Attachment 1- Pricebook.xlsx
XLSX spreadsheet 83 KB Posted
- Solicitation number
- W912CM25QA011
About this file
The document is a comprehensive Pricebook (Preisbuch) for a maintenance and repair contract for doors, gates, and barriers at U.S. Army Garrison Wiesbaden in Germany. The solicitation (W912CM25QA011) covers a 36-month contract period with a 12-month base year and two 12-month option periods, starting approximately 9 July 2025. The contract includes preventive maintenance and on-demand repairs for six door/gate categories and droparm barriers across ten locations, including Amelia Earhart Center, Clay Kaserne Wiesbaden, and other sites.
The pricing structure is hybrid, combining fixed-price (FFP) preventive maintenance and time-and-materials (T&M) on-demand repairs. For preventive maintenance (CLIN 0001, 1001, 2001), vendors must price maintenance for individual equipment types across different locations, with rates including travel and labor costs. On-demand repair CLINs (0002, 1002, 2002) involve 750 labor hours in the base year and 500 hours in each option period, with material costs calculated based on government estimates. The contract requires compliance with German laws and is administered by the Department of the Army Materiel Command Army Contracting Command, with a site visit scheduled for 12 May 2025.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BASE PERIOD
| Preisbuch fuer den Anbieter / Pricebook for the Vendors |
| Base Year |
CLIN Description Description or calculation of prices Price
0001 Preventive Maintenance on Door's and Gate's within USAG Wiesbaden Base period, POP FY25-FY26, FY 25, IAW PWS.
| Die Türen und Tore sind in 6 Kategorien an 10 Standorten eingeteilt. In der Kategorie CLIN 0001 wird der Wartungspreis für eine einzelnes Equipment eingetragen. Bitte sehen Sie in den PWS nach, welche Mindestanforderungen gegeben sind. Anfahrtskosten und Stundenlohn sind in diesem Einzelpreis enthalten und können nicht separat in Rechnung gestellt werden. | ||
| Doors and gates are subdivided into 6 categories in 10 locations. CLIN 0001 the maintenance price for a single Equipment is entered in the category. Please see in PWS which minimum requirements are given. Travel and hourly wages are included in this single price and cannot be invoiced separately. | € 0.00 |
| Overview | remarks/comment | ||||||||||
| Sectional door | 41 | - 0 € | |||||||||
| Reel gate | 60 | - 0 € | |||||||||
| Sliding door | 44 | - 0 € | |||||||||
| Sliding gate | 24 | - 0 € | |||||||||
| Wing door | 77 | - 0 € | |||||||||
| Folding door | 2 | - 0 € | |||||||||
| Total | 248 | $ - 0 | |||||||||
| Description | Quantity | Quantity of maintenance | PRICE | ||||||||
| Sectional door | 41 | Price for single equipment | |||||||||
| Total | - 0 € | ||||||||||
| Amelia Earhart Center | 0 | - 0 € | |||||||||
| Aukamm | 0 | - 0 € | |||||||||
| Clay Kaserne Wiesbaden | 25 | 12x semi annual Maintenance | - 0 € | ||||||||
| Egelsbach | 0 | - 0 € | |||||||||
| Hainerberg | 3 | - 0 € | |||||||||
| Mainz Kastel Station | 5 | - 0 € | |||||||||
| Mc Cully Barracks | 4 | - 0 € | |||||||||
| Rheinblick Golf Course | 4 | - 0 € | |||||||||
| Schwabenwaeldchen | 0 | - 0 € | |||||||||
| Wiesbaden Small Arms | 0 | - 0 € | |||||||||
| Reel gate | 60 | Price for single equipment | |||||||||
| Total | - 0 € | ||||||||||
| Amelia Earhart Center | 0 | - 0 € | |||||||||
| Aukamm | 2 | - 0 € | |||||||||
| Clay Kaserne Wiesbaden | 12 | - 0 € | |||||||||
| Egelsbach | 0 | - 0 € | |||||||||
| Hainerberg | 26 | - 0 € | |||||||||
| Mainz Kastel Station | 11 | - 0 € | |||||||||
| Mc Cully Barracks | 4 | - 0 € | |||||||||
| Rheinblick Golf Course | 5 | - 0 € | |||||||||
| Schwabenwaeldchen | 0 | - 0 € | |||||||||
| Wiesbaden Small Arms | 0 | - 0 € | |||||||||
| Sliding door | 44 | Price for single equipment | |||||||||
| Total | - 0 € | ||||||||||
| Amelia Earhart Center | 1 | semi annual Maintenance | - 0 € | ||||||||
| Aukamm | 0 | - 0 € | |||||||||
| Clay Kaserne Wiesbaden | 9 | 3x semi annual Maint. | - 0 € | ||||||||
| Egelsbach | 3 | - 0 € | |||||||||
| Hainerberg | 18 | 18x semi annual Maint. | - 0 € | ||||||||
| Mainz Kastel Station | 10 | 2x semi annual Maint. | - 0 € | ||||||||
| Mc Cully Barracks | 0 | - 0 € | |||||||||
| Rheinblick Golf Course | 1 | semi annual Maintenance | - 0 € | ||||||||
| Schwabenwaeldchen | 0 | - 0 € | |||||||||
| Wiesbaden Small Arms | 2 | - 0 € | |||||||||
| Sliding gate | 24 | Price for single equipment | |||||||||
| Total | - 0 € | ||||||||||
| Amelia Earhart Center | 1 | semi annual Maintenance | - 0 € | ||||||||
| Aukamm | 0 | - 0 € | |||||||||
| Clay Kaserne Wiesbaden | 20 | 3x semi annual Maint. | - 0 € | ||||||||
| Egelsbach | 0 | - 0 € | |||||||||
| Hainerberg | 0 | 18x semi annual Maint. | - 0 € | ||||||||
| Mainz Kastel Station | 0 | 2x semi annual Maint. | - 0 € | ||||||||
| Mc Cully Barracks | 2 | - 0 € | |||||||||
| Rheinblick Golf Course | 1 | semi annual Maintenance | - 0 € | ||||||||
| Schwabenwaeldchen | 0 | - 0 € | |||||||||
| Wiesbaden Small Arms | 0 | - 0 € | |||||||||
| Wing door | 77 | Price for single equipment | |||||||||
| Total | - 0 € | ||||||||||
| Amelia Earhart Center | 21 | 21x semi annual Maint. | - 0 € | ||||||||
| Aukamm | 0 | - 0 € | |||||||||
| Clay Kaserne Wiesbaden | 44 | 9x semi annual Maint. | - 0 € | ||||||||
| Egelsbach | 0 | - 0 € | |||||||||
| Hainerberg | 9 | 5x semi annual Maint. | - 0 € | ||||||||
| Mainz Kastel Station | 0 | - 0 € | |||||||||
| Mc Cully Barracks | 2 | - 0 € | |||||||||
| Rheinblick Golf Course | 1 | semi annual Maintenance | - 0 € | ||||||||
| Schwabenwaeldchen | 0 | - 0 € | |||||||||
| Wiesbaden Small Arms | 0 | - 0 € | |||||||||
| Folding door | 2 | Price for single equipment | |||||||||
| Total | - 0 € | ||||||||||
| Amelia Earhart Center | 0 | - 0 € | |||||||||
| Aukamm | 0 | - 0 € | |||||||||
| Clay Kaserne Wiesbaden | 0 | - 0 € | |||||||||
| Egelsbach | 0 | - 0 € | |||||||||
| Hainerberg | 2 | 2x semi annual Maint. | - 0 € | ||||||||
| Mainz Kastel Station | 0 | - 0 € | |||||||||
| Mc Cully Barracks | 0 | - 0 € | |||||||||
| Rheinblick Golf Course | 0 | - 0 € | |||||||||
| Schwabenwaeldchen | 0 | - 0 € | |||||||||
| Wiesbaden Small Arms | 0 | - 0 € | |||||||||
| 0002 | On-demand repair in accordance with T&M Doors, Gates and Barriers | ||||||||||
| Base period, POP FY25-FY26, IAW PWS. | Price: | ||||||||||
| € 0.00 | |||||||||||
| SCLIN | CLIN Description | Qty | Unit | Price | Description or calculation of prices | ||||||
| 01 | Labor Hours | 750 | hour | Bitte geben Sie den Stundensatz für die Arbeit ein. Dieser wird mit den von der Vergabestelle geschätzten 750 Stunden multipliziert. Der Stundensatz wurde bisher in einem Bereich von - bis berechnet, je nach eingegebenem Preis ergibt sich der Materialpreis. Gilt nur für die CLIN 0002 | |||||||
| Please enter the rate of hourly labor. This is multiplied by the 750 hours estimated by the government. The hourly rate was previously calculated in a range from - to, depending on the price entered, the material price results. Applies only to the CLIN 0002 | € - 0 | ||||||||||
| 02 | Material/Spares | 1 | lot | / | Der Anbieter muss hierzu keine Angaben machen. |
Die CLIN- Gesamtsumme basiert auf dem von der US-Regierung errechneten Betrag für diese CLIN, der für die gesamten 3 Jahre fest und unveränderlich ist. Die Differenz aus 750 Stunden multipliziert mit dem vom Vertragsnehmer angegebenen Stundenpreis und dem festen CLIN-Gesamtbetrag ergibt den Gesamtmaterialpreis.
The supplier does not have to provide any information here.
| The CLIN total is based on the U.S. Government's estimated amount for this CLIN, which is fixed and unchangeable for the entire 5 years. The difference of 900 hours multiplied by the vendor's entered hourly price and the fixed CLIN total is the total material price. | € - 0 | |
| Note: |
Government Fair Cost Estimate Base Year USAG Wiesbaden Emergency Power Systems
OPTION PERIOD 1
| Preisbuch fuer den Anbieter / Pricebook for the Vendors |
| Ordering Period 1 |
CLIN Description Description or calculation of prices Price
1001 Preventive Maintenance on Door's and Gate's within USAG Wiesbaden Ordering Period 1, POP FY26-FY27 IAW PWS.
| Die Türen und Tore sind in 6 Kategorien an 10 Standorten eingeteilt. In der Kategorie CLIN 1001 wird der Wartungspreis für eine einzelnes Equipment eingetragen. Bitte sehen Sie in den PWS nach, welche Mindestanforderungen gegeben sind. Anfahrtskosten und Stundenlohn sind in diesem Einzelpreis enthalten und können nicht separat in Rechnung gestellt werden. | ||
| Doors and gates are subdivided into 6 categories in 10 locations. CLIN 1001 the maintenance price for a single Equipment is entered in the category. Please see in PWS which minimum requirements are given. Travel and hourly wages are included in this single price and cannot be invoiced separately. | € 0.00 |
| Overview | remarks/comment | ||||||
| Sectional door | 41 | - 0 € | |||||
| Reel gate | 60 | - 0 € | |||||
| Sliding door | 44 | - 0 € | |||||
| Sliding gate | 24 | - 0 € | |||||
| Wing door | 77 | - 0 € | |||||
| Folding door | 2 | - 0 € | |||||
| Total | 248 | $ - 0 | |||||
| Description | Quantity | Quantity of maintenance | PRICE | ||||
| Sectional door | 41 | Price for single equipment | |||||
| Total | - 0 € | ||||||
| Amelia Earhart Center | 0 | - 0 € | |||||
| Aukamm | 0 | - 0 € | |||||
| Clay Kaserne Wiesbaden | 25 | 12x semi annual Maintenance | - 0 € | ||||
| Egelsbach | 0 | - 0 € | |||||
| Hainerberg | 3 | - 0 € | |||||
| Mainz Kastel Station | 5 | - 0 € | |||||
| Mc Cully Barracks | 4 | - 0 € | |||||
| Rheinblick Golf Course | 4 | - 0 € | |||||
| Schwabenwaeldchen | 0 | - 0 € | |||||
| Wiesbaden Small Arms | 0 | - 0 € | |||||
| Reel gate | 60 | Price for single equipment | |||||
| Total | - 0 € | ||||||
| Amelia Earhart Center | 0 | - 0 € | |||||
| Aukamm | 2 | - 0 € | |||||
| Clay Kaserne Wiesbaden | 12 | - 0 € | |||||
| Egelsbach | 0 | - 0 € | |||||
| Hainerberg | 26 | - 0 € | |||||
| Mainz Kastel Station | 11 | - 0 € | |||||
| Mc Cully Barracks | 4 | - 0 € | |||||
| Rheinblick Golf Course | 5 | - 0 € | |||||
| Schwabenwaeldchen | 0 | - 0 € | |||||
| Wiesbaden Small Arms | 0 | - 0 € | |||||
| Sliding door | 44 | Price for single equipment | |||||
| Total | - 0 € | ||||||
| Amelia Earhart Center | 1 | semi annual Maintenance | - 0 € | ||||
| Aukamm | 0 | - 0 € | |||||
| Clay Kaserne Wiesbaden | 9 | 3x semi annual Maint. | - 0 € | ||||
| Egelsbach | 3 | - 0 € | |||||
| Hainerberg | 18 | 18x semi annual Maint. | - 0 € | ||||
| Mainz Kastel Station | 10 | 2x semi annual Maint. | - 0 € | ||||
| Mc Cully Barracks | 0 | - 0 € | |||||
| Rheinblick Golf Course | 1 | semi annual Maintenance | - 0 € | ||||
| Schwabenwaeldchen | 0 | - 0 € | |||||
| Wiesbaden Small Arms | 2 | - 0 € | |||||
| Sliding gate | 24 | Price for single equipment | |||||
| Total | - 0 € | ||||||
| Amelia Earhart Center | 1 | semi annual Maintenance | - 0 € | ||||
| Aukamm | 0 | - 0 € | |||||
| Clay Kaserne Wiesbaden | 20 | 3x semi annual Maint. | - 0 € | ||||
| Egelsbach | 0 | - 0 € | |||||
| Hainerberg | 0 | 18x semi annual Maint. | - 0 € | ||||
| Mainz Kastel Station | 0 | 2x semi annual Maint. | - 0 € | ||||
| Mc Cully Barracks | 2 | - 0 € | |||||
| Rheinblick Golf Course | 1 | semi annual Maintenance | - 0 € | ||||
| Schwabenwaeldchen | 0 | - 0 € | |||||
| Wiesbaden Small Arms | 0 | - 0 € | |||||
| Wing door | 77 | Price for single equipment | |||||
| Total | - 0 € | ||||||
| Amelia Earhart Center | 21 | 21x semi annual Maint. | - 0 € | ||||
| Aukamm | 0 | - 0 € | |||||
| Clay Kaserne Wiesbaden | 44 | 9x semi annual Maint. | - 0 € | ||||
| Egelsbach | 0 | - 0 € | |||||
| Hainerberg | 9 | 5x semi annual Maint. | - 0 € | ||||
| Mainz Kastel Station | 0 | - 0 € | |||||
| Mc Cully Barracks | 2 | - 0 € | |||||
| Rheinblick Golf Course | 1 | semi annual Maintenance | - 0 € | ||||
| Schwabenwaeldchen | 0 | - 0 € | |||||
| Wiesbaden Small Arms | 0 | - 0 € | |||||
| Folding door | 2 | Price for single equipment | |||||
| Total | - 0 € | ||||||
| Amelia Earhart Center | 0 | - 0 € | |||||
| Aukamm | 0 | - 0 € | |||||
| Clay Kaserne Wiesbaden | 0 | - 0 € | |||||
| Egelsbach | 0 | - 0 € | |||||
| Hainerberg | 2 | 2x semi annual Maint. | - 0 € | ||||
| Mainz Kastel Station | 0 | - 0 € | |||||
| Mc Cully Barracks | 0 | - 0 € | |||||
| Rheinblick Golf Course | 0 | - 0 € | |||||
| Schwabenwaeldchen | 0 | - 0 € | |||||
| Wiesbaden Small Arms | 0 | - 0 € | |||||
| 1003 | Preventive Maintenance on Droparm Barriers within USAG Wiesbaden | ||||||
| Ordering Period 1, POP FY26-FY27 IAW PWS. | Die Droparm-Schranken sind in 10 Standorte unterteilt. Der Wartungspreis für ein einzelnes Gerät wird unter CLIN 1003 erfasst. Die Mindestanforderungen entnehmen Sie bitte der Leistungsbeschreibung. Reisekosten und Stundenlöhne sind in diesem Einheitspreis enthalten und können nicht separat in Rechnung gestellt werden. | ||||||
| The Droparm barriers are divided into 10 locations. The maintenance price for a single device can be entered under CLIN 1003. Please refer to the service description for the minimum requirements. Travel expenses and hourly wages are included in this unit price and cannot be invoiced separately. | € 0.00 |
| Droparm Barriers | 29 | Price for single equipment | remarks/comment | |||||||
| Total | - 0 € | |||||||||
| Amelia Earhart Center | 3 | - 0 € | ||||||||
| Aukamm | 0 | - 0 € | ||||||||
| Clay Kaserne Wiesbaden | 14 | - 0 € | ||||||||
| Egelsbach | 0 | - 0 € | ||||||||
| Hainerberg | 4 | - 0 € | ||||||||
| Mainz Kastel Station | 1 | - 0 € | ||||||||
| Mc Cully Barracks | 3 | - 0 € | ||||||||
| Rheinblick Golf Course | 0 | - 0 € | ||||||||
| Mainz Kastel Housing | 2 | - 0 € | ||||||||
| Dagger | 2 | - 0 € | ||||||||
| 1002 | On-demand repair in accordance with T&M Doors, Gates and Barriers | |||||||||
| Ordering Period 1, POP FY26-FY27 IAW PWS. | Price: | |||||||||
| € 0.00 | ||||||||||
| SCLIN | CLIN Description | Qty | Unit | Price | Description or calculation of prices | |||||
| 01 | Labor Hours | 500 | hour | Bitte geben Sie den Stundensatz für die Arbeit ein. Dieser wird mit den von der Vergabestelle geschätzten 5000 Stunden multipliziert. Der Stundensatz wurde bisher in einem Bereich von - bis berechnet, je nach eingegebenem Preis ergibt sich der Materialpreis. Gilt nur für die CLIN 1002 | ||||||
| Please enter the rate of hourly labor. This is multiplied by the 500 hours estimated by the government. The hourly rate was previously calculated in a range from - to, depending on the price entered, the material price results. Applies only to the CLIN 1002 | € - 0 | |||||||||
| 02 | Material/ | |||||||||
| Spares | 1 | lot | / | Der Anbieter muss hierzu keine Angaben machen. |
Die CLIN- Gesamtsumme basiert auf dem von der US-Regierung errechneten Betrag für diese CLIN, der für die gesamten 3 Jahre fest und unveränderlich ist. Die Differenz aus 500 Stunden multipliziert mit dem vom Vertragsnehmer angegebenen Stundenpreis und dem festen CLIN-Gesamtbetrag ergibt den Gesamtmaterialpreis.
The supplier does not have to provide any information here.
| The CLIN total is based on the U.S. Government's estimated amount for this CLIN, which is fixed and unchangeable for the entire 5 years. The difference of 900 hours multiplied by the vendor's entered hourly price and the fixed CLIN total is the total material price. | € - 0 | |
| Note: |
Base Year USAG Wiesbaden Emergency Power Systems
OPTION PERIOD 2
| Preisbuch fuer den Anbieter / Pricebook for the Vendors |
| Ordering Period 2 |
CLIN Description Description or calculation of prices Price
2001 Preventive Maintenance on Door's and Gate's within USAG Wiesbaden Ordering Period 2, POP FY27-FY28 IAW PWS.
| Die Türen und Tore sind in 6 Kategorien an 10 Standorten eingeteilt. In der Kategorie CLIN 2001 wird der Wartungspreis für eine einzelnes Equipment eingetragen. Bitte sehen Sie in den PWS nach, welche Mindestanforderungen gegeben sind. Anfahrtskosten und Stundenlohn sind in diesem Einzelpreis enthalten und können nicht separat in Rechnung gestellt werden. | ||
| Doors and gates are subdivided into 6 categories in 10 locations. CLIN 0001 the maintenance price for a single Equipment is entered in the category. Please see in PWS which minimum requirements are given. Travel and hourly wages are included in this single price and cannot be invoiced separately. | € 0.00 |
| Overview | remarks/comment | ||||||
| Sectional door | 41 | - 0 € | |||||
| Reel gate | 60 | - 0 € | |||||
| Sliding door | 44 | - 0 € | |||||
| Sliding gate | 24 | - 0 € | |||||
| Wing door | 77 | - 0 € | |||||
| Folding door | 2 | - 0 € | |||||
| Total | 248 | $ - 0 | |||||
| Description | Quantity | Quantity of maintenance | PRICE | ||||
| Sectional door | 41 | Price for single equipment | |||||
| Total | - 0 € | ||||||
| Amelia Earhart Center | 0 | - 0 € | |||||
| Aukamm | 0 | - 0 € | |||||
| Clay Kaserne Wiesbaden | 25 | 12x semi annual Maintenance | - 0 € | ||||
| Egelsbach | 0 | - 0 € | |||||
| Hainerberg | 3 | - 0 € | |||||
| Mainz Kastel Station | 5 | - 0 € | |||||
| Mc Cully Barracks | 4 | - 0 € | |||||
| Rheinblick Golf Course | 4 | - 0 € | |||||
| Schwabenwaeldchen | 0 | - 0 € | |||||
| Wiesbaden Small Arms | 0 | - 0 € | |||||
| Reel gate | 60 | Price for single equipment | |||||
| Total | - 0 € | ||||||
| Amelia Earhart Center | 0 | - 0 € | |||||
| Aukamm | 2 | - 0 € | |||||
| Clay Kaserne Wiesbaden | 12 | - 0 € | |||||
| Egelsbach | 0 | - 0 € | |||||
| Hainerberg | 26 | - 0 € | |||||
| Mainz Kastel Station | 11 | - 0 € | |||||
| Mc Cully Barracks | 4 | - 0 € | |||||
| Rheinblick Golf Course | 5 | - 0 € | |||||
| Schwabenwaeldchen | 0 | - 0 € | |||||
| Wiesbaden Small Arms | 0 | - 0 € | |||||
| Sliding door | 44 | Price for single equipment | |||||
| Total | - 0 € | ||||||
| Amelia Earhart Center | 1 | semi annual Maintenance | - 0 € | ||||
| Aukamm | 0 | - 0 € | |||||
| Clay Kaserne Wiesbaden | 9 | 3x semi annual Maint. | - 0 € | ||||
| Egelsbach | 3 | - 0 € | |||||
| Hainerberg | 18 | 18x semi annual Maint. | - 0 € | ||||
| Mainz Kastel Station | 10 | 2x semi annual Maint. | - 0 € | ||||
| Mc Cully Barracks | 0 | - 0 € | |||||
| Rheinblick Golf Course | 1 | semi annual Maintenance | - 0 € | ||||
| Schwabenwaeldchen | 0 | - 0 € | |||||
| Wiesbaden Small Arms | 2 | - 0 € | |||||
| Sliding gate | 24 | Price for single equipment | |||||
| Total | - 0 € | ||||||
| Amelia Earhart Center | 1 | semi annual Maintenance | - 0 € | ||||
| Aukamm | 0 | - 0 € | |||||
| Clay Kaserne Wiesbaden | 20 | 3x semi annual Maint. | - 0 € | ||||
| Egelsbach | 0 | - 0 € | |||||
| Hainerberg | 0 | 18x semi annual Maint. | - 0 € | ||||
| Mainz Kastel Station | 0 | 2x semi annual Maint. | - 0 € | ||||
| Mc Cully Barracks | 2 | - 0 € | |||||
| Rheinblick Golf Course | 1 | semi annual Maintenance | - 0 € | ||||
| Schwabenwaeldchen | 0 | - 0 € | |||||
| Wiesbaden Small Arms | 0 | - 0 € | |||||
| Wing door | 77 | Price for single equipment | |||||
| Total | - 0 € | ||||||
| Amelia Earhart Center | 21 | 21x semi annual Maint. | - 0 € | ||||
| Aukamm | 0 | - 0 € | |||||
| Clay Kaserne Wiesbaden | 44 | 9x semi annual Maint. | - 0 € | ||||
| Egelsbach | 0 | - 0 € | |||||
| Hainerberg | 9 | 5x semi annual Maint. | - 0 € | ||||
| Mainz Kastel Station | 0 | - 0 € | |||||
| Mc Cully Barracks | 2 | - 0 € | |||||
| Rheinblick Golf Course | 1 | semi annual Maintenance | - 0 € | ||||
| Schwabenwaeldchen | 0 | - 0 € | |||||
| Wiesbaden Small Arms | 0 | - 0 € | |||||
| Folding door | 2 | Price for single equipment | |||||
| Total | - 0 € | ||||||
| Amelia Earhart Center | 0 | - 0 € | |||||
| Aukamm | 0 | - 0 € | |||||
| Clay Kaserne Wiesbaden | 0 | - 0 € | |||||
| Egelsbach | 0 | - 0 € | |||||
| Hainerberg | 2 | 2x semi annual Maint. | - 0 € | ||||
| Mainz Kastel Station | 0 | - 0 € | |||||
| Mc Cully Barracks | 0 | - 0 € | |||||
| Rheinblick Golf Course | 0 | - 0 € | |||||
| Schwabenwaeldchen | 0 | - 0 € | |||||
| Wiesbaden Small Arms | 0 | - 0 € | |||||
| 2003 | Preventive Maintenance on Droparm Barriers within USAG Wiesbaden | ||||||
| Ordering Period 2, POP FY27-FY28 IAW PWS. | Die Droparm-Schranken sind in 10 Standorte unterteilt. Der Wartungspreis für ein einzelnes Gerät wird unter CLIN 2003 erfasst. Die Mindestanforderungen entnehmen Sie bitte der Leistungsbeschreibung. Reisekosten und Stundenlöhne sind in diesem Einheitspreis enthalten und können nicht separat in Rechnung gestellt werden. | ||||||
| The Droparm barriers are divided into 10 locations. The maintenance price for a single device can be entered under CLIN 2003. Please refer to the service description for the minimum requirements. Travel expenses and hourly wages are included in this unit price and cannot be invoiced separately. | € 0.00 |
| remarks/comment | ||||||||||
| Droparm Barriers | 29 | Price for single equipment | ||||||||
| Total | - 0 € | |||||||||
| Amelia Earhart Center | 3 | - 0 € | ||||||||
| Aukamm | 0 | - 0 € | ||||||||
| Clay Kaserne Wiesbaden | 14 | - 0 € | ||||||||
| Egelsbach | 0 | - 0 € | ||||||||
| Hainerberg | 4 | - 0 € | ||||||||
| Mainz Kastel Station | 1 | - 0 € | ||||||||
| Mc Cully Barracks | 3 | - 0 € | ||||||||
| Rheinblick Golf Course | 0 | - 0 € | ||||||||
| Mainz Kastel Housing | 2 | - 0 € | ||||||||
| Dagger | 2 | - 0 € | ||||||||
| 2002 | On-demand repair in accordance with T&M Doors, Gates and Barriers | |||||||||
| Ordering Period 1, POP FY27-FY28 IAW PWS. | Price: | |||||||||
| € 0.00 | ||||||||||
| SCLIN | CLIN Description | Qty | Unit | Price | Description or calculation of prices | |||||
| 01 | Labor Hours | 500 | hour | Bitte geben Sie den Stundensatz für die Arbeit ein. Dieser wird mit den von der Vergabestelle geschätzten 500 Stunden multipliziert. Der Stundensatz wurde bisher in einem Bereich von - bis berechnet, je nach eingegebenem Preis ergibt sich der Materialpreis. Gilt nur für die CLIN 2002 | ||||||
| Please enter the rate of hourly labor. This is multiplied by the 500 hours estimated by the government. The hourly rate was previously calculated in a range from - to, depending on the price entered, the material price results. Applies only to the CLIN 2002 | € - 0 | |||||||||
| 02 | Material/ | |||||||||
| Spares | 1 | lot | / | Der Anbieter muss hierzu keine Angaben machen. |
Die CLIN- Gesamtsumme basiert auf dem von der US-Regierung errechneten Betrag für diese CLIN, der für die gesamten 3 Jahre fest und unveränderlich ist. Die Differenz aus 500 Stunden multipliziert mit dem vom Vertragsnehmer angegebenen Stundenpreis und dem festen CLIN-Gesamtbetrag ergibt den Gesamtmaterialpreis.
The supplier does not have to provide any information here.
| The CLIN total is based on the U.S. Government's estimated amount for this CLIN, which is fixed and unchangeable for the entire 5 years. The difference of 900 hours multiplied by the vendor's entered hourly price and the fixed CLIN total is the total material price. | € - 0 | |
| Note: |
Base Year USAG Wiesbaden Emergency Power Systems
File details come from the government source that posted it. Updated .