W912CM24Q0024.pdf
PDF 2 MB Posted
- Solicitation number
- W912CM24Q0024
About this file
This document is a Performance Work Statement (PWS) for a contract to provide maintenance and repair services for elevator systems at the U.S. Army Garrison (USAG) Wiesbaden, Germany. The contract will consist of a base year and two option years, with a proposed performance start date of around September 24, 2024.
The PWS outlines the contractor's responsibilities, which include providing all necessary management, personnel, supervision, tools, parts, materials, and transportation to perform preventive maintenance, inspections, and on-demand repairs on the elevator systems listed in the inventory. The contractor must comply with German laws and regulations, as well as manufacturer requirements. Key tasks include recurring preventive maintenance services, on-demand repair services, TUEV inspections, and providing on-site training for government personnel. The contractor must also develop and maintain a quality control plan, provide background checks for personnel, and comply with security, environmental, and safety requirements. The government will provide utilities, but the contractor must furnish all other necessary materials and equipment.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 1 Price Book Elevators FY 24-26 V08292024.xlsx | XLSX spreadsheet | |
| W912CM24Q0024 Amendment 0002.pdf | ||
| W912CM24Q0024 Amendment 00001.pdf | ||
| Attachment 4 - Question and Answers.pdf | ||
| Attachment 2 InventoryList.xlsx | XLSX spreadsheet | |
| Attachment 1 Price Book Elevators Fy 24-26.xlsx | XLSX spreadsheet | |
| Attachment 3 Reference Information Sheet.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W912CM24Q0024 02-Aug-2024
b. TELEPHONE NUMBER
+49 611143 546 6759
8. OFFER DUE DATE/LOCAL TIME
10:00 AM 03 Sep 2024
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA X ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W912CM9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
GOTZMER, SEBASTIAN
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
0012120805-0001
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED ORX
SMALL BUSINESS
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
RCO WIESBADEN
KO DIRECTORATE OF CONTRACTING
CMR 410, BOX 741
APO AE 09096
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE W582RS 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
W6E9 USAG WIESBADEN
WOLFGANG SCHAMP, USAG WIESBADEN DPW
01057 DILTZ PLACE
UNIT 29623, BOX 30, APO AE 09005-9623
TEL: FAX:
FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$12,500,000
NAICS:
811310
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF93
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
Performance Work Statement:
M&R - Passenger and Freight Elevators
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job 0001 Preventive Maintenance
FFP
Preventive Maintenance On Elevator-Systems. Non-personal services for Elevator-Systems at different locations throughout the USAG Wiesbaden in accordance with the descriptions of the scope of work in PWS and Inventory attachment 2 .
FOB: Destination
PURCHASE REQUEST NUMBER: 0012120805-0001
PSC CD: J039
NET AMT
0002 1 Job 0002 On-Demand Services T&M
FFP
On-demand repair for Elevators at USAG-Wiesbaden IAW PWS paragraphs
5.4 through 5.4.3, and reimbursed IAW the paragraph "Payments" in FAR 52.212-4 (ALT 1). Work shall be priced based on the hourly labor rates shown in Price Book Attachment 1. Repair/spare parts IAW PWS 5.4.3 prices for such parts shall be reimbursed at actual cost (seller's invoice) and in accordance with the paragraph "Payments" in FAR 52.212-4 (ALT 1). The labor hour rates and material costs will not be paid for those repairs which are performed during regular maintenance services. The amount of this CLIN is an estimated ceiling amount which shall under no circumstances be exceeded without prior approval of the Contracting Officer.
FOB: Destination
0003 1 Job 0003 TUEV-Inspections
FFP
TUEV-Inspections In accordance with the Performance Work Statement (PWS) of this contract.
FOB: Destination
0004 2 Job 0004 TUEV On Site Training
FFP
TUEV On Site Training In accordance with the Performance Work Statement (PWS) of this contract.
FOB: Destination
1001 1 Job 1001 Preventive Maintenance
FFP
Preventive Maintenance On Elevator-Systems. Non-personal services for Elevator-Systems at different locations throughout the USAG Wiesbaden in accordance with the descriptions of the scope of work in PWS and Inventory attachment 2 .
FOB: Destination
1002 1 Job 1002 On-Demand Services T&M
FFP
On-demand repair for Elevators at USAG-Wiesbaden IAW PWS paragraphs
5.4 through 5.4.3, and reimbursed IAW the paragraph "Payments" in FAR 52.212-4 (ALT 1). Work shall be priced based on the hourly labor rates shown in Price Book Attachment 1. Repair/spare parts IAW PWS 5.4.3 prices for such parts shall be reimbursed at actual cost (seller's invoice) and in accordance with the paragraph "Payments" in FAR 52.212-4 (ALT 1). The labor hour rates and material costs will not be paid for those repairs which are performed during regular maintenance services. The amount of this CLIN is an estimated ceiling amount which shall under no circumstances be exceeded without prior approval of the Contracting Officer.
