Construction of Warehouse, CEOPAZ, El Salvador
Solicitation number
W912CL18Q0029
Issued by

About this file

See above file name

View the file

Other files

File Type Posted
W912CL-18-Q-0029-0004_El_Salvador_Warehouse_Amendment.pdf PDF
W912CL-18-Q-0029_El_Salvador_Warehouse_Solicitation_Conformed_Copy2.pdf PDF
W912CL-18-Q-0029-0003_El_Salvador_Warehouse_Solicitation_Amendment.pdf PDF
W912CL-18-Q-0029-0001_El_Salvador_Warehouse_Solicitation_Amendment.pdf PDF
W912CLL18Q029-0002_El_Salvador_Warehouse_Amendment.pdf PDF
Attachment_1_Price_Breakdown_Material_List.xlsx XLSX spreadsheet
Attachment_2_Performance_Reference.doc DOC document
Technical_Exhibit_1_(REV)_The_Submittal_Schedule.docx DOCX document
TE_3_DRW_Design-A111.dwg DWG drawing
TE_3_DRW_Design.pdf PDF
TE_3_DRW_Design-S001.dwg DWG drawing
TE_3_DRW_Design-E101.dwg DWG drawing
TE_3_DRW_Design-S102.dwg DWG drawing
TE_3_DRW_Design-X001.dwg DWG drawing
TE_3_DRW_Design-S103.dwg DWG drawing
TE_3_DRW_Design-S104.dwg DWG drawing
TE_3_DRW_Design-E002.dwg DWG drawing
TE_3_DRW_Design-P101.dwg DWG drawing
TE_3_DRW_Design-X002.dwg DWG drawing
TE_3_DRW_Design-A101.dwg DWG drawing
TE_3_DRW_Design-S101.dwg DWG drawing
TE_3_DRW_Design-E003.dwg DWG drawing
Conformed_Solicitation_W912CL-18-Q-0029_16_Jan_19.pdf PDF
TE_3_DRW_Design-A601.dwg DWG drawing
TE_3_DRW_Design-C101.dwg DWG drawing
TE_3_DRW_Design-C102.dwg DWG drawing
TE_3_DRW_Design-S105.dwg DWG drawing
TE_3_DRW_Design-A402.dwg DWG drawing
Technical_Exhibit_2_Project-Sign-plaque-seal.ppt PPT presentation
TE_3_DRW_Design-A301.dwg DWG drawing
TE_3_DRW_Design-A102.dwg DWG drawing
TE_3_DRW_Design-A501.dwg DWG drawing
TE_3_DRW_Design-C201.dwg DWG drawing
TE_3_DRW_Design-LS01.dwg DWG drawing
TE_3_DRW_Design-E111.dwg DWG drawing
TE_3_DRW_Design-A401.dwg DWG drawing
TE_3_DRW_Design-A201.dwg DWG drawing
TE_3_DRW_Design-E001.dwg DWG drawing
Technical_Exhibit_1_The_Submittal_Schedule.docx DOCX document
TE_3_DRW_Design-X000.dwg DWG drawing
TE_3_DRW_Design-C202.dwg DWG drawing
TE_3_DRW_Design-A602.dwg DWG drawing
180503_-_SOW_SLV_GPOI_Warehouse_(OPD_Updated).docx DOCX document
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Warehouse GPOI

CONTRACTOR COST/PRICE BREAKDOWN SHEET
SLV GPOI: CONSTRUCTION OF WAREHOUSE
ItemDescriptionUnitQTYCostLabor CostPartial Cost
1GENERAL
1.1Dedication PlaqueEA1
1.2ARSOUTH SealEA1
1.3Project SignEA1
1.4PRELIMINARY. Includes bonds, construction permits, transportation of materials, equipment, personnel, and tools.LS1
1.5TEMPORARY INSTALLATIONS. Temporary office, water, power, and commo.LS1
1.6FINAL CLEAN UPLS1
2DEMOLITION
2.1Orange plastic safety fencing, Budget, 4' x 50' roll, mesh opening 3"x 1.25"EA7
2.2Existing Conditions, Building Demolition, Concrete foundation and footing demolition, Reinforced concrete (1 CY yields 1.66 loose CY)SM111
2.3Earthwork, Backfill trenchesCM23
2.4Earthwork, Site Grading, General area rough grading with 100 HP D-4 tractorLS1
3DESIGN AFTER AWARD
3.1SURVEY, DESIGN, AND TESTS. To include project site survey, project designs validation and certification, and required structural, electrical, plumbing, and mechanical tests.
