Updated Materials List
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation_Amendment2_CEOPAZ_Water_Project_El_Salvador_(Mod_Copy).docx | DOCX document | |
| Solicitation_Amendment2_CEOPAZ_Water_Project_El_Salvador_(Conform_Copy).docx | DOCX document | |
| Solicitation_Amendment1_CEOPAZ_Water_Project_El_Salvador_(Mod_Copy).docx | DOCX document | |
| Industry_Questions_and_Answers_CEOPAZ.docx | DOCX document | |
| Technical_Exhibit_1_CEOPAZ_Facilities.pptx | PPTX presentation | |
| Materials_List.xls | XLS spreadsheet | |
| Solicitation_CEOPAZ_Water_Project_El_Salvador.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SLV Water Syst Upgrade
| Materials List | |||||
| CEOPAZ Water System Upgrade El Salvador | |||||
| Item | Description | Unit | Quantity | Unit Cost | Partial Cost |
| 01 | DESIGN AND TESTS | $ - 0 | |||
| 01.01 | Design includes site adapt and as-built designs | LS | 1.00 | $ - 0 | |
| 01.02 | Soil study for tanks | LS | 1.00 | $ - 0 | |
| 01.03 | Required electrical load and plumbing tests | LS | 1.00 | $ - 0 | |
| 01.04 | Water quality tests | LS | 1.00 | $ - 0 | |
| 01.05 | Water capacity and demand | LS | 1.00 | $ - 0 | |
| 02 | SITE PREPARATION | $ - 0 | |||
| 02.01 | Excavation and trenches for utilities (i.e. electrical, plumbing) connection | sm | 500.00 | $ - 0 | |
| 02.02 | Elevated tank and cistern | sm | 900.00 | $ - 0 | |
| 03 | Water Well Work | $ - 0 | |||
| 03.01 | Water well pump, 30 horse power, 300 gallon per minutes, installed in wells, 6 inches submersible | Ea | 1.00 | $ - 0 | |
| 03.02 | Water system pump 15 horse power plus hydro-pneumatic system for the well and water system tanks and panel control | Ea | 1.00 | $ - 0 | |
| 03.03 | Gravel pack | EA | 1.00 | $ - 0 | |
| 03.04 | Screen, slotted PVC, 6" diameter | LF | 130.00 | $ - 0 | |
| 03.05 | Gravel pack | EA | 1.00 | $ - 0 | |
| 03.06 | Screen, slotted PVC, 6" diameter | LF | 130.00 | $ - 0 | |
| 03.07 | Sterilization with chlorine | EA | 1.00 | $ - 0 | |
| 04 | ELECTRICAL | $ - 0 | |||
| 04.01 | Electrical control for submersible pump | Ea | 1.00 | $ - 0 | |
| 04.02 | Primary power line from existing pole to control cabin | Ea | 1.00 | $ - 0 | |
| 04.03 | Single phase pole mounted transformer 75 KVA | Ea | 1.00 | $ - 0 | |
| 04.04 | Pole for transformer | Ea | 1.00 | $ - 0 | |
| 04.05 | Circuit breaker | LS | 1.00 | $ - 0 | |
| 04.06 | Grounding and lighting protection system | LS | 1.00 | $ - 0 | |
| 04.07 | Electrical wire, breaker, load center | LS | 1.00 | $ - 0 | |
| 05 | PLUMBING | $ - 0 | |||
| 05.01 | PVC 2 inch diameter potable water distribution line to all CEOPAZ/CIFA existing and future facilities | LF | 3,500.00 | $ - 0 | |
| 05.02 | Distribution line to connect to each facility/building 3/4 inch PVC pipe | LS | 1.00 | $ - 0 | |
| 05.03 | Connection line to connect to tanks PVC pipe (include fittings and accessories) | LS | 1.00 | $ - 0 | |
| 05.04 | Valves at each facility/building entrance and other as required by code | LS | 1.00 | $ - 0 | |
| 05.05 | Valves at each tanks and as required by code | LS | 1.00 | $ - 0 | |
| 05.06 | Connection to include accessories, fittings, and inspection boxes as required by code | LS | 1.00 | $ - 0 | |
| 07 | ELEVATED WATER TANK | $ - 0 | |||
| 07.01 | Storage tank construction (125,000 gal) | Ea | 1.00 | $ - 0 | |
| 07.02 | Elevated storage tanks (37,000 gal) | Ea | 1.00 | $ - 0 | |
| 07.03 | Tank tower, 45 feet high | Ea | 1.00 | $ - 0 | |
| 08 | CHLORINATION SYSTEM | $ - 0 | |||
| 08.01 | Chlorination system | Ea | 1.00 | $ - 0 | |
| 08.02 | Chlorine for 1 year | Ea | 1.00 | $ - 0 | |
| 09 | PAINT | $ - 0 | |||
| 09.01 | Paint for tanks (1 coat primer and 2 coats of paint) | LS | 1.00 | $ - 0 | |
| 09.02 | |||||
| 10 | MISCELLANEOUS ITEMS | $ - 0 | |||
| 10.01 | Plaque | Ea | 1.00 | $ - 0 | |
| 10.02 | Project sign | Ea | 1.00 | $ - 0 | |
| 10.03 | Final clean up | sm | 900.00 | $ - 0 | |
| 10.04 | Training | Ea | 1.00 | $ - 0 | |
| 10.05 | Maintenance manual | Ea | 1.00 | $ - 0 | |
| 10.06 | Final docs | Ea | 1.00 | $ - 0 | |
| DIRECT COST | $ - 0 | ||||
| 11 | OTHER | $ - 0 | |||
| 11.01 | Labor | LS | 1.00 | $ - 0 | |
| 11.02 | Utilities | LS | 1.00 | $ - 0 | |
| 11.03 | Taxes | LS | 1.00 | $ - 0 | |
| 11.04 | Transportation | LS | 1.00 | $ - 0 | |
| 11.05 | Contingency and profit | LS | 1.00 | $ - 0 | |
| TOTAL PROJECT COST | $ - 0 | ||||
| Notes: | |||||
| 1. Quantities presented in this table are approximately and it is contractor responsibility to validate them to reflect actual site conditions, SOW, and Technical Exhibits. Contractor may adjust quantities and add any missing item(s). This table is only a guide for the contractor and it is not intent to be final. |