081425_PWS_Panama Documents_08.15.25.pdf
PDF 407 KB Posted
- Attached to
- ARSOUTH Fence & Shelf Installation for Storage Federal contract opportunity
- Solicitation number
- W912CL-25-Q-A034
About this file
This Statement of Work (SOW) details a contract for restoration of an existing fence and fence gate inside Building 4191 at Joint Base San Antonio, Ft Sam Houston, TX, to create a secure storage area for U.S. Army South's historic documents. The project requires the contractor to provide non-personal services to coordinate, prepare, procure, and execute fence restoration, with specific tasks including:
- Inspecting and repairing the existing fence, installing a new black High-Density Polyethylene (HDPE) privacy screen, and realigning barbed wire 2. Reinforcing the fence gate steel frame posts, installing a new digital cipher lock, and ensuring gate security 3. Replacing a broken window, cleaning and preparing existing windows, and installing one-way mirror privacy film 4. Submitting material samples and specifications within 10 days of contract award 5. Completing the entire project within 60 calendar days after contract award. The contract is a firm fixed-price type, with zero deviation allowed on quality control standards, and will be 100% inspected by the Contracting Officer's Representative (COR) upon work completion.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFIs.pdf | ||
| Solicitation - SF1449_W912CL25QA034_.pdf | ||
| Solicitation SF1449_W912CL25QA034.pdf | ||
| Floor Plan.pdf | ||
| 081425_PWS_Panama Documents_08.15.25.docx | DOCX document | |
| NEW UAR JBSA FORM 7 - 2024.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW) [410th CSB TEMPLATE] Version 2 1 Jun 2019
Buiding 4191 Fencing Restoration
2 JUL 2025
NOTE TO OUR CUSTOMERS: THIS TEMPLATE MUST BE TAILORED FOR YOUR AGENCY
BY INCLUDING YOUR UNIQUE REQUIREMENTS, QUANTITIES FOR WORKLOAD,
SPECIFIC SURVEILLANCE TECHNIQUES, ETC. ANY QUESTIONS REGARDING THIS
TEMPLATE SHOULD BE ADDRESSED WITH YOUR ASSIGNED ACQUISITION TEAM.
GENERAL INFORMATION IS PRESENTED IN BLUE ITALICS WITH PARENTHESIS
BORDERS, WHILE FILL-IN GUIDANCE IS PRESENTED IN BLUE ITALICS WITH BRACKET
BORDERS. PLEASE DELETE ALL BLUE ITALICS WHEN FINALIZING THE SOW.
Part 1
General Information
1. GENERAL: This is a non-personal services contract under which the personnel rendering the services are not subject, either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees. The United States (U.S.) Government shall not exercise any supervision or control over the Contractor’s employees performing the tasks herein. Such contract employees shall be accountable solely to the Contractor who, in turn shall be responsible to the U.S. Government.
1.1 SCOPE OF WORK: Under this contract, the Contractor shall furnish all labor, transportation, equipment, materials, and any other items and services necessary to restore existing fence and fence gate inside building 4191 for the storage of historical documents as defined in this SOW except for those items specified as government furnished property (GFP) and government furnished services (GFS). The contractor shall perform to the standards in this contract.
1.2 Background: The Army South’s area of responsibility encompasses 31 countries and 15 areas of special sovereignty in Central and South America, and the Caribbean. Army South enables multidomain operations identifying, exposing, and degrading malign influence, setting the theater, and conducting security operations and activities in the U.S. Southern Command area of responsibility as part of integrated deterrence towards threats to the U.S. Homeland.
U.S. Army South is currently storing historic documents in an off-base, out-of-state location. These documents will be transported to their new storage space inside building 4191 at Joint Base San Antonio, Ft Sam Houston, TX. This contract covers the restoration of existing fence and fence gate inside building 4191 for the storage of the historic documents.
1.3 Objectives: This contract is for the procurement of all types of Furniture, Fixtures, and Equipment (FF&E); construction and construction management; and other ancillary services/products required to complete the restoration of existing fence and fence gate inside Building 4191.
1.4 Required Delivery: Contractor shall provide non-personal services to coordinate, prepare, procure, and execute the restoration of existing fence and fence gate inside building 4191. The contractor shall accomplish the secure storage of the historic documents inside the new fenced area created under this contract.
1.5 Period of Performance: The work shall begin within 5 calendar days after the Contractor receives the award, and the project shall be completed in 60 calendar days after the Notice to Proceed or less from receipt of contract award. The 60 day period includes the time for mobilization, demobilization, and clean-up of the site area.
1.6 General Information:
1.6.1 Quality Control (QC): The Contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this SOW and applicable regulations. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services.
The Contractor’s quality control program is the means by which he assures himself that his work complies with the requirement of the contract.
