Attachment 1- Pricebook 29MAY2025.xlsx
XLSX spreadsheet 84 KB Posted
- Solicitation number
- W912CM25QA011
About this file
This document is a comprehensive Pricebook (Attachment 1) for a maintenance and repair contract for doors, gates, and barriers at multiple U.S. Army locations in Wiesbaden, Germany. The solicitation (W912CM25QA011) covers a 12-month base period with two 12-month option periods, starting around 9 July 2025, and involves preventive maintenance and on-demand repairs for various equipment types across 10 different locations including Amelia Earhart Center, Clay Kaserne Wiesbaden, and others.
The pricing structure includes two primary Contract Line Item Numbers (CLINs): CLIN 0001/1001/2001 for preventive maintenance of six door and gate categories (sectional doors, reel gates, sliding doors, sliding gates, wing doors, and hangar gates), and CLIN 0002/1002/2002 for on-demand time and materials repairs. The contract is a hybrid fixed-price and time-and-materials arrangement, with the government estimating 750 hours for the base year and 500 hours for each option period. Contractors must be registered in the System for Award Management (SAM) and comply with German legal requirements for performing services in Germany. A site visit is scheduled for 12 May 2025 at 10:00 CET.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BASE PERIOD
| Preisbuch fuer den Anbieter / Pricebook for the Vendors |
| Base Year |
CLIN Description Description or calculation of prices Price
0001 Preventive Maintenance on Door's and Gate's within USAG Wiesbaden Base period, POP FY25-FY26, FY 25, IAW PWS.
| Die Türen und Tore sind in 6 Kategorien an 10 Standorten eingeteilt. In der Kategorie CLIN 0001 wird der Wartungspreis für eine einzelnes Equipment eingetragen. Bitte sehen Sie in den PWS nach, welche Mindestanforderungen gegeben sind. Anfahrtskosten und Stundenlohn sind in diesem Einzelpreis enthalten und können nicht separat in Rechnung gestellt werden. | ||
| Doors and gates are subdivided into 6 categories in 10 locations. CLIN 0001 the maintenance price for a single Equipment is entered in the category. Please see in PWS which minimum requirements are given. Travel and hourly wages are included in this single price and cannot be invoiced separately. | € 0.00 |
| Overview | remarks/comment | ||||||||||
| Sectional door | 47 | - 0 € | |||||||||
| Reel gate | 59 | - 0 € | |||||||||
| Sliding door | 44 | - 0 € | |||||||||
| Sliding gate | 11 | - 0 € | |||||||||
| Wing door | 75 | - 0 € | |||||||||
| Hangar gate | 16 | - 0 € | |||||||||
| Total | 252 | $ - 0 | |||||||||
| Description | Quantity | Quantity of maintenance | PRICE | ||||||||
| Sectional door | 47 | Price for single equipment | |||||||||
| Total | - 0 € | ||||||||||
| Amelia Earhart Center | 0 | - 0 € | |||||||||
| Aukamm | 0 | - 0 € | |||||||||
| Clay Kaserne Wiesbaden | 12 | semi annual maintenance & inspection | - 0 € | ||||||||