FOB: Destination
1003 1 Job 1003 TUEV-Inspections
FFP
CLIN 1003: TUEV-Inspections In accordance with the Performance Work Statement (PWS) of this contract.
FOB: Destination
1004 2 Job 1004 TUEV On Site Training
FFP
TUEV On Site Training In accordance with the Performance Work Statement (PWS) of this contract.
FOB: Destination
2001 1 Job 2001 Preventive Maintenance
FFP
Preventive Maintenance On Elevator-Systems. Non-personal services for Elevator-Systems at different locations throughout the USAG Wiesbaden in accordance with the descriptions of the scope of work in PWS and Inventory attachment 2 .
FOB: Destination
2002 1 Job 2002 On-Demand Services T&M
FFP
On-demand repair for Elevators at USAG-Wiesbaden IAW PWS paragraphs
5.4 through 5.4.3, and reimbursed IAW the paragraph "Payments" in FAR 52.212-4 (ALT 1). Work shall be priced based on the hourly labor rates shown in Price Book Attachment 1. Repair/spare parts IAW PWS 5.4.3 prices for such parts shall be reimbursed at actual cost (seller's invoice) and in accordance with the paragraph "Payments" in FAR 52.212-4 (ALT 1). The labor hour rates and material costs will not be paid for those repairs which are performed during regular maintenance services. The amount of this CLIN is an estimated ceiling amount which shall under no circumstances be exceeded without prior approval of the Contracting Officer.
FOB: Destination
2003 1 Job 2003 TUEV-Inspections
FFP
TUEV-Inspections In accordance with the Performance Work Statement (PWS) of this contract.
FOB: Destination
2004 2 Job 2004 TUEV On Site Training
FFP
TUEV On Site Training In accordance with the Performance Work Statement (PWS) of this contract.
FOB: Destination
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government 0004 Destination Government Destination Government 1001 Destination Government Destination Government 1002 Destination Government Destination Government 1003 Destination Government Destination Government
1004 Destination Government Destination Government 2001 Destination Government Destination Government 2002 Destination Government Destination Government 2003 Destination Government Destination Government 2004 Destination Government Destination Government
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 POP 24-SEP-2024 TO
23-APR-2025
N/A W6E9 USAG WIESBADEN
WOLFGANG SCHAMP, USAG
WIESBADEN DPW
01057 DILTZ PLACE
UNIT 29623, BOX 30, APO AE 09005-9623
FOB: Destination
W582RS
0002 POP 24-SEP-2024 TO
23-APR-2025
N/A (SAME AS PREVIOUS LOCATION)
0003 POP 24-SEP-2024 TO
23-APR-2025
N/A (SAME AS PREVIOUS LOCATION)
0004 POP 24-SEP-2024 TO
24-APR-2025
N/A (SAME AS PREVIOUS LOCATION)
1001 POP 24-APR-2025 TO
23-APR-2026
N/A (SAME AS PREVIOUS LOCATION)
1002 POP 24-APR-2025 TO
N/A (SAME AS PREVIOUS LOCATION)
1003 POP 24-APR-2025 TO
N/A (SAME AS PREVIOUS LOCATION)
1004 POP 24-APR-2025 TO
N/A (SAME AS PREVIOUS LOCATION)
2001 POP 24-APR-2026 TO
23-APR-2027
N/A (SAME AS PREVIOUS LOCATION)
2002 POP 24-APR-2026 TO
N/A (SAME AS PREVIOUS LOCATION)
2003 POP 24-APR-2026 TO
N/A (SAME AS PREVIOUS LOCATION)
2004 POP 24-APR-2026 TO
24-APR-2027
N/A (SAME AS PREVIOUS LOCATION)
SITE VISIT
It will be difficult to submit an acceptable quote without attending the scheduled site visit, so all interested vendors are urged and expected to inspect the site where the work will be performed, to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.
SITE VISIT: A one-time site visit for this requirement will be held.
DATE: 08 August 2024 TIME: 09:00 hours Central European Time (CET) LOCATION: We will meet at the Lucius D. Clay Kaserne Visitor Center, 65205 Wiesbaden, Germany, Visitors will be required to be at the Main Gate Visitor Center no later than 8:45 hours on the day of the meeting.
No later than 15:00 hours Central European Time (CET) on 07 August 2024, interested vendors shall inform.
Sebastian Gotzmer, Sebastian.Gotzmer.LN@army.mil and Aaron M. Ritter, aaron.m.ritter.civ@army.mil of their intent to attend the site visit. This notification shall include the full names of all attendees and if they currently have installation access. A maximum of two (2) representatives from each vendor may attend the site visit.