1.6.1.1 The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services.
The following paragraphs (1.6.1.3 through 1.6.1.6) are for GTMO use only:
1.6.1.3 Inspection System: N/A
1.6.1.4 Deficiency Prevention: N/A
1.6.1.5 Inspection Files: N/A
1.6.1.6 Complaints: N/A
1.6.1.7 Operations Security (OPSEC) SOP/Plan Requirements: N/A
1.6.2 Quality Assurance (QA): The government shall evaluate the contractor’s performance under this contract in accordance with (IAW) the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the contractor has performed IAW the performance standards and contract quality requirements are met. Contract quality requirements” means the technical requirements in the contract relating to the quality of the product or service and those contract clauses prescribing inspection, and other quality controls incumbent on the contractor, to ensure the product or service conforms to the contractual requirements. It defines how the performance standards will be applied, the frequency of surveillance, the performance threshold, and deductions, if applicable.
1.6.3 Recognized Holidays: Contractor is not required to perform services on holidays.
New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Independence Day Christmas Day
1.6.4 Hours of Operation: The contractor is responsible for conducting business between the hours of 0800 to 1700, Monday through Friday, except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. For other than firm fixed price contracts, the contractor will not be reimbursed when the government facility is closed for the above reasons. The Contractor must, at all times, maintain an adequate workforce for the uninterrupted performance of all tasks defined within this SOW when the Government facility is not closed for the above reasons.
1.6.5 Place of Performance: The work to be performed under this contract will be performed at Building 4191, Joint Base San Antonio, Ft Sam Houston, TX.
1.6.6 Type of Contract: This is a firm fixed price contract.
1.6.7 Access and General Protection Policy and Procedures:
1.6.7.1 FPCON: In addition to the changes otherwise authorized by the changes of clause of contract, should the US Government Force Protection Condition (FPCON) at any individual installation change, the
Government may require changes in contractor security matters or process in accordance with DoDI 2000.16.
During FPCONs Charlie and Delta, only contract services that have been deemed “mission essential” by the Government will continue. Contract services will resume when the FPCON is reduced to Bravo or lower.
1.6.7.2 Physical Security: The contractor shall be responsible for safeguarding all government equipment, information, and property provided for contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured IAW Army Regulation (AR) 190-13, “The Army Physical Security Program.”
1.6.7.3 Escorts: The Contractor and all associated sub-contractor employees performing services under this contract shall be escorted at all times by host nation security personnel or by an individual designated by the Government Representative while accessing U.S. facilities or activities.
1.6.7.4 Personnel Security Clearance Requirements: N/A
1.6.7.4.1 The contractor shall follow DOD Federal Acquisition Regulation Supplement (DFARS) clause 252.223-7004, Drug-free Work Force; and local policies regarding drug testing. The contractor shall conduct drug tests, ensuring all top secret cleared contractor employees are tested at least once per year, each year of the contract, as well as when there is a reasonable suspicion that an employee uses illegal drugs. The drug testing shall be at the contractor’s expense. Positive drug test results shall be made available to both the KO and COR within 24 hours of known test results. Records of drug testing shall be made available to the COR.
1.6.7.5 Background Checks: The Contractor shall ensure contractor employees and subcontractor employees performing services under this contract have passed a security check conducted by the Host Nation Police Department of their residence or the State Police Department of their U.S. residence. Security checks that have been completed as part of a personnel security clearance background investigation, or a previous background check that was a condition of employment, meet this requirement. Documentation of these checks will be made available to the KO or COR upon request. The Government retains the right to exclude any employee from performance of duties under this contract if a background security check reveals an employee is a security risk. The exclusion of an employee for security reasons will not relieve the Contractor from performance of services required under this contract. If the Government determines additional background checks are required, at a minimum, and upon request from the Government, the Contractor shall provide to the KO or COR, the following information on any contractor or subcontractor employee performing services under this contract:
• Full birth name
• Married name (if applicable)
• SSN or local equivalent (ID card number)
• Date of birth
• Place of birth (city, country)
1.6.7.5.1 Background Check Notification Requirements: If a background check on any employee or subcontractor employee performing services under this contract, whether the check was conducted as a condition of employment or as part of the contract with the Government, reveals any information from any source (including host country law enforcement) of criminal activity by Contractor employees, subcontractors, or subcontractor employees, the Contractor shall immediately notify the KO and COR of that information. The Contractor shall make notification of:
(1) Traffic violations, other than parking, will be reported to the KO or COR only if the contract is for drivers for the Government;
(2) Any suspicious activity by Contractor employees, subcontractors, or subcontractor employees the Contractor believes may pose a risk to U.S. or host nation national security or imminent risk of deadly bodily harm to any person; and
(3) Any actions taken against Contractor employees, subcontractors, or subcontractor employees pursuant to this requirement.
1.6.7.5.2 Remedies. In addition to other remedies available to the Government, the Contractor’s failure to comply with the requirements of this paragraph my result in requiring the Contractor to remove a Contractor employee or employees from the performance of the contract.
1.6.7.5.3 Subcontracts. The Contractor shall include the substance of this paragraph and the preceding paragraph in all subcontracts.
1.6.7.6 Uncleared Contractor Common Access Card (CAC) Credentialing and Access Procedures
1.6.7.6.1 Contractor Common Access Card (CAC) Eligible Requirements: N/A
1.6.7.6.1.1 Federal Installation/Facility Access: Contractor and all associated sub-contractor employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The employee performing services under this contract shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services, Security Office or the host nation equivalent.
