W912CN-23-B-0006 SF 1442 Solicitation.pdf
PDF 2 MB Posted
- Solicitation number
- W912CN-23-B-0006
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912CN-23-B-0006 Amendment 2 SF 30.pdf | ||
| W912CN-23-B-0006 Amendment 1 SF 30.pdf | ||
| ATTACHMENT 4 Alaska Specifications 26 May 2023.pdf | ||
| ATTACHMENT 1 EXCEL BID SHEET.xlsx | XLSX spreadsheet | |
| ATTACHMENT 3 SOW Roof 02 FEB 2023.pdf | ||
| ATTACHMENT 2 BID ATTACHMENT.docx | DOCX document | |
| ATTACHMENT 4 Alaska Specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0011609684
PROJECT TITLE: This is a f irm f ixed price requirements- type construction contract to furnish all labor, materials, equipment, management, supervision, tools, transportation and other incidental items to perform Reroofing and Roof Repairs of Miscellaneous Buildings at Fort Wainw right, Alaska
NAICS: 238160
MAGNITUDE OF CONSTRUCTION: More than $10,000,000 to $25,000,000
X
MELODIE E CLARE (808) 787-8894
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
10-May-2023
(RFP)
(IFB)
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______30 calendar days and complete it w ithin ________10 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________30 May 2023 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______180 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
413 CSB
413TH CSB, RCO-HAWAII,
742 SANTOS DUMONT AVENUE
BLDG 108, 3RD FLOOR (WAAF)
SCHOFIELD BARRACKS HI 96857-5026
W912CN
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
09:00 AM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
W912CN23B0006 413
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
W912CN23B0006
Section 00 10 00 - Solicitation
SUBMISSION REQUIREMENTS
1. This Solicitation is 100% Small Business Set-Aside. The NAICS is 238160 and the Size Standard is $19 Million.
Bids from contractors that do not meet this size standard will be deemed non-responsive and ineligible to submit bid.
2. CONTRACT TYPE: The Government intends to award a firm fixed price requirements-type construction contract. Split or multiple awards will not result from this acquisition.
3. PERIOD OF PERFORMANCE: The anticipated period of performance will be a base year and two (2) one-year option periods as shown below:
Base Year: 30 JUN 2023 – 29 JUN 2024 Option 1: 30 JUN 2024 – 29 JUN 2025 Option 2: 30 JUN 2025 – 29 JUN 2026
52.517-8: 6 Months
4. QUESTIONS. Questions must be submitted by email to Melodie Clare, melodie.e.clare.civ@army.mil with CC to Mark Dahilig, mark.r.dahilig.civ@army.mil, with the IFB number W912CN-23-B-0006 in the subject line. Telephone and faxed inquires will not be accepted. In order to ensure a timely response, questions must be submitted no later than 10:00am, seven days after the date of IFB issuance as identified in Block 3 of the solicitation. Questions and responses will be issued on an amendment. Any questions received after the due date may not be answered.
5. AWARD. Award will be made to the responsible bidder whose bid is responsive to the terms and conditions of the IFB and is the apparent lowest bid.
Contracting Officers, when evaluating bids for contract award, as part of the price evaluation, will evaluate the Option to Extend Services under FAR clause 52.217-8 by adding one-half of the offeror’s final option price to the offeror’s total price. The final award evaluation will include the base year, all option years, and the six month FAR 52.217-8 clause option. The FAR 52.217-8 clause us useable at periods throughout the life of the contract (i.e., after the base period, after the end of any of the exercised option periods); but not to exceed 6 months for the total life of the contract.
6. DUE DATE. All bids must be received by the due date indicated in the IFB.
7. BID OPENING DATE AND TIME. A teleconference bid opening will be conducted (see detail below) To attend the Bid Opening via telephone, offerors must notify Melodie Clare, melodie.e.clare.civ@army.mil with CC to Mark Dahilig, mark.r.dahilig.civ@army.mil, no later than seven days prior to the Bid Opening date. List the name, phone number, number of personnel attending the teleconference. The conference call number and password will be provided via e-mail.
Date & Time: 30 May 2023, 1000AM HST Teleconference Number: Will be emailed upon notification.
INSTRUCTION TO OFFEROR
1. BID SUBMITTAL. Contractor shall provide a complete breakdown in the bid attachment. Contractor shall provide priced line items on Attachment 1 for each CLIN listed on SF 1442 as the price schedule.
2. (a) Bid Submission Requirement:
Bids shall be submitted by date and time specified in Block 13.A. of the SF 1442. Subject line of the email will read
– Solicitation W912CN-23-B-0006, short description. Bid shall be emailed to Melodie Clare, Contract Specialist, at melodie.e.clare.civ@army.mil and CC to Mark Dahilig, Contracting Officer, at mark.r.dahilig.civ@army.mil.
SUBMISSION REQUIREMENT
1. Offers shall include the following:
a. Completed Standard Form 1442.
b. Completed Attachment 1 – Excel Sheet Schedule of offer/bids/prices.
All unit price and estimated amount filled out.
c. Completed Attachment 2 - Bid Attachment.
d. Signed or other acknowledgement of all amendments.
e. Completed Representation and Certifications.
f. Bid Guarantee in accordance with FAR 52.228-1.
2. Offerors shall furnish unit prices and extended total for all items listed on the schedule of bid items in
Section 00 10 00. In the event there is a difference between the unit price and the extended total, the unit price will be the intended bid. In the event the unit price or extended total are omitted for any item, the bid will be deemed non-responsive.
3. Facsimile proposals/Bids will not be considered.
4. Telegraphic proposals/Bids will not be considered.
5. Proposals /Bids must be submitted by date and time specified in Block 13 above.
GENERAL INFORMATION:
1. Scope of Work: This is a firm fixed price requirements-type construction contract to furnish all labor, materials, equipment, management, supervision, tools, transportation and other incidental items to perform Reroofing and Roof Repairs of Miscellaneous Buildings at Fort Wainwright, Alaska
2. The contractor shall submit a safety plan within 30 days of award or 7 days prior to commencement of on-site work, whichever occurs first in accordance with the AR 385-10, Construction Safety, US Army Corps of Engineers "Safety and Health Requirements Manual (EM 385-1-1)" and Occupational Safety and Health Administration (OSHA) regulations.
3. To assure compliance with general construction trade practice, the contractor shall establish and maintain quality control for materials and work. The Government may perform inspections and conduct tests while the contractor's work is in process to assure compliance to performance standards.
4. Existing conditions or areas damaged or disturbed by the contractor's operation shall be restored to their original condition, or near original condition as possible, to the satisfaction of the Contracting Officer at no additional cost to the Government.
