This document is a comprehensive Pricebook (Attachment 1) for a maintenance and repair contract for doors, gates, and barriers at multiple U.S. Army locations in Wiesbaden, Germany. The solicitation (W912CM25QA011) covers a 12-month base period with two 12-month option periods, starting around 9 July 2025, and involves preventive maintenance and on-demand repairs for various equipment types across 10 different locations including Amelia Earhart Center, Clay Kaserne Wiesbaden, and others.

The pricing structure includes two primary Contract Line Item Numbers (CLINs): CLIN 0001/1001/2001 for preventive maintenance of six door and gate categories (sectional doors, reel gates, sliding doors, sliding gates, wing doors, and hangar gates), and CLIN 0002/1002/2002 for on-demand time and materials repairs. The contract is a hybrid fixed-price and time-and-materials arrangement, with the government estimating 750 hours for the base year and 500 hours for each option period. Contractors must be registered in the System for Award Management (SAM) and comply with German legal requirements for performing services in Germany. A site visit is scheduled for 12 May 2025 at 10:00 CET.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BASE PERIOD

Preisbuch fuer den Anbieter / Pricebook for the Vendors
Base Year

CLIN Description Description or calculation of prices Price

0001 Preventive Maintenance on Door's and Gate's within USAG Wiesbaden Base period, POP FY25-FY26, FY 25, IAW PWS.

Die Türen und Tore sind in 6 Kategorien an 10 Standorten eingeteilt. In der Kategorie CLIN 0001 wird der Wartungspreis für eine einzelnes Equipment eingetragen. Bitte sehen Sie in den PWS nach, welche Mindestanforderungen gegeben sind. Anfahrtskosten und Stundenlohn sind in diesem Einzelpreis enthalten und können nicht separat in Rechnung gestellt werden.
Doors and gates are subdivided into 6 categories in 10 locations. CLIN 0001 the maintenance price for a single Equipment is entered in the category. Please see in PWS which minimum requirements are given. Travel and hourly wages are included in this single price and cannot be invoiced separately.€ 0.00
Overviewremarks/comment
Sectional door47- 0 €
Reel gate59- 0 €
Sliding door44- 0 €
Sliding gate11- 0 €
Wing door75- 0 €
Hangar gate16- 0 €
Total252$ - 0
DescriptionQuantityQuantity of maintenancePRICE
Sectional door47Price for single equipment
Total- 0 €
Amelia Earhart Center0- 0 €
Aukamm0- 0 €
Clay Kaserne Wiesbaden12semi annual maintenance & inspection- 0 €
19annual maintenance & inspection- 0 €
Egelsbach0- 0 €
Hainerberg3annual maintenance & inspection- 0 €
Mainz Kastel Station5annual maintenance & inspection- 0 €
Mc Cully Barracks4annual maintenance & inspection- 0 €
Rheinblick Golf Course4annual maintenance & inspection- 0 €
Schwabenwaeldchen0- 0 €
Wiesbaden Small Arms0- 0 €
Reel gate59Price for single equipment
Total- 0 €
Amelia Earhart Center0- 0 €
Aukamm2annual maintenance & inspection- 0 €
Clay Kaserne Wiesbaden11annual maintenance & inspection- 0 €
Egelsbach0- 0 €
Hainerberg26annual maintenance & inspection- 0 €
Mainz Kastel Station11annual maintenance & inspection- 0 €
Mc Cully Barracks4annual maintenance & inspection- 0 €