1.6.7.6.2. Contractor Non CAC Eligible Requirements for DOD Facility and Installation Access: Contractor and all associated subcontractor employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations. The employee performing services under this contract shall provide all information required for background checks to meet installation access requirements to the installation Provost Marshal Office, Director of Emergency Services, or Security Office.
1.6.7.7 Employment Eligibility: The Contractor shall ensure that all Contractor employees and sub-contractor employees performing services under this contract in the U.S. or its territories have been pre-screened for employment eligibility using the E-verify Program on the Department of Homeland Security website http://www.uscis.gov/e-verify. Personnel that have not met the employment eligibility requirement on this website are not authorized to perform services under this contract. Verification of the eligibility check will be made available to the KO or COR upon request. This requirement is not in lieu of and does not relieve the Contractor from the I-9 Employment Eligibility Verification Forms for employment of personnel.
1.6.7.8 Access to Government Information Systems: N/A
1.6.7.9 Key Control: N/A
1.6.8 Post Award Conference/Contract Periodic Progress Meetings: The Contractor shall attend the post award conference convened by the contracting activity or contract administration office IAW Federal Acquisition Regulation (FAR) Subpart 42.5. The KO, COR, with other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings the KO will apprise the contractor of how the government views the Contractor's performance and the Contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.
1.6.8.1 The Project Engineer/Architect may be required to meet at least weekly with the KO/and/or the COR during the first month of construction and then as required throughout the period of performance. The http://www.uscis.gov/e-verify
Contractor shall be responsible for keeping minutes of these meetings. The written minutes of these meetings shall be signed by the Project Engineer/Architect and any other individuals in attendance, and be submitted to the KO for approval. Minutes are due five (5) days after the meeting has concluded.
1.6.9 Contracting Officer Representative (COR): The (COR) will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: ensure the Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance; maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements, including Government drawings, designs, specifications; monitor Contractor's performance and notifies both the KO and Contractor of any deficiencies; coordinate availability of government furnished property; and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates, or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.
1.6.10 Key Personnel: The following personnel are considered key personnel by the government:
1. Contract manager/alternate contract manager
1.6.10.1 The Contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate, who shall act for the Contractor when the manager is absent, shall be designated in writing to the Contracting Officer. The Contract Manager and alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract.
1.6.10.2 Qualifications for all Key Personnel are listed in 1.6.10, are below: N/A
1.6.11 Special Qualifications or Certifications: N/A
1.6.11.1 IA/IT Training Certification: N/A
1.6.12 Identification of Contractor Employees: Contractor employees shall identify themselves as Contractor personnel and shall avoid representing themselves as Government employees. This identification includes meeting attendance, answering Government telephones, email communications, and working in other situations where Contractor status is not obvious. Contractor personnel identification shall be easily identifiable through the display of badges, name tags, lanyards, etc
1.6.12.1 Badging of Contractor Employees: If required by the Government, contract personnel and all associated subcontractors employees accessing U.S. facilities or activities, shall present a valid picture ID provided by the Government while accessing Government owned or contracted facilities and shall adhere to facility security policies and restrictions. If applicable, Government issued access badges will not be worn outside designated facility where visible to the general public.
1.6.12.2 Uniform: N/A
1.6.13 Contractor Travel: N/A
1.6.14 Other Direct Costs (ODC): N/A
1.6.15 Data Rights: N/A
1.6.16. Non-Disclosure Requirements: Performance under this contract may require the Contractor to access data and information proprietary to a Government agency, another Government Contractor, or of such nature that its dissemination or use other than as specified in this work statement would be adverse to the interests of the Government or others. Neither the Contractor, nor Contractor personnel, shall divulge, nor release data or information developed, or obtained under performance of this work statement, except to authorize Government personnel or upon written approval of the KO. The Contractor shall not use, disclose, or reproduce proprietary data, which bears a restrictive legend, other than as specified in this SOW. All documentation showing individual names or other personal information shall apply, and shall be controlled and protected under the provisions of the Privacy Act of 1974, Public Law 93-579, 5 United States Code (U.S.C.) Section 552a.
1.6.16.1 Non-Disclosure Statements: N/A
1.6.16.2 Advertisement and Social Media: The Contractor shall NOT post information to public website or social media locations, personal or professional, that in any way disclose names, locations, hotel data, participants, discussions, pictures, etc. before, during or after the contract period of performance without the express consent of the Government. The use of propaganda violates DOD Commercial Use of Imagery Guidelines stated at (http://www.defenseimagery.mil/products/DODimagery/commercialuse.html). The Contractor shall not cite any information (e.g., contract information, pictures, locations, etc.) obtained through this contract on any marketing tools to include its company website.