3.1.1SurveyLS1
3.1.2DesignLS1
3.1.3TestsLS1
3.2REQUIRED STUDIES. To include soil, electrical loads, and water demand studies.
3.2.1Soil studyLS1
3.2.2Electrical loadLS1
3.2.3Water demandsLS1
3.3SITE PREPARATION. Include earth movement, grading, utilities infrastructure instalation, and drainage.LS1
4FOUNDATIONS
4.1FORMWORK
4.1.1Concrete, Excavation for Concrete Work, Backfill with 1/2 CY utility

backhoe/loader, 150 CFM compressor & pneumatic tamper, Spec grade

compactionLS1
4.1.2Concrete, Formwork for Concrete, Wall footing, grade beam or tie
beam forms,SM49
4.2REINFORCEMENT
4.2.1Concrete, Reinforcing Steel Bars, ASTM-615 grade 60, #13EA26
4.2.2Concrete, Reinforcing Steel Bars, ASTM-615 grade 60, #19EA44
4.2.3Concrete, Concrete Reinforcing Steel, Reinforcing steel placed and tied
in footings and grade beams, #13LM156
4.2.4Concrete, Concrete Reinforcing Steel, Reinforcing steel placed and tied
in footings and grade beams, #19LM250
4.3CONCRETE
4.3.1Concrete, Ready-Mix Concrete and Placing, Footings, pile caps, foundations, Direct from chuteCM29
5SUB-STRUCTURE
5.1FORMWORK
5.1.1Concrete, Formwork for Concrete, Slab-on-grade forms, Add for 2 x 2" tapered keyed joint, one-piece, .38 BF per LF, 1 useLM91
5.1.2Concrete, Slab membrane, 6 mil polyethyleneSM188
5.2REINFORCEMENT
5.2.1Concrete, Welded wire mesh, Welded wire mesh, galvanized steel, electric weld, including 15% waste and overlap, 6" x 6" W2.9 x W2.9 (#6 x #6), slabsSM188
5.3CONCRETE
5.3.1Concrete, Concrete Accessories, Expansion joints cane fiber, asphalt impregnated, pre-molded, 1/2" x 4", slabsLM152
5.3.2Concrete, Concrete Sidewalk Finishes, Broom finishLS1
5.3.3Concrete, Ready-Mix Concrete and Placing, Slabs-on-grade, Direct from chuteCM34
6SUPER-STRUCTURE$ - 0
6.1ROOF STRUCTURE$ - 0
6.1.1Metals, Structural Steel, Structural shapes, Trusses and girders, Under 20 pounds per LF, Fascia, Ridge Cap, Screws, Sofit and sealed, and sloped to prevent leaks. Drainage and gutters (to include end cap, downspout, elbows, and splash block).LS1$ - 0
6.1.2Foam insulated sandwich panel roofing and siding, per SM of roof and accessoriesSM200$ - 0
7EXTERIOR CLOSURE
7.1WALLS-CMU
7.1.1Masonry, Concrete Block Wall Assemblies, Additional costs for concrete block wall assemblies, Grouting concrete block wall cores, Using C476 grout, pumpedCM5
7.1.2Masonry, Concrete Block Wall Assemblies, Concrete Block Bond Beams, Cost per linear foot of bond beam block, 8" wide, 8" high, 16"LM65
7.1.3Masonry, Concrete Block Wall Assemblies, Walls constructed with 8" x 16" blocks laid in running bond, 4" thick wallSM99
7.1.4Masonry, Concrete Block Wall Assemblies, Walls constructed with 8" x 16" blocks laid in running bond, 8" thick wallSM177
7.1.5Masonry, Concrete Wall Assemblies, SillsLM25
7.1.6Masonry, Masonry Lintels and Coping, Precast concrete coping, 5" average thickness, 4' to 8' long, 10" wide, gray concreteLM25
7.1.7Masonry, Masonry Accessories, Dur-O-Wal reinforcing, Ladur or standard, 10' lengths, 8" wide wallLM328
