2046; Equipment Rental of 25 ton Crane with Operator.

FOB: Destination

SECTION 07 14 00 Page 88

2047 5 Each

OPTION REPAIR OR ALTERATION OF OFFICE BLDG

FFP

: CLIN 2047; Equipment Hauling, round trip to include delivery to jobsite location and return to Rental Company.

FOB: Destination

2048 30 Each

OPTION REPAIR OR ALTERATION OF OFFICE BLDG

FFP

: CLIN 2048; REMOVE AND REINSTALL SOLAR PANELS.

FOB: Destination

SECTION 07 14 00 Page 89

2049 25 Linear

: CLIN 2049; Install RIDGE VENTS, Installation of Ridge Vents, for Composition Shingle Roofing. Includes creating new opening & installing preformed material, cap sheet and all incidental items required.

FOB: Destination

2050 30 Each

OPTION REPAIR OR ALTERATION OF OFFICE BLDG

FFP

: CLIN 2050; SAMPLE ANALYSIS, Collection and Laboratory analysis to determine if paint contains Lead. To include all incidental items required.

FOB: Destination

SECTION 07 14 00 Page 90

2051 15 Each

OPTION REPAIR OR ALTERATION OF OFFICE BLDG

FFP

: CLIN 2051; SAMPLE ANALYSIS, Collection and Laboratory analysis (TCLP) to determine if paint/demolition debris contains Lead Based Paint and resulting debris can be classified as hazardous waste To include all incidental items required.

FOB: Destination

2052 20,000 Square

: CLIN 2052; LEAD BASED PAINT ABATEMENT, Removal/Disposal of lead containing (hazardous) materials to include all incidental items r equired.

FOB: Destination

SECTION 07 14 00 Page 91

2053 50 Each

OPTION REPAIR OR ALTERATION OF OFFICE BLDG

FFP

: CLIN 2053; Install RIDGE VENTS, Installation of Ridge Vents for metal roofing (10" to 36"W X10'-0"L), Includes creating new opening & installing preformed material, flashing, and all incidental items required to provide a complete useable product.

FOB: Destination

2054 5,000 Linear

: CLIN 2054; Install Cant Strips, Installation of Cant Strips. To include all incidental items required. To include Removal, instal lation, disposal and all required materials and equipment to complete work.

FOB: Destination

SECTION 07 14 00 Page 92

2055 Square

CLIN NOT NEEDED.

FOB: Destination

2056 Square

CLIN NOT NEEDED.

FOB: Destination

SECTION 07 14 00 Page 93

2057 30,000 Square

: CLIN 2057; Plastic Sheeting, install plastic sheeting to protect furniture, equipment, supplies, etc. from dust. Includes clean-up and removal.

FOB: Destination

2058 1 Each

OPTION REPAIR OR ALTERATION OF OFFICE BLDG

FFP

: CLIN 2058; Contractor Manpower reporting (CMR).

FOB: Destination

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 POP 01-FEB-2019 TO

31-JAN-2020

N/A USAG-HI DPW, ENG DIV

USAG-HI DPW, ENG DIV

742 SANTOS DUMONT AVE, BLDG 108

SCHOFIELD BARRACKS, HI HI 96857-5013

FOB: Destination

WX3JN3

SECTION 07 14 00 Page 94

0002 POP 01-FEB-2019 TO

31-JAN-2020

N/A (SAME AS PREVIOUS LOCATION)

0003 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

0004 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

0005 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

0006 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

0007 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

0008 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

0009 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

0010 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

0011 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

0012 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

0013 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

0014 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

0015 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

0016 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

0017 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

0018 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

0019 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

0020 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

SECTION 07 14 00 Page 95

0021 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

0022 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

0023 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

0024 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

0025 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

0026 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

0027 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

0028 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

0029 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

0030 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

0031 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

0032 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

0033 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

0034 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

0035 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

0036 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

0037 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

0038 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

SECTION 07 14 00 Page 96

0039 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

0040 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

0041 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

0042 POP 01-FEB-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

0043 POP 01-FEB-2019…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.