1.6.16.3 INFORMATION ASSURANCE: At no time will the Contractor or associated sub-contractor employees transmit government documents or information over using methods that do not meet the security requirements specified in the National Institute of Standards and Technology (NIST) Special Publication (SP) 800-171, "Protecting Controlled Unclassified Information in Nonfederal Information Systems and Organizations" such as personal electronic mail accounts, public digital data storage sites (cloud storage), social media platforms or instant messaging. Approved government sites such as U.S. Army Aviation and Missile Research Development and Engineering Center (ARMDEC) Safe Exchange at https://safe.amrdec.army.mil/SAFE/About.aspx, or All Partners Access Network (APAN) at https://community.apan.org/, or other transmission means determined by the government must be used
Organizational Conflict of Interest (OCI)
1.6.17 Organizational Conflict of Interest (OCI) Contractor and subcontractor personnel performing work under this contract may receive, have access to, or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the KO immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the KO to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the KO and in the event the KO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the KO may affect other remedies as he or she deems necessary, including prohibiting the Contractor from
1.6.18 Phase-in/Phase-Out (PIPO) Period: N/A
1.6.19 General Training Requirements:
1.6.19.1 Anti-Terrorism (AT) Level I Training: N/A
1.6.19.2 OPSEC Awareness: N/A
1.6.19.3 Information Assurance (IA) Training: N/A
1.6.19.4 Information Assurance (IA)/Information Technology (IT) Training: N/A
1.6.19.5 Threat Awareness Reporting Program (TARP Training): N/A http://www.defenseimagery.mil/products/dodimagery/commercialuse.html
1.6.19.6 iWATCH Training: N/A
1.6.19.7 OPSEC Training: N/A
1.6.20 Overseas Training Requirements: N/A
1.6.20.1 Antiterrorism (AT) Awareness Training for Contractor Personnel Traveling: N/A
1.6.20.2 SERE Training: N/A
1.6.21 Foreign (OCONUS) Requirements: N/A
1.6.21.1 Theater and Country Clearance Requirements: N/A
1.6.21.2 Vetting: N/A
1.6.21.3 Installation Access to DOD Facility or Host Nation Installation: N/A
1.6.21.4 Host Nation Installation Access with No DOD Facility: N/A
1.6.21.5 Deoxyribonucleic Acid (DNA) Samples: N/A
1.6.21.6 Medical Travel Requirement: N/A
1.6.21.7 GTMO Medical Requirements: N/A
1.6.21.7.1 GTMO Medical and Dental Services: N/A
1.6.22 Synchronized Pre-deployment and Operational Tracker (SPOT): N/A
1.6.23 Licenses and Permits:
1.6.23.1 Contractor Licenses and Permits. The Contractor shall, at no additional cost to the U.S. Government, obtain all licenses and permits required for performance of work. Contractor shall comply with all applicable national, regional, and local Local laws, rules, and regulations. The Contractor shall submit proper documentation and evidence satisfactory to the KO or the COR demonstrating compliance with this requirement when directed by the KO or COR.
1.6.23.2 Sub-contractor Licenses and Permits. The Contractor shall inform the COR and KO in writing that all sub-contractors and others performing work. The Contractor shall submit a copy of the licenses and permits (if applies) to the KO and COR demonstrating compliance with this requirement when directed by the KO and/or COR.
1.6.24 Environmental Protection:
1.6.24.1 Pollution and Abatement Control. In order to present and provide for abatement and control of any environmental pollution arising from the activities in the performance of this contract, the Contractor shall comply with all applicable pollution control and abatement policies, and all applicable provisions of the Local codes, regulations, and laws.
1.6.24.2 Environmental Protection. Environmental protection action required by this section shall consist of furnishing all labor, materials, and equipment and performing all work required for the abatement and prevention of pollution during and as the result of construction operations under this contract. For the purpose of this specification, environmental pollution is defined as the presence of chemical, physical, or biological elements or agents which adversely affect human health or welfare; unfavorably alter ecological balances;
detrimentally impact on biological species and/or their habitat; or degrade the aesthetic and recreational value of the area.
1.6.24.3 Spills and Disposal. The Contractor shall not pollute storm or sewer lines; or swales with fuels, oils, bitumen, calcium chloride, acid, construction wastes, or other harmful materials. It is the responsibility of the Contractor to investigate and comply with all applicable Local laws concerning pollution of river and streams. All work under this contract shall be performed in such a manner that objectionable conditions shall not be created in streams through or adjacent to the project areas.
1.6.24.4 Waste Material. Waste material is defined as any material for which no use or reuse is intended and which is to be discarded. Disposal of hazardous waste, containers or components thereof, shall be in a hazardous waste disposal site only and no other location shall be utilized for such disposal. U.S.
Environmental Protection Agency (EPA) defined hazardous waste as a waste with properties that make it dangerous or capable of having a harmful effect on human health or the environment. Hazardous waste is generated from many sources, ranging from industrial manufacturing process wastes to batteries and may come in many forms, including liquids, solids gases, and sludges. Only hazardous waste sites which are permitted by the EPA, and/or the local government shall be utilized for such disposal actions. Contractor shall coordinate with local environmental agencies for disposal/storage activities. The Contractor shall maintain all required documentation related to hazardous material use and waste disposal in accordance with the Government of Belize regulations and requirements.