| 19 | annual maintenance & inspection | - 0 € | |||||||||
| Egelsbach | 0 | - 0 € | |||||||||
| Hainerberg | 3 | annual maintenance & inspection | - 0 € | ||||||||
| Mainz Kastel Station | 5 | annual maintenance & inspection | - 0 € | ||||||||
| Mc Cully Barracks | 4 | annual maintenance & inspection | - 0 € | ||||||||
| Rheinblick Golf Course | 4 | annual maintenance & inspection | - 0 € | ||||||||
| Schwabenwaeldchen | 0 | - 0 € | |||||||||
| Wiesbaden Small Arms | 0 | - 0 € | |||||||||
| Reel gate | 59 | Price for single equipment | |||||||||
| Total | - 0 € | ||||||||||
| Amelia Earhart Center | 0 | - 0 € | |||||||||
| Aukamm | 2 | annual maintenance & inspection | - 0 € | ||||||||
| Clay Kaserne Wiesbaden | 11 | annual maintenance & inspection | - 0 € | ||||||||
| Egelsbach | 0 | - 0 € | |||||||||
| Hainerberg | 26 | annual maintenance & inspection | - 0 € | ||||||||
| Mainz Kastel Station | 11 | annual maintenance & inspection | - 0 € | ||||||||
| Mc Cully Barracks | 4 | annual maintenance & inspection | - 0 € | ||||||||
| Rheinblick Golf Course | 5 | annual maintenance & inspection | - 0 € | ||||||||
| Schwabenwaeldchen | 0 | - 0 € | |||||||||
| Wiesbaden Small Arms | 0 | - 0 € | |||||||||
| Sliding door | 44 | Price for single equipment | |||||||||
| Total | - 0 € | ||||||||||
| Amelia Earhart Center | 1 | semi annual maintenance & inspection | - 0 € | ||||||||
| Aukamm | 0 | - 0 € | |||||||||
| Clay Kaserne Wiesbaden | 3 | semi annual maintenance & inspection | - 0 € | ||||||||
| 7 | annual maintenance & inspection | - 0 € | |||||||||
| Egelsbach | 0 | - 0 € | |||||||||
| Hainerberg | 20 | semi annual maintenance & inspection | - 0 € | ||||||||
| Mainz Kastel Station | 2 | semi annual maintenance & inspection | - 0 € | ||||||||
| 8 | annual maintenance & inspection | - 0 € | |||||||||
| Mc Cully Barracks | 0 | - 0 € | |||||||||
| Rheinblick Golf Course | 1 | semi annual maintenance & inspection | - 0 € | ||||||||
| Schwabenwaeldchen | 0 | - 0 € | |||||||||
| Wiesbaden Small Arms | 2 | annual maintenance & inspection | - 0 € | ||||||||
| Sliding gate | 11 | Price for single equipment | |||||||||
| Total | - 0 € | ||||||||||
| Amelia Earhart Center | 1 | annual maintenance & inspection | - 0 € | ||||||||
| Aukamm | 0 | - 0 € | |||||||||
| Clay Kaserne Wiesbaden | 3 | semi annual maintenance & inspection | - 0 € | ||||||||
| 1 | annual maintenance & inspection | - 0 € | |||||||||
| Egelsbach | 3 | annual maintenance & inspection | - 0 € | ||||||||
| Hainerberg | 0 | - 0 € | |||||||||
| Mainz Kastel Station | 0 | - 0 € | |||||||||
| Mc Cully Barracks | 2 | annual maintenance & inspection | - 0 € | ||||||||
| Rheinblick Golf Course | 1 | annual maintenance & inspection | - 0 € | ||||||||
| Schwabenwaeldchen | 0 | - 0 € | |||||||||
| Wiesbaden Small Arms | 0 | - 0 € | |||||||||
| Wing door | 75 | Price for single equipment | |||||||||
| Total | - 0 € | ||||||||||
| Amelia Earhart Center | 21 | semi annual maintenance & inspection | - 0 € | ||||||||
| Aukamm | 0 | - 0 € | |||||||||
| Clay Kaserne Wiesbaden | 5 | semi annual maintenance & inspection | - 0 € | ||||||||
| 39 | annual maintenance & inspection | - 0 € | |||||||||
| Egelsbach | 0 | - 0 € | |||||||||
| Hainerberg | 7 | semi annual maintenance & inspection | - 0 € | ||||||||
| Mainz Kastel Station | 0 | - 0 € | |||||||||
| Mc Cully Barracks | 2 | annual maintenance & inspection | - 0 € | ||||||||
| Rheinblick Golf Course | 1 | semi annual maintenance & inspection | - 0 € | ||||||||
| Schwabenwaeldchen | 0 | - 0 € | |||||||||
| Wiesbaden Small Arms | 0 | - 0 € | |||||||||
| Hangar gate | 16 | Price for single equipment | |||||||||
| Total | - 0 € | ||||||||||
| Amelia Earhart Center | 0 | - 0 € | |||||||||
| Aukamm | 0 | - 0 € | |||||||||
| Clay Kaserne Wiesbaden | 0 | - 0 € | |||||||||
| Egelsbach | 0 | - 0 € | |||||||||
| Hainerberg | 16 | annual maintenance & inspection | - 0 € | ||||||||
| Mainz Kastel Station | 0 | - 0 € | |||||||||
| Mc Cully Barracks | 0 | - 0 € | |||||||||
| Rheinblick Golf Course | 0 | - 0 € | |||||||||
| Schwabenwaeldchen | 0 | - 0 € | |||||||||
| Wiesbaden Small Arms | 0 | - 0 € | |||||||||
| 0002 | On-demand repair in accordance with T&M Doors, Gates and Barriers | ||||||||||
| Base period, POP FY25-FY26, IAW PWS. | Price: | ||||||||||
| € 0.00 | |||||||||||
| SCLIN | CLIN Description | Qty | Unit | Price | Description or calculation of prices | ||||||
| 01 | Labor Hours | 750 | hour | Bitte geben Sie den Stundensatz für die Arbeit ein. Dieser wird mit den von der Vergabestelle geschätzten 750 Stunden multipliziert. Der Stundensatz wurde bisher in einem Bereich von - bis berechnet, je nach eingegebenem Preis ergibt sich der Materialpreis. Gilt nur für die CLIN 0002 | |||||||
| Please enter the rate of hourly labor. This is multiplied by the 750 hours estimated by the government. The hourly rate was previously calculated in a range from - to, depending on the price entered, the material price results. Applies only to the CLIN 0002 | € - 0 | ||||||||||
| 02 | Material/Spares | 1 | lot | / | Der Anbieter muss hierzu keine Angaben machen. |
Die CLIN- Gesamtsumme basiert auf dem von der US-Regierung errechneten Betrag für diese CLIN, der für die gesamten 3 Jahre fest und unveränderlich ist. Die Differenz aus 750 Stunden multipliziert mit dem vom Vertragsnehmer angegebenen Stundenpreis und dem festen CLIN-Gesamtbetrag ergibt den Gesamtmaterialpreis.
The supplier does not have to provide any information here.
| The CLIN total is based on the U.S. Government's estimated amount for this CLIN, which is fixed and unchangeable for the entire 5 years. The difference of 900 hours multiplied by the vendor's entered hourly price and the fixed CLIN total is the total material price. | € - 0 | |
| Note: |
Government Fair Cost Estimate Base Year USAG Wiesbaden Emergency Power Systems
OPTION PERIOD 1
| Preisbuch fuer den Anbieter / Pricebook for the Vendors |
| Ordering Period 1 |
CLIN Description Description or calculation of prices Price
1001 Preventive Maintenance on Door's and Gate's within USAG Wiesbaden Ordering Period 1, POP FY26-FY27 IAW PWS.
| Die Türen und Tore sind in 6 Kategorien an 10 Standorten eingeteilt. In der Kategorie CLIN 1001 wird der Wartungspreis für eine einzelnes Equipment eingetragen. Bitte sehen Sie in den PWS nach, welche Mindestanforderungen gegeben sind. Anfahrtskosten und Stundenlohn sind in diesem Einzelpreis enthalten und können nicht separat in Rechnung gestellt werden. | ||
| Doors and gates are subdivided into 6 categories in 10 locations. CLIN 1001 the maintenance price for a single Equipment is entered in the category. Please see in PWS which minimum requirements are given. Travel and hourly wages are included in this single price and cannot be invoiced separately. | € 0.00 |
| Overview | remarks/comment | |||||
| Sectional door | 47 | - 0 € | ||||
| Reel gate | 59 | - 0 € | ||||
| Sliding door | 44 | - 0 € | ||||
| Sliding gate | 11 | - 0 € | ||||
| Wing door | 75 | - 0 € | ||||
| Hangar gate | 16 | - 0 € | ||||
| Total | 252 | $ - 0 | ||||
| Description | Quantity | Quantity of maintenance | PRICE | |||
| Sectional door | 47 | Price for single equipment | ||||
| Total | - 0 € | |||||
| Amelia Earhart Center | 0 | - 0 € | ||||
| Aukamm | 0 | - 0 € | ||||
| Clay Kaserne Wiesbaden | 12 | semi annual maintenance & inspection | - 0 € | |||
| 19 | annual maintenance & inspection | - 0 € | ||||
| Egelsbach | 0 | - 0 € | ||||
| Hainerberg | 3 | annual maintenance & inspection | - 0 € | |||
| Mainz Kastel Station | 5 | annual maintenance & inspection | - 0 € | |||
| Mc Cully Barracks | 4 | annual maintenance & inspection | - 0 € | |||
| Rheinblick Golf Course | 4 | annual maintenance & inspection | - 0 € | |||
| Schwabenwaeldchen | 0 | - 0 € | ||||
| Wiesbaden Small Arms | 0 | - 0 € | ||||
| Reel gate | 59 | Price for single equipment | ||||
| Total | - 0 € | |||||
| Amelia Earhart Center | 0 | - 0 € | ||||
| Aukamm | 2 | annual maintenance & inspection | - 0 € | |||
| Clay Kaserne Wiesbaden | 11 | annual maintenance & inspection | - 0 € | |||
| Egelsbach | 0 | - 0 € | ||||
| Hainerberg | 26 | annual maintenance & inspection | - 0 € | |||
| Mainz Kastel Station | 11 | annual maintenance & inspection | - 0 € | |||
| Mc Cully Barracks | 4 | annual maintenance & inspection | - 0 € | |||
| Rheinblick Golf Course | 5 | annual maintenance & inspection | - 0 € | |||
| Schwabenwaeldchen | 0 | - 0 € | ||||
| Wiesbaden Small Arms | 0 | - 0 € | ||||
| Sliding door | 44 | Price for single equipment | ||||
| Total | - 0 € | |||||
| Amelia Earhart Center | 1 | semi annual maintenance & inspection | - 0 € | |||
| Aukamm | 0 | - 0 € | ||||
| Clay Kaserne Wiesbaden | 3 | semi annual maintenance & inspection | - 0 € | |||
| 7 | annual maintenance & inspection | - 0 € | ||||
| Egelsbach | 0 | - 0 € | ||||
| Hainerberg | 20 | semi annual maintenance & inspection | - 0 € | |||
| Mainz Kastel Station | 2 | semi annual maintenance & inspection | - 0 € | |||
| 8 | annual maintenance & inspection | - 0 € | ||||
| Mc Cully Barracks | 0 | - 0 € | ||||
| Rheinblick Golf Course | 1 | semi annual maintenance & inspection | - 0 € | |||
| Schwabenwaeldchen | 0 | - 0 € | ||||
| Wiesbaden Small Arms | 2 | annual maintenance & inspection | - 0 € | |||
| Sliding gate | 11 | Price for single equipment | ||||
| Total | - 0 € | |||||
| Amelia Earhart Center | 1 | annual maintenance & inspection | - 0 € | |||
| Aukamm | 0 | - 0 € | ||||
| Clay Kaserne Wiesbaden | 3 | semi annual maintenance & inspection | - 0 € | |||
| 1 | annual maintenance & inspection | - 0 € | ||||
| Egelsbach | 3 | annual maintenance & inspection | - 0 € | |||
| Hainerberg | 0 | - 0 € | ||||
| Mainz Kastel Station | 0 | |||||
| Mc Cully Barracks | 2 | annual maintenance & inspection | - 0 € | |||
| Rheinblick Golf Course | 1 | annual maintenance & inspection | - 0 € | |||
| Schwabenwaeldchen | 0 | - 0 € | ||||
| Wiesbaden Small Arms | 0 | - 0 € | ||||
| Wing door | 75 | Price for single equipment | ||||
| Total | - 0 € | |||||
| Amelia Earhart Center | 21 | semi annual maintenance & inspection | - 0 € | |||
| Aukamm | 0 | - 0 € | ||||
| Clay Kaserne Wiesbaden | 5 | semi annual maintenance & inspection | - 0 € | |||
| 39 | annual maintenance & inspection | - 0 € | ||||
| Egelsbach | 0 | - 0 € | ||||
| Hainerberg | 7 | semi annual maintenance & inspection | - 0 € | |||
| Mainz Kastel Station | 0 | - 0 € | ||||
| Mc Cully Barracks | 2 | annual maintenance & inspection | - 0 € | |||
| Rheinblick Golf Course | 1 | semi annual maintenance & inspection | - 0 € | |||
| Schwabenwaeldchen | 0 | - 0 € | ||||
| Wiesbaden Small Arms | 0 | - 0 € | ||||
| Hangar gate | 16 | Price for single equipment | ||||
| Total | - 0 € | |||||
| Amelia Earhart Center | 0 | - 0 € | ||||
| Aukamm | 0 | - 0 € | ||||
| Clay Kaserne Wiesbaden | 16 | annual maintenance & inspection | - 0 € | |||
| Egelsbach | 0 | - 0 € | ||||
| Hainerberg | 0 | - 0 € | ||||
| Mainz Kastel Station | 0 | - 0 € | ||||
| Mc Cully Barracks | 0 | - 0 € | ||||
| Rheinblick Golf Course | 0 | - 0 € | ||||
| Schwabenwaeldchen | 0 | - 0 € | ||||
| Wiesbaden Small Arms | 0 | - 0 € | ||||
| Preventive Maintenance on Droparm Barriers within USAG Wiesbaden | ||||||
| Ordering Period 1, POP FY26-FY27 IAW PWS. | Die Droparm-Schranken sind in 10 Standorte unterteilt. Der Wartungspreis für ein einzelnes Gerät wird unter CLIN 1003 erfasst. Die Mindestanforderungen entnehmen Sie bitte der Leistungsbeschreibung. Reisekosten und Stundenlöhne sind in diesem Einheitspreis enthalten und können nicht separat in Rechnung gestellt werden. | |||||
| The Droparm barriers are divided into 10 locations. The maintenance price for a single device can be entered under CLIN 1003. Please refer to the service description for the minimum requirements. Travel expenses and hourly wages are included in this unit price and cannot be invoiced separately. | € 0.00 |
| Droparm Barriers | 29 | Price for single equipment | remarks/comment | |||||||
| Total | - 0 € | |||||||||
| Amelia Earhart Center | 3 | annual maintenance | - 0 € | |||||||
| Aukamm | 0 | - 0 € | ||||||||
| Clay Kaserne Wiesbaden | 14 | annual maintenance | - 0 € | |||||||
| Egelsbach | 0 | - 0 € | ||||||||
| Hainerberg | 4 | annual maintenance | - 0 € | |||||||
| Mainz Kastel Station | 1 | annual maintenance | - 0 € | |||||||
| Mc Cully Barracks | 3 | annual maintenance | - 0 € | |||||||
| Rheinblick Golf Course | 0 | - 0 € | ||||||||
| Mainz Kastel Housing | 2 | annual maintenance | - 0 € | |||||||
| Dagger | 2 | annual maintenance | - 0 € | |||||||
| 1002 | On-demand repair in accordance with T&M Doors, Gates and Barriers | |||||||||
| Ordering Period 1, POP FY26-FY27 IAW PWS. | Price: | |||||||||
| € 0.00 | ||||||||||
| SCLIN | CLIN Description | Qty | Unit | Price | Description or calculation of prices | |||||
| 01 | Labor Hours | 500 | hour | Bitte geben Sie den Stundensatz für die Arbeit ein. Dieser wird mit den von der Vergabestelle geschätzten 500 Stunden multipliziert. Der Stundensatz wurde bisher in einem Bereich von - bis berechnet, je nach eingegebenem Preis ergibt sich der Materialpreis. Gilt nur für die CLIN 1002 | ||||||
| Please enter the rate of hourly labor. This is multiplied by the 500 hours estimated by the government. The hourly rate was previously calculated in a range from - to, depending on the price entered, the material price results. Applies only to the CLIN 1002 | € - 0 | |||||||||
| 02 | Material/ | |||||||||
| Spares | 1 | lot | / | Der Anbieter muss hierzu keine Angaben machen. |
Die CLIN- Gesamtsumme basiert auf dem von der US-Regierung errechneten Betrag für diese CLIN, der für die gesamten 3 Jahre fest und unveränderlich ist. Die Differenz aus 500 Stunden multipliziert mit dem vom Vertragsnehmer angegebenen Stundenpreis und dem festen CLIN-Gesamtbetrag ergibt den Gesamtmaterialpreis.
The supplier does not have to provide any information here.
| The CLIN total is based on the U.S. Government's estimated amount for this CLIN, which is fixed and unchangeable for the entire 3 years. The difference of 500 hours multiplied by the vendor's entered hourly price and the fixed CLIN total is the total material price. | € - 0 | |
| Note: |
Base Year USAG Wiesbaden Emergency Power Systems
OPTION PERIOD 2
| Preisbuch fuer den Anbieter / Pricebook for the Vendors |
| Ordering Period 2 |
CLIN Description Description or calculation of prices Price
2001 Preventive Maintenance on Door's and Gate's within USAG Wiesbaden Ordering Period 2, POP FY27-FY28 IAW PWS.
| Die Türen und Tore sind in 6 Kategorien an 10 Standorten eingeteilt. In der Kategorie CLIN 2001 wird der Wartungspreis für eine einzelnes Equipment eingetragen. Bitte sehen Sie in den PWS nach, welche Mindestanforderungen gegeben sind. Anfahrtskosten und Stundenlohn sind in diesem Einzelpreis enthalten und können nicht separat in Rechnung gestellt werden. | ||
| Doors and gates are subdivided into 6 categories in 10 locations. CLIN 0001 the maintenance price for a single Equipment is entered in the category. Please see in PWS which minimum requirements are given. Travel and hourly wages are included in this single price and cannot be invoiced separately. | € 0.00 |
| Overview | remarks/comment | |||||
| Sectional door | 47 | - 0 € | ||||
| Reel gate | 59 | - 0 € | ||||
| Sliding door | 44 | - 0 € | ||||
| Sliding gate | 11 | - 0 € | ||||
| Wing door | 75 | - 0 € | ||||
| Hangar gate | 16 | - 0 € | ||||
| Total | 252 | $ - 0 | ||||
| Description | Quantity | Quantity of maintenance | PRICE | |||
| Sectional door | 47 | Price for single equipment | ||||
| Total | - 0 € | |||||
| Amelia Earhart Center | 0 | - 0 € | ||||
| Aukamm | 0 | - 0 € | ||||
| Clay Kaserne Wiesbaden | 12 | semi annual maintenance & inspection | - 0 € | |||
| 19 | annual maintenance & inspection | - 0 € | ||||
| Egelsbach | 0 | - 0 € | ||||
| Hainerberg | 3 | annual maintenance & inspection | - 0 € | |||
| Mainz Kastel Station | 5 | annual maintenance & inspection | - 0 € | |||
| Mc Cully Barracks | 4 | annual maintenance & inspection | - 0 € | |||
| Rheinblick Golf Course | 4 | annual maintenance & inspection | - 0 € | |||
| Schwabenwaeldchen | 0 | - 0 € | ||||
| Wiesbaden Small Arms | 0 | - 0 € | ||||
| Reel gate | 59 | Price for single equipment | ||||
| Total | - 0 € | |||||
| Amelia Earhart Center | 0 | - 0 € | ||||
| Aukamm | 2 | annual maintenance & inspection | - 0 € | |||
| Clay Kaserne Wiesbaden | 11 | annual maintenance & inspection | - 0 € | |||
| Egelsbach | 0 | - 0 € | ||||
| Hainerberg | 26 | annual maintenance & inspection | - 0 € | |||
| Mainz Kastel Station | 11 | annual maintenance & inspection | - 0 € | |||
| Mc Cully Barracks | 4 | annual maintenance & inspection | - 0 € | |||
| Rheinblick Golf Course | 5 | annual maintenance & inspection | - 0 € | |||
| Schwabenwaeldchen | 0 | - 0 € | ||||
| Wiesbaden Small Arms | 0 | - 0 € | ||||
| Sliding door | 44 | Price for single equipment | ||||
| Total | - 0 € | |||||
| Amelia Earhart Center | 1 | semi annual maintenance & inspection | - 0 € | |||
| Aukamm | 0 | - 0 € | ||||
| Clay Kaserne Wiesbaden | 3 | semi annual maintenance & inspection | - 0 € | |||
| 7 | annual maintenance & inspection | - 0 € | ||||
| Egelsbach | 0 | - 0 € | ||||
| Hainerberg | 20 | semi annual maintenance & inspection | - 0 € | |||
| Mainz Kastel Station | 2 | semi annual maintenance & inspection | - 0 € | |||
| 8 | annual maintenance & inspection | - 0 € | ||||
| Mc Cully Barracks | 0 | - 0 € | ||||
| Rheinblick Golf Course | 1 | semi annual maintenance & inspection | - 0 € | |||
| Schwabenwaeldchen | 0 | - 0 € | ||||
| Wiesbaden Small Arms | 2 | annual maintenance & inspection | - 0 € | |||
| Sliding gate | 11 | Price for single equipment | ||||
| Total | - 0 € | |||||
| Amelia Earhart Center | 1 | annual maintenance & inspection | - 0 € | |||
| Aukamm | 0 | - 0 € | ||||
| Clay Kaserne Wiesbaden | 3 | semi annual maintenance & inspection | - 0 € | |||
| 1 | annual maintenance & inspection | - 0 € | ||||
| Egelsbach | 3 | annual maintenance & inspection | - 0 € | |||
| Hainerberg | 0 | |||||
| Mainz Kastel Station | 0 | |||||
| Mc Cully Barracks | 2 | annual maintenance & inspection | - 0 € | |||
| Rheinblick Golf Course | 1 | annual maintenace & inspection | - 0 € | |||
| Schwabenwaeldchen | 0 | - 0 € | ||||
| Wiesbaden Small Arms | 0 | - 0 € | ||||
| Wing door | 75 | Price for single equipment | ||||
| Total | - 0 € | |||||
| Amelia Earhart Center | 21 | semi annual maintenance & inspection | - 0 € | |||
| Aukamm | 0 | - 0 € | ||||
| Clay Kaserne Wiesbaden | 5 | semi annual maintenance & inspection | - 0 € | |||
| 39 | annual maintenance & inspection | - 0 € | ||||
| Egelsbach | 0 | - 0 € | ||||
| Hainerberg | 7 | semi annual maintenance & inspection | - 0 € | |||
| Mainz Kastel Station | 0 | - 0 € | ||||
| Mc Cully Barracks | 2 | annual maintenance & inspection | - 0 € | |||
| Rheinblick Golf Course | 1 | semi annual maintenance & inspection | - 0 € | |||
| Schwabenwaeldchen | 0 | - 0 € | ||||
| Wiesbaden Small Arms | 0 | - 0 € | ||||
| Hangar gate | 16 | Price for single equipment | ||||
| Total | - 0 € | |||||
| Amelia Earhart Center | 0 | - 0 € | ||||
| Aukamm | 0 | - 0 € | ||||
| Clay Kaserne Wiesbaden | 0 | - 0 € | ||||
| Egelsbach | 0 | - 0 € | ||||
| Hainerberg | 16 | annual maintenance & inspection | - 0 € | |||
| Mainz Kastel Station | 0 | - 0 € | ||||
| Mc Cully Barracks | 0 | - 0 € | ||||
| Rheinblick Golf Course | 0 | - 0 € | ||||
| Schwabenwaeldchen | 0 | - 0 € | ||||
| Wiesbaden Small Arms | 0 | - 0 € | ||||
| Preventive Maintenance on Droparm Barriers within USAG Wiesbaden | ||||||
| Ordering Period 2, POP FY27-FY28 IAW PWS. | Die Droparm-Schranken sind in 10 Standorte unterteilt. Der Wartungspreis für ein einzelnes Gerät wird unter CLIN 2003 erfasst. Die Mindestanforderungen entnehmen Sie bitte der Leistungsbeschreibung. Reisekosten und Stundenlöhne sind in diesem Einheitspreis enthalten und können nicht separat in Rechnung gestellt werden. | |||||
| The Droparm barriers are divided into 10 locations. The maintenance price for a single device can be entered under CLIN 2003. Please refer to the service description for the minimum requirements. Travel expenses and hourly wages are included in this unit price and cannot be invoiced separately. | € 0.00 |
| remarks/comment | ||||||||||
| Droparm Barriers | 29 | Price for single equipment | ||||||||
| Total | - 0 € | |||||||||
| Amelia Earhart Center | 3 | annual maintenance | - 0 € | |||||||
| Aukamm | 0 | - 0 € | ||||||||
| Clay Kaserne Wiesbaden | 14 | annual maintenance | - 0 € | |||||||
| Egelsbach | 0 | - 0 € | ||||||||
| Hainerberg | 4 | annual maintenance | - 0 € | |||||||
| Mainz Kastel Station | 1 | annual maintenance | - 0 € | |||||||
| Mc Cully Barracks | 3 | annual maintenance | - 0 € | |||||||
| Rheinblick Golf Course | 0 | - 0 € | ||||||||
| Mainz Kastel Housing | 2 | annual maintenance | - 0 € | |||||||
| Dagger | 2 | annual maintenance | - 0 € | |||||||
| 2002 | On-demand repair in accordance with T&M Doors, Gates and Barriers | |||||||||
| Ordering Period 1, POP FY27-FY28 IAW PWS. | Price: | |||||||||
| € 0.00 | ||||||||||
| SCLIN | CLIN Description | Qty | Unit | Price | Description or calculation of prices | |||||
| 01 | Labor Hours | 500 | hour | Bitte geben Sie den Stundensatz für die Arbeit ein. Dieser wird mit den von der Vergabestelle geschätzten 500 Stunden multipliziert. Der Stundensatz wurde bisher in einem Bereich von - bis berechnet, je nach eingegebenem Preis ergibt sich der Materialpreis. Gilt nur für die CLIN 2002 | ||||||
| Please enter the rate of hourly labor. This is multiplied by the 500 hours estimated by the government. The hourly rate was previously calculated in a range from - to, depending on the price entered, the material price results. Applies only to the CLIN 2002 | € - 0 | |||||||||
| 02 | Material/ | |||||||||
| Spares | 1 | lot | / | Der Anbieter muss hierzu keine Angaben machen. |
Die CLIN- Gesamtsumme basiert auf dem von der US-Regierung errechneten Betrag für diese CLIN, der für die gesamten 3 Jahre fest und unveränderlich ist. Die Differenz aus 500 Stunden multipliziert mit dem vom Vertragsnehmer angegebenen Stundenpreis und dem festen CLIN-Gesamtbetrag ergibt den Gesamtmaterialpreis.
The supplier does not have to provide any information here.
| The CLIN total is based on the U.S. Government's estimated amount for this CLIN, which is fixed and unchangeable for the entire 3 years. The difference of 500 hours multiplied by the vendor's entered hourly price and the fixed CLIN total is the total material price. | € - 0 | |
| Note: |
Base Year USAG Wiesbaden Emergency Power Systems
File details come from the government source that posted it. Updated .