7.1.8Masonry, Grouting concrete block wall cores, Add for grouting cores at32" intervals, poured by hand, 8" thick wall, (9.97 SF per CF)SM177
7.1.9Masonry, Masonry Accessories, Tie wire, black, 16 gauge, Roll, 400'EA5
7.2EXTERIOR WALL FINISHES
7.2.1Finishes, Plastering, Portland cement stucco on exterior walls, scratch, brown and finish coats totaling 1" thick, Natural gray, sand floatSM200
7.2.2Doors, Prehung Steel Exterior Doors, 6-panel premium prehung exterior steel doors, no brick mold (double door)EA2
7.2.3Paints, Coatings, and Supplies, Stucco, masonry and concrete paint, Masonry and stucco paint, Elastomeric waterproofingLT19
7.2.4Windows, Aluminum Louver windows, Tempered Glass, Mill finish windows, single glazed, includes hardware, (L=1600cm)EA11
7.2.5Windows, Aluminum Louver, Tempered Glass windows, Mill finish windows, single glazed (L=800cm)EA4
8INTERIOR CONSTRUCTION
8.1INTERIOR DOORS
8.1.1Openings, Prehung Steel Doors, 6 or 8 panel doors, Jamb to 5-1/2"
wide, 2'8" x 6'8", or 3'0" x 6'8"EA2
8.2WALL FINISHES
8.2.1Finishes, Ceramic Tile, 4-1/4" x 4-1/4" glazed wall tile, Matte finish, better qualitySM33
8.2.2Finishes, Painting labor costs — commercial and industrial work, Masonry walls, paint two coat, Roll concrete blockSM200
8.2.3Masonry and stucco paint. Acrylic latex paint for interior or exterior. Smooth, rough or textured masonry
surfaces.LT10
8.2.4Elastomeric waterproofingLT10
8.2.5Toilet partitions, floor mounted. Standard sizes, include 1 panel, 1 door and all pilasters and hardware. Stainless SteelEA1
8.2.6Urinal screens, wall mounted with brackets, 18" wide by 48” high. Stainless steelEA1
8.3FLOOR FINISHES
8.3.1Concrete, Concrete Slab Finishes, Liquid curing and sealing compound, silicate based.SM200
8.3.2Quarry Tile, 6" x 6" x 1/2", 1/4" straight joints, Unglazed natural red tile set in a portland cement bed with mortar joints.SM16
8.3.3Installation of tile in thin-set mortar Includes grout. Costs are for mortar and grout.SM16
8.3.4Concrete, Concrete Slab Finishes, Trowel finishing, Steel, machine workSM150
8.4CEILING FINISHES
8.4.1Gypsum Drywall and Accessories, 1/2" plain board, CeilingsSM23
8.4.2Finishes, Painting labor costs — commercial and industrial work,

Exterior metals coated with a single coat of epoxy or mastic, 8 to 10 mil

film, Spray epoxy coatingSM160
8.4.3Paints, Coatings, and Supplies, Metal coatings, Stops Rust, Rust-
Oleum® (1 Liter each)EA40
8.4MISC. INTERIOR
Fire Suppression, Fire extinguishers, 5 lb, with mounting accessoriesEA5
Bathroom Accessories, Mirrors, stainless steel framed, surface mount, no light or cabinet, 18" high x 24" wideEA1
Bathroom Accessories, Shelf, chrome, 24" LEA1
Bathroom Accessories, Toilet tissue roll holder, chromeEA1
9MECHANICAL
9.1PLUMBING
9.1.1Plumbing, Fixtures and final connection assemblies, Fixture costs are based on good to better quality white fixtures of standard dimensions and include all trim and valves required by code, Urinals, Wall-hung urinal, vitreous china, washout flush action, 3/4" top spud with hand operated flush valve/vacuum breaker, Urinal, trim and valvesEA1
9.1.2Plumbing, Floor drains, 5" x 3" plastic grate and bodyEA1
9.1.3Plumbing, Hangers and Supports, Pipe straps, galvanized, two hole, lightweight, 2-1/2" pipe strapEA10
9.1.4Plumbing, Hangers and Supports, Pipe straps, galvanized, two hole, lightweight, 4" pipe strapEA5
9.1.5Plumbing, Rough-in Plumbing Assemblies, Floor sink, floor drain, 4" cast iron DWV rough-inEA1
9.1.6Plumbing, Rough-in Plumbing Assemblies, Lavatory rough-in, Lavatory, rough-in includes 15' of 1-1/2" DWV pipe and 15' of 1/2" supply pipe with typical fittings, hangers and strapping, Plastic DWV and copper supply rough-inEA2
9.1.7Plumbing, Rough-in Plumbing Assemblies, Urinal rough-in, Wallhung urinal, rough-in includes 15' of DWV pipe and 8' of supply pipe with typical fittings, hangers and strapping, Plastic DWV and copperEA1
9.1.8Plumbing, Rough-in Plumbing Assemblies, Water closet rough-in, Floor mounted, tank type, rough-in includes 7' of 3", 8' of 1-1/2" DWV pipe and 8' of 1/2" supply pipe with typical fittings, hangers, and
strapping, Plastic DWV and PEX supply rough-in with typical fittings, hangers and strapping, Plastic DWV and copperEA1
9.1.9Bathroom Accessories, Soap holder, surface mounted, with drain holes, chromeEA1
9.1.10Plumbing Fixture Rough-In Assemblies, Drains and vents:, Drains and ventsEA1
9.1.11Plumbing Fixtures and Equipment, Lavatories, Rectangular, wall-hung vitreous china lavatory, hot and cold valved supplies, single lever faucet and pop-up drain fitting and trap assembly, Wall-hung china lavatory
and trimEA1
9.1.12Wall-hung urinal, vitreous china, washout flush action, 3/4" top spud with hand operated flush valve/vacuum breaker
Urinal, trim and valvesEA1
9.1.13Plumbing Fixtures and Equipment, Water closets, Floor-mounted, residential tank type 1.6 gal. vitreous china toilet, valved closet supply, and toilet seat with cover, Floor-mount tank type water closet and trimEA1
9.2FANS AND LOUVERS (VENT)
9.2.1Thru-the-wall utility fan. Steel housing with built-in damper and white polymeric grille. Permanently lubricated motor. Rotary on and off switch. Housing dimensions: 14-1/4-inch length, 14-1/4-inch width, 4-1/2-inch depth. UL listed. CFM (cubic feet of air per minute). 180 Labor includes setting and connecting only.EA3
9.2.2Exterior Louver for Thru-the-wall utility fanEA3
9.2.3House BibEA1
10ELECTRICAL
10.1SERVICE AND DISTRIBUTION
10.1.1Warehouses, estimates per square meter of floor area for all electrical work and materials, including service entrance, distribution, circuits, light fixtures, receptacles, wiring, fans, exhaust fans, rough-in and finish.SM150
10.1.3Distribution Panel with breakers, grounding rod and #10 bare copper, 100A pull-outLS1
10.1.4Receptacle Ground Fault Circuit Interrupter (GFCI) with plate metallicEA1
Receptacle Ground Fault Circuit Interrupter (GFCI), waterproof, with plate metallicEA1
10.1.5Receptacles with plate metallic, DCOEA14
10.1.6Switches with plate metallic, singleEA4
10.1.7Switches with plate metallic, 3 phaseEA4
10.1.8Light fixture, FT3EA6
Light fixture, FT3E, with backup batteryEA4
Ligth fixture, wall bracket mounted, FF1EA1
High pressured sodium wall pack fixture, EH5EA4
10.1.9Wall mounted flood light, type EH8EA4
10.1.10Ceiling mounted fansEA3
10.1.164"x4", Electrical metallic boxEA28
10.1.21Exit sign, XL1EA2
6.8.5Gang switch boxes, 2" x 3" x 1-5/8",EA8
6.8.7Handy boxes, 4" x 2-1/8"EA18
6.8.8Service connection, underground conduit, wire, Overhead connection to poleLS1
10.2TELEPHONE/DATA SYSTEMLS1
10.3FIRE ALARM SYSTEMLS1
11WASTEWATER
11.1Sewer connection, connection fittings and pipes, and all other accessories.LS1
12FURNITURE
12.1Executive ChairEA1
12.2Office chairsEA3
12.3Administrative deskEA1
SUB-TOTAL
13GENERAL COSTS
13.1IVA (13%)LS1
13.2Contingency and Overheads (5%)LS1
13.3DBAEA1
TOTAL PROJECT COST

&P/&N

Sheet1

Door A17, Exterior Aluminum w/Glass (Item added by the Offeror) EA 1,00 $73.524,02 $73.524,02
6.5.16 Door A20, Exterior Aluminum w/Glass EA 1,00 $32.584,18 $32.584,18
6.5.17 Door A23, Exterior Aluminum EA 2,00 $11.236,16 $22.472,33
6.5.18 Door Dressing Rooms EA 14,00 $14.825,94 $207.563,14
6,6 WINDOWS
6.6.1 Type A1 - Sliding Aluminum EA 7,00 $27.934,89 $195.544,23
6.6.2 Type A2 - Framed Glass EA 3,00 $14.434,75 $43.304,24
6.6.3 Type A3-Ventillation Grill (0.6 m x 3.20 m) EA 1,00 $21.227,44 $21.227,44
6.6.4 Type A4- Sliding Aluminum EA 4,00 $35.534,02 $142.136,09
6.6.5 Type A6 - Sliding Aluminum EA 3,00 $34.497,69 $103.493,06
6.6.6 Type A7 - Sliding Aluminum EA 6,00 $17.342,14 $104.052,82
6.6.7 Type A8 - Sliding Aluminum EA 8,00 $15.890,37 $127.122,97
6.6.8 Type A15 - Sliding Aluminum EA 4,00 $12.543,60 $50.174,40
6.6.9 Type A18 - Framed Glass EA 4,00 $19.466,45 $77.865,80
6.6.10 Type A19 - Framed Glass EA 1,00 $13.261,63 $13.261,63
6.6.11 Type A21 - Framed Glass EA 2,00 $11.236,16 $22.472,33
6.6.11 Type A22 - Framed Glass (Item added by the Offeror) EA 2,00 $47.592,52 $95.185,04
6.6.12 Insect screen SM 30,72 $3.437,43 $105.597,92
6,7 STEEL
6.7.1 Security bar for windows SM 152,00 $6.415,76 $975.195,62
6.7.2 Handrail for handicap ramp and water tank. Also include water tower steel stairs. LS 4,00 $104.911,64 $419.646,55
6,8 ELECTRIC SYSTEM
6.8.1 Main control panel to include automatic transfer switch LS 1,00 $622.497,70$622.497,70
6.8.2 Distribution panels LS 4,00 $124.499,54 $497.998,16
6.8.3 Receptacle Ground Fault Circuit Interrupter (GFCI) with plate EA 20,00 $9.337,47 $186.749,31
6.8.4 Receptacles with plate EA 120,00 $1.867,49 $224.099,17
6.8.5 Switches with plate LS 35,00 $9.212,97 $322.453,81
6.8.6 Register box EA 6,00 $12.449,95 $74.699,72
6.8.7 Conductors/Wiring LS 4,00 $74.699,72 $298.798,90
URY HAP 25847: CONSTRUCTION OF KITCHEN-LAUNDRY - URUGUAY
Item Description Unit Quantity Unit Cost Total Cost
URY HAP 25847: CONSTRUCTION OF KITCHEN-LAUNDRY - URUGUAY
6.8.8
Exterior Lights with lamps outside the building. 2-main entrance, 2-front (corners), 2-back, 1
at each side. For the storage, 2 for front of the building. Energy efficient LED.
EA 10,00 $8.714,97 $87.149,68
6.8.9
Perimeter exterior lights with lamps. Energy efficient LED. Include 10 meters reinforced
pole, dual lamps, brackets, and accessories.
EA 12,00 $19.919,93 $239.039,12
6.8.10 Interior lights with lamps. Energy efficient LED. Include ceiling and walllights. EA 40,00 $4.979,98 $199.199,26
6.8.11 Ceiling mounted fans EA 10,00 $8.714,97 $87.149,68
6.8.12 Smoke detector EA 10,00 $6.224,98 $62.249,77
6.8.13 Bell EA 5,00 $4.357,48 $21.787,42
6.8.14 Air Conditioner and heating units 12000 BTU/hr EA 6,00 $21.613,12 $129.678,72
6.8.15 Air Conditioner and heating units 24000 BTU/hr EA 4,00 $23.156,91 $92.627,$ 66.00
6.8.16 Emergency light EA 10,00 $7.469,97 $74.699,72
6.8.17 Hand-dryer EA 2,00 $17.429,94 $34.859,87
6.8.18 Vent EA 7,00 $1.312,23 $9.185,58
6.8.19 Exit sign EA 6,00 $7.469,97 $44.819,83
6.8.20
Diesel generator with main fuel, sub-base fuel tanks, and retaining/leak containment pool.
Include transfer switch and connection accessories.
LS 1,00 $2.426.921,67 $2.426.921,67
6.8.21
Grounding and lighting protection systems. Include clinic, storages, generator, and elevated
water tower.
EA 1,00 $62.249,77 $62.249,77
6.8.22 Electric meter with input and output electrical accessories EA 1,00 $37.349,86 $37.349,86
6.8.23
Electrical conduit, connection, and transformer. Include all conduits, fitting, bands, and
accessories requires to run wires according to electrical code. It also includesa transformer.
LS 1,00 $186.749,31 $186.749,31
6,9 SHACK FOR GENERATOR AND FUEL TANK LS 1,00 $215.220,15 $215.220,15
6,10 UNDERGROUND UTILITIES LS 1,00 $161.849,40 $161.849,40
6,11 PLUMBING ACCESSORIES
6.11.1 White low tank toilet with seat and lid (water saver). Italian quality. EA7,00 $5.961,12 $41.727,86
6.11.2 NOT USED
6.11.3 NOT USED
6.11.4 Italian quality dual sink EA 2,00 $4.780,78 $9.561,56
Italian quality dual sink (Included) EA $4.780,78
6.11.5 Paper toilet holder EA 7,00 $943,79 $6.606,54
6.11.6 Soap holder EA 10,00 $943,79 $9.437,91
6.11.7 Small towel holder bar at sink EA 10,00 $1.068,29 $10.682,90
6.11.8 Hook at sink EA 2,00 $757,04 $1.514,08
6.11.9 Faucet sink EA 4,00 $1.867,49 $7.469,97
6.11.10 Goose neck faucet kitchen sink EA 8,00 $5.708,53 $45.668,25
6.11.11 Faucet utilities (outside clinic, janitor, and storage) EA 4,00 $263.770,21 $1.055.080,85
6.11.12 Double Bowl Kitchen Sink EA 3,00 $5.708,53 $17.125,59
6.11.13 Single Bowl Kitchen Sink EA 3,00 $2.146,03 $6.438,10
6.11.14 Drain point with PVC pipe (Included) EA
6.11.15 Vent with PVC 2 inches pipe EA 16,00 $2.852,40 $45.638,39
6.11.16 4 inches PVC pipe M 50,00 $19.350,18 $967.509,14
6.11.17 2 inches PVC pipe (Included) M
6.11.18 Threaded clean out 4 inches diameter EA 8,00 $41.429,33 $331.434,66
6.11.19 Drain for kitchen sink 2 inches diameter EA 4,00 $14.087,18 $56.348,70
6.11.20 Cold water point with PVC pipe EA 8,00 $56.764,27 $454.114,18
6.11.21 Distribution network 1/2 inch PVC pipe M 20,00 $4.102,26 $82.045,20
6.11.22 Distribution network 3/4 inch PVC pipe M 10,00 $46.452,57 $464.525,72
6.11.23 Potable PVC 2 inches pipe M 50,00 $12.743,27 $637.163,32
6.11.24 Double bow concrete utility sink (Included) EA
6.11.25 Janitor utility room sink (Included) EA
6.11.26 Handicap grab bars EA 2,00 $35.121,53 $70.243,06
6.11.27
Installation of potable water pipes, drain pipes, and fittings. Include installation and
materials.
LS 1,00 $454.010,78 $454.010,78
6.11.28 Mirrors with wooden frame LS 1,00 $2.498,43 $2.498,43
6,12 TILES
6.12.1 Floor tiles plus "zócalo". Anti-skid tiles shall be provided SM 1.372,00 $2.279,92 $3.128.050,17
6.12.2 Wall tiles (Type "azulejo") M 729,00 $2.433,52 $1.774.039,58
6,13 LOCKS AND HARDWARE
6.13.1 Key dead lock exterior doors (building, storage, generator, water tower) (Included) EA
6.13.2 Key knob lock interior doors (building) (Included) EA
6.13.3 Silencer (exterior doors) (Included) EA
6.13.4 Handle main entrance (Included) EA
6.13.5 Commercial type heavy duty handle all other doors (Included) EA
6.13.6 Door stopper (Included) EA
6.13.7 Hinges (Included) EA
6.13.8 Weather strips (Included) EA
6,14 PAINT
6.14.1 Masonry primer (one coat) SM 2.200,00 $63,98 $140.764,66
6.14.2 Exterior & Interior masonry paint (two coats) SM 1.420,00 $321,55 $456.606,24
6.14.3 Anticorrosive paint SM 10,00 $737,50 $7.375,02
6.14.4 Varnish for cabinets and doors. Two coats SM 60,00 $381,20 $22.872,01
7,0 SPECIAL ITEMS AND SYSTEMS
7,1 Sewer connection, connection fittings and pipes, and all other accessories. (Included) LS
7,2 Sidewalks (deck) LS 1,00 $243.090,63 $243.090,63
Item Description Unit Quantity Unit Cost Total Cost
URY HAP 25847: CONSTRUCTION OF KITCHEN-LAUNDRY - URUGUAY
7,3
Water storage tank, tower, pump, connection fittings and pipes, cistern, and allother
accessories. (Included)
LS
7,4 Washer EA 4,00 $203.168,01 $812.672,06
7,5 Dryer EA 4,00 $166.764,19 $667.056,76
7,6 Bin EA 21,00 $20.108,78 $422.284,37
7,7 Folding table EA 6,00 $23.229,11 $139.374,64
7,8 Drop ceiling LS 1,00 $204.931,64 $204.931,64
7,9 Ironing EA 2,00 $96.730,16 $193.460,33
8,0 SIGNS
8,1 Room and area signs LS 1,00 $20.802,19 $20.802,19
8,2 Kitchen and Laundry sign LS 1,00 $20.802,19 $20.802,19
9,0 CABINETS
9,1
Wall hardwood cabinets. Include provision and installation, two shelves each, hardware,
hinges, and door knobs. (Not included)
LS
9,2 Base hardwood cabinets. For kitchen and bathroom sinks. (Not included) LS
10,0 TELEPHONE SYSTEM LS 1,00 $104.010,93 $104.010,93
11,0 FIRE ALARM SYSTEM LS 1,00 $388.307,47 $388.307,47
12,0 AUTOMATIC SPRINKLER SYSTEM (Not included) SM
13,0 PLAQUE, SEAL, and SIGN
13,1 Dedication Plaque EA 1,00 $41.604,37 $41.604,37
13,2 ARSOUTH Seal EA 1,00 $41.604,37 $41.604,37
13,3 Project Sign EA 1,00 $41.604,37 $41.604,37
14,0 OPTION 1. FURNITURE, APPLIANCE, AND EQUIPMENT
14,1 Stove with gas tank and gas tank shack EA 2,00 $106.957,90 $213.915,81
14,2 Microwave EA 1,00 $6.136,64 $6.136,64
14,3 Refrigerator EA 4,00 $28.915,04 $115.660,15
14,4 Commercial convection gas ovens with deck EA 3,00 $743.227,43 $2.229.682,28
14,5 Dining table with 4 chairs EA 1,00 $17.086,92 $17.086,92
14,6 Office chairs EA 4,00 $6.089,15 $24.356,59
14,7 Waiting room chairs EA 4,00 $1.853,47 $7.413,90
14,8 Administrative desk EA 7,00 $7.206,22 $50.443,57
14,9 Lockers EA 50,00 $1.346,36 $67.318,18
14,10 Fire extinguishers EA 10,00 $5.269,89 $52.698,87
$ 15.00
OPTION 2. PARKING. Include base, concrete surface 152 mm thick), parking stopper,
marking spaces, handicap space
SM 1.000,00 $1.291,92 $1.291.919,96
16 TRAINING (Included) EA
17 FINAL CLEAN UP LS 1,00 $209.528,74 $209.528,74
Sub-Total Estimated project cost
18 OTHER
18,1 Labor LS 1,00 $896.396,69 $896.396,69
18,2 Utilities (Included) LS
18,3 Taxes (Includes IVA and Social Security Taxes) LS 1,00 $26.557.117,84 $26.557.117,84
18,4 Transportation LS 1,00 $235.283,03 $235.283,03
18,5 Contingency and profit LS 1,00 $9.471.204,41 $9.471.204,41
19 OTHER ITEMS ADDED BY THE OFFEROR
19,01 Reinforced concrete Columns CM 8,00 $47.186,76 $377.494,07
19,02 Reinforced concrete Beams CM 23,00 $47.186,76 $1.085.295,46
19,03 Exterior slab on grade SM 1.130,00 $1.502,17 $1.697.450,85
19,04 Cement mortar SM 359,00 $371,80 $133.474,50
19,05 Cold chamber floor isolation SM 49,00 $655,71 $32.129,65
19,06 Masonry walls SM 1.400,00 $1.072,98 $1.502.169,51
19,07 Cemnt plaster SM 1.975,00 $929,63 $1.836.016,13
19,08 Roof waterproofing SM 371,00 $2.723,05 $1.010.250,35
19,09 Foundation beams waterproofing M 436,00 $517,29 $225.538,03
19,1 Bathroom waterproofing SM 70,00 $793,06 $55.513,99
TOTAL PROJECT COST $99.153.336,19
Performance period 360 days
Notes:
Price are indicated in Uruguayan Pesos, taxes IVA (22%) and Social Security Taxesarea included in Item 18,3 "Taxes"
Price are fixed in Uruguayan Pesos
In the file list of Exceptions it's indicated the scope of the works included inour proposal

File details come from the government source that posted it.