Materials_List.xls

XLS spreadsheet 44 KB Posted

Attached to
CEOPAZ Water Project Federal contract opportunity
Solicitation number
W912CL-17-R-0006
Issued by
Department of the Army Cyber Command

About this file

Material List

View the file

Other files for this federal contract opportunity

Other files attached to CEOPAZ Water Project, newest first.
File Type Posted
Solicitation_Amendment2_CEOPAZ_Water_Project_El_Salvador_(Conform_Copy).docx DOCX document
Material_List_Updated.xls XLS spreadsheet
Solicitation_Amendment2_CEOPAZ_Water_Project_El_Salvador_(Mod_Copy).docx DOCX document
Solicitation_Amendment1_CEOPAZ_Water_Project_El_Salvador_(Mod_Copy).docx DOCX document
Industry_Questions_and_Answers_CEOPAZ.docx DOCX document
Technical_Exhibit_1_CEOPAZ_Facilities.pptx PPTX presentation
Solicitation_CEOPAZ_Water_Project_El_Salvador.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SLV Water Syst Upgrade

Materials List
CEOPAZ Water System Upgrade El Salvador
ItemDescriptionUnitQuantityUnit CostPartial Cost
01DESIGN AND TESTS$ - 0
01.01Design includes site adapt and as-built designsLS1.00$ - 0
01.02Soil study at the tanks and well locationLS1.00$ - 0
01.03Required electrical load and plumbing testsLS1.00$ - 0
01.04Water quality testsLS1.00$ - 0
01.05Water capacity and demandLS1.00$ - 0
02SITE PREPARATION$ - 0
02.01Excavation and trenches for utilities (i.e. electrical, plumbing) connectionsm500.00$ - 0
02.02Elevated tank, cistern, and well site preparationsm900.00$ - 0
03PUMPS$ - 0
03.01Water well pump, 30 horse power, 300 gallon per minutes, installed in wells, 6 inches submersibleEa1.00$ - 0
03.02Water system pump 15 horse power plus hydro-pneumatic system for the well and water system tanks and panel controlEa1.00$ - 0
04ELECTRICAL$ - 0
04.01Electrical control for submersible pumpEa1.00$ - 0
04.02Primary power line from existing pole to control cabinEa1.00$ - 0
04.03Single phase pole mounted transformer 75 KVAEa1.00$ - 0
04.04Pole for transformerEa1.00$ - 0
04.05Circuit breakerLS1.00$ - 0
04.06Grounding and lighting protection systemLS1.00$ - 0
04.07Electrical wire, breaker, load centerLS1.00$ - 0
05PLUMBING$ - 0
05.01PVC 2 inch diameter potable water distribution line to all CEOPAZ/CIFA existing and future facilitiesLF3,500.00$ - 0
05.02Distribution line to connect to each facility/building 3/4 inch PVC pipeLS1.00$ - 0
05.03Connection line to connect to tanks PVC pipe (include fittings and accessories)LS1.00$ - 0
05.04Valves at each facility/building entrance and other as required by codeLS1.00$ - 0
05.05Valves at each tanks and as required by codeLS1.00$ - 0
05.06Connection to include accessories, fittings, and inspection boxes as required by codeLS1.00$ - 0
06WATER WELL$ - 0
06.01Wells, drilled hole in normal soil, sand, gravel, 8" diameterLF650.00$ - 0
06.02Gravel packEA1.00$ - 0
06.03Screen, slotted PVC, 6" diameterLF130.00$ - 0
06.04Steel casingLF525.00$ - 0
06.05Well and pump testsHR48.00$ - 0
06.06Removal and reset reset pumpEA1.00$ - 0
06.07Sterilization with chlorineEA1.00$ - 0
07ELEVATED WATER TANK$ - 0
07.01Storage tank construction (150,000 gal)Ea1.00$ - 0
07.02Elevated storage tanks (37,000 gal)Ea1.00$ - 0
07.03Tank tower, 45 feet highEa1.00$ - 0
08CHLORINATION SYSTEM$ - 0
08.01Chlorination systemEa1.00$ - 0
08.02Chlorine for 1 yearEa1.00$ - 0
09PAINT$ - 0
09.01Paint for tanks (1 coat primer and 2 coats of paint)LS1.00$ - 0
09.02
10MISCELLANEOUS ITEMS$ - 0
10.01PlaqueEa1.00$ - 0
10.02Project signEa1.00$ - 0
10.03Final clean upsm900.00$ - 0
10.04TrainingEa1.00$ - 0
10.05Maintenance manualEa1.00$ - 0
10.06Final docsEa1.00$ - 0
DIRECT COST$ - 0
11OTHER
11.01LaborLS1.00
11.02UtilitiesLS1.00
11.03TaxesLS1.00
11.04TransportationLS1.00
11.05Contingency and profitLS1.00
TOTAL PROJECT COST$ - 0
Notes:
1. Quantities presented in this table are approximately and it is contractor responsibility to validate them to reflect actual site conditions, SOW, and Technical Exhibits. Contractor shall adjust quantities and add any missing item. This table is only a guide for the contractor and it is not intent to be final.

Sheet1