Rheinblick Golf Course5annual maintenance & inspection- 0 €
Schwabenwaeldchen0- 0 €
Wiesbaden Small Arms0- 0 €
Sliding door44Price for single equipment
Total- 0 €
Amelia Earhart Center1semi annual maintenance & inspection- 0 €
Aukamm0- 0 €
Clay Kaserne Wiesbaden3semi annual maintenance & inspection- 0 €
7annual maintenance & inspection- 0 €
Egelsbach0- 0 €
Hainerberg20semi annual maintenance & inspection- 0 €
Mainz Kastel Station2semi annual maintenance & inspection- 0 €
8annual maintenance & inspection- 0 €
Mc Cully Barracks0- 0 €
Rheinblick Golf Course1semi annual maintenance & inspection- 0 €
Schwabenwaeldchen0- 0 €
Wiesbaden Small Arms2annual maintenance & inspection- 0 €
Sliding gate11Price for single equipment
Total- 0 €
Amelia Earhart Center1annual maintenance & inspection- 0 €
Aukamm0- 0 €
Clay Kaserne Wiesbaden3semi annual maintenance & inspection- 0 €
1annual maintenance & inspection- 0 €
Egelsbach3annual maintenance & inspection- 0 €
Hainerberg0- 0 €
Mainz Kastel Station0- 0 €
Mc Cully Barracks2annual maintenance & inspection- 0 €
Rheinblick Golf Course1annual maintenance & inspection- 0 €
Schwabenwaeldchen0- 0 €
Wiesbaden Small Arms0- 0 €
Wing door75Price for single equipment
Total- 0 €
Amelia Earhart Center21semi annual maintenance & inspection- 0 €
Aukamm0- 0 €
Clay Kaserne Wiesbaden5semi annual maintenance & inspection- 0 €
39annual maintenance & inspection- 0 €
Egelsbach0- 0 €
Hainerberg7semi annual maintenance & inspection- 0 €
Mainz Kastel Station0- 0 €
Mc Cully Barracks2annual maintenance & inspection- 0 €
Rheinblick Golf Course1semi annual maintenance & inspection- 0 €
Schwabenwaeldchen0- 0 €
Wiesbaden Small Arms0- 0 €
Hangar gate16Price for single equipment
Total- 0 €
Amelia Earhart Center0- 0 €
Aukamm0- 0 €
Clay Kaserne Wiesbaden0- 0 €
Egelsbach0- 0 €
Hainerberg16annual maintenance & inspection- 0 €
Mainz Kastel Station0- 0 €
Mc Cully Barracks0- 0 €
Rheinblick Golf Course0- 0 €
Schwabenwaeldchen0- 0 €
Wiesbaden Small Arms0- 0 €
0002On-demand repair in accordance with T&M Doors, Gates and Barriers
Base period, POP FY25-FY26, IAW PWS.Price:
€ 0.00
SCLINCLIN DescriptionQtyUnitPriceDescription or calculation of prices
01Labor Hours750hourBitte geben Sie den Stundensatz für die Arbeit ein. Dieser wird mit den von der Vergabestelle geschätzten 750 Stunden multipliziert. Der Stundensatz wurde bisher in einem Bereich von - bis berechnet, je nach eingegebenem Preis ergibt sich der Materialpreis. Gilt nur für die CLIN 0002
Please enter the rate of hourly labor. This is multiplied by the 750 hours estimated by the government. The hourly rate was previously calculated in a range from - to, depending on the price entered, the material price results. Applies only to the CLIN 0002€ - 0
02Material/Spares1lot/Der Anbieter muss hierzu keine Angaben machen.

Die CLIN- Gesamtsumme basiert auf dem von der US-Regierung errechneten Betrag für diese CLIN, der für die gesamten 3 Jahre fest und unveränderlich ist. Die Differenz aus 750 Stunden multipliziert mit dem vom Vertragsnehmer angegebenen Stundenpreis und dem festen CLIN-Gesamtbetrag ergibt den Gesamtmaterialpreis.

The supplier does not have to provide any information here.