5. Prior to start of any excavation or trenching work, the contractor shall obtain clearance, in writing, from the appropriate communications agency and from the Directorate of Public Works.
6. Interruptions to existing utilities shall be held to a minimum. A schedule for any required power or water outages shall be submitted to the Contracting Officer a minimum of four weeks prior to the intended outage.
7. The contractor shall establish work procedures and methods to prevent interference with existing operations within or adjacent to the construction area.
8. The Contractor’s normal working hours will be 7:30 a.m. – 4:30 p.m. Monday thru Friday. The Contractor will not normally work on Saturdays, Sundays, or Holidays. If the Contractor chooses to work outside the normal working hours, Contractor must submit an application to the Contracting Officer in writing one week prior to the requested work for approval.
9. Rubbish and debris shall be removed from Government-controlled property daily unless otherwise directed, so as not to allow accumulation inside or outside the building. Materials that cannot be removed daily shall be stored in areas designated by the Contracting Officer.
10. The contractor shall provide, install, and maintain all necessary signs, lights, barricades, markers, cones, flagmen, and other protective facilities and shall take all necessary precautions for the protection and for the convenience and safety of military and public traffic (vehicular and pedestrian).
11. The amount of dust resulting from the contractor's work shall be controlled to prevent the spread of dust and to avoid creation of a nuisance in the surrounding area. Use of water will not be permitted when it will result in, or create, hazardous or objectionable conditions such as flooding and pollution.
12. The contractor shall obtain the necessary hot work permit from the appropriate Fire Department prior to any welding, burning, and torching operations.
13. Daily Clean-up - During the course of the work, the Contractor shall keep the entire premises free from any accumulation of empty cans, rags, etc. or rubbish that constitutes a fire hazard. At the end of each days work, the Contractor shall remove all debris. The entire area shall be cleaned and left in a condition acceptable to the Technical Representative of the Contracting Officer.
14. Storage area will not be provided
15. When available, the Government may provide a reasonable amount of water and electricity. If not available or cannot be provided it shall be specified in the task order documents.
16. The Contractor shall be responsible to have a quality control program to ensure services are performed in accordance with the Scope of Work and commonly accepted commercial practices.
17. The Contractor is required to follow DPW’s Best Management Practice (BMP) of Storm Water Compliance.
Copy will be provided at the pre-construction conference, if requested.
18. The work shall be constructed using best practices per industry standards. The Contractor shall abide by all applicable regulations to include Federal, State, local requirements.
19. Progress of Work. Contractor shall submit all proposed work schedules to the Contracting Officer for review/approval within ten (10) calendar days after issuance of the Notice to Proceed (NTP) unless otherwise specified.
20. Contractor shall submit schedule of values as a material submittal within 30 days of contract award for projects at or above $250,000. Schedule of values will be sent with requested billings to the project inspector and CC the COR to justify billing requests.
21. If a dumpster is provided for this contract, contractor shall include a sign on the dumpster with their name/address/phone and indicate the dumpster is only used for construction debris.
22. Abbreviations used in the Unit column: (use if applicable)
CY = Cubic Yard; LH = Labor Hours; SF = Square Foot; SQ = Square (100 Square Feet) EA = Each; LF = Linear Foot; SY = Square Yard; CLF = Cubic Linear Foot (100 Linear Feet); LB/MSF = Pounds per 1,000 square feet
23. Contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes."
24. Identification of Contractor Employees.
(a) Provide each employee with identification (ID) badge made of nonmetallic material, easily readable and including employee’s name, contractor’s name, functional area of assignment, with recent color photograph of the employee.
(b) All contractor personnel shall wear the ID badge at all times when performing work under this contract at a Government site, including while attending Government meetings that may take place outside the Government facility. Contractor employee shall wear the ID badge in a conspicuous place on the front of exterior clothing above the waist except when safety or health reasons prohibit such placement.
25. Estimated Quantities
All quantities are estimated and are stated for the information of the prospective contractors. The actual quantities ordered may be more or less than the estimated quantities. (See clause at 52.216-21, Section 00 70 00 entitled “Requirements”). As a prerequisite, there must be (i) adequate and sufficient funds available to cover the order, and
(ii) an administrative determination by the Government that the requirement exists.
26. Issuance of Task Orders
(a) The work to be accomplished under this contract will be performed via issuance of a task order. The Contractor shall coordinate all work with the Contracting Officer in order that there will be a minimum of interruption and inconvenience to the Government. Scheduling and programming of work shall be arranged during the pre-construction conference.
(b) Survey of Unit Price Items: At least ten (10) workdays prior to the issuance of a task order, a joint inspection by the Contractor and the Contracting Officer Representative shall be made to determine the work to be accomplished therein. Survey will be conducted within two (2) workdays of notification by the COR. During the inspection and survey, both parties will jointly annotate on the order form to be prescribed by the Contracting Officer, the quantity for each unit price item that is to be utilized. The Contracting Officer will confirm the starting and completion date of work for each unit in the task order.
27. HARDWARE, PAINT and items on the mandatory procurement list are to be purchased from AbilityOne.
Please refer to FAR Clause 52.208-9. See website http://www.abilityone.com for ordering instructions.
28. Unless otherwise specified herein, the contractor shall furnish all supplies, material and equipment necessary for the performance of work under this contract. The contractor shall utilize products and materials made from biobased materials (e.g. biobased degreasers and biobased toilet bowl cleaner) to the maximum extent practical without jeopardizing the intended end use or detracting from the overall quality delivered to the end user. The EPA’s Comprehensive Procurement Guidelines and product list can be found at http://www.epa.gov/epawaste/conserve/tools/cpg/index.htm.
Upon request of the COR, the contractor shall submit a list indicating the name of the manufacturer, the brand name, and the intended use of each of the materials used in the performance of its work. The Contractor shall not use any materials, chemicals, or compound which the COR determines would be unsuitable for the intended purpose or harmful to the surfaces to which applied or, as might be the case for such items as paper or soap products, unsatisfactory for use by occupants. For biobased content products evaluation, all non-chemical products proposed for use under this contract must conform to the Department of Agriculture (USDA) Designated Biobased Products List (DBPL) whenever practicable.
29. Applicable Codes and Regulations
(a) The latest edition of the following Codes, regulations, guides, and criteria shall be used for all design and construction under this contract. If there is a conflict between these codes or regulations and these contract specifications the Unified Facility Criteria will override. The Contractor shall have a copy of each of these documents available for use during the term of this contract.