All attendees must present their identification card or passport and car registration to gain entry. Security guards may perform body search and/or vehicle inspections.
Guest are encourage to arrive by Car rather than a commercial work Van as this will result in longer wait time upon arrival.
IMPORTANT: Quoters must be registered in the System for Award Management (SAM) by the date of submission of quotes. For SAM registration instructions visit the following web link: https://sam.gov/content/entity-registration
(End of Summary of Changes)
PWS
PERFORMANCE WORK STATEMENT (PWS)
Maintenance and Repair (M&R) of Passenger and Freight Elevators, Small Freight Elevators and Handicapped Stair Lifts within USAG Wiesbaden
07/17/2024
Part 1
General Information
1. General: This is a non-personal services contract under which the personnel rendering the services are not subject, either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees.
1.1 Description of Services/Introduction: This is a non-personal services contract to provide maintenance services consisting of all required system inspections, repair and, if needed, replacement of equipment listed on the attached inventory lists (Attachment 2).
1.2 Background: The Contractor shall ensure that all the mechanical and electrical equipment (fixed or freestanding) listed in the attachments is maintained or repaired in accordance with established commercial standards and the performance standards and life safety standards as specified herein.
The Contractor shall conduct maintenance, TUEV inspections, and repair of the equipment listed on the attached inventory list (Attachment 2). The Government will not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn, is responsible to the Government. The service includes all required preventive maintenance, on-demand repair services, repair parts, materials and labeling for elevators installed within the United State Army Garrison (USAG) Wiesbaden area of operations. These duties also include work on connected systems and switches.
The Contractor shall comply with existing applicable laws and regulations for equipment (e.g. DIN (Deutsches Institut fuer Normung), VDE (Verband der Elektrotechnik Elektronik Informationstechnik e.V.), VDMA (Verband deutscher Maschinen und Anlagenbau), DIN EN 81/DIN EN 13015 Elevators), environmental laws and accepted commercial standards and practices, as well as manufacturers requirements.
The Contractor shall provide all necessary management, personnel, supervision, tools, parts, materials, general and specialized equipment, reporting, and transportation necessary to perform preventive maintenance, TUEV inspections, repairs and on-demand repairs on the equipment listed on the inventory list (Attachment 2).
During this contract’s period of performance, USAG Wiesbaden may experience realignments or other changes to its operational footprint that may include acquiring additional real property, constructing new buildings, or removing buildings and other property from its inventory. In all such cases, the changes in inventory shall be within the scope of this contract.
1.4 Objectives: The Contractor shall perform all related administrative actions required to provide services or perform work such as material requisitioning, developing a quality control plan, financial control, meetings, and correspondence. The Contractor shall also maintain accurate and complete records, files, and libraries of documents to include all U.S., German, and local regulations, standards, provisions, codes, laws, technical manuals, and manufacturers’ instructions and recommendations that are necessary and related to the functions being performed. The Contractor shall compile historical data and prepare required reports. The required services include the performance of maintenance and inspection of elevators. On-demand repair services of listed equipment in inventory list (Attachment 2) is required as needed.
1.5 General Information:
1.5.1 Quality Control Plan (QCP) (Deliverable #1): The Contractor shall develop and maintain a QCP to ensure services are performed in accordance with (IAW) this PWS.
The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor's QCP is the means by which it assures that the work provided complies with the requirements of the contract.
The Contractor’s Proposed QCP shall be submitted to the Contracting Officer (KO) through the Contracting Officer’s Representative (COR) for review within ten (10) calendar days after contract award.
The Government will review and either notify the Contractor in writing of acceptance of the plan or return their comments to the Contractor within ten (10) calendar days. If the Government has provided comments, the Contractor shall then have five (5) calendar days to submit a Final QCP. After receipt of the Final QCP, the Contractor may receive the Contracting Officer’s acceptance in writing. Any proposed changes to the accepted QCP are required to be resubmitted for acceptance by the Contracting Officer no later than fifteen (15) calendar days prior to the anticipated change and before implementation by the Contractor. The timeline noted above will apply for review and acceptance for proposed changes.
At a minimum, the QCP must include the following to be acceptable:
(a) A chart showing the organizational structure and lines of authority, the names, qualifications, duties, responsibilities, and classification of each member of the Contractor's Quality Control Team.
(b) How the Contractor will monitor work to ensure that performance complies with all timelines, deadlines, and goals
(c) How the Contractor will monitor work to ensure that performance complies with all specifications and requirements of the contract, including clauses.
(d) How the Contractor will monitor and ensure staff qualifications remain current and valid throughout contract performance.