The CLIN total is based on the U.S. Government's estimated amount for this CLIN, which is fixed and unchangeable for the entire 5 years. The difference of 900 hours multiplied by the vendor's entered hourly price and the fixed CLIN total is the total material price.€ - 0
Note:

Government Fair Cost Estimate Base Year USAG Wiesbaden Emergency Power Systems

OPTION PERIOD 1

Preisbuch fuer den Anbieter / Pricebook for the Vendors
Ordering Period 1

CLIN Description Description or calculation of prices Price

1001 Preventive Maintenance on Door's and Gate's within USAG Wiesbaden Ordering Period 1, POP FY26-FY27 IAW PWS.

Die Türen und Tore sind in 6 Kategorien an 10 Standorten eingeteilt. In der Kategorie CLIN 1001 wird der Wartungspreis für eine einzelnes Equipment eingetragen. Bitte sehen Sie in den PWS nach, welche Mindestanforderungen gegeben sind. Anfahrtskosten und Stundenlohn sind in diesem Einzelpreis enthalten und können nicht separat in Rechnung gestellt werden.
Doors and gates are subdivided into 6 categories in 10 locations. CLIN 1001 the maintenance price for a single Equipment is entered in the category. Please see in PWS which minimum requirements are given. Travel and hourly wages are included in this single price and cannot be invoiced separately.€ 0.00
Overviewremarks/comment
Sectional door47- 0 €
Reel gate59- 0 €
Sliding door44- 0 €
Sliding gate11- 0 €
Wing door75- 0 €
Hangar gate16- 0 €
Total252$ - 0
DescriptionQuantityQuantity of maintenancePRICE
Sectional door47Price for single equipment
Total- 0 €
Amelia Earhart Center0- 0 €
Aukamm0- 0 €
Clay Kaserne Wiesbaden12semi annual maintenance & inspection- 0 €
19annual maintenance & inspection- 0 €
Egelsbach0- 0 €
Hainerberg3annual maintenance & inspection- 0 €
Mainz Kastel Station5annual maintenance & inspection- 0 €
Mc Cully Barracks4annual maintenance & inspection- 0 €
Rheinblick Golf Course4annual maintenance & inspection- 0 €
Schwabenwaeldchen0- 0 €
Wiesbaden Small Arms0- 0 €
Reel gate59Price for single equipment
Total- 0 €
Amelia Earhart Center0- 0 €
Aukamm2annual maintenance & inspection- 0 €
Clay Kaserne Wiesbaden11annual maintenance & inspection- 0 €
Egelsbach0- 0 €
Hainerberg26annual maintenance & inspection- 0 €
Mainz Kastel Station11annual maintenance & inspection- 0 €
Mc Cully Barracks4annual maintenance & inspection- 0 €
Rheinblick Golf Course5annual maintenance & inspection- 0 €
Schwabenwaeldchen0- 0 €
Wiesbaden Small Arms0- 0 €
Sliding door44Price for single equipment
Total- 0 €
Amelia Earhart Center1semi annual maintenance & inspection- 0 €
Aukamm0- 0 €
Clay Kaserne Wiesbaden3semi annual maintenance & inspection- 0 €
7annual maintenance & inspection- 0 €
Egelsbach0- 0 €
Hainerberg20semi annual maintenance & inspection- 0 €
Mainz Kastel Station2semi annual maintenance & inspection- 0 €
8annual maintenance & inspection- 0 €
Mc Cully Barracks0- 0 €
Rheinblick Golf Course1semi annual maintenance & inspection- 0 €
Schwabenwaeldchen0- 0 €
Wiesbaden Small Arms2annual maintenance & inspection- 0 €
Sliding gate11Price for single equipment
Total- 0 €
Amelia Earhart Center1annual maintenance & inspection- 0 €
Aukamm0- 0 €