The Unified Facility Criteria (UFC) documents including, but not limited to:
UFC 3-410-01 Design: Heating, Ventilating, And Air Conditioning UFC 4-010-01 Dod Minimum Antiterrorism Standards For Buildings UFC 3-600-01 Design: Fire Protection Engineering For Facilities UFC 1-200-01 DoD Building Code (General Building Requirements A complete listing can be obtained at http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4
(b) The Unified Facility Guide Specifications are mandatory for all work required under this contract. The contractor is responsible for obtaining the Unified Facility Guide Specifications and for maintaining updates to the specifications. The specifications whether referenced or not (in whole or part), shall be considered to be a part of all task orders issued under this contract. Where two specifications are listed for a certain item of work the Army section as denoted by an A shall be used. When there is no Army designated spec use the Navy (denoted by N ) or in the absence of either use an industry standard specifications or others listed in the Construction Criteria Base CCB. A complete listing of the UFGS Division 01 - General Requirements can be obtained at https://wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs (c ) The following are additional criteria, codes, regulations and guides which shall be incorporated into all designs and used for construction:
ASHRAE 90.1 Energy Standard for Buildings Except Low-Rise Residential Buildings EPACT 2005 Energy Policy Act of 2005, Public Law 109-58.
IBC, International Building Code IEEE C2, National Electrical Safety Code IESNA Illuminating Engineering Society of North America MIL HDBK 1190, Military Handbook for Facility Planning and Design Guide MIL HDBK 1191, Military Handbook for Medical and Dental Treatment Facilities, Design and Construction Criteria Guide Uniform Building Code Uniform Mechanical Code Uniform Plumbing Code Standard Building Code National Electrical Code (NEC)
Life Safety Code, National Fire Protection Association (NFPA) 101 National Fire Protection Association (NFPA) 70 MIL Handbook 1190 Occupational safety and Health Administration (OSHA) Regulation www.OSHA.gov National Fire protection Association (NFPA) Regulations www.NFPA.org
30. DPW requirements
a. Federal Fire. Electrical installation must be in accordance with NFPA 70E for electrical safety in the workplace.
b. Electrical. Power assessment as well as installation is to be done by a certified electrician/contractor, to determine existing power availability, assess whether existing infrastructure needs to be upgraded to accommodate those requirements and provide installation as required in compliance with NEC, NESC and UFC 3-520-01.
c. Environmental. Ensure all asbestos and lead paint are removed by a qualified and licensed contractor. Handling, storing and disposal of hazardous materials must be done in accordance with local, state and federal laws and regulations.
d. Contractor must adhere to the Ft. Wainwright Environmental Requirements for Construction, Demolition, and Renovation Projects in the Statement of Work dated 2 February 2023.
30. SF 1442 Attachment(s) Attachment 1: Excel Sheet Bid Schedule Attachment 2: Word Bid Attachment Attachment 3: Statement of Work, dated 2 February 2023 Attachment 4: Alaska Specifications
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
CLIN0001 RESERVED
FFP
CLIN0001 RESERVED
PURCHASE REQUEST NUMBER: 0011609684
NET AMT
CLIN0002 RESERVED
FFP
CLIN0002 RESERVED
CLIN0003 RESERVED
FFP
CLIN0003 RESERVED
CLIN0004 RESERVED
FFP
CLIN0004 RESERVED
CLIN0005 RESERVED
FFP
CLIN0005 RESERVED
CLIN0006 RESERVED
FFP
CLIN0006 RESERVED
CLIN0007 RESERVED
FFP
CLIN0007 RESERVED
CLIN0008 RESERVED
FFP
CLIN0008 RESERVED
CLIN0009 RESERVED
FFP
CLIN0009 RESERVED
CLIN0010 RESERVED
FFP
CLIN0010 RESERVED
0011 60 Each CLIN0011 Install Permanent Fall Protecti
FFP
CLIN0011 Install Permanent Fall Protection System FOB: Destination
PSC CD: Z2QA
0012 181 Square CLIN0012 20YR Non-Penal Sum EPDM Roof Wa
FFP
CLIN0012 20YR Non-Penal Sum EPDM Roof Wa FOB: Destination
0013 181 Square CLIN0013 25YR Non-Penal Sum Metal Roof W
FFP
CLIN0013 25YR Non-Penal Sum Metal Roof Warranty-Falls under the spec FOB: Destination
0014 1,000 Square
Foot
CLIN0014 Install Plastic Sheeting
FFP
CLIN0014 Plastic Sheeting, install plastic sheeting to protect furniture, equipment, supplies, etc. from dust. Includes clean up and removal.
FOB: Destination
0015 5 Each CLIN0015 (Bulk Point) PLM Test Asbestos
FFP
CLIN0015 48 Hours or Longer Turnaround, (Bulk Point Counting) PLM Test Asbestos Testing FOB: Destination
0016 5 Each CLIN0016 (Bulk Point) TEM Test Asbestos
FFP