1.6.25 Personnel Safety: The Contractor shall ensure the safety of their personnel in accordance with Local law. The Contractor shall immediately correct all safety deficiencies upon notification of such deficiencies by the KO/COR and shall notify the KO/COR of the corrective action taken. The Contractor shall be responsible for the safety of their workers and all visitors at each work site; and ensure that all personnel are wearing appropriate safety gear at all times (i.e. safety glasses, helmet, harness, gloves, and safety shoes).
1.6.25.1 Accident Protection (AP) and Emergency Medical Treatment (EMT). The Contractor shall have personnel licensed by the Local government to be trained and capable of dealing with minor personnel injuries. The personnel shall be qualified to provide first aid in case of emergency. The number of AP and EMT shall be sufficient to care for the number of employees at the site in the case of an emergency.
1.6.25.2 Emergency Services and Facilities. All work crews, Contractor management personnel, and the COR shall be provided with information pertaining to the Contractor's arrangements for emergency medical treatment five (5) days prior to the start of work. This information shall include the following:
Local Hospital: Name Phone No.
Local Ambulance: Name Phone No.
Local Doctor: Name Phone No
1.6.26 Marking of Work Zones. The Contractor shall mark all work zones using two lines of plastic yellow security ribbon. Yellow security ribbons shall be 8 cm wide and supported on stable wood stakes. Likewise, the project excavation or high accident risk zones shall be signaled with warning signs or fences as protective measurements by the Contractor.
1.6.27 Construction Operations and Storage Areas:
1.6.27.1 Confinement to Authorized Areas. The Contractor shall confine all operations (including storage of materials) to areas authorized or approved by the COR from information received by local authorities. U.S.
Government agencies shall have access to the premises for official fire, safety, and security inspections and/or to conduct site visits as authorized by the COR.
1.6.27.2 Access to Contractor Storage Yard. The Contractor shall only store materials and equipment for this project at a designated location.
1.6.28 Contractor Vehicles:
1.6.28.1 Vehicular Access. The Contractor shall, and in accordance with any regulations specified by the municipal and local country authorities, use only established site entrances and roadways at both worksite locations.
1.6.28.2 Vehicle list. The Contractor shall provide a list of all vehicles used in the performance of this contract to include vehicle description, valid vehicle registration number, and identification ID card numbers to the COR and KO within ten (10) days after contract award and update as the changes occur. ID information will be used by the site to verify credentials and issue access permits. Contractor shall coordinate Local local security office to access sites.
1.6.29 Unforeseen Conditions: The Contractor shall conduct aerial, surface, underground or embedded interference survey to avoid damage to pipes, boxes, cables, utility poles, hoses, wells or other elements in the work area. If a potential interference is found, the Contractor shall promptly give written notice to the KO/COR in accordance with FAR Clause 52.236-2, and prepare information for possible alternatives.
PART 2
DEFINITIONS & ACRONYMS
2. DEFINITIONS AND ACRONYMS:
2.1. Definitions:
2.1.1 Area of Responsibility. The U.S. Southern Command (USSOUTHCOM) area of responsibility (AOR) includes the geographic areas of Antigua and Barbuda, Argentina, Aruba, Barbados, Belize, Bolivia, Brazil, British Virgin Islands, Cayman Islands, Chile, Colombia, Costa Rica, Cuba, Curacao, Dominica, Dominican Republic, Ecuador, El Salvador, Falkland Islands, French Guiana, Grenada, Guadeloupe, Guatemala, Guyana, Haiti, Honduras, Jamaica, Martinique, Mayotte, Montserrat, Nicaragua, Panama, Paraguay, Peru, Saint Barthélemy, Saint Martin, Saint Kitts and Nevis, Saint Lucia, Saint Vincent and the Grenadines, Saint Maarten, Suriname, Trinidad and Tobago, Turks and Caicos Islands, Uruguay, and Venezuela.
2.1.2. Contractor. The total contractor organization or a separate entity of it; such as an affiliate, division, or plant that performs its own purchasing.
2.1.3. Contracting officer (KO). A person with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings.
2.1.4. Contracting officer’s representative (COR). An individual designated and authorized in writing by the contracting officer to perform specific technical or administrative functions.
2.1.5. Defective Service. A service output that does not meet the standard of performance associated with the Statement of Work.
2.1.6. Deliverable. Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.
2.1.7. Key Personnel. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the SOW. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
2.1.8. Local National. For the purpose of this clause or provision, a local national (LN) is defined as any person who is performing services under a contract and is a resident of any country within the
USSOUTHCOM AOR.
2.1.9. Statement of Work (SOW). A statement of work for performance-based acquisitions that describes the required results in clear, specific, and objective terms with measurable outcomes.
2.1.10. Physical Security. Protection of the perimeter area, government property, and assets that prevent the loss or damage of Government property.
2.1.11. Quality Assurance. The various functions, including inspection, performed by the government to determine whether a Contractor has fulfilled the contract obligations pertaining to quality and quantity.
2.1.12. Quality Assurance Surveillance Plan (QASP). A plan describing how the agency will survey, observe, test, sample, evaluate and document the Contractor’s performance in meeting critical performance standards identified in the contract.