Clay Kaserne Wiesbaden3semi annual maintenance & inspection- 0 €
1annual maintenance & inspection- 0 €
Egelsbach3annual maintenance & inspection- 0 €
Hainerberg0- 0 €
Mainz Kastel Station0
Mc Cully Barracks2annual maintenance & inspection- 0 €
Rheinblick Golf Course1annual maintenance & inspection- 0 €
Schwabenwaeldchen0- 0 €
Wiesbaden Small Arms0- 0 €
Wing door75Price for single equipment
Total- 0 €
Amelia Earhart Center21semi annual maintenance & inspection- 0 €
Aukamm0- 0 €
Clay Kaserne Wiesbaden5semi annual maintenance & inspection- 0 €
39annual maintenance & inspection- 0 €
Egelsbach0- 0 €
Hainerberg7semi annual maintenance & inspection- 0 €
Mainz Kastel Station0- 0 €
Mc Cully Barracks2annual maintenance & inspection- 0 €
Rheinblick Golf Course1semi annual maintenance & inspection- 0 €
Schwabenwaeldchen0- 0 €
Wiesbaden Small Arms0- 0 €
Hangar gate16Price for single equipment
Total- 0 €
Amelia Earhart Center0- 0 €
Aukamm0- 0 €
Clay Kaserne Wiesbaden16annual maintenance & inspection- 0 €
Egelsbach0- 0 €
Hainerberg0- 0 €
Mainz Kastel Station0- 0 €
Mc Cully Barracks0- 0 €
Rheinblick Golf Course0- 0 €
Schwabenwaeldchen0- 0 €
Wiesbaden Small Arms0- 0 €
Preventive Maintenance on Droparm Barriers within USAG Wiesbaden
Ordering Period 1, POP FY26-FY27 IAW PWS.Die Droparm-Schranken sind in 10 Standorte unterteilt. Der Wartungspreis für ein einzelnes Gerät wird unter CLIN 1003 erfasst. Die Mindestanforderungen entnehmen Sie bitte der Leistungsbeschreibung. Reisekosten und Stundenlöhne sind in diesem Einheitspreis enthalten und können nicht separat in Rechnung gestellt werden.
The Droparm barriers are divided into 10 locations. The maintenance price for a single device can be entered under CLIN 1003. Please refer to the service description for the minimum requirements. Travel expenses and hourly wages are included in this unit price and cannot be invoiced separately.€ 0.00
Droparm Barriers29Price for single equipmentremarks/comment
Total- 0 €
Amelia Earhart Center3annual maintenance- 0 €
Aukamm0- 0 €
Clay Kaserne Wiesbaden14annual maintenance- 0 €
Egelsbach0- 0 €
Hainerberg4annual maintenance- 0 €
Mainz Kastel Station1annual maintenance- 0 €
Mc Cully Barracks3annual maintenance- 0 €
Rheinblick Golf Course0- 0 €
Mainz Kastel Housing2annual maintenance- 0 €
Dagger2annual maintenance- 0 €
1002On-demand repair in accordance with T&M Doors, Gates and Barriers
Ordering Period 1, POP FY26-FY27 IAW PWS.Price:
€ 0.00
SCLINCLIN DescriptionQtyUnitPriceDescription or calculation of prices
01Labor Hours500hourBitte geben Sie den Stundensatz für die Arbeit ein. Dieser wird mit den von der Vergabestelle geschätzten 500 Stunden multipliziert. Der Stundensatz wurde bisher in einem Bereich von - bis berechnet, je nach eingegebenem Preis ergibt sich der Materialpreis. Gilt nur für die CLIN 1002
Please enter the rate of hourly labor. This is multiplied by the 500 hours estimated by the government. The hourly rate was previously calculated in a range from - to, depending on the price entered, the material price results. Applies only to the CLIN 1002€ - 0
02Material/
Spares1lot/Der Anbieter muss hierzu keine Angaben machen.

Die CLIN- Gesamtsumme basiert auf dem von der US-Regierung errechneten Betrag für diese CLIN, der für die gesamten 3 Jahre fest und unveränderlich ist. Die Differenz aus 500 Stunden multipliziert mit dem vom Vertragsnehmer angegebenen Stundenpreis und dem festen CLIN-Gesamtbetrag ergibt den Gesamtmaterialpreis.

The supplier does not have to provide any information here.

The CLIN total is based on the U.S. Government's estimated amount for this CLIN, which is fixed and unchangeable for the entire 3 years. The difference of 500 hours multiplied by the vendor's entered hourly price and the fixed CLIN total is the total material price.€ - 0
Note:

Base Year USAG Wiesbaden Emergency Power Systems

OPTION PERIOD 2

Preisbuch fuer den Anbieter / Pricebook for the Vendors
Ordering Period 2

CLIN Description Description or calculation of prices Price

2001 Preventive Maintenance on Door's and Gate's within USAG Wiesbaden Ordering Period 2, POP FY27-FY28 IAW PWS.

Die Türen und Tore sind in 6 Kategorien an 10 Standorten eingeteilt. In der Kategorie CLIN 2001 wird der Wartungspreis für eine einzelnes Equipment eingetragen. Bitte sehen Sie in den PWS nach, welche Mindestanforderungen gegeben sind. Anfahrtskosten und Stundenlohn sind in diesem Einzelpreis enthalten und können nicht separat in Rechnung gestellt werden.
Doors and gates are subdivided into 6 categories in 10 locations. CLIN 0001 the maintenance price for a single Equipment is entered in the category. Please see in PWS which minimum requirements are given. Travel and hourly wages are included in this single price and cannot be invoiced separately.€ 0.00
Overviewremarks/comment
Sectional door47- 0 €
Reel gate59- 0 €
Sliding door44- 0 €
Sliding gate11- 0 €
Wing door75- 0 €
Hangar gate16- 0 €
Total252$ - 0
DescriptionQuantityQuantity of maintenancePRICE
Sectional door47Price for single equipment
Total- 0 €
Amelia Earhart Center0- 0 €
Aukamm0- 0 €
Clay Kaserne Wiesbaden12semi annual maintenance & inspection- 0 €
19annual maintenance & inspection- 0 €
Egelsbach0- 0 €
Hainerberg3annual maintenance & inspection- 0 €
Mainz Kastel Station5annual maintenance & inspection- 0 €
Mc Cully Barracks4annual maintenance & inspection- 0 €
Rheinblick Golf Course4annual maintenance & inspection- 0 €
Schwabenwaeldchen0- 0 €
Wiesbaden Small Arms0- 0 €
Reel gate59Price for single equipment
Total- 0 €
Amelia Earhart Center0- 0 €
Aukamm2annual maintenance & inspection- 0 €
Clay Kaserne Wiesbaden11annual maintenance & inspection- 0 €
Egelsbach0- 0 €
Hainerberg26annual maintenance & inspection- 0 €
Mainz Kastel Station11annual maintenance & inspection- 0 €
Mc Cully Barracks4annual maintenance & inspection- 0 €
Rheinblick Golf Course5annual maintenance & inspection- 0 €
Schwabenwaeldchen0- 0 €
Wiesbaden Small Arms0- 0 €
Sliding door44Price for single equipment
Total- 0 €
Amelia Earhart Center1semi annual maintenance & inspection- 0 €
Aukamm0- 0 €
Clay Kaserne Wiesbaden3semi annual maintenance & inspection- 0 €
7annual maintenance & inspection- 0 €
Egelsbach0- 0 €
Hainerberg20semi annual maintenance & inspection- 0 €
Mainz Kastel Station2semi annual maintenance & inspection- 0 €
8annual maintenance & inspection- 0 €
Mc Cully Barracks0- 0 €
Rheinblick Golf Course1semi annual maintenance & inspection- 0 €
Schwabenwaeldchen0- 0 €
Wiesbaden Small Arms2annual maintenance & inspection- 0 €
Sliding gate11Price for single equipment
Total- 0 €
Amelia Earhart Center1annual maintenance & inspection- 0 €
Aukamm0- 0 €
Clay Kaserne Wiesbaden3semi annual maintenance & inspection- 0 €
1annual maintenance & inspection- 0 €
Egelsbach3annual maintenance & inspection- 0 €
Hainerberg0
Mainz Kastel Station0
Mc Cully Barracks2annual maintenance & inspection- 0 €
Rheinblick Golf Course1annual maintenace & inspection- 0 €
Schwabenwaeldchen0- 0 €
Wiesbaden Small Arms0- 0 €
Wing door75Price for single equipment
Total- 0 €
Amelia Earhart Center21semi annual maintenance & inspection- 0 €
Aukamm0- 0 €
Clay Kaserne Wiesbaden5semi annual maintenance & inspection- 0 €
39annual maintenance & inspection- 0 €
Egelsbach0- 0 €
Hainerberg7semi annual maintenance & inspection- 0 €
Mainz Kastel Station0- 0 €
Mc Cully Barracks2annual maintenance & inspection- 0 €
Rheinblick Golf Course1semi annual maintenance & inspection- 0 €
Schwabenwaeldchen0- 0 €
Wiesbaden Small Arms0- 0 €
Hangar gate16Price for single equipment
Total- 0 €
Amelia Earhart Center0- 0 €
Aukamm0- 0 €
Clay Kaserne Wiesbaden0- 0 €
Egelsbach0- 0 €
Hainerberg16annual maintenance & inspection- 0 €
Mainz Kastel Station0- 0 €
Mc Cully Barracks0- 0 €
Rheinblick Golf Course0- 0 €
Schwabenwaeldchen0- 0 €
Wiesbaden Small Arms0- 0 €
Preventive Maintenance on Droparm Barriers within USAG Wiesbaden
Ordering Period 2, POP FY27-FY28 IAW PWS.Die Droparm-Schranken sind in 10 Standorte unterteilt. Der Wartungspreis für ein einzelnes Gerät wird unter CLIN 2003 erfasst. Die Mindestanforderungen entnehmen Sie bitte der Leistungsbeschreibung. Reisekosten und Stundenlöhne sind in diesem Einheitspreis enthalten und können nicht separat in Rechnung gestellt werden.
The Droparm barriers are divided into 10 locations. The maintenance price for a single device can be entered under CLIN 2003. Please refer to the service description for the minimum requirements. Travel expenses and hourly wages are included in this unit price and cannot be invoiced separately.€ 0.00
remarks/comment
Droparm Barriers29Price for single equipment
Total- 0 €
Amelia Earhart Center3annual maintenance- 0 €
Aukamm0- 0 €
Clay Kaserne Wiesbaden14annual maintenance- 0 €
Egelsbach0- 0 €
Hainerberg4annual maintenance- 0 €
Mainz Kastel Station1annual maintenance- 0 €
Mc Cully Barracks3annual maintenance- 0 €
Rheinblick Golf Course0- 0 €
Mainz Kastel Housing2annual maintenance- 0 €
Dagger2annual maintenance- 0 €
2002On-demand repair in accordance with T&M Doors, Gates and Barriers
Ordering Period 1, POP FY27-FY28 IAW PWS.Price:
€ 0.00
SCLINCLIN DescriptionQtyUnitPriceDescription or calculation of prices
01Labor Hours500hourBitte geben Sie den Stundensatz für die Arbeit ein. Dieser wird mit den von der Vergabestelle geschätzten 500 Stunden multipliziert. Der Stundensatz wurde bisher in einem Bereich von - bis berechnet, je nach eingegebenem Preis ergibt sich der Materialpreis. Gilt nur für die CLIN 2002
Please enter the rate of hourly labor. This is multiplied by the 500 hours estimated by the government. The hourly rate was previously calculated in a range from - to, depending on the price entered, the material price results. Applies only to the CLIN 2002€ - 0
02Material/
Spares1lot/Der Anbieter muss hierzu keine Angaben machen.

Die CLIN- Gesamtsumme basiert auf dem von der US-Regierung errechneten Betrag für diese CLIN, der für die gesamten 3 Jahre fest und unveränderlich ist. Die Differenz aus 500 Stunden multipliziert mit dem vom Vertragsnehmer angegebenen Stundenpreis und dem festen CLIN-Gesamtbetrag ergibt den Gesamtmaterialpreis.

The supplier does not have to provide any information here.

The CLIN total is based on the U.S. Government's estimated amount for this CLIN, which is fixed and unchangeable for the entire 3 years. The difference of 500 hours multiplied by the vendor's entered hourly price and the fixed CLIN total is the total material price.€ - 0
Note:

Base Year USAG Wiesbaden Emergency Power Systems

File details come from the government source that posted it. Updated .