CLIN0016 48 Hour or Longer Turnaround, (Bulk) TEM Test, Asbestos Testing FOB: Destination
0017 3 Each CLIN0017 (Air) PCM Test, Asbestos
FFP
CLIN0017 (Air) Next Day Turnaround, (Air) PCM Test, Asbestos Testing FOB: Destination
0018 5 Each CLIN0018 (Air) TEM Test, Asbestos
FFP
CLIN0018 (Air) TEM Test, Asbestos FOB: Destination
0019 500 Square
CLIN0019 Asbestos Abatement Thermal Insu
CLIN0019 Asbestos Abatement Thermal Insu FOB: Destination
0020 500 Square
CLIN0020 Asbestos Abatement Tar & Felt R
CLIN0020 Asbestos Abatement Tar & Felt R FOB: Destination
0021 2 Each CLIN0021 TCLP Lead Test & Lab Fee
FFP
CLIN0021 TCLP Lead Test & Lab Fee FOB: Destination
0022 5 Each CLIN0022 Concrete Deck Cut Set Up
FFP
CLIN0022 Concrete Deck Cut Set Up FOB: Destination
0023 9 Square
CLIN0023 Remov & Disp Concrete Roof Deck
CLIN0023 Remov & Disp Concrete Roof Deck FOB: Destination
0024 200 Square
CLIN0024 Inst & Infil Concrete Roof Deck
CLIN0024 Inst & Infil Concrete Roof Deck FOB: Destination
0025 55 Job CLIN0025 24" Wide Steel Ladder
FFP
CLIN0025 24" Wide Steel Ladder, Unit of Issue: VLF FOB: Destination
0026 3 Each CLIN0026 24" Wide Steel Ladder Handrails
FFP
CLIN0026 24" Wide Steel Ladder Handrails FOB: Destination
0027 22 Job CLIN0027 Remov & Disp Vert Cage Ladder
FFP
CLIN0027 Remov & Disp Vert Cage Ladder, Unit of Issue: VLF FOB: Destination
0028 1,000 Square
CLIN0028 Demo Metal Roof Deck
CLIN0028 Demo Metal Roof Deck FOB: Destination
0029 500 Square
CLIN0029 Up To 2" Galvan Steel Deck
CLIN0029 Up To 2" Galvan Steel Deck FOB: Destination
0030 1,000 Square
CLIN0030 <2"-3" Galvan Steel Deck
CLIN0030 <2"-3" Galvan Steel Deck FOB: Destination
0031 100 Square
CLIN0031 <3"-4-1/2" Galvan Steel Deck
CLIN0031 <3"-4-1/2" Galvan Steel Deck FOB: Destination
0032 100 Square
CLIN0032 <4-1/2"-6" Galvan Steel Deck
CLIN0032 <4-1/2"-6" Galvan Steel Deck FOB: Destination
0033 300 Linear
CLIN0033 Metal Roof Purlins
CLIN0033 Metal Roof Purlins FOB: Destination
0034 20,000 Square
CLIN0034 5/8" CDX Plywood Roof Decking
CLIN0034 5/8" CDX Plywood Roof Decking FOB: Destination
0035 2,655 Square
CLIN0035 1/2" Int BC Plywood Sheathing
CLIN0035 1/2" Int BC Plywood Sheathing FOB: Destination
0036 6,110 Linear
CLIN0036 Curb Wall Build up
CLIN0036 Curb Wall Build up FOB: Destination
0037 450 Square CLIN0037 Application of Primer
FFP
CLIN0037 Application of Primer FOB: Destination
CLIN0038 RESERVED
FFP
CLIN0038 RESERVED
0039 300 Square CLIN0039 40MIL Roofing Underlayment
FFP
CLIN0039 40MIL Roofing Underlayment FOB: Destination
0040 1,000 Square
CLIN0040 1" Molded Polystyrene Board
CLIN0040 1" Molded Polystyrene Board FOB: Destination
0041 1,000 Square
CLIN0041 2" Molded Polystyrene Board
CLIN0041 2" Molded Polystyrene Board FOB: Destination
0042 1,000 Square
CLIN0042 3" Molded Polystyrene Board
CLIN0042 3" Molded Polystyrene Board FOB: Destination
0043 1,000 Square
CLIN0043 4" Molded Polystyrene Board
CLIN0043 4" Molded Polystyrene Board FOB: Destination
0044 1,000 Square
CLIN0044 5" Molded Polystyrene Board
CLIN0044 5" Molded Polystyrene Board FOB: Destination
0045 1,000 Square
CLIN0045 6" Molded Polystyrene Board
CLIN0045 6" Molded Polystyrene Board FOB: Destination
0046 1,000 Square
CLIN0046 7" Molded Polystyrene Board
CLIN0046 7" Molded Polystyrene Board FOB: Destination
0047 1,000 Square
CLIN0047 8" Molded Polystyrene Board
CLIN0047 8" Molded Polystyrene Board FOB: Destination
0048 1,000 Square
CLIN0048 9" Molded Polystyrene Board
CLIN0048 9" Molded Polystyrene Board FOB: Destination
0049 1,000 Square
CLIN0049 10" Molded Polystyrene Board
CLIN0049 10" Molded Polystyrene Board FOB: Destination
0050 1,000 Square
CLIN0050 11" Molded Polystyrene Board
CLIN0050 11" Molded Polystyrene Board FOB: Destination
0051 20,000 Square
CLIN0051 12" Molded Polystyrene Board
CLIN0051 12" Molded Polystyrene Board FOB: Destination
0052 1,000 Square
CLIN0052 13" Molded Polystyrene Board
CLIN0052 13" Molded Polystyrene Board FOB: Destination
0053 1,000 Square
CLIN0053 14" Molded Polystyrene Board
CLIN0053 14" Molded Polystyrene Board FOB: Destination
0054 1,000 Square
CLIN0054 15" Molded Polystyrene Board
CLIN0054 15" Molded Polystyrene Board FOB: Destination
0055 1,000 Square
CLIN0055 16" Molded Polystyrene Board
CLIN0055 16" Molded Polystyrene Board FOB: Destination
0056 15,000 Square
CLIN0056 Sloped, Tapered EPS
CLIN0056 Sloped, Tapered EPS FOB: Destination
0057 4,900 Square
CLIN0057 Demo & Disp Rigid Insulation
CLIN0057 Demo & Disp Rigid Insulation FOB: Destination
0058 15,000 Square
CLIN0058 1/2" Fiberglass Gypsum Roof Boa
CLIN0058 1/2" Fiberglass Gypsum Roof Boa FOB: Destination
0059 5,868 Square
CLIN0059 7/16" OSB
CLIN0059 7/16" OSB
FOB: Destination