(e) How the Contractor will ensure all keys issued will remain controlled items (See
1.7 Key Control)
(f) How the Contractor will identify, investigate, and correct any non-conforming performance and prevent similar deficiencies in the future
(g) How the Contractor will file and save all Quality Control related documents for the life of the contract plus 5 years.
1.5.1.1 An Analysis of Quality Control and Timeliness of Submittals (i.e. deliverables) shall be provided to the COR within ten (10) calendar days upon completion of each option period or Task Order. (Deliverable #2)
1.5.1.2 The Contractor shall verbally inform the COR of issues or potential issues that might affect the performance within one (1) workday of identifying those issues. Verbal reports shall be followed up by written reports within three (3) calendar days. (Deliverable #3)
1.5.2 Quality Assurance: The Government will evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP).
This plan is primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the performance standards specified herein. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rates, and the acceptable quality levels (performance thresholds).
1.5.3 Recognized Holidays: The following provides information on recognized holidays for the purpose of the PWS. If submittal of any documentation (e.g. deliverables, submittals, etc.) deadlines fall on a holiday, the closest work day prior to the holiday will apply as the deadline for submittal.
1.5.3.1 U.S. Holidays: Work shall not be performed on U.S. holidays occurring during the normal workweek unless otherwise directed by the Contracting Officer. When a U.S holiday occurs on a Saturday or a Sunday, the holiday is observed on the preceding Friday or following Monday, respectively.
New Year’s Day January 1st M. L. King Memorial Day 3rd Monday in Jan Presidents Day 3rd Monday in February Memorial Day last Monday in May Juneteenth June 19th Independence Day July 4th Labor Day 1st Monday in September Columbus Day 2nd Monday in October Veteran’s Day November 11th Thanksgiving Day 4th Thursday in November Christmas Day December 25th
1.5.3.2 Host Nation Holidays: Work shall not be performed on local Host Nation holidays occurring during the normal workweek unless otherwise directed by the Contracting Officer. The German national and local holidays are:
New Year’s Day January 1st Good Friday varies yearly Easter Monday varies yearly Labor Day May 1st Ascension Day varies yearly Whit Monday varies yearly Corpus Christi varies yearly Day of German Unity October 3rd 1st Christmas Day December 25th 2nd Christmas Day December 26th
1.5.4 Operating Hours: The Government facility office hours, facility operating hours, and the Contractor support hour requirements often coincide, however, they may differ.
Please refer to the following.
1.5.4.1 Government Facility Office Hours: The Government facility office hours are 0715 to 1600, Monday through Friday, except U.S. and Host Nation Holidays identified in paragraph above or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings.
1.5.4.2 Government Facility Operating Hours: The Government facility operating hours are 0715 to 1600, Monday through Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The Contractor will not normally provide services on U.S. or German holidays. If the Contractor is requested to perform any work on one of the above listed holidays, it may only be performed with the coordination and approval of the COR in advance of any work being performed.
1.5.4.3 Contractor Support Hours: The Contractor shall provide routine maintenance services between the hours of 0715 to 1600 and times for on-demand services will vary.
The Contractor shall at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons.
1.5.4.3.1 Contractor Work Plan: Reserved
1.5.5 Training Holidays: USAREUR has historically granted military personnel Training Holidays as compensation for time that they spent in field training. These are typically combined with regular holiday leave schedules (for example, Christmas half days or day on day off schedules). Training Holidays may affect access to military operated facilities.
If scheduled work or access to facilities is required, coordination with occupants will be necessary or the work in affected facilities shall be rescheduled after the training holiday.
However, announced training holidays or exodus of military personnel may provide the Contractor with an opportunity for unrestricted access to facilities and areas. The Contractor shall take full advantage of such opportunities by planning maintenance or actions that are better accomplished when such areas are vacant, in coordination with the COR.
1.5.6 Place of Performance: The work to be performed under this contract will be performed at various locations and buildings within USAG Wiesbaden. Reference the inventory list (Attachment 2) for further details.
1.6 Security Requirements: The following information is provided on security related matters.
1.6.1 Security Program: The Contractor’s employees and all associated subcontractor employees shall comply with applicable installation, facility, and area commander installation and facility access and local security policies and procedures (provided by the
(COR).
1.6.2 Personnel Security Clearance Requirements: Reserved
1.6.3 Installation Access: Access to U.S. installations and controlled areas is limited to personnel who meet security criteria and are authorized by Host Nation law to work in that country. Failure to submit required information or data and obtain required documentation or clearances in accordance with Army in Europe (AE) Regulation 190- 16, Installation Access Control, will be grounds for denying access to U.S. installations and controlled areas. The Contractor shall ensure that any Subcontractor used in performance of this contract complies with these requirements and that all employees, of both the Contractor and any Subcontractor utilized by the contractor, are made aware of and comply with these requirements.