2.1.13. Quality Control (QC). Tasks performed by the Contractor to improve the quality of the organization’s output.
2.1.14. Shall. Imperative.
2.1.15. Subcontractor. Any supplier, distributor, vendor, or firm that furnishes supplies or services to or for a prime contractor or another subcontractor.
2.1.16. Third Country National. For the purpose of this clause or provision, a third country national (TCN) is defined as any person, regardless of citizenship, who travels into the USSOUTHCOM AOR from outside of the USSOUTHCOM AOR. This includes personnel who are citizens of the country where performance of the contract is being conducted, but reside outside of the USSOUTHCOM AOR. For this purpose, non- DOD contractor personnel are considered traveling under DOD sponsorship.
2.1.17. Work Day. The number of hours per day the Contractor provides services in accordance with the contract.
2.1.18. Work Week. Monday through Friday, unless specified otherwise.
2.2 Acronyms:
AFFSSIR Armed Forces Repository of Specimen Samples ALMS Army Learning Management System ANSI American National Standards Institute AOR Area of Responsibility AR Army Regulation ATCTS Army Training Certification Tracking System AT Anti-Terrorism CAC Common Access Card CFR Code of Federal Regulations CI Counter Intelligence CLIN Contract Line Item Number CMR Contract Manpower Reporting CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer Representative DD Form 254 Department of Defense Contract Security Requirement List DNA Deoxyribonucleic Acid (DNA) DOD Department of Defense DODD Department of Defense Directive DODI Department of Defense Instruction FAR Federal Acquisition Regulation FHP Force Health Protection FCG Foreign Clearance Guide FY Fiscal Year GFE Government Furnished Equipment GFP Government Furnished Property GFS Government Furnished Services IA Information Assurance IAW In Accordance With IT Information Technology JPAS Joint Personnel Adjudication System JTR Joint Travel Regulation KO Contracting Officer LN Local National
LOA Letter of Authorization NCIC-III National Crime Information Center Interstate Identification Index NIST National Institute of Standards and Technology ODC Other Direct Costs OCI Organizational Conflict of Interest OCONUS Outside Continental United States (includes Alaska and Hawaii) ODC Other Direct Costs OSHA Occupational Safety and Health Administration OPSEC Operation Security PIPO Phase In/Phase Out PRS Performance Requirements Summary SOW Statement of Work QA Quality Assurance QASP Quality Assurance Surveillance Plan QCP Quality Control Program RA Requiring Activity SOP Standard Operating Procedures SPOT Synchronized Predeployment and Operational Tracker TCN Third Country National TE Technical Exhibit TSDB Terrorist Screening Data Base U.S.C. United States Code USSOUTHCOM United States Southern Command
THIS SECTION INTENTIONALLY LEFT BLANK
PART 3
Government Furnished Equipment (GFE), Government Furnished Property (GFP), and Government
Furnished Services (GFS)
3. GOVERNMENT FURNISHED ITEMS AND SERVICES:
3.1. Services: N/A
3.2 Facilities: N/A
3.3 Utilities: The Government will make available all utilities in the facility for the contractor’s use in performance of the tasks outlined in this SOW. The Contractor shall instruct employees in utilities conservation practices. The Contractor shall be responsible for operating under conditions that preclude the waste of utilities, which include turning off the faucets, turning off lights, and powering off equipment at the end of the work day.
3.4 Equipment: N/A
3.5 Materials: N/A
PART 4
CONTRACTOR FURNISHED ITEMS AND SERVICES
4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:
4.1 General: The Contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under Part 3 of this SOW.
4.2 Facility Security Clearance: N/A
4.3. Materials: The Contractor shall furnish materials, supplies, and equipment necessary to meet the requirements under this SOW.
4.4. Equipment: The Contractor shall furnish all necessary equipment to meet the requirements under this
SOW.
4.5 Insurance: N/A
4.6 Contractor Vehicles and Passes: N/A
4.7 RESPONSIBILITIES OF CONTRACTOR.
4.7.1 Damage to Persons or Property: The Contractor shall be responsible for all damages to persons or properties at the worksite that occur as a result of the Contractor's own fault or negligence. The Contractor shall take proper safety and health precautions to protect the work sites, the workers, the public, and the property of others.
4.7.2 Responsibility for Work Performed: The Contractor shall be responsible for all materials delivered and work performed until final completion and acceptance of the entire project, except for any completed unit of work which may have been accepted in writing by the COR under the contract.
4.8 CONTRACTOR RECORDS/PROGRESS REPORTS. The Contractor shall certify all completed work on a bi-weekly basis and provide a bi-weekly progress report to the COR and KO. The first bi-weekly report is due every other Friday, no later than 1700 CST. First report is due 15 days after the contract is awarded.
4.9 CONTRACTOR WORK SCHEDULES: After the notice to proceed, the contractor shall provide a revised complete project management schedule utilizing the Critical Path Method (CPM), Program Evaluation & Review Technique (PERT) or Gantt Chart showing major construction phases (i.e. clearing site, site prep, foundation, concrete structure, metallic structure, electrical system, masonry, stucco, windows, doors, tests, cleaning, perimeter fence, landscaping, final inspection and punch list corrections). These items will become part of the contract at award. Sufficient float time shall be incorporated in the schedule to account for down days due to inclement weather. Contractor shall include quality control inspections performed by their QC rep at each worksite to include the installation of pile foundations. If there are changes to the work schedule, the Contractor shall submit a revised work schedule.
4.10 REPAIR: The Contractor shall repair any damage to the existing grounds, facilities, or property incurred during the course of construction to its original pre-existing conditions. Refer to section 4.5.1 Damage to Persons or Property for additional info.
4.11 SAFETY: The Contractor shall be responsible for the safety of workers and visitors to the work sites.
The Contractor shall ensure that all personnel wear appropriate safety gear at all times in compliance with all Local Occupational Safety & Health regulations and ensue all local safety regulations are followed at all times. The Contractor shall provide sanitation for workers in accordance with the latest edition of Army
Corps of Engineers Safety and Health Manual EM 385-1-1 and Local safety and health laws. Contractor shall comply with safety and health requirements as established by EM 385-1-1. Information about how to obtain electronic and/or hard copies of this manual is located at the following website:
http://www.usace.army.mil/CESO/Pages/EM385-1-1.aspx.
4.11.1 Prohibition on Asbestos and Lead Based Paints: The Contractor shall not use materials containing Asbestos or Lead Based Paints in this construction project. Upon completion of each construction project, the Contractor shall submit two copies of a Certified Letter to the COR stating that no lead based paints or materials containing asbestos were used in this project. One copy of the letter shall be filed with project documents in the Resident Engineer's Office and second copy filed in the COR’s project folder.
4.12 UTILITIES CONNECTIONS AND EXCAVATIONS
4.12.1 Utility Connections: The U.S. Government will not provide any utility connections. It is the Contractor’s responsibility to provide any generators required to operate its own equipment at its own expense. The Contractor shall be responsible for providing potable water daily at the construction worksite for all employees at Contractor’s own expense. If a water tank truck is planned for this purpose, the Contractor shall be responsible for providing registration information that must be included with the Contractor’s equipment listing.
4.12.2 Excavations: The Contractor shall be responsible for coordinating excavation with local utility companies and shall take every precaution to avoid damage to underground utilities. The Contractor shall be responsible for any damages they incur to the underground utilities and shall repair any construction damages at the worksite at own expense. The Contractor shall be responsible for coordinating the connection of potable water, sewage (if available), and electrical power with local utility companies.
4.13 INTERRUPTION OF UTILITY SERVICES: Any planned interruptions of utility services (electrical power, water, natural gas, etc.) shall be detailed and coordinated by the Contractor. If the outage affects only the facilities in this contract, the request shall be submitted at least three (3) working days before the planned outage. The Contractor shall not interrupt service(s) until written approval has been granted by the Local Public Works or equivalent entity. Requests shall include facility/facilities affected, date of scheduled outage, and duration. Requests for interruption of service(s) will not be approved unless all equipment and materials required for the applicable/ particular phase of work are on the job site. Interruptions will be granted Monday through Friday for the following times: 7:15 A.M. until 11:00 A.M. and 12:30 P.M. until 4:00 P.M.
If weekend (Saturday and Sunday) outages are required or are preferred, such outages shall be coordinated as specified above.
4.14 Defense Base Act (DBA) Workers' Compensation Insurance: The Contractor shall acquire, by means of an insurance policy or a self-insurance program, workers’ compensation coverage required by the DBA.
This applies to any contractor, either from local country or from any other country. Contractor shall submit a copy of the insurance policy to the KO within 15 days after contract award. For more information to:
http//www.dol.gov/owcp/dlhwc/isdba/htm
PART 5
SPECIFIC TASKS
5. Specific Tasks: Contractor shall provide non-personal services to coordinate, prepare, procure, and execute the restoration of existing fence and fence gate inside building 4191. The contractor shall accomplish the secure storage of the historic documents inside the new fenced area created under this contract. The Contractor shall perform to the standards of this contract.
5.1. Basic Services. GENERAL: The Contractor shall furnish all labor, transportation, equipment, materials necessary to install new fencing and shelving units inside building 4191. The Contractor shall be responsible for the development of a material list for COR review. The contractor shall provide samples and specifications of materials such as paint, tiles, windows, etc. prior to installation. The Contractor shall submit all material under this section for COR approval and ensure that materials for project are environmentally friendly in accordance with paragraph 1.6.18.
5.1.1 Contractor shall understand that this document does not limit the level of effort to the actions outlined here. The Government is relying on the Contractor’s industry expertise and experience to point out and include in the proposal any necessary efforts excluded here for a successful project execution.
5.1.2 Contractor shall field verify all dimensions, quantities, and conditions prior to submission of a final proposal.
Figure 1 – Building 4191 Proposed Area of Work
5.2 Existing Fence:
5.2.1 Contractor shall thoroughly inspect existing fence inside proposed work area to ensure it is in good condition, and shall make any repair necessary to eliminate deficiencies, if necessary.
5.2.2 Contractor shall furnish new heavy duty black High-Density Polyethylene (HDPE) privacy screen with 90% opacity and install all around existing fence. Privacy screen shall be secured to existing fence using stainless steel zip ties or grommet-mounted fasteners.
PROPOSED
AREA OF
WORK
5.2.3 Contractor shall realign and refasten existing barbed wire for perimeter fence inside work area.
Contractor shall adjust the positioning of the barbed wire as necessary for increased security in the perimeter of the proposed work area.
5.3 Existing Fence Gate:
5.3.1 Contractor shall thoroughly inspect existing fence gate to ensure it is in good condition, and shall make any repair necessary to eliminate deficiencies, if necessary.
5.3.2 Contractor shall reinforce fence gate steel frame posts and heavy-duty hinges to prevent door from sagging and allowing easy access to secured area.
5.3.3 Contractor shall furnish and install new digital cipher lock mechanism with keypad entry for secure access control. New cipher lock shall be include a heavy-duty weatherproof keypad with battery backup and programmable access codes.
5.4 Existing Windows:
5.4.1 Contractor shall replace existing broken window inside proposed work area with new window to match existing glass pane and window steel frame. Contractor shall dispose of damaged window at an approved off-site location.
5.4.2 Contractor shall thoroughly inspect remaining windows to ensure they are in good condition, and shall make any repair necessary to eliminate deficiencies, if necessary.
5.4.3 Contractor shall clean and prepare existing three windows located in the proposed work area in preparation for the installation of new privacy film.
5.4.4 Contractor shall furnish and install new one-way mirror privacy film for enhanced security, heat dissipation, and UV ray protection. New privacy film shall be commercial-grade with static cling or adhesive backing. New film shall be scratch resistant and have UV-resistant coating.
5.5 CONTRACTOR MANPOWER REPORTING (CMR): The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract the installation of fence and shelving units in building 4191 via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address:
http://www.ecmra.mil/, and then click on the “Department of the Army CMRA” or the icon of the DOD organization that is receiving or benefitting from the contract services.
Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2013. If contract period of performance ends prior to September 30, the contractor has 30 days from end date of the contract to complete the CMR requirement. Contractors may direct questions to the help desk by clicking on the “Send an email” which is located under the Help Resources ribbon on the right side of the login page of the applicable Service/Component’s CMR website.
http://www.ecmra.mil/
PART 6
APPLICABLE PUBLICATIONS
6. APPLICABLE PUBLICATIONS (CURRENT EDITIONS)
6.1. The Contractor must abide by all applicable regulations, publications, manuals, and local policies and procedures.
6.1.1 DOD Commercial Use of Imagery Guidelines
6.1.2 AR 190-13, The Army Physical Security Program
6.1.3 Army Directive 2014-05, Policy and Implementation Procedures for CAC Credentialing Access for Uncleared Contractors
6.1.4 DOD 5220.22-M, National Industrial Security Program Operating Manual
6.1.5 Defense Federal Acquisition Regulation Supplement (DFARS)
6.1.6 Joint Travel Regulation (JTR)
6.1.7 AR 735-5, Policies and Procedures for Property Accountability
6.1.8 DODD 8570.01, Information Assurance Training Certification and Workforce Management
6.1.9 DOD 8570.01-M, Information Assurance Workforce Improvement Program
6.1.10 AR 25-2, Information Assurance
6.1.11 DODI 3020.41, Contractor Personnel Authorized to Accompany the U.S. Armed Forces
6.1.12 USSOUTHCOM SC Regulation 40-501, Medical Suitability Screening Regulation
6.1.13 DODI 2000.16 DoD Antiterrorism (AT) Program
PART 7
ATTACHMENT/TECHNICAL EXHIBIT LISTING
7. Attachment/Technical Exhibit List:
7.1 Attachment 1 – Deliverables Schedule
7.2 Attachment 2 – QCP Schedule
ATTACHMENT 1
Deliverables Schedule
Deliverable Frequency # of Copies Medium/Format Submit To Material Samples and Specifications Submittals [SOW para. 5.1]
Contractor shall submit material samples and product specification submittals within 10 days of contract award.
Contractor shall provide one (1) copy for review.
Contractor shall provide either paper hard copy or PDF document.
Contractor shall deliver required document to Contracting Officer.
ATTACHMENT 2
QCP Schedule
Objective
Standard Performance Threshold (This is the maximum error rate. It could possibly be “Zero deviation from standard”)
Method of Surveillance
% Deduction from monthly invoice for not meeting Performance
Standards
B3070-Quality Control Program
Contractor shall establish a quality control program to assure adherence to the RFP design and construction requirements and to report on the installation quality.
Zero deviation 100% Inspection by COR at work completion.
F20-Selective Building Demolition F2020- Hazardous Component Abatement
Disposal: All waste materials shall become the property of the Contractor and shall be transported, disposed of, or recycled IAW NAVFAC SE, PWD Key West, Environmental Department’s policies.
Zero deviation 100% Inspection
G10-Site Preparation G1010- Site Clearing
All grubbing and clearing residue, demolished material, rubbish and debris generated by this project shall be hauled off-site and off station by the Contractor.
Zero deviation 100% Inspection
1.1 Materials and
Methods of Construction