0060 30 Square CLIN0060 Ceramic Coated Shingles
FFP
CLIN0060 Ceramic Coated Shingles FOB: Destination
0061 100 Square CLIN0061 Rem & Disp 30lb Roofing Felt
FFP
CLIN0061 Rem & Disp 30lb Roofing Felt FOB: Destination
0062 100 Square CLIN0062 Install 30lb Roofing Felt
FFP
CLIN0062 Install 30lb Roofing Felt FOB: Destination
0063 2,500 Square
CLIN0063 Rem & Disp Metal Roof Panel
CLIN0063 Rem & Disp Metal Roof Panel FOB: Destination
0064 100 Square
CLIN0064 2", 24 Gauge Metal Roof Panel
CLIN0064 2", 24 Gauge Metal Roof Panel FOB: Destination
0065 100 Square
CLIN0065 2-1/2", 24 Gauge Metal Roof Pan
CLIN0065 2-1/2", 24 Gauge Metal Roof Pan FOB: Destination
0066 100 Square
CLIN0066 3", 24 Gauge Metal Roof Pan
CLIN0066 3", 24 Gauge Metal Roof Pan FOB: Destination
0067 100 Square
CLIN0067 4", 24 Gauge Metal Roof Pan
CLIN0067 4", 24 Gauge Metal Roof Pan FOB: Destination
0068 100 Square
CLIN0068 5", 24 Gauge Metal Roof Pan
CLIN0068 5", 24 Gauge Metal Roof Pan FOB: Destination
0069 100 Square
CLIN0069 6", 24 Gauge Metal Roof Pan
CLIN0069 6", 24 Gauge Metal Roof Pan FOB: Destination
0070 15,000 Square
CLIN0070 Rem & Disp Roofing Panels
CLIN0070 Rem & Disp Roofing Panels FOB: Destination
0071 2,500 Square
CLIN0071 Steel Sheet Metal Roofing Panel
CLIN0071 Steel Sheet Metal Roofing Panel FOB: Destination
0072 2,000 Square
CLIN0072 Aluminum Roofing Panels
CLIN0072 Aluminum Roofing Panels FOB: Destination
0073 100 Square
CLIN0073 Copper Roof Shingles
CLIN0073 Copper Roof Shingles FOB: Destination
0074 300 Square CLIN0074 Aluminum Roof Shingles
FFP
CLIN0074 Aluminum Roof Shingles FOB: Destination
0075 250 Square CLIN0075 Steel Roof Shingles
FFP
CLIN0075 Steel Roof Shingles FOB: Destination
0076 50 Linear
CLIN0076 Ridge Vents
CLIN0076 Ridge Vents FOB: Destination
0077 125 Square CLIN0077 Rem & Disp 90lb Mineral Surface
FFP
CLIN0077 Rem & Disp 90lb Mineral Surface FOB: Destination
0078 49 Square CLIN0078 Rem & Disp Gravel on Built-up R
FFP
CLIN0078 Rem & Disp Gravel on Built-up R FOB: Destination
0079 187 Square CLIN0079 Rem & Disp EPDM Roofing System
FFP
CLIN0079 Rem & Disp EPDM Roofing System FOB: Destination
0080 82 Square CLIN0080 60MIL 1-60 EPDM Roofing Membran
FFP
CLIN0080 60MIL 1-60 EPDM Roofing Membran FOB: Destination
0081 59 Square CLIN0081 60MIL 1-90 EPDM Roofing Membran
FFP
CLIN0081 60MIL 1-90 EPDM Roofing Membran FOB: Destination
0082 20 Square CLIN0082 90MIL 1-60 EPDM Roofing Membran
FFP
CLIN0082 90MIL 1-60 EPDM Roofing Membran FOB: Destination
0083 20 Square CLIN0083 90MIL 1-90 EPDM Roofing Membran
FFP
CLIN0083 90MIL 1-90 EPDM Roofing Membran FOB: Destination
0084 200 Linear
CLIN0084 30" EPDM Walkway Protection Pad
CLIN0084 30" EPDM Walkway Protection Pad FOB: Destination
0085 80 Linear
CLIN0085 30" EPDM Walkwy Protect Pad Sup
CLIN0085 30" EPDM Walkwy Protect Pad Sup FOB: Destination
0086 1,206 Square
CLIN0086 EPDM Membrane Base Flashing
CLIN0086 EPDM Membrane Base Flashing FOB: Destination
0087 19 Each CLIN0087 4" EPDM Pipe Cone/Boot
FFP
CLIN0087 4" EPDM Pipe Cone/Boot FOB: Destination
0088 28 Each CLIN0088 4"-8" EPDM Pipe Cone/Boot
FFP
CLIN0088 4"-8" EPDM Pipe Cone/Boot FOB: Destination
0089 19 Each CLIN0089 8"-13" EPDM Pipe Cone/Boot
FFP
CLIN0089 8"-13" EPDM Pipe Cone/Boot FOB: Destination
0090 1,000 Square
CLIN0090 Rem & Disp Sheet Metal Flashing
CLIN0090 Rem & Disp Sheet Metal Flashing FOB: Destination
0091 1,000 Square
CLIN0091 Aluminum Flashing
CLIN0091 Aluminum Flashing FOB: Destination
0092 1,000 Square
CLIN0092 Galvanized Steel Flashing
CLIN0092 Galvanized Steel Flashing FOB: Destination
0093 500 Square
CLIN0093 Copper Flashing
CLIN0093 Copper Flashing FOB: Destination
0094 1,500 Linear
CLIN0094 Rem & Disp Gutter & Downspouts
CLIN0094 Rem & Disp Gutter & Downspouts FOB: Destination
0095 1,500 Linear
CLIN0095 Aluminum Gutter & Downspouts
CLIN0095 Aluminum Gutter & Downspouts FOB: Destination
0096 200 Linear
CLIN0096 Galvanized Steel Gutter & Downs
CLIN0096 Galvanized Steel Gutter & Downs FOB: Destination
0097 2,000 Job CLIN0097 Copper Gutter & Downspouts
FFP
CLIN0097 Copper Gutter & Downspouts FOB: Destination
0098 500 Job CLIN0098 Ridge Flashing
FFP
CLIN0098 Ridge Flashing FOB: Destination
0099 100 Job CLIN0099 Eave Flashing
FFP
CLIN0099 Eave Flashing FOB: Destination
0100 350 Job CLIN0100 Valley Flashing
FFP
CLIN0100 Valley Flashing FOB: Destination
0101 500 Job CLIN0101 Hip Flashing
FFP
CLIN0101 Hip Flashing FOB: Destination
0102 200 Job CLIN0102 5"-9" Metal Drip Edge
FFP
CLIN0102 5"-9" Metal Drip Edge FOB: Destination
0103 200 Job CLIN0103 10"-14" Coping System
FFP
CLIN0103 10"-14" Coping System FOB: Destination
0104 200 Job CLIN0104 14"-16" Coping System
FFP
CLIN0104 14"-16" Coping System FOB: Destination