The Contractor is responsible for being aware of and complying with the requirements associated with Installation Access Control. The Government is not liable for any costs associated with performance delays due solely to a firm’s failure to comply with Installation Access Control (IAC) processing requirements.
The Contractor is responsible for returning installation passes to the issuing Installation Access Control Office (IACO) when the contract is completed or when a contractor employee no longer requires access.
AE 190-16 (and AE 190-16-G German translation) can be found on the following website:
http://www.aepubs.eur.army.mil/AE-Regulations
Below is the responsible Organizational Sponsor & Installation Access Control Office for this contract: Organizational Sponsor: USAG Wiesbaden, Clay Kaserne
Location: Clay Kaserne Building No: 1557 DSN Phone No: 548-4066 Commercial Phone No: 0611-143 548 4066
Installation Access Control Office:
Location: Clay Kaserne Building No: 1062 DSN Phone No: 548-47080/1/2/3 Commercial Phone No: 0611-143 548 7080/1/2/3
1.6.3.1 Installation Pass Log (Deliverable #4): The Contractor shall provide an installation pass log to the Contracting Officer, via the COR, within five (5) calendar days after contract award. The Installation Pass Log shall be updated as employees are added and removed and shall remain available at any time upon request by the Government.
Updated Installation Pass Logs shall be submitted to the COR within five (5) calendar days after any changes to the log.
The log must, at a minimum, contain the following information:
- Name of all employees working under this contract
- Date of birth of all employees working under this contract
- Nationality of all employees working under this contract
1.6.3.2 Individual Termination or Expiration of Employment (Deliverable #5): Upon the termination of employment or termination or cancellation of this contract, the Contractor shall collect the installation access passes the same day employment of an individual has expired or been terminated and return them to the issuing office within three
(3) calendar days.
1.6.3.3 Contract Termination or Cancellation (Deliverable #5): Upon termination or cancellation of this contract, the Contractor shall collect all outstanding installation access passes and return them to the issuing office within three (3) days.
1.6.3.4 Common Access Cards (CAC) and CAC Log: RESERVED
1.6.4 Background Checks: AE Regulation 604-1 provides guidance pertaining to background checks for U.S. and Host Nation Contractors. The Contractor shall provide all information required for background checks to meet installation access requirements to be accomplished by the installation Provost Marshal Office, Director of Emergency Services, or Security Office, and residence permits for local national installation passes and access rosters. The Contractor workforce shall comply with all personal identity verification requirements as directed by DoD, HQDA, and local policy. The Contractor may have to complete additional security training to comply with the security standards of this contract. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in Contractor security matters or processes.
1.6.4.1 U.S. Citizen (Deliverable #6): Contractors that work with or teach youth under the age of 18 years are subject to U.S and host nation if OCONUS background checks.
The Requiring Activity Manager will determine the extent of background checks required.
The Contractor employee may begin performance of the contract after receiving a favorable local background check. The Contractor agrees to replace the employee should results of the background check, if required, be unfavorable as determined by the Requiring Activity Manager. The Contractor’s replacement of the employee with the unfavorable background check shall be within a timeframe provided by the Requiring Activity Manager. The Contractor shall also replace employees whose background check, during their tenure of employment, renders them with an unfavorable local or stateside background check, as determined by the Requiring Activity Manager. The Contractor shall forward a copy to the Contracting Officer via the COR and the Requiring Activity Manager of each favorable background check within thirty (30) calendar days of receipt by the Contractor, identifying such with the appropriate contract number. The Contractor shall forward a copy to the Contracting Officer via the COR and the Requiring Activity Manager of each unfavorable background check within thirty (30) days of receipt by the Contractor, identifying such with the appropriate contract number. When the Government awards a non-personal services contract directly to an individual, the failure of the individual to provide a favorable background check would be grounds for termination.
1.6.4.2 Local Nationals and Third Country Nationals (Deliverable #6): Local national and third country national Contractors that work with or teach youths under the age of 18 years are subject to background checks as determined by the Requiring Activity Manager.
As a minimum prior to beginning performance, Contractors employing local national and third country nationals shall furnish the Contracting Officer via the COR and the Requiring Activity Manager a Polizeiliches Fuehrungszeugnis, issued within the previous four months, no later than thirty (30) workdays after contract award. Forwarding correspondence from the Contractors shall identify the associated contract number. The Requiring Activity Manager will determine the favorability of the Polizeiliche Fuehrungszeugnis and notify the Contractor. The Contractor shall forward a copy of unfavorable Polizeiliche Fuehrungszeugnis to the Contracting Officer via the COR and the Requiring Activity Manager within thirty (30) workdays of receipt, identifying such with the appropriate contract number. Local nationals and third country nationals agree to the same employee termination provisions as stated for U.S. Citizens (see paragraph 1.6.4.1 above, in particular, same requirements to replace the employee (and within timeframe noted) when results of background check are unfavorable).
1.6.5 Physical Security: The Contractor shall safeguard all Government equipment and information provided for Contractor use. At the close of each work period, Government facilities, equipment, and materials shall be secured IAW AR 190-13, “The Army Physical Security Program.”
1.6.6 Operations Security (OPSEC) Requirements: Contractor personnel shall adhere to facility security policies and restrictions. The Contractor shall immediately report suspicious activities to security personnel.
1.7 Key Control: The Contractor shall establish and implement methods of making sure all keys issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. NOTE: All references to keys include key cards. No keys issued to the Contractor by the Government shall be duplicated. The Contractor shall develop procedures covering key control that shall be included in the QCP (Deliverable #1). Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The Contractor shall immediately report any incidents of lost or duplicate keys to the Contracting Officer. In the event keys, other than master keys, are lost or duplicated, the Contractor shall, upon direction of the Contracting Officer, re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying. When the replacement of locks or re-keying is performed by the Government, the total cost of re-keying or the replacement of the lock or locks shall be deducted from payment due to the Contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost deducted from the payment due to the Contractor. The Contractor shall prohibit the use of Government issued keys by any persons other than the Contractor’s employees. The Contractor shall prohibit the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the Contracting Officer. The Contractor shall establish and implement methods of ensuring that all lock combinations are not revealed to unauthorized persons.
The Contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations. These procedures shall be included in the QCP.
1.8 Post Award Conference/Periodic Progress Meetings: The Contractor shall attend any post award conference convened by the contracting activity or contract administration office in accordance with FAR Subpart 42.5. The Contracting Officer, COR, and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings the Contracting Officer will apprise the Contractor of how the Government views the Contractor's performance and the Contractor shall apprise the Government of problems, if any, being experienced.
Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.
1.8.1 The Contractor shall attend, participate in, and furnish input to scheduled and unscheduled meetings, conferences, and briefings that relate to the functions and services herein as required by the Government to provide effective communication and impart necessary information. The Contract Manager or designated representative shall attend meetings as requested by the Government. Meeting attendees shall at times include Contractor managerial, supervisory, and other personnel knowledgeable of the subject matter. Meetings may start or end outside of regular duty hours.
1.9 Contracting Officer’s Representative (COR): Refer to Part 2 of this PWS for the definition of a COR. As determined by the Contracting Officer, a COR will be appointed and identified by letter of designation, a copy of which will be provided to the Contractor by the Contracting Officer. The designation letter states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates, or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is not authorized to obligate the Government. If the work is not written in the contract, the COR is not authorized to request new work. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract, perform inspections necessary in connection with contract performance, maintain written and oral communications with the Contractor concerning technical aspects of the contract, issue written interpretations of technical requirements, including Government drawings, designs, specifications, monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies, coordinate availability of Government property, and coordinate site entry of Contractor personnel.
1.10 Personnel Requirements & Qualifications:
1.10.1 Key Personnel: Certain experienced professional and/or technical personnel are essential for successful accomplishment of the work to be performed under this contract.
Such personnel are defined as “key personnel” and are those persons whose resumes, or qualification documents, were submitted for evaluation of the proposal. The Contractor shall not remove such personnel from the contract work, nor replace them, without being in compliance with the following:
a) If key personnel, for any reason, become or are expected to become unavailable for work under this contract for a continuous period exceeding ten (10) workdays, or is expected to devote substantially less effort to the work than indicated in the proposal or initially anticipated, the Contractor shall, subject to the concurrence of the Contracting Officer, promptly replace personnel with equal ability and qualifications.
b) All requests for approval of substitutions hereunder must be in writing and provide a detailed explanation of the circumstances necessitating the proposed substitutions. The request must contain a resume, or other experience / qualifications document, for the proposed substitute, and any other information requested by the Contracting Officer, and be submitted within ten (10) workdays of being notified as substitution will be required (Deliverable #3). The Contracting Officer shall promptly notify the Contractor of approval or disapproval in writing.
c) If the Contracting Officer determines that suitable and timely replacement of key personnel who have been reassigned, terminated or have otherwise become unavailable for the contract work is not reasonably forthcoming, or that the resultant reduction of productive effort would be so substantial as to impair successful completion of the contract, the Contracting Officer may terminate the contract for default or for the convenience of the Government, as appropriate, or make an equitable adjustment to the contract to compensate the Government for any resultant delay, loss, or damage.
The following positions are considered key personnel: Contract Manager.
1.10.1.1 Contract Manager: The Contractor shall provide and maintain a Contract Manager who shall be responsible for the performance of the work. This individual shall serve as a liaison between the Government and the Contractor. The Contract Manager shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract.
1.10.1.2 The Contract Manager shall be available between 07:15 to 16:00, Monday through Friday. The Contract Manager shall possess the following minimum qualifications:
- Certified Engineer (Ingenieur, Techniker, Meister) in electronic or mechanical field with a minimum of three (3) years of experience in an Elevator manufacturing company or in a company which holds a license (work-commitment) to a manufacturing company or a company which performs maintenance and repair of elevators and lifts.
- Ability to read, write, and speak English fluently enough to communicate with
Government personnel, accurately record data, and to complete and submit documentation in accordance with this PWS.
1.10.1.3 Should the Contract Manager be absent, the Contractor shall provide an alternate Contract Manager to fill-in temporarily in order to maintain continuity of contract performance and communications between the Government and the Contractor. The alternate manager shall have the same, or similar, qualifications and experience as the Contract Manager and shall have the same duties and authority to act for the Contractor.
Unless something unforeseen occurs, the Contractor shall give the Government notice of the Contract Manager’s absence no later than five (5) workdays before said absence, to include the name and contact information for the fill-in manager.
1.10.2 Other Personnel Requirements: The Contractor shall provide certified, fully qualified and trained personnel for maintaining and repairing elevators with a minimum of three (3) years expert knowledge performing the required services and shall have a minimum of one of the following diplomas:
Apprenticeship diploma electrical engineering (unaltered German version (“Gesellenbrief/Facharbeiterbrief Elektrotechnik”)
Apprenticeship diploma mechanical engineering (unaltered German version (“Gesellenbrief/Facharbeiterbrief Mechanik”)
Apprenticeship diploma mechatronic engineering (unaltered German version ("Gesellenbrief/Facharbeiterbrief Mechatronik"), and
Any other certificates of training, or equivalent qualifications, to perform maintenance and repair on the elevators and lifts located throughout USAG Wiesbaden (see Attachment 2).
The Contractor shall maintain all licenses and certifications on file and will have them accessible if requested by the COR. All certifications obtained abroad must be translated to German and certified by the Federal Ministry for Education (Bundesministerium fuer Bildung und Forschung) per www.anerkennung-in-deutschland.de.
1.11 Identification of Contractor Employees: All Contractor personnel attending meetings, answering Government telephones, and working in other situations where their Contractor status is not obvious to third parties must identify themselves, to include proper marking of signature blocks in correspondence, to avoid creating an impression in the minds of members of the public that they are Government officials. The Contractor shall ensure that all documents or reports, produced by Contractors are suitably marked as Contractor products or that Contractor participation is appropriately disclosed.
1.12.1 Contractor Workspace: Reserved
1.12.2 Contractor Identification Badges: Contractor personnel shall be easily identifiable through the display of badges IAW Contractor Identification (AE Reg. 27-715).
(For services at Child, Youth, and School Services where children are present, recommend personnel wear identification when children are present.) The Contractor shall provide each of their employees an easily readable identification badge. The badge must include the employee’s name, the contractor’s company name, the functional area of assignment. Companies with U.S. Government contracts will require their employees to wear these badges visibly when performing work at Government workplaces unless this would be impractical because of mission or safety considerations. The Contractor shall collect all ID Badges upon completion of the contract or termination of employee. A listing of issued ID cards shall be furnished to the COR within five (5) calendar days after contract award, and an updated list as needed to reflect Contractor personnel changes.
Updated list shall be submitted to the COR within three (3) calendar days, after changes occur (Deliverable #7).
1.13 Contractor Travel: Reserved
1.14 Other Direct Costs (ODCs): Reserved
1.15 Data Rights: The Government has unlimited rights to all documents and materials produced under this contract. All documents and materials, to include the source codes of software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership and copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the Contractor without written permission from the Contracting Officer. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.
1.16 Non-Disclosure Requirements: Performance under this contract may require the Contractor to access data and information proprietary to a Government agency, another Government Contractor, or of such nature that its dissemination or use other than as specified in this work statement would be adverse to the interests of the Government or others. The Contractor and Contractor personnel shall not divulge or release data or information developed, or obtained under performance of this PWS, except to authorize Government personnel or upon written approval of the Contracting Officer. The Contractor shall not use, disclose, or reproduce proprietary data, which bears a restrictive legend, other than as specified in this PWS. All documentation showing individual names or other personal information shall be controlled and protected under the provisions of the Privacy Act of 1974, Public Law 93-579, 5 United States Code (U.S.C.) Section 552a.
1.17 Protection of Government and Contract Information: Per Public Use Notice of Limitations stated by Defense imagery Management operations Center and contained at www.dimoc.mil/resources/limitations/ , the Contractor shall not cite any information (e.g., contract information, pictures, locations, etc.) obtained through this contract on any hard copy or digital marketing tools to include its company website.
1.18 Non-Disclosure Statements: Reserved
1.19 Organizational Conflict of Interest (OCI): Reserved
1.20 Phase In /Phase Out Period: Reserved
1.21 Safety: The following provides information pertaining to Safety and Accident Prevention.
1.21.1 Safety Laws and Regulations: The Contractor shall comply with FAR 52.236- 13, Accident Prevention (November 1991), the references contained therein (e.g. U.S.
Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1)), and applicable Host Nation Safety Laws and Regulations.
The requirements under FAR 52.236-13 and specifically of the EM 385-1-1 include, but are not limited to the following:
(a) Before initiation of work at the job site, an Accident Prevention Plan, written by the Contractor for the specific work and hazards of the contract and implementing in detail the pertinent requirements of EM 385-1-1; will be reviewed for acceptance by designated Government personnel (Deliverable #8). The plan shall be submitted to the COR within fifteen (15) calendar days after contract award.
Specific requirements for development of the Accident Prevention Plan are found in 01.A and Appendix A of EM 385-1-1. EM 385-1-1 is available online at www.usace.army.mil.
(b) Before beginning each activity involving a type of work presenting hazards not experienced in previous project operations or where a new work crew or subcontractor is to perform work, activity hazard analysis (AHA) shall be prepared by the Contractor performing the work activity (See paragraph 01.a.09 of EM 385- 1-1);
(c) The Contractor shall require subcontractors to submit their plan of operations showing methods they propose to use in accomplishing major phases of work;
(d) The Contractor shall discuss the plans in conferences convened by the Contracting Officer prior to starting work on each major phase of operation. Plans shall include all pertinent information such as layout of haul roads, access roads, storage areas, electrical distribution lines, methods of providing minimum exposure to overhead loads, and methods of access to work areas.
(e) In all areas where construction, demolition, alteration, building, or similar related activities take place, the Contractor shall have the following minimum personal protective clothing and equipment requirements in place for any person working on or visiting the site:
(i) Short sleeve shirt;
(ii) Long trousers;
(iii) Steel-toed safety boots; and
(iv) Hard hat.
1.21.1.1 In addition to other requirements for accident prevention specified in this contract, the Contractor shall comply with all Federal and State requirements governing safety and health protection on construction sites and other applicable occupational safety codes.
The Contractor shall indicate its plan for compliance considering conditions of the work described by the design, technical proposal, operational activities of the Government or others in the area of the work, identification of the coordinator, and implementation of all other accident prevention provisions of this contract.
1.21.1.2 The Contractor shall complete and provide safety notifications required and will provide documented proof to the Contracting Officer, via the COR, no later than two (2) workdays after notifications were made. (Deliverable #9)
1.22 Environmental Compliance: The following provides information on Environmental Compliance.
1.22.1 Environmental Compliance Plan and Program: The Contractor shall ensure that all of its operations and activities conform to the USAG Wiesbaden's environmental policy requirements. The Contractor shall ensure that all contract personnel have received appropriate levels of training in the handling, use, storage, and disposal of hazardous material. In addition, the Contractor shall ensure that all Contractor controlled activities on USAG Wiesbaden installations are conducted in accordance with the USAG Wiesbaden Spill Prevention and Response Plan, Solid Waste Policy, Final Governing Standards-Germany, and applicable German environmental laws/standards. If contract requires the use of hazardous materials/substances, the Contractor shall, prior to mobilization, inform the Contracting Officer and COR of the types and amount of hazardous materials needed to be brought onto the Garrison in order to fulfill their contractual requirements. Contractor shall also provide the Safety Data Sheets, storage requirements and proposed storage locations for the hazardous material. The COR shall provide a copy of this information to the Garrison Fire Department and the Environmental Division.
Prior to contract completion, the Contractor shall remove all hazardous materials and dispose of all hazardous waste (HW) generated in accordance with Final Governing Standards Germany and applicable German environmental laws/standards. A copy of the HW disposal documents must be forwarded to the HW program manager at the DPW Environmental Division.
The Contractor shall clean up at its own expense any contamination, including soil and ground water contamination caused by hazardous materials/substances brought onto the garrison, or by his activities. The Contractor must immediately report any hazardous substance spills to the Garrison Fire Department at CIV 0611-705-117. The Contractor shall contact the COR or the USAG Wiesbaden Directorate of Public Works- Environmental Division (DPW-ED), DSN 548-4092, CIV 0611143-548-4092, Bldg. 1059, Clay Kaserne for a copy of the Garrison Environmental Policy, Spill Prevention and Response Red Plan, Garrison Solid Waste Policy and German Final Governing Standards.
Current Environmental Policy (Garrison policy Number 22) is available at the Garrison website:
htt…
This is the start of the file's text. The full file is on GovTribe.