0105 200 Job CLIN0105 16"-22" Coping System
FFP
CLIN0105 16"-22" Coping System FOB: Destination
0106 1,000 Job CLIN0106 22"-30" Coping System
FFP
CLIN0106 22"-30" Coping System FOB: Destination
0107 1,000 Square
CLIN0107 24 Gauge Concealed Fast Roofing
CLIN0107 24 Gauge Concealed Fast Roofing FOB: Destination
0108 1,000 Square
CLIN0108 22 Gauge Concealed Fast Roofing
CLIN0108 22 Gauge Concealed Fast Roofing FOB: Destination
0109 500 Square
CLIN0109 Rem & Disp Zinc/Copper Roofing
CLIN0109 Rem & Disp Zinc/Copper Roofing FOB: Destination
0110 3,258 Linear
CLIN0110 5"-9" Metal Drip Edge
CLIN0110 5"-9" Metal Drip Edge FOB: Destination
0111 3,258 Linear
CLIN0111 Rem & Disp Snow Guards
CLIN0111 Rem & Disp Snow Guards FOB: Destination
0112 250 Linear
CLIN0112 Snow Guards
CLIN0112 Snow Guards FOB: Destination
0113 10,000 Each CLIN0113 Polycarbonate Snow Guards
FFP
CLIN0113 Polycarbonate Snow Guards FOB: Destination
0114 50 Linear
CLIN0114 Ridge Vents
CLIN0114 Ridge Vents FOB: Destination
0115 300 Linear
CLIN0115 Cant Strips
CLIN0115 Cant Strips FOB: Destination
0116 11 Each CLIN0116 Scupper Drains
FFP
CLIN0116 Scupper Drains FOB: Destination
0117 100 Square CLIN0117 Demo & Rem Roofing Pavers
FFP
CLIN0117 Demo & Rem Roofing Pavers FOB: Destination
0118 100 Square CLIN0118 Demo & Rem PVC Roofing
FFP
CLIN0118 Demo & Rem PVC Roofing FOB: Destination
0119 1,000 Square
CLIN0119 Roof Repair, Built-Up Roofing
CLIN0119 Roof Repair, Built-Up Roofing FOB: Destination
0120 500 Square
CLIN0120 Roof Repair, Membrane Roofing
CLIN0120 Roof Repair, Membrane Roofing FOB: Destination
0121 100 Square
CLIN0121 Roof Repair, Shingle Roofing
CLIN0121 Roof Repair, Shingle Roofing FOB: Destination
0122 300 Square
CLIN0122 Roof Repair, Standing Seam
CLIN0122 Roof Repair, Standing Seam FOB: Destination
0123 100 Square
CLIN0123 Seam/Hole Repair Strip-In
CLIN0123 Seam/Hole Repair Strip-In FOB: Destination
0124 100 Linear
CLIN0124 Missing Lap Seal/Caulking
CLIN0124 Missing Lap Seal/Caulking FOB: Destination
0125 25 Each CLIN0125 Repair Inside/Outside Corner
FFP
CLIN0125 Repair Inside/Outside Corner FOB: Destination
0126 250 Square
CLIN0126 EIFS Wall Repair
CLIN0126 EIFS Wall Repair FOB: Destination
0127 3 Each
CLIN0127 3' X 6'8" - 7'2"
FFP
CLIN0127 3' X 6'8" - 7'2" HIGH, 14 GAUGE, Welded, insulated, 1-1/2 hr fire rated, METAL DOOR FRAME FOB: Destination
0128 5 Each CLIN0128 6' X >7'2" Metal Door Frame
FFP
CLIN0128 6' X >7'2" THROUGH 9’ HIGH, 14 GAUGE, Welded, insulated, 1-1/2 hr fire rated, METAL DOOR FRAME FOB: Destination
0129 5 Each
CLIN0129 3’ X 6’8” X 1-3/4”, 16 GUAGE
FFP
CLIN0129 3’ X 6’8” X 1-3/4”, 16 GUAGE, 1-1/2 hr fire rated, insulated, METAL
DOOR
FOB: Destination
0130 8 Pair CLIN0130 4" X 4" Standard Duty Hinge
FFP
CLIN0130 4" X 4" Standard Duty Hinge FOB: Destination
0131 5 Each CLIN0131 8" X 32" Kick Plate
FFP
CLIN0131 8" X 32" Kick Plate FOB: Destination
0132 5 Each CLIN0132 Lever Trim (230L) with Cylinder
FFP
CLIN0132 Lever Trim (230L) with Cylinder FOB: Destination
0133 5 Each CLIN0133 36" X 36" Roof Hatch
FFP
CLIN0133 36" X 36" Roof Hatch FOB: Destination
0134 24 Each CLIN0134 Rem & Disp Cast Iron Roof Drain
FFP
CLIN0134 Rem & Disp Cast Iron Roof Drain FOB: Destination
0135 24 Each CLIN0135 Cast Iron Roof Drain/w 3" Dome
FFP
CLIN0135 Cast Iron Roof Drain/w 3" Dome FOB: Destination
0136 10 Each CLIN0136 Cast Iron Roof Drain/w 4" Dome
FFP
CLIN0136 Cast Iron Roof Drain/w 4" Dome FOB: Destination
0137 6 Each CLIN0137 Cast Iron Roof Drain/w 6" Dome
FFP
CLIN0137 Cast Iron Roof Drain/w 6" Dome FOB: Destination
0138 7 Each CLIN0138 3" Roof Drain Downspout Nozzle
FFP
CLIN0138 3" Roof Drain Downspout Nozzle FOB: Destination
0139 5 Each CLIN0139 4" Roof Drain Downspout Nozzle
FFP
CLIN0139 4" Roof Drain Downspout Nozzle FOB: Destination
0140 10 Each CLIN0140 6" Roof Drain Downspout Nozzle
FFP
CLIN0140 6" Roof Drain Downspout Nozzle FOB: Destination
0141 19 Each CLIN0141 3"-4" Roof Vent Pipe Extension
FFP
CLIN0141 3"-4" Roof Vent Pipe Extension FOB: Destination
0142 19 Each CLIN0142 4"-6" Roof Vent Pipe Extension
FFP
CLIN0142 4"-6" Roof Vent Pipe Extension FOB: Destination
0143 19 Each CLIN0143 6"-8" Roof Vent Pipe Extension
FFP
CLIN0143 6"-8" Roof Vent Pipe Extension FOB: Destination
0144 90 Pound CLIN0144 Sheet Metal Ductwork
FFP
CLIN0144 Sheet Metal Ductwork FOB: Destination
0145 26 Each CLIN0145 Auto Gutter Ice Melting Control
FFP
CLIN0145 Auto Gutter Ice Melting Control FOB: Destination
0146 29 Each CLIN0146 Self Regulating Heating Cable
FFP
CLIN0146 Self Regulating Heating Cable FOB: Destination
0147 3,000 Linear
CLIN0147 Self Regulating Low Temp Cable
CLIN0147 Self Regulating Low Temp Cable FOB: Destination
0148 9 Each CLIN0148 Equip Protection Circuit Breake
FFP
CLIN0148 Equip Protection Circuit Breake FOB: Destination
0149 34 Cubic Feet CLIN0149 3/4" Conduit Assembly
FFP
CLIN0149 3/4" Conduit Assembly, Unit of Issue: CLF (100 Linear Feet) FOB: Destination
0150 8 Each CLIN0150 3/4" 90 Degree Elbow
FFP
CLIN0150 3/4" 90 Degree Elbow FOB: Destination
0151 28 Each CLIN0151 3-1/2" Depth, 4" Square Box
FFP
CLIN0151 3-1/2" Depth, 4" Square Box FOB: Destination
0152 20 Each CLIN0152 Flat 4" Square Exposed Work Cov
FFP
CLIN0152 Flat 4" Square Exposed Work Cov FOB: Destination
0153 26 Each CLIN0153 4”x 4” x 4” Screw Cover, Galvan
FFP
CLIN0153 4”x 4” x 4” Screw Cover, Galvanized Cast Iron NEMA 3 Enclosure FOB: Destination
0154 40 Linear
CLIN0154 3"-4" Diameter Pipe
CLIN0154 3"-4" Diameter Pipe FOB: Destination
0155 22 Linear
CLIN0155 4"-6" Diameter Pipe
CLIN0155 4"-6" Diameter Pipe FOB: Destination
0156 40 Linear
CLIN0156 6"-8" Diameter Pipe
CLIN0156 6"-8" Diameter Pipe FOB: Destination
0157 447 Square
CLIN0157 0.010ƒ?? Aluminum Insulation Jack
CLIN0157 0.010ƒ?? Aluminum Insulation Jack FOB: Destination
CLIN0158 RESERVED
FFP
CLIN0158 RESERVED
CLIN0159 RESERVED
FFP
CLIN0159 RESERVED
0160 20 Each CLIN0160 Rep Missing/Broken Drain Screen
FFP
CLIN0160 Rep Missing/Broken Drain Screen FOB: Destination
0161 2 Each CLIN0161 Rem & Re-Inst Exhaust Fan
FFP
CLIN0161 Rem & Re-Inst Exhaust Fan FOB: Destination
0162 34 Each CLIN0162 Pre-cast Concrete Splash Blocks
FFP
CLIN0162 Pre-cast Concrete Splash Blocks FOB: Destination
CLIN0163 RESERVED
FFP
CLIN0163 RESERVED
0164 3 Week CLIN0164 500,000 BTU/HR Space Heater
FFP
CLIN0164 500,000 BTU/HR Space Heater FOB: Destination
CLIN0165 RESERVED
FFP
CLIN0165 RESERVED
CLIN0166 RESERVED
FFP
CLIN0166 RESERVED
CLIN0167 RESERVED
FFP
CLIN0167 RESERVED
CLIN0168 RESERVED
FFP
CLIN0168 RESERVED
CLIN0169 RESERVED
FFP
CLIN0169 RESERVED
CLIN0170 RESERVED
FFP
CLIN0170 RESERVED
CLIN0171 RESERVED
FFP
CLIN0171 RESERVED
0172 200 Square
CLIN0172 Temp Wall for Temp Heating
CLIN0172 Temp Wall for Temp Heating, 7/16" OSB Wall sheething on one side, Wood stud wall At 16' O.C.
FOB: Destination
0173 200 Square
CLIN0173 Temp Wall for Temp Heating
CLIN0173 Temp Wall for Temp Heating, 6 mil plasic sheething on one side, Wood stud wall At 16' O.C.
FOB: Destination
0174 500 Square
CLIN0174 6 mil, Plastic Sheething, Floor
CLIN0174 6 mil, Plastic Sheething, Floor FOB: Destination
0175 500 Square
CLIN0175 6 mil, Plastic Sheething, Wall
CLIN0175 6 mil, Plastic Sheething, Wall FOB: Destination
0176 500 Square
CLIN0176 6 mil, Plastic Sheething, Ceili
CLIN0176 6 mil, Plastic Sheething, Ceili FOB: Destination
0177 5 Each CLIN0177 7' Zipper Door for Plastic Shee
FFP
CLIN0177 7' Zipper Door for Plastic Shee FOB: Destination
0178 200 Linear
CLIN0178 Zip Wall Kit & ICRA Dust Contr
CLIN0178 Zip Wall Kit & ICRA Dust Contr FOB: Destination
CLIN0179 RESERVED
FFP
CLIN0179 RESERVED
0180 50 Bag
CLIN0180 RESERVED
FFP
CLIN0180 RESERVED
FOB: Destination
CLIN0181 RESERVED
FFP
CLIN0181 RESERVED
CLIN0182 RESERVED
FFP
CLIN0182 RESERVED
CLIN0183 RESERVED
FFP
CLIN0183 RESERVED
CLIN0184 RESERVED
FFP
CLIN0184 RESERVED
CLIN0185 RESERVED
FFP
CLIN0185 RESERVED
CLIN0186 RESERVED
FFP
CLIN0186 RESERVED
CLIN0187 RESERVED
FFP
CLIN0187 RESERVED
CLIN0188 RESERVED
FFP
CLIN0188 RESERVED
CLIN0189 RESERVED
FFP
CLIN0189 RESERVED
CLIN0190 RESERVED
FFP
CLIN0190 RESERVED
CLIN0191 RESERVED
FFP
CLIN0191 RESERVED
0192 50 Job CLIN0192 Seeding. Push Spreader or Hand
FFP
CLIN0192 Seeding. Push Spreader or Hand Seeding, Unit of Issue: 4lb/MSF FOB: Destination
0193 500 Job CLIN0193 Seeding. Hydro or Air Mechanica
FFP
CLIN0193 Seeding. Hydro or Air Mechanical, Unit of Issue: 4lb/MSF FOB: Destination
OPTION CLIN1001 RESERVED
FFP
CLIN1001 RESERVED
OPTION CLIN1002 RESERVED
FFP
CLIN1002 RESERVED
OPTION CLIN1003 RESERVED
FFP
CLIN1003 RESERVED
OPTION CLIN1004 RESERVED
FFP
CLIN1004 RESERVED
OPTION CLIN1005 RESERVED
FFP
CLIN1005 RESERVED
OPTION CLIN1006 RESERVED
FFP
CLIN1006 RESERVED
OPTION CLIN1007 RESERVED
FFP
CLIN1007 RESERVED
OPTION CLIN1008 RESERVED
FFP
CLIN1008 RESERVED
OPTION CLIN1009 RESERVED
FFP
CLIN1009 RESERVED
OPTION CLIN1010 RESERVED
FFP
CLIN1010 RESERVED
1011 60 Each OPTION CLIN1011 Install Permanent fall protecti
FFP
CLIN1011 Install Permanent fall protecti FOB: Destination
1012 3 Square OPTION CLIN1012 20YR Non-Penal Sum EPDM Roof Wa
FFP
CLIN1012 20YR Non-Penal Sum EPDM Roof Wa FOB: Destination
1013 1 Square OPTION CLIN1013 25YR Non-Penal Sum Metal Roof W
FFP
CLIN1013 25YR Non-Penal Sum Metal Roof W FOB: Destination
1014 1,000 Square
OPTION CLIN1014 Install Plastic Sheeting
CLIN1014 Install Plastic Sheeting FOB: Destination
1015 5 Each OPTION CLIN1015 (Bulk Point) PLM Test Asbestos
FFP
CLIN1015 (Bulk Point) PLM Test Asbestos FOB: Destination
1016 5 Each OPTION CLIN1016 (Bulk Point) TEM Test Asbestos
FFP
CLIN1016 (Bulk Point) TEM Test Asbestos FOB: Destination
1017 3 Each OPTION CLIN1017 (Air) PCM Test, Asbestos
FFP
CLIN1017 (Air) PCM Test, Asbestos FOB: Destination
1018 5 Each OPTION CLIN1018 (Air) TEM Test, Asbestos
FFP
CLIN1018 (Air) TEM Test, Asbestos FOB: Destination
1019 500 Square
OPTION CLIN1019 Asbestos Abatement Thermal Insu
CLIN1019 Asbestos Abatement Thermal Insu FOB: Destination
1020 500 Square
OPTION CLIN1020 Asbestos Abatement Tar & Felt R
CLIN1020 Asbestos Abatement Tar & Felt R FOB: Destination
1021 2 Each OPTION CLIN1021 TCLP Lead Test & Lab Fee
FFP
CLIN1021 TCLP Lead Test & Lab Fee FOB: Destination
1022 5 Each OPTION CLIN1022 Concrete Deck Cut Set Up
FFP
CLIN1022 Concrete Deck Cut Set Up FOB: Destination
1023 9 Square
OPTION CLIN1023 Remov & Disp Concrete Roof Deck
CLIN1023 Remov & Disp Concrete Roof Deck FOB: Destination
1024 200 Square
OPTION CLIN1024 Inst & Infil Concrete Roof Deck
CLIN1024 Inst & Infil Concrete Roof Deck FOB: Destination
1025 55 Job OPTION CLIN1025 24" Wide Steel Ladder
FFP
CLIN1025 24" Wide Steel Ladder, Unit of Issue: VLF FOB: Destination
1026 3 Each OPTION CLIN1026 24" Wide Steel Ladder Handrails
FFP
CLIN1026 24" Wide Steel Ladder Handrails FOB: Destination
1027 22 Job OPTION CLIN1027 Remov & Disp Vert Cage Ladder
FFP
CLIN1027 Remov & Disp Vert Cage Ladder, Unit of Issue: VLF FOB: Destination
1028 1,000 Square
OPTION CLIN1028 Demo Metal Roof Deck
CLIN1028 Demo Metal Roof Deck FOB: Destination
1029 500 Square
OPTION CLIN1029 Up To 2" Galvan Steel Deck
CLIN1029 Up To 2" Galvan Steel Deck FOB: Destination
1030 1,000 Square
OPTION CLIN1030 <2"-3" Galvan Steel Deck
CLIN1030 <2"-3" Galvan Steel Deck FOB: Destination
1031 100 Square
OPTION CLIN1031 <3"-4-1/2" Galvan Steel Deck
CLIN1031 <3"-4-1/2" Galvan Steel Deck FOB: Destination
1032 100 Square
OPTION CLIN1032 <4-1/2"-6" Galvan Steel Deck
CLIN1032 <4-1/2"-6" Galvan Steel Deck FOB: Destination
1033 300 Linear
OPTION CLIN1033 Metal Roof Purlins
CLIN1033 Metal Roof Purlins FOB: Destination
1034 20,000 Square
OPTION CLIN1034 5/8" CDX Plywood Roof Decking
CLIN1034 5/8" CDX Plywood Roof Decking FOB: Destination
1035 2,655 Square
OPTION CLIN1035 1/2" Int BC Plywood Sheathing
CLIN1035 1/2" Int BC Plywood Sheathing FOB: Destination
1036 6,110 Linear
OPTION CLIN1036 Curb Wall Build up
CLIN1036 Curb Wall Build up FOB: Destination
1037 450 Square OPTION CLIN1037 Application of Primer
FFP
CLIN1037 Application of Primer FOB: Destination
OPTION CLIN1038 RESERVED
FFP
CLIN1038 RESERVED
1039 300 Square OPTION CLIN1039 40MIL Roofing Underlayment
FFP
CLIN1039 40MIL Roofing Underlayment FOB: Destination
1040 1,000 Square
OPTION CLIN1040 1" Molded Polystyrene Board
CLIN1040 1" Molded Polystyrene Board FOB: Destination
1041 1,000 Square
OPTION CLIN1041 2" Molded Polystyrene Board
CLIN1041 2" Molded Polystyrene Board FOB: Destination
1042 1,000 Square
OPTION CLIN1042 3" Molded Polystyrene Board
CLIN1042 3" Molded Polystyrene Board FOB: Destination
1043 1,000 Square
OPTION CLIN1043 4" Molded Polystyrene Board
CLIN1043 4" Molded Polystyrene Board FOB: Destination
1044 1,000 Square
OPTION CLIN1044 5" Molded Polystyrene Board
CLIN1044 5" Molded Polystyrene Board FOB: Destination
1045 1,000 Square
OPTION CLIN1045 6" Molded Polystyrene Board
CLIN1045 6" Molded Polystyrene Board FOB: Destination
1046 1,000 Square
OPTION CLIN1046 7" Molded Polystyrene Board
CLIN1046 7" Molded Polystyrene Board FOB: Destination
1047 1,000 Square
OPTION CLIN1047 8" Molded Polystyrene Board
CLIN1047 8" Molded Polystyrene Board FOB: Destination
1048 1,000 Square
OPTION CLIN1048 9" Molded Polystyrene Board
CLIN1048 9" Molded Polystyrene Board FOB: Destination
1049 1,000 Square
OPTION CLIN1049 10" Molded Polystyrene Board
CLIN1049 10" Molded Polystyrene Board FOB: Destination
1050 1,000 Square
OPTION CLIN1050 11" Molded Polystyrene Board
CLIN1050 11" Molded Polystyrene Board FOB: Destination
1051 20,000 Square
OPTION CLIN1051 12" Molded Polystyrene Board
CLIN1051 12" Molded Polystyrene Board FOB: Destination
1052 1,000 Square
OPTION CLIN1052 13" Molded Polystyrene Board
CLIN1052 13" Molded Polystyrene Board FOB: Destination
1053 1,000 Square
OPTION CLIN1053 14" Molded Polystyrene Board
CLIN1053 14" Molded Polystyrene Board FOB: Destination
1054 1,000 Square
OPTION CLIN1054 15" Molded Polystyrene Board
CLIN1054 15" Molded Polystyrene Board FOB: Destination
1055 1,000 Square
OPTION CLIN1055 16" Molded Polystyrene Board
CLIN1055 16" Molded Polystyrene Board FOB: